L-A 1

L-A 2
Lampiran A.1
Formulir data survei kondisi jalan section 1
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
10,9 m
UNIT
BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 1
SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 294,3 m2 27 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 2,87 1,45 4,32 1,47 10,00
19L 7,74 7,74 2,63 3,00
11L 0,48 0,48 0,16 0,00
6L 7,52 7,52 2,56 6,00
L-A 3
L-A 4
L-A 5
L-A 6
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 10,9 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 2


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 294,3 m2 27 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
10L 0,80 0,35 8,10 9,25 3,14 3,00
19L 11,64 11,64 3,95 4,50
11L 3,44 28,84 32,28 10,97 18,00
11M 4,62 1,94 6,79 13,36 4,54 21,00
6M 5,46 5,46 1,86 10,00
1M 0,52 0,52 0,18 10,00
L-A 7
L-A 8
L-A 9
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
11,2 m
UNIT
BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 3
SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 1,93 1,93 0,65 2,00
19L 12,12 23,50 35,62 12,00 8,00
11M 37,44 37,44 12,61 34,50
10M 4,30 4,30 1,45 5,00
10L 6,40 6,40 2,16 1,00
L-A 10
L-A 11
L-A 12
L-A 13
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 4


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 7,98 7,98 2,69 17,00
1M 6,36 6,36 2,14 30,00
11L 19,21 1,76 7,36 1,36 39,39 69,08 23,27 23,50
11H 3,96 3,96 1,33 21,50
10L 3,70 3,70 1,25 0,00
L-A 14
L-A 15
L-A 16
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 5


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
1L 2,01 2,01 0,68 9,00
11L 52,21 2,98 55,18 18,59 21,00
12L 2,39 2,39 0,81 0,00
9L 5,00 5,00 1,68 4,50
10L 1,40 1,40 0,47 0,00
L-A 17
L-A 18
L-A 19
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 6


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
1L 0,63 0,63 0,21 4,00
8L 3,14 3,14 1,06 2,50
6L 4,23 0,74 4,97 1,67 5,00
11L 18,50 8,01 26,51 8,93 15,00
10L 1,38 1,80 3,18 1,07 0,00
L-A 20
L-A 21
L-A 22
L-A 23
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 7


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
6L 0,59 0,59 0,20 3,50
10L 1,10 3,44 10,00 14,54 4,90 3,50
11L 13,00 13,76 2,86 2,10 14,76 46,47 15,66 20,00
2L 39,75 39,75 13,39 7,50
1L 1,10 1,10 0,37 5,00
L-A 24
L-A 25
L-A 26
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 8


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 4,25 1,84 6,09 2,05 14,50
11L 4,32 31,20 35,52 11,97 18,00
1L 3,98 3,98 1,34 14,00
6M 5,30 5,30 1,79 10,00
10M 19,10 19,10 6,44 15,00
L-A 27
L-A 28
L-A 29
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 9


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 8,23 8,23 2,77 16,00
3M 18,20 18,20 6,13 12,00
11L 10,08 3,89 13,97 4,71 9,50
8L 22,50 22,50 7,58 7,50
10L 1,64 1,64 0,55 0,00
6L 7,92 7,92 2,67 5,00
1M 0,32 0,32 0,11 7,50
L-A 30
L-A 31
L-A 32
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 10


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
1H 2,10 2,10 0,71 29,00
11M 18,07 3,08 21,84 42,99 14,48 17,50
11L 0,77 8,52 9,29 3,13 6,00
10L 3,38 3,38 1,14 0,00
19L 7,00 7,00 2,36 3,00
L-A 33
L-A 34
L-A 35
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 11


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
19L 6,72 6,72 2,26 3,50
5L 5,00 5,00 1,68 3,00
10L 1,00 1,00 0,34 0,00
11L 10,65 16,55 27,20 9,16 17,00
3L 8,88 8,88 2,99 2,00
L-A 36
L-A 37
L-A 38
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 1 SAMPLE UNIT : 12


