CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,

LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL)

GENERALLY
Works Package Contractor to note:-

The Works Package Contractor shall refer to the


Safety, Health and Environmental Management
requirements as specified in the General Specification
(G5 and G6) for pricing.

All quantities are PROVISIONAL unless otherwise


specified. The unit “sum” shall means '“lump sum”.

The rates and prices inserted by the PDP are the


minimum suggested rates and prices. The Works
Package Contractor may insert additional item and
pricing where indicated but in any case the overall total
quoted price in this Safety, Health and Environmental
Management bill shall not exceeding 3.0% of the
Contract Sum less Prime Cost Sum for the Works.
PDP reserves the right to adjust the prices and rates in
this bill submitted by the Works Package Contractor
to ensure their reasonableness before formalisation of
Contract and the decision of PDP shall be final.

PDP also reserves the right to adjust the prices and


rates in these Bill 4.0 shall not exceeding 3.0% of the
Contract Sum less Prime Cost Sum for the Works
Specifications and the decision of PDP shall be final.

The Works Package Contractos shall be fully


responsible and comply with the minimum quantities
required under the Contract. Notwithstanding, the
Works Package Contractor shall ensure adequate
number of personnel to meet his obligations under the
Contract and relevant laws and any extra personnel
deemed required by the Works Package Contractor
shall be allowed in his rates.

The Works Package Contractor shall keep the PDP


and the Owner indemnified against all claims,
proceedings, damages, costs, losses, charges and
expenses of any nature whatsoever arising from the
Works Package Contractor's failure to comply with his
obligations under the Contract.

Page : BQ/4/1 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

GENERALLY (CONT'D)
Works Package Contractor to note (Cont'd):-

For description of Materials, Workmanship and Labour


applicable to this bill, refer to the Drawings,
Specifications, Method of Measurement and
Preambles for all trades.

The item description in this bill are not necessary


complete in all aspects and they must be read in
conjunction with the Drawings,Specifications, Method
of Measurement and Preambles and all other
documents forming part of the Contract. The Works
Package Contractor shall ensure that his pricing items
and rates are adequate to meet his obligations under
the Contract, and requirements arising from all relevant
laws and his own operations including but not limited
to personnel, labour,materials, relevant Authorities’
requirements, and etc.

Page : BQ/4/2 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH901 REWARD & RECOGNITION (ALL PROVISIONAL)

Performance Award
WPC shall be assessed on monthly basis and reward
will be awarded based on quaterly basis based on the
performance and tied with Contractors' Performance
Procedure.
4.1 AH901.1 Assessment 85% - 100% - RM100,000.00 nr 4 100,000.00 400,000.00
4.2 AH901.2 Assessment 75% - 84% - RM50,000.00 nr 4 50,000.00 200,000.00
4.3 AH901.3 Assessment 70% - 75% - RM25,000.00 nr 4 25,000.00 100,000.00

Annual Special Award


Special Award shall be based on the achievement gain
by WPC for International or National Special Award for
Safety and Health, or Special Award for Environment or
2,000,000 man hours without lost time injury at LRT3
Project.
4.4 AH901.4 2,000,000 man hours without lost time injury nr 2 100,000.00 200,000.00
4.5 AH901.5 Special Award on Safety & Health nr 3 100,000.00 300,000.00
4.6 AH901.6 Special Award on Environmental nr 3 100,000.00 300,000.00

AH902 Occupational Safety and Health (OSH)


Management Team and Equipment

Full time Safety and Health key personnel complete with


provision of vehicle, laptop/desktop computer, smart
telephone, digital camera including maintenance, fuel,

4.7 AH902.1 Safety and Health Manager (minimum one personnel) mth 38

4.8 AH902.2 Safety and Health Officers (minimum one personnel) mth 38

4.9 AH902.3 Site Safety Supervisors (minimum two personnel) mth 38

4.10 AH902.4 Prepare and submit all necessary documentation for


legal compliance and OSH Management System
compatible with OHSAS 18001 or MS 1722 standards,
including site layout plan,safety and health plan, site
sanitation plan, safety and health risk register,
procedures and instructions, emergency preparedness
and response plan, project registration with DOSH,
plant and machinery inventory list, including review and
updating of the OSH Records. sum

Page : BQ/4/3 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH903 OSH Requirements (Provision within the


Construction Site)

To provide and maintain brand new materials including


replacement as specified in the General Specifications
(Section 5 and Section G6) for pricing.
4.11 AH903.1 Movable lightweight plastic New Jersey Barrier (NJB) nr 1,700

