DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
II , .JAN 2016
DEPARTMENT ORDER ) SUBJECT: ADOPTING A UNIFORM TRANSITION
) JOINTS ON HIGH TYPE PAVEMENT
NO. 08 _
)
)
SURFACING ALONG
ROADS AND LOCAL STREETS
NATIONAL
Series of 201~C>1.13.1" )
All Implementing units of the Department are hereby directed to adhere to the following
typical transition joints for the construction of road projects involving high type pavement
surfacing in order to provide stronger joint between concrete pavement and asphalt
pavement, to attain the highest quality of work, and to produce sound, durable and
economical structures:
1111111111111111111111111111111111111
WIN6R01209
Republic 'of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
•
BUREAU OF DESIGN, HIGHWAYS DMSION
Bonifacio Drive, Port Area, Manila
R~SON
SECRETARY
III 1111IIII1IIIIRIIIgIIIIIIIIIIIIII
WIN6R01209
ANNEX" 1 "JOINING ROAD WITH PCCP (AT ROAD INTERSECTION)
I~
"'"
"
5
"m
~
(
FIGURE la : TRANSITION PROFILE, EXISTING
"'"
l~
NOT TO SCALE
5
"
m
WEARING COURSE
(5Omm)
BINDER COURSE
(5Omm) TRANSITION ZONE, L '" 20.00m, MinimLnl
8
REPUBLIC Of THE PHILIPPINES
~ DEPARTMENTOF PUBLIC WORKS AND HIGHWA YS DESIGN: PETER~~EHSQUlBt. J
±g ±g
EXISTING SLAB
Vt£ARING COURSE
(5Omm) NOTE:
BINDER COURSE 1. THE MILLING OF EXISTING SlAB SHOULD END AT THE NEXT
(5Omm)
'NEAKENED PlANE JOINT.
1111111I~llIllImlll.111I1111I1I111
WIN6R01209
8
~ DEPARTMENTOF PUBLICWORKS AND HIGHWAYS
BUREAU OF DESIGN
HIGHWAYS DIVISION
BONIFACIO DAA'E, PORT AREA, MNI..A
AS - SHOWN JOINING ROAD IMTH PCCP
(ALONG THRU· ROAD)
DESIGN
llAAWl<
CHEC~ED:
..•....
PETIR.w.EST.ESQIJIBrL
PACX.OCAALOM.SAl.VJl.lOR
ROM~g$e.-~~
I
RAUL C. ASIS
UNOERSECRET....,.
ANNEX" 3 " TRANSITION ZONE APPROACHING EXISTING
BRIDGE I FLVOYER
«
TRANSITION ZONE, l '" 2O.00m,Minimum :I:
':I:"
"WEARING COURSE
"«o g
(5Qmm)
BINDER COURSE '"
ll.
ll. '"
ll.
ll.
(5Omm) « «
NOTE:
1. THE MilLING OF EXISTING SLAB SHOULD END AT 'THE NEXT
WEAKENED PLANE JOINT.
I
2. THE AlGEBRAIC DIFFERENCE OF GRADIENT AT JOINING ROAD "
SHOULD NOT EXceeD 0.50%. OTHERWISE APPROPRIATE VERTICAL
PARABOLIC CURVE SHALL BE PROVIDED IF THE ALGEBRAIC DIFFERENCE
FIGURE 3b : TRANSITION PROFILE, AC OVERLAY OF GRADIENT IS MORE THAN 0.50%.
NOT TO SCALE
111111111101111111111111I111I1111
WIN6R01209
REPUBLIC OF THE PHILIPPINES SHm CONTtNTS: SHttT 1lT1.l: PREPARED BY: DATE:
8
~ DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BUREAU OF DESIGN
HIGHWAYS DIVISION
BONIFACIO ORNE. PORT AA£A JMNllA
AS - SHOWN TRANSITION ZONE APPROACHING
EXISTING BRIDGE I FLVOYER
OESIGN
OMWIt
PETERWJi.ESCXJ&./
PAOlO CARO M. &ALVAOOR
1<0
atE COYEASHEETfORIlGMIIlUR£"
RAUL C. ASIS
UNDERSECRETARY