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 2,95 3,70 6,65 2,24 5,00
19L 5,40 5,40 1,82 2,50
11M 28,39 28,39 9,56 30,50
3L 3,30 3,30 1,11 0,00
10L 3,05 3,05 1,03 0,00
L-A 39
Lampiran A.2
Formulir data survei kondisi jalan section 2
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 1


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 8,92 4,88 2,87 11,96 1,46 30,09 10,14 17,00
2L 2,02 2,02 0,68 0,00
10L 8,00 8,00 2,70 2,00
L-A 40
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 2


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 1,47 6,76 1,66 4,66 3,00 17,55 5,91 11,00
16L 1,71 1,71 0,58 1,00
10M 4,00 4,00 1,35 4,50
7L 5,00 5,00 1,68 3,00
9L 5,50 5,50 1,85 3,00
L-A 41
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 3


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 2,94 4,68 17,15 24,77 8,34 29,00
1L 12,30 12,30 4,14 25,00
4M 1,70 1,70 0,57 9,50
L-A 42
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 4


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 3,80 3,80 1,28 10,00
19M 5,00 3,00 8,00 2,70 11,00
3L 14,82 14,82 4,99 7,00
10L 3,10 2,00 10,80 2,00 17,90 6,03 6,50
13H 1,70 0,98 2,69 0,90 50,00
1L 1,25 1,25 0,42 7,00
6L 20,02 20,02 6,75 12,00
16L 6,37 6,37 2,15 9,00
L-A 43
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 5


SURVEYED BY : KN, WP, PKC, EK DATE : June/21/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
10L 1,80 6,10 3,00 10,90 3,67 2,50
16M 8,00 1,20 9,20 3,10 20,00
4L 0,34 0,34 0,11 0,00
2L 6,00 6,00 2,02 0,00
1L 1,85 1,85 0,62 8,00
11M 1,65 1,65 0,56 7,00
13L 0,25 0,25 0,08 1,00
L-A 44
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 6


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 36,66 2,82 3,11 1,31 43,90 14,79 20,00
7M 9,95 9,95 3,35 9,50
3L 11,56 11,56 3,89 4,00
16L 9,36 9,36 3,15 11,00
10L 2,44 2,22 4,66 1,57 0,00
19L 5,21 5,21 1,75 2,00
L-A 45
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 7


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
10L 1,10 2,10 3,20 1,08 0,00
6L 8,37 8,37 2,82 7,00
19L 4,80 4,80 1,62 4,00
11L 2,12 2,12 0,71 2,00
16L 3,89 3,89 1,31 6,50
4L 13,03 13,03 4,39 9,50
1L 15,39 15,39 5,19 28,00
11M 1,20 1,20 0,40 6,00
L-A 46
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 8


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 43,20 7,85 51,04 17,20 20,50
10L 1,57 4,23 5,80 1,95 0,00
19L 2,27 2,27 0,76 0,00
1L 1,11 8,85 9,95 3,35 23,00
L-A 47
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 9


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
16M 7,35 7,35 2,48 18,00
6L 7,14 7,14 2,41 7,50
11L 28,91 11,11 40,02 13,49 20,00
15L 68,37 68,37 23,04 36,50
13L 0,50 0,50 0,17 4,50
10L 2,00 2,00 0,67 0,00
12L 2,97 2,97 1,00 0,00
L-A 48
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 10


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 30,14 31,27 61,41 20,69 42,00
7H 1,17 1,17 0,39 9,00
13M 0,88 3,47 4,35 1,47 39,00
3M 1,34 1,34 0,45 0,00
19L 9,41 9,41 3,17 2,00
17L 2,37 2,37 0,80 4,00
10L 2,00 2,00 0,67 0,00
15L 34,28 34,28 11,55 29,50
L-A 49
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 11