4.12 AH903.2 Movable precast concrete NJB for protection of public


and temporary works for scaffold installation nr 1,700

4.13 AH903.3 Movable lightweight plastic hoarding for protection


within site nr 1,700

4.14 AH903.4 Double layer heavy duty industrial netting (for crossing
live traffic & public). m2 26,000

4.15 AH903.5 Temporary heavy duty catch platform (for crossing live
traffic & public). set 20

4.16 AH903.6 Guardrail for edge protection m 10,000

4.17 AH903.7 Provide, maintained and emptied portable toilets as per


specification at every work area complete with flushing,
washing and hand washing facilities. nr 36

4.18 AH903.8 Moving, cleaning and maintain portable shaded rest /


eating areas complete with drinking water facilities,
smoking facilities and first aid box facilities. nr 36

4.19 AH903.9 Portable first aid rooms complete with electric supply,
lighting, emergency lighting, fan, air-conditioning, first
aid kit (Class C), table with storage cabinets, chairs,
examination and treatment couch, stretcher and torch
light complete with batteries. nr 1

AH904 Emergency Response at Site

4.20 AH904.1 To host half yearly emergency drills such as fire and
evacuation,rescue from height and confined space with
equipment, plant and machinery including refreshment,
maintenance and replacement. nr 6

AH905 OSH Promotion

4.21 AH905.1 To provide brand new and replacement of OSH Notice


and Statistics Board (internal site office notice board)
to be displayed at every worker's mustering area
including banner, LISA, UCUAct etc. nr 5

Page : BQ/4/4 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH906 Auditing and Inspections

4.22 AH906.1 To conduct audit by accredited 3rd party auditor


(approved by PDP) on management system and
submit report (per audit). nr 6

AH907 Occupational Safety and Health (OSH)


Management

4.23 AH907.1 Prepare and submit all necessary OSH reports such
as monthly performance report, incident report,
Non-Compliance Report (NCR) and Stop Work Order
(SWO) closure, minutes of Safety,Health and
Environmental (SHE) Committee formation, monthly
meeting and any other items 'deemed necessary sum

AH908 Personal Protective Equipment (PPE) for WPC

4.24 AH908.1 Personal Protective Equipment with DOSH / SIRIM


approval to all workers, WPC's staffs and visitors
including replacement of damage equipment such as
safety helmet, safety shoes, safety boots, safety rain
boots, high visibility vest, grip gloves, impervious
gloves, steel / anti-cut gloves, leather gloves,
electrician gloves, disposable ear plug, ear muff,
disposable dust mask, goggles, safety spectacle, face
shield, welding glass, full body safety harness
complete with lanyard / double lanyard, lifeline, anchor
point, shock / energy absorbers complete with testing
in compliance with Malaysian and/or EN Standards as
specified in Specification sum

AH909 Fire Protection and Prevention

4.25 AH909.1 Temporary fire protection and prevention equipment,


alarm system including moving, maintenance and
replacement of damaged equipment such as, but not
limited to ABC Dry Powder fire extinguishers, CO2 fire
extinguisher, fire blankets and flashback arrestors for
gas cylinders. All fire extinguishers to provide annual
BOMBA certificate renewal as specified in
Specification sum

4.26 AH909.2 Fire retardant net for any hot works under life traffic or
pedestrian walkway. m2 7,000

Page : BQ/4/5 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH910 Electrical Safety

4.27 AH910.1 Pre-use inspections, weekly inspection, monthly


testing and maintenance of temporary electrical
systems by licensed electrician complete with tagging,
inspection sticker of portable electrical equipment and
tools by qualified personnel mth 38

4.28 AH910.2 Overhead power cable protection goal post, lock out
isolator, overhead power line (national grid) protection
complete with heavy duty safety netting for lifting
operation including moving, maintenance and
replacement (if applicable) sum

AH911 OSH Safety and Warning Signages complying


with MS 980:1985, MS 981:1985

4.29 AH911.1 To provide and display mandatory multi-lingual signage


at the entrance to site and within site; such as
SAFETY FIRST, mandatory PPE full body harness for
work at height, ear plug for noisy area, breathing
protection, eye protection, no smoking, do not enter
without authorization, danger zone, emergency exit
directional sign, assembly area sign, warning /
notification signage such as slewing machine, noisy
area, falling objects, tripping hazards,falling hazards,
confined space, electrical hazards, underground
utilities and first aid room including moving and
replacement of damage signage sum

Page : BQ/4/6 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH912 OSH Training

