Office of The Secretary: Republic of The Philippines Department of Public Works and Highways

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1!7'7.

/3 Jj7~#
Republic of the Philippines 0/ ~18.~/(,
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila

II , .JAN 2016
DEPARTMENT ORDER ) SUBJECT: ADOPTING A UNIFORM TRANSITION
) JOINTS ON HIGH TYPE PAVEMENT
NO. 08 _
)
)
SURFACING ALONG
ROADS AND LOCAL STREETS
NATIONAL
Series of 201~C>1.13.1" )

All Implementing units of the Department are hereby directed to adhere to the following
typical transition joints for the construction of road projects involving high type pavement
surfacing in order to provide stronger joint between concrete pavement and asphalt
pavement, to attain the highest quality of work, and to produce sound, durable and
economical structures:

A. Annex "1" Joining road with PCCP(At Road Intersection)


Figure 1 : Schematic Plan
Figure 1a : Transition Profile, Existing
Figure 1b: Transition Profile, AC Overlay

B. Annex "2" Joining road with PCCP(Along Thru-Road)


Figure 2 : Schematic Plan
Figure 2a: Transition Profile, Existing
Figure 2b: Transition Profile, AC Overlay

C. Annex "3" Transition Zone Approaching Existing (Bridges/Flyovers)


Figure 3 : Schematic Plan
Figure 3a: Transition Profile, Existing
Figure 3b: Transition Profile, AC Overlay

For strict compliance.

Department of Public Works and Highways


Office of the Secretary

1111111111111111111111111111111111111
WIN6R01209
Republic 'of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


BUREAU OF DESIGN, HIGHWAYS DMSION
Bonifacio Drive, Port Area, Manila

STANDARD HIGHWAYS DESIGN PLANS

1. STANDARD JOINING ROAD WITH PCCP (AT ROAD INTERSECTION)

2. STANDARD JOINING ROAD WITH PCCP (ALONG THRU-ROAD)

3. STANDARD TRANSITION ZONE APPROACHING EXISTING BRIDGE/FL YOVER

CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL:

R~SON
SECRETARY

Qepartment of Public Works and Highways


Office of the Secretary

III 1111IIII1IIIIRIIIgIIIIIIIIIIIIII
WIN6R01209
ANNEX" 1 "JOINING ROAD WITH PCCP (AT ROAD INTERSECTION)

1st. STEP: MILLING OF EXISTING SLAB

TRANSITION ZONE, l = 20.00m, Minimum

EXISTING PAVEMENT (lONGITUDINAL SLOPE", i)

MilLING OF EXISTING CONCRETE PAVEMENT

I~
"'"
"
5
"m
~
(
FIGURE la : TRANSITION PROFILE, EXISTING
"'"

l~
NOT TO SCALE

5
"
m

2nd. STEP: LAYING OF REMAINING ASPHALT COURSES

WEARING COURSE
(5Omm)

BINDER COURSE
(5Omm) TRANSITION ZONE, L '" 20.00m, MinimLnl

EXISTING PAVEMENT (LONGITUDINAL SLOPE" i)

CROSS SLOPE. 1.5% NOTE:


T :;: THICKNESS OF VlJEARING COURSE 1. THE MILLING OF EXISTING SLAB SHOULD END AT THE NEXT
(5Omm) WEAKENED PlANE JOINT.
±g
, 2. THE ALGEBRAIC DIFFERENCE OF GRADIENT AT JOINING ROAD
SHOULD NOT EXCEED 0.50%. OTHERWISE APPROPRIATE VERTICAl
ExiSTING PCCP • PARABOLIC CURVE SHALL BE PROVIDED IF THE ALGEBRAIC DIFFERENCE
'. OF GRADIENT IS MORE THAN 0.50%.

NEW BITUMINOUS PAVEMENT

EXISTING CONCRETE PAVEMENT


FIGURE 1 SCHEMATIC PLAN
NOT TO SCALE

FIGURE lb : TRANSITION PROFILE, AC OVERLAY Oepartmerrt of Public Works and Highways


NOT TO SCAlE Offtce d the Secretary

III 11111IIIIIIIIIIIIImlllllii 1111III


WIN6R01209

SHtn CONTENTS: SHEET TITLE: PREPARED BY: DATE:

8
REPUBLIC Of THE PHILIPPINES
~ DEPARTMENTOF PUBLIC WORKS AND HIGHWA YS DESIGN: PETER~~EHSQUlBt. J

BUREAU OF DESIGN JOINING ROAD WITH PCCP PAO..OCARlOM.$Al..VAOOR


AS - SHOWN
HIGHWAYS DlVISIDN (AT ROAD INTERSECTION) DRAWN: MARCIAl.D.ORICt RAUL C. ASIS
CHECKED: ROMEO C_ RAAGAS UNDERSECRETAAY
eoNlFAClO DRIVE. PORT AAfA MANILA
ANNEX" 2 " JOINING ROAD WITH PCCP

