Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

OF

ON:

Date
NC II

start:
Date of
340 hrs.

TRAINEE
finished:

NAME OF

Student 9
Student 8
Student 7
Student 6
Student 5
Student 4
Student 3
Student 2
Student 1
TRAINING:
DURATION

Student 23
Student 22
Student 21
Student 20
Student 19
Student 18
Student 17
Student 16
Student 15
Student 14
Student 13
Student 12
Student 11
Student 10
SERVICING
CONSUMER
ELECTRONIC
QUALIFICATI
BASIC COMPETENCIES
Participate in workplace communication

Work in a team environment


Practice career professionalism

Practice occupational health and safety


procedures
COMMON COMPETENCIES
Prepare construction materials and tools

Observe procedures,
specification and manuals for instruction
Progress chart

Interpret technical drawings and plans

Maintain tools and equipment


CORE COMPETENCIES
Prepare electrical power and hydraulic tools
Electrical installation and maintenance NC II

Perform roughing –in activities for


communication and distribution

Install wiring devices for floor and ground fault


current interrupting outlets

Install electrical lighting systems on auxiliary


outlet and lighting
fixtures
Student 24
Student 25
Noted by: Legend:
C – Competent
NC – Not Competent

Criteria Yes No
Did you ……
Lift the competencies from the TR or the CBC? /
Include basic competencies in the chart? /
Include common competencies in the chart? /
Include core competencies in the chart? /
Reflect all Los of the Competencies in the chart? /
Write a legend for recording achievements to the progress chart? /
ACHIEVEMENT CHART
ELECTRICAL INSTALLATION AND MAINTENANCE
BASIC COMPETENCIES COMMON COMPETENCIES CORE COMPETENCIES
Participat Work in a Practice Practice Prepare Observe Interpr Maintain Prepar Perfor Install wiring devices Install
e in team career occupational constructi procedur et tools and e m for floor and ground electric
workplace environm professional health and on e, technic equipme electric rough fault current al
communic ent ism safety materials specificat al nt al ing – interrupting outlets lightin
ation procedures and tools ion and drawin power in g
manuals gs and and activit system
for plans hydrau ies for s on
instructi lic comm auxilia
on tools unicat ry
ion outlet
and and
distri lightin
butio g
n fixture
s
specification and manuals

power and hydraulic tools

Install electrical protection


Achieve professionalism

Plan and prepare work,


Achieve Work in a team

Can Maintain tools and

Plan and prepare work


construction materials

Plan technical drawings


Achieve occupational

Plan and prepare work


Plan Prepare electrical
Achieve workplace

health and safety


communication

plan and prepare work


Install lighting fixture
environment

apply roughing –in


procedures

equipment
and tools

system
Plan procedure,

for instruction

and plans
Noted by:

Criteria YES NO
Lift the competencies from the TR or the CBC? /
Include required task/ job to the performed ass a part of learning /
activities?
Include required output/projects for the competency? /
Lift based the outputs and tasks/jobs to be performed from your CBLM? /
Write a legend for the recording accomplishments? /
Base your chart on recommended format? /

You might also like