4.30 AH912.1 OSH internal and external training such as, NPSP,
CIDB green card, railway operators, PICOW,
LOOKOUT, fire prevention, fire fighting and emergency
response, competency first aid training courses, work
at height training, monthly mass tool box talks,OSH
leadership training (approved by PDP), lifting operation
and lifting supervisor, safety talks during pre and post
tensioning works and relocation of utilities, health
hazards during construction, public safety, working on
live traffic, skilled scaffold erector, competent rigger
and slinger, competency advanced first aid training
course, designated and authorized personnel for
confined space training, authorized gas tester and
entry supervisor for confined space training OSH
campaign for project wide involvement and
participation, daily spot rewards to exemplary workers sum

AH913 Crane and Lifting Operations

4.31 AH913.1 Pre-mobilization inspection, annual inspection,


inspection after dismantling and assembly by 3rd
Party Inspectors for cranes and lifting equipment
(including the 10-15 years crane). Inspection of lifting
gears by 3rd Party Inspector every 3 months sum

4.32 AH913.2 To provide adequate qualified lifting personnel such as


lifting planner and lifting supervisor to guide movement
of cranes and lifting equipment sum

AH914 Housekeeping

4.33 AH914.1 To provide dedicated housekeeping team at every


work area by WPC sum

AH915 5S Implementation Requirement

4.34 AH915.1 Training and consultancy by a certified 5S organisation sum

4.35 AH915.2 Certification audit nr 1

4.36 AH915.3 Six (6) monthly surveilance audit over full duration of
LRT3 project of three (3) years nr 6

Page : BQ/4/7 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

AH916 Site Maintenance

4.37 AH916.1 To provide weekly larviciding and pest control for all
site areas. sum

AH917 Safety Provision for excavation works and


working at height

4.38 AH917.1 To provide access and egress scaffold ladder complete


with handrail, double layer nettings on access scaffold
and excavated area (complete with toe board / edge
protection system). sum

AH918 Safety Provision for Work Above Live


Traffic/Pedestrian

4.39 AH918.1 Installation of double layer heavy duty industrial safety


nettings adequately wrapped around the guideway
above live traffic and pedestrian. Provision of arrest
falling objects / Fall arrest Safety Catch Net System sum

AH919 Safety Provision to Prevent Hit by Moving


Object/Plant

4.40 AH919.1 Installation and moving of concrete NJB (equivalent or


better as approved by PDP) for the following works, but
not limited to:
i) Construction of pier and portal
ii) Installation of noise barrier
iii) Painting works
iv) Access to guideway
v) Piloting and relocation of utilities sum

AH 920 Working Over Water/river

4.41 AH920.1 Mandatory PPE Inflatable life Jacket to be provided nr 40

4.42 AH 920.2 Water rescue Equipments : Ring Bouy, power driven


rescue boat, rescue line, life jacket, boat hook, pike
pole, bouyant line 15 meter whistle, warning alarm
equipments, life hook and pole sum

Page : BQ/4/8 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

ENVIRONMENTAL MANAGEMENT

The Works Package Contractor is requested to


price for the the following Environmental
Management Items:

AH921 Environmental Management Plan (EMP) and


Erosion and Sedimentation Control Plan (ESCP)

Prepare and submit the approved Site Specific EMP


and ESCP by environmental consultant registered with
DOE

4.43 AH921.1 Site Specific EMP nr 1

4.44 AH921.2 Site Specific ESCP nr 1

Update and resubmit the approved Site Specific EMP


and ESCP by environmental consultant registered with
DOE

4.45 AH921.3 Site Specific EMP nr 2

4.46 AH921.4 Site Specific ESCP nr 2

AH922 Environmental Management Team and Equipment

Full time Environmental Manager and Environmental


Officer for environmental management works only,
complete with provision of vehicle, laptop/desktop
computer, smart telephone, digital camera including
maintenance, fuel, service, toll, charges and etc.

4.47 AH922.1 Environmental Manager (minimum one personnel) mth 38

4.48 AH922.2 Environmental Officer (minimum one personnel) mth 38

Page : BQ/4/9 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

AH923 Environmental Monitoring, Audit and Training

Water Quality Monitoring

4.49 AH923.1 To conduct baseline and monthly river / stream / other


water bodies water quality monitoring as specified in
the DEIA approval conditions for the following
parameters or as directed by the PDP.
i) pH
ii) Temperature
iii) Dissolved Oxygen (DO)
iv) Chemical Oxygen Demand (COD)
v) Biochemical Oxygen Demand (BOD5)
vi) Total Suspended Solids (TSS)
vii) Oil & Grease
viii) E. Coli
ix) Ammonical Nitrogen (NH3-N)
x) Heavy Metals nr 252

