APPDCL 2X800 MW SDSTPP Switchyard Control Room-

TATA Projects Limited


KRISHNAPATNAM Analysis Design

B.4 DESIGN OF ONE WAY SLAB ATAT FLOOR LEVEL


Head Room Roof Slab
DATA : Slab name :
Concrete M25 fck = 25 N/mm²
Steel Fe500 fy = 500 N/mm² LY/LX
Cover 20 mm

Assuming Depth of Slab = 115 mm


Assuming Dia of reinf. = 8 mm

Eff. Depth of Slab = 91 mm


Eff.Shorter Span lx = 2.66 m

LOAD CALCULATIONS:

Self wt. = 2.875 kN/m²


Finishing = 2 kN/m²
Live load = 2 kN/m²
sand filling = 0 kN/m²
Total 6.88 kN/m²

Load Factor 1.5

Factored Load 10.313 kN/m²

Support Moment
Msup. = wlx²/8 = 10.313 x 2.66²/8 9.12 kN.m
Msup./bd = 9120891/(1000 x 91²) =
2
1.10
pt = 0.27

Required Spacing 8mm dia bars @ 206


Provided Spacing of 8mm dia bars = 125

% of reinf. Provided ptp = 0.44

Span Moment
Mspan = wlx²/10 = 10.31 x 2.66²/10 = 7.30 kN.m
Mspan/bd = 7296713/(1000 x 91²) =
2
0.88
pt = 0.21

Required Spacing 8mm dia bars 261


Provided Spacing of 8mm dia bars = 125

% of reinf. Provided ptp = 0.44

Reinforcement in Longer direction

Minimum distribution reinforcement percentage for slab = 0.12 %


Diameter of bar = 10 mm

Required spacing of 10mm dia bars @ 719


Provided Spacing of 10mm dia bars = 475

Doc. No. TPL-069-CAL-C-7885, Rev. P0-A FICHTNER INDIA


APPDCL 2X800 MW SDSTPP Switchyard Control Room-
TATA Projects Limited
KRISHNAPATNAM Analysis Design

CHECK FOR SHEAR

Maximum S.F at sup. Vu = wlx/2


= 10.313 x 2.66/2
= 13.7 kN

Actual Shear Stress tv = Vu/bd


= 13716/(1000 x 91)
= 0.15 N/mm²

% of tension reinforcement provided in support pt= 0.44

IS:456 - 2000 Table 19


Allowable shear stress tc = 0.46 N/mm²

As per IS:456 cl. 40.2.1.1 k value for slab 1.3

Design shear stress for concrete = k x tc = 1.3 x 0.46 = 0.604 N/mm²

Actual Shear Stress < Design Shear Stress


0.151 < 0.604 SAFE

CHECK FOR DEFLECTION

Allowable span / depth Ratio l/d = 26


% of Tension reinforcement ptp = 0.44
Steel stress of service loads fs = 0.58 fy (Area of steel reqd./ area provided)
= 263.6 N/mm^2

Corresponding Compression reinf. Bar dia = 10 mm spacing = 200


% of Compression reinforcement pc = 0.43

Modification factor for Tension reinf. F1 = 1.40 ( From Fig 4 in IS 456 - 2000)
Modification factor for Comp. reinf. F2 = 1.00 ( From Fig 5 in IS 456 - 2000)

Modified span/depth ratio = l/d x F1 x F2


= 26 x 1.40 x 1.00
= 36.40

Actual span/depth ratio = 2660/91


= 29.23

Actual span/depth ratio < Modified span/depth ratio


29.23 < 36.40 SAFE

Doc. No. TPL-069-CAL-C-7885, Rev. P0-A FICHTNER INDIA


BHEL - 2 X 250MW BHILAI TPS
PE-DC-239-640-C020
DESIGN CALCULATION FOR CENTRAL MONITORING BASIN

11.3.0 DESIGN OF PLATFORM SLAB AT EL(+)1.000


(One way distribution)
DATA :
Concrete M30 fck = 30 N/mm²
Steel Fe500 fy = 500 N/mm²
Cover 25 mm

Assuming Depth of Slab = 150 mm


Assuming Dia of reinf. = 8 mm

Eff. Depth of Slab = 121 mm


Eff.Shorter Span lx = 1.80 m

LOAD CALCULATIONS:

Self wt. = 3.75 kN/m²


Finishing = 1.25 kN/m²
Pipe load 0 kN/m²
Live load = 1.50 kN/m²
Equipment = 0 kN/m²
Total 6.500 kN/m²

Load Factor 1.5

Factored Load 9.750 kN/m²

Support Moment
Msup. = Wlx²/8 = 9.750 x 1.80²/8 3.95 kN.m
Msup./bd = 3948750/(1000 x 121²) =
2
0.27
pt = 0.06

Required Spacing 8mm dia bars @ 663


Provided Spacing of 8mm dia bars = 150

% of reinf. Provided ptp = 0.28

Span Moment
Mspan = Wlx²/10 = 9.75 x 1.80²/10 = 3.16 kN.m
Mspan/bd = 3159000/(1000 x 121²) =
2
0.22
pt = 0.05

Required Spacing 8mm dia bars 831


Provided Spacing of 8mm dia bars = 150

% of reinf. Provided ptp = 0.28

Reinforcement in Longer direction

Minimum distribution reinforcement percentage for slab = 0.12


Diameter of bar = 8 mm

Required spacing of 8mm dia bars @ 346

file:///conversion/tmp/activity_task_scratch/577943868.xls KHM 02/21/2022


BHEL - 2 X 250MW BHILAI TPS
PE-DC-239-640-C020
DESIGN CALCULATION FOR CENTRAL MONITORING BASIN

Provided Spacing of 8mm dia bars = 200

file:///conversion/tmp/activity_task_scratch/577943868.xls KHM 02/21/2022


BHEL - 2 X 250MW BHILAI TPS
PE-DC-239-640-C020
DESIGN CALCULATION FOR CENTRAL MONITORING BASIN

CHECK FOR SHEAR

Maximum S.F at sup. Vu = Wlx/2


= 9.750 x 1.80/2
= 8.8 kN

Actual Shear Stress tv = Vu/bd


= 8775/(1000 x 121)
= 0.07 N/mm²

% of tension reinforcement provided in support pt= 0.28

IS:456 - 2000 Table 19


Allowable shear stress tc = 0.39 N/mm²

As per IS:456 cl. 40.2.1.1 k value for slab 1.3

Design shear stress for concrete = k x tc = 1.3 x 0.386 = 0.502 N/mm²

Actual Shear Stress < Design Shear Stress


0.073 < 0.502 SAFE

CHECK FOR DEFLECTION

Allowable span / depth Ratio l/d = 26


% of Tension reinforcement pt = 0.28
Steel stress of service loads fs = 0.58 fy (Area of steel reqd./ area provided)
= 65.6 N/mm^2

Corresponding Compression reinf. Bar dia = 8 mm spacing = 150


% of Compression reinforcement pc = 0.28

Modification factor for Tension reinf. F1 = 2.00 ( From Fig 4 in IS 456 - 2000)
Modification factor for Comp. reinf. F2 = 1.10 ( From Fig 5 in IS 456 - 2000)

Modified span/depth ratio = l/d x F1 x F2


= 26 x 2.00 x 1.10
= 57.20

Actual span/depth ratio = 1800/121


= 14.88

Actual span/depth ratio < Modified span/depth ratio


14.88 < 57.20 SAFE