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
15L 33,56 33,56 11,31 29,00
19L 34,60 10,80 45,40 15,30 8,00
12H 0,88 0,88 0,30 0,00
3L 4,45 4,45 1,50 0,50
8L 13,75 13,75 4,63 4,50
11L 9,84 9,84 3,32 7,00
10L 3,20 3,20 1,08 0,00
L-A 50
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 11,2 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 2 SAMPLE UNIT : 12


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 296,8 m2 26,5 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m2) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 3,94 72,35 30,36 106,64 35,93 29,00
10M 9,80 9,80 3,30 9,00
13L 1,33 1,33 0,45 11,00
L-A 51
Lampiran A.3
Formulir data survei kondisi jalan section 3
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 1


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
1M 3,35 3,35 1,13 24,00
11L 85,56 25,58 3,95 7,80 122,88 41,29 30,50
10L 8,00 8,00 2,69 1,00
L-A 52
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 2


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m
1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 1,14 0,35 0,36 86,80 5,50 94,15 31,64 29,00
10M 17,00 17,00 5,71 14,00
16M 0,69 0,69 0,23 3,50
11M 9,70 8,64 18,34 6,16 26,50
10L 6,50 6,50 2,18 0,00
L-A 53
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 3


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11M 6,11 6,11 2,05 10,00
1M 7,84 7,84 2,63 32,50
L-A 54
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 4


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
1L 6,72 6,72 2,26 19,00
11L 1,36 63,66 2,69 6,95 74,65 25,09 25,00
3L 17,77 17,77 5,97 16,00
L-A 55
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 5


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
12L 4,32 4,32 1,45 0,00
9L 3,61 3,61 1,21 2,50
3L 22,52 22,52 7,57 7,50
L-A 56
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 6


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
12L 8,70 8,70 2,92 0,00
L-A 57
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 7


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 0,33 0,50 0,55 1,39 0,47 0,00
11M 0,07 0,07 0,02 0,00
L-A 58
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 8


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
13L 0,40 0,40 0,13 3,00
4L 0,29 0,29 0,10 0,00
L-A 59
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 9


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
12L 4,50 4,50 1,51 0,00
13M 0,04 0,04 0,01 6,50
L-A 60
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 10


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
19L 9,40 9,40 3,16 2,00
L-A 61
ASPHALT SURFACED ROADS AND PARKING LOTS SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 11


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 297,6 m2 31 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
19L 1,69 1,69 0,57 2,00
11L 23,12 23,12 7,77 13,50
10L 1,75 1,75 0,59 0,00
L-A 62
ASPHALT SURFACED ROADS AND PARKING LOTS+A298:N322 SKETCH :
CONDITION SURVEI DATA SHEET FOR SAMPLE
UNIT 9,6 m

BRANCH : Jl. Kaliurang KM 6,6 - 7,6 SECTION : 3 SAMPLE UNIT : 12


SURVEYED BY : KN, WP, PKC, AI DATE : June/22/2017 SAMPLE AREA : 211,2 m2 22 m

1. Alligator Cracking (m2) 6. Depression (m2) 11. Patching & Util cut Patch (m) 16. Shoving (m2)
2. Bleeding (m2) 7. Edge Cracking (m) 12. Polished Aggregate (m) 17. Slippage Cracking (m2)
3. Block Cracking (m2) 8. Jt. Reflection Cracking (m) 13. Potholes (m2) 18. Swell (m2)
4. Bump and Sags (m2) 9. Lane/Shoulder Drop Off (m) 14. Rail Road Crossing (m2) 19. Weathering/Ravelling (m2)
5. Corrugation (m2) 10. Long & Trans Cracking (m) 15. Rutting (m2)
DISTRESS DENSITY DEDUCT
QUANTITY TOTAL
SEVERITY % VALUE
11L 17,27 8,64 25,92 12,27 18,50
19L 1,40 1,40 0,66 2,00
10L 5,50 5,50 2,60 2,00