4.50 AH923.2 To conduct additional river / stream / other water


bodies water quality monitoring with complete of report
as directed by PDP. nr 20

4.51 AH923.3 To conduct monthly water quality monitoring at


discharge outlet of silt trap, sediment pond, sediment
basin as specified in the DEIA approval conditions for
Total Suspended Solid (TSS) and Turbidity or as
directed by the PDP nr 252

4.52 AH923.4 To conduct additional monthly water quality monitoring


at discharge outlet of silt trap, sediment pond,
sediment basin with complete of report as directed by
PDP. nr 20

Air Quality Monitoring

4.53 AH923.5 To conduct baseline and monthly air quality monitoring


for Total Suspended Particulates (TSP), NOx and CO
for 24 hours including wind velocity and direction as
specified in the DEIA approval conditions or as
directed by the PDP nr 252

Page : BQ/4/10 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

Air Quality Monitoring (Cont'd)

4.54 AH923.6 To conduct additional air quality monitoring for Total


Suspended Particulates (TSP), NOx and CO for 24
hours including wind velocity and direction with
complete of report as directed by PDP. nr 20

Noise Monitoring

4.55 AH923.7 To conduct baseline and monthly noise monitoring (24


hours) including Leq, L10, L90 and Lmax as specified
in the DEIA approval conditions or as directed by the
PDP nr 170

24 Hours Continuous Noise Monitoring only as


directed by PDP (hot spot area only)

4.56 AH923.8 To conduct additional noise monitoring (24 hours)


including Leq, L10, L90 and Lmax complete with report
as directed by PDP to monitor, management of data
collection and report for daily noise (L10, Lmax, L90,
Leq) by acoustic expert nr 68

Vibration Monitoring

4.57 AH923.9 To conduct baseline and monthly vibration monitoring


(24 hours) as specified in the DEIA approval conditions
or as directed by the PDP nr 170

4.58 AH923.10 To conduct additional vibration monitoring (24 hours)


as directed by PDP. nr 10

Monthly Environmental Monitoring Report

4.59 AH923.11 To prepare and submit the reports including sampling


details, methodology, result, trend analysis, sources,
conclusion for:
i) Water quality
ii) Air quality
iii) Noise level
iv) Vibration level mth 36

Page : BQ/4/11 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

To provide and maintain environmental monitoring


equipment gauge set to conduct in-situ environmental
monitoring

4.60 AH923.12 Portable total suspended solid meter nr 1

4.61 AH923.13 Portable turbidity meter nr 1

4.62 AH923.14 Rain gauge set nr 2

AH924 Environmental Audit

4.63 AH924.1 To conduct closure audit prior to issuance of certificate


of practical completion including preparation of the
report nr 1

AH925 Dust and Mud Control

4.64 AH925.1 Water Browser Truck


To provide browser truck including operator, water
tank, water pump, water, diesel, moving, maintenance
and other necessary equipment for carrying out water
spraying along haul / access roads, entrances and
near settlements mth 38

AH926 Fuel Spillage Management

4.65 AH926.1 Containment Bund for Bulk Fuel Tank


To construct and maintain impervious concrete base
to contain 110% volume of stored fuel including grease
trap as per General Specification nr 3

4.66 AH926.2 Spill Response Equipment


To provide and maintain adequate spill response
equipment to remove and clean up any oil spillage nr 7

4.67 AH926.3 Portable Drip Tray


To provide and maintain portable drip tray as a
secondary containment for any fuel drums storage or
fuel used machinery nr 100

Page : BQ/4/12 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

AH927 Environmental Training and Promotion

4.68 AH927.1 Conduct internal and external competency


environmental related training for site personnel.
Environmental campaign and promotions at site for all
staffs and workers sum

AH928 Endorsement of Professional Engineer (PE) for


Fuel Burning Equipment Approval

4.69 AH928.1 To obtain written approval from Suruhanjaya Tenaga of


any erect or used of fuel burning equipment to
generate power that is rated to consume pulverised
fuel or any solid fuel at more than 30kg per hour or any
liquid or gaseous matter at more than 15kg per hour nr 10

AH929 Sediment Control

4.70 AH929.1 Portable Water/Wastewater Treatment System


To supply, install and maintain portable
water/wastewater treatment system to reduce the
suspended solids content or as directed by the PDP nr 2

AH930 Tyre Washing Facilities

4.71 AH930.1 Wash Trough


To supply and maintain portable wash through or
construct and maintain wash trough including
excavation, backfilling, disposal of surplus materials,
formwork, reinforcement, hardcore, aggregate layer,
concrete and desilting and water jet as per drawing nr 16