( ALONG THRU - ROAD)


1st. STEP: MILLING OF EXISTING SLABS

TRANSITION ZONE, L '" 2O.00n, Minimum


MILLING OF EXISTING CONCRETE PAVEMENT
LI2

EXISTING PAVEMENT (lONGITUDiNAl SLOPE ~ i)

±g ±g

EXISTING SLAB

T = THICKNESS OF 'A£ARING COURSE


(SOmm)

AC OVERLAY TRANSITION ZONE EXISTING SLAB

FIGURE 2a : TRANSITION PROFILE


NOT TO
EXISTING
SCALE
I I I I
~

2nd. STEP: LAYING OF REMAINING ASPHALT COURSES

FIGURE 2 SCHEMATIC PLAN


NOT TO SCALE
TRANSITION ZONE, L s: 20.00m, Miniml..m

Vt£ARING COURSE
(5Omm) NOTE:
BINDER COURSE 1. THE MILLING OF EXISTING SlAB SHOULD END AT THE NEXT
(5Omm)
'NEAKENED PlANE JOINT.

2. THE AlGEBRAIC DIFFERENCE OF GRADIENT AT JOINING ROAD


SHOULD NOT EXCEED 0.50%. OTHERWISE APPROPRIATE VERTICAL
PARABOLIC CURVE SHALL BE PROVIDED IF THE ALGEBRAIC DIFFERENCE
EXISTING PAVEMENT (lONGITUDiNAl SLOPE == i) OF GRADIENT IS MORE THAN 0.50%.

FIGURE 2b : TRANSITION PROFILE I AC OVERLAY


NOT TO SCALE

Department of Public Works and Highways


Office cI the Secretary

1111111I~llIllImlll.111I1111I1I111
WIN6R01209

SHEn CONTtNTS: SHEET TlTLl: PRtPARED BY: DATt,


REPUBLIC OF THE PHILIPPINES

8
~ DEPARTMENTOF PUBLICWORKS AND HIGHWAYS

BUREAU OF DESIGN
HIGHWAYS DIVISION
BONIFACIO DAA'E, PORT AREA, MNI..A
AS - SHOWN JOINING ROAD IMTH PCCP
(ALONG THRU· ROAD)
DESIGN

llAAWl<
CHEC~ED:
..•....
PETIR.w.EST.ESQIJIBrL
PACX.OCAALOM.SAl.VJl.lOR

ROM~g$e.-~~
I

RAUL C. ASIS
UNOERSECRET....,.
ANNEX" 3 " TRANSITION ZONE APPROACHING EXISTING

BRIDGE I FLVOYER

1st. STEP: MILLING OF EXISTING SLABS

TRANSITION ZONE, l '" 20.00m, Miniml.lTl

EXISTING SLAB FLYOVER

FIGURE 3a : TRANSITION PROFILE EXISTING


NOT TO SCALE

2nd. STEP: LAYING OF REMAINING ASPHALT COURSES FL YQVER

«
TRANSITION ZONE, l '" 2O.00m,Minimum :I:
':I:"
"WEARING COURSE
"«o g
(5Qmm)
BINDER COURSE '"
ll.
ll. '"
ll.
ll.
(5Omm) « «

FIGURE 3 SCHEMATIC PLAN FOR EXISTING FLYOVER


NOT TO SCALE

NOTE:
1. THE MilLING OF EXISTING SLAB SHOULD END AT 'THE NEXT
WEAKENED PLANE JOINT.
I
2. THE AlGEBRAIC DIFFERENCE OF GRADIENT AT JOINING ROAD "
SHOULD NOT EXceeD 0.50%. OTHERWISE APPROPRIATE VERTICAL
PARABOLIC CURVE SHALL BE PROVIDED IF THE ALGEBRAIC DIFFERENCE
FIGURE 3b : TRANSITION PROFILE, AC OVERLAY OF GRADIENT IS MORE THAN 0.50%.
NOT TO SCALE

Dep.rtmenl. of Public Works and Hlgh'N8Y5


Offlceafthe Secretary

111111111101111111111111I111I1111
WIN6R01209

REPUBLIC OF THE PHILIPPINES SHm CONTtNTS: SHttT 1lT1.l: PREPARED BY: DATE:

8
~ DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

BUREAU OF DESIGN
HIGHWAYS DIVISION
BONIFACIO ORNE. PORT AA£A JMNllA
AS - SHOWN TRANSITION ZONE APPROACHING
EXISTING BRIDGE I FLVOYER
OESIGN

OMWIt
PETERWJi.ESCXJ&./
PAOlO CARO M. &ALVAOOR
1<0
atE COYEASHEETfORIlGMIIlUR£"

RAUL C. ASIS
UNDERSECRETARY