Standard Operating Procedure

Department : Engineering Services

Item : Electrical & Substation

Item Description:

SL No Items Description
01 1500 KVA, 11/0.415 KV Oil Immersed
Transformer
02 900 KVAr Auto/Manual PFI Panel
03 11 KV HT Switchgear (VCB)
04 LT Panel
05 ELT Panel
06 Floor MDB at every floor
07 Floor SDB at every floor
08 Solar Panel (7 Kw)

1. Daily Check List:

Sl No Description

01 Check transformer temperature

02 Check Transformer Silica gel color

03 Check HT Panel

04 Check LT Panel

05 Check PFI Panel

06 Check ATS panel

07 Check Generator Synchronous Panel

08 Check Solar panel

09 Check every floor MDB, SDB if any CB


found tripped condition, then find out the
reason & solve it.
10 Check lights on every floor.

11 Check pump room.

12 Maintain daily log sheet


13 Receive problem from different department &
take initiate to solve.
14 Ensure safety before start any task.

2. Weekly Checklist:

SL No Description

01 Clean Sub station


02 Conduct Maintenance at HT, LT panel if
needed
03 Maintain register
04 Keep all servicing documents

3. Documentation:

a. Keep the service reports.

b. Maintain Log book for R/H.

c. Maintain Register for consumable items as well as tools.

4. Tools:

a. Tester, Screw Driver, Combination Pliers, Adjustable Pliers, PVC Tape, Nose Pliers,

Wire, Ladder, Torch Light, Cable Tie, Drill Machine, Hammer, Cutting Pliers, Hot

Air gun, Air blower etc.

5. EMERGENCY CONTACT NO’s:

a. Place DANGER sign at Transformer area.

b. Place Fire service no at visible place.

c. Place BPDB control rooms no at visible place.

Prepared By Checked By Approved By