AH931 Waste Management

Scheduled and Hazardous Waste Management


4.72 AH931.1 To construct and maintain storage shed to temporary
house scheduled and hazardous waste or as directed
by the PDP nr 1

4.73 AH931.2 Disposal of scheduled and hazardous waste such as,


but not limited to used oil, used lubricant,
contaminated soil, used drums, used rag, used cloth
and used glove to designated and approved disposal site trip 9

Page : BQ/4/13 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

Grease Trap (Under Plant and Machinery)


4.74 AH931.3 To provide and maintain grease traps at workshop nr 1

Construction Waste Management


4.75 AH931.4 To provide and maintain dumpster to store
construction waste and disposal to designated and
approved disposal off site or as directed by the PDP nr 10

3R Recycle Bin
4.76 AH931.5 To provide and maintain 3R recycle bin to reduce,
reuse and recycle the waste at worksite or as directed
by the PDP set 3

4.77 AH932 Noise Control During Construction

Portable Noise Barrier


4.78 AH932.1 To supply and install necessary noise mitigation
measure for plants/equipment and works set 20

Temporary Noise Barrier (as directed by PDP)


4.79 AH932.2 To supply and maintain temporary noise barrier with
maximum 6m height at location as specific directed
by PDP. m2 10,000

AH933 Erosion Control

Artificial Temporary Control Proprietary Products


4.80 AH933.1 To supply, install and maintain proprietary products to
be used and expended such as organic fibre sheet
(Envirefelt CF250 / Fibromat DC 250 or equivalent) for
slope protection, silt trap and river bank protection or
as directed by the PDP sum

AH934 Stockpiled Soil / Sand Protection

4.81 AH934.1 To provide plastic sheet/ geotextile and/or canvas to


cover stockpile soil /sand or as directed by the PDP sum

AH935 Sediment Control

4.82 AH935.1 Sand Bags / Concrete Block


To supply, lay and maintain sand bags/hollow blocks
(or equivalent) where earthworks interface with public
roads/mother nature. sum

Page : BQ/4/14 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

AH900 SAFETY, HEALTH AND ENVIRONMENTAL


MANAGEMENT (ALL PROVISIONAL) (Cont'd)

The Works Package Contractor is requested to


price for the the following Environmental
Management Items: (Cont'd)

AH935 Sediment Control (Cont'd)

Silt Fence
4.83 AH935.2 To construct and maintain high silt fence complete
with with non-woven geotextile and wooden post or as
directed by the PDP sum

Silt Trap and Sediment Basin


4.84 AH935.3 To construct and maintain silt trap, gabion cage
complete with rock fill and geotextile, including
excavation, sand bedding to form silt traps, stone
filling at outlet, 300mm thick mortared rip-rap, jointing,
backfilling, disposal of surplus materials and earth
drain or as directed by the PDP sum

Gabion Wall
4.85 AH935.4 To construct and maintain gabion wall, gabion cage
complete with rock fill, sand bed and geotextile
including excavation, jointing, backfilling and disposal
of surplus materials or as directed by the PDP sum

Check Dam
4.86 AH935.5 To construct and maintain check dam complete with
rocks, backfilling and disposal of surplus materials or
as directed by the PDP sum

Coir Log
4.87 AH935.6 To provide and maintain coir log complete with coconut
fiber or equivalent to secure toe of slope and slow
down water for any sediment or as directed by the
PDP and Authorities approval. sum

Control in River
4.92 AH935.7 To provide and maintain silt curtain or equivalent
control measures to control the sedimentation and
siltation while working near or in the river. nr 2

Domestic Waste
4.88 AH935.8 Disposal of domestic waste to designated and
approved disposal off site sum

Page : BQ/4/15 Carried To Collection


CONSTRUCTION AND COMPLETION OF PACKAGE GS04 - GUIDEWAY, STATIONS,
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES


BILL NO. 4 - SAFETY, HEALTH AND ENVIRONMENTAL MANAGEMENT

Item No. Code No. Description Unit Qty. Rate Amount (RM)

COLLECTION

Page : BQ/4/1

Page : BQ/4/2

Page : BQ/4/3

Page : BQ/4/4

Page : BQ/4/5

Page : BQ/4/6

Page : BQ/4/7

Page : BQ/4/8

Page : BQ/4/9

Page : BQ/4/10

Page : BQ/4/11

Page : BQ/4/12

Page : BQ/4/13

Page : BQ/4/15

TOTAL CARRIED TO SUMMARY OF


Page : BQ/4/16
TENDER SUM