Updated as at 07 January 2022

Index of Provisionally Approved Mix Designs


K. Wah Asphalt Limited

I. Normal Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
10mm Wearing Course 10WC/KWA/HD/002 10WC/KWA/HD/002 10-Mar-2020 26-May-2020 25-May-2023
20mm Wearing Course 20WC/KWA/HD/002 20WC/KWA/HD/002 12-Mar-2020 26-May-2020 25-May-2023
28mm Base Course 28BC/KWA/HD/002 28BC/KWA/HD/002 9-Jan-2020 26-May-2020 25-May-2023
37.5mm Base Course 40BC/KWA/HD/002 40BC/KWA/HD/002 17-Mar-2020 26-May-2020 25-May-2023
37.5mm Roadbase (recipe mix) 40RB/KWA/HD/001 40RB/KWA/HD/001 16-Feb-2017 -- --

II. Reclaimed Asphalt Pavement (RAP) Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
10mm Wearing Course 10WC/KWA/HD/RAP15/002 10WC/KWA/HD/RAP15/002 10-Dec-2019 13-Mar-2020 12-Mar-2023
20mm Wearing Course 20WC/KWA/HD/RAP15/002 20WC/KWA/HD/RAP15/002 13-Nov-2019 13-Mar-2020 12-Mar-2023
28mm Base Course 28BC/KWA/HD/RAP15/002 28BC/KWA/HD/RAP15/002 17-Dec-2019 13-Mar-2020 12-Mar-2023
37.5mm Base Course 40BC/KWA/HD/RAP15/002 40BC/KWA/HD/RAP15/002 2-Jan-2020 13-Mar-2020 12-Mar-2023
37.5mm Roadbase (recipe mix) 40RB/KWA/HD/RAP15/001 40RB/KWA/HD/RAP15/001 16-Feb-2017 -- --

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
10mm Wearing Course 10WC/KWA/HD/RAP20/002 10WC/KWA/HD/RAP20/002 19-Mar-2020 24-Jul-2020 23-Jul-2023
20mm Wearing Course 20WC/KWA/HD/RAP20/002 20WC/KWA/HD/RAP20/002 29-Oct-2019 31-Dec-2019 30-Dec-2022
28mm Base Course 28BC/KWA/HD/RAP20/002 28BC/KWA/HD/RAP20/002 02-Sep-2019 31-Dec-2019 30-Dec-2022
37.5mm Base Course 40BC/KWA/HD/RAP20/002 40BC/KWA/HD/RAP20/002 16-Apr-2020 24-Jul-2020 23-Jul-2023

III. Polymer Modified Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
10mm Polymer Modified Friction Course 10PMFC/KWA/HD/PG/002 10PMFC/KWA/HD/PG/002 29-Jul-2019 31-Dec-2019 30-Dec-2022
3.35mm Polymer Modified Cushion Course CC/KWA/HD/PG/002 CC/KWA/HD/PG/002 2-Oct-2019 31-Dec-2019 30-Dec-2022
6mm Polymer Modified Stone Mastic Asphalt 6PMSMA/KWA/HD&BQ/PG/ITE/75/002 6PMSMA/KWA/HD&BQ/PG/ITE/75/002 24-Sep-2021 4-Nov-2021 3-Nov-2024
10mm Polymer Modified Stone Mastic Asphalt 10PMSMA/KWA/HD/PG/ITE/75/002 10PMSMA/KWA/HD/PG/ITE/75/002 12-Aug-2019 2-Dec-2019 1-Dec-2022

IV. Special Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
20mm Stone Mastic Asphalt 20SMA/KWA/HD/ITE/75/002 20SMA/KWA/HD/ITE/75/002 23-Apr-2020 24-Jul-2020 23-Jul-2023
10mm Stone Mastic Asphalt 10SMA/KWA/HD/ITE/75/002 10SMA/KWA/HD/ITE/75/002 7-May-2020 24-Jul-2020 23-Jul-2023

V. Lime Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
37.5mm Roadbase (recipe mix) 40RB/KWA/HD/LIME/001 40RB/KWA/HD/LIME/001 9-Aug-2018 -- --

VI. Reclaimed Asphalt Pavement (RAP) with Lime Mix

Bituminous Material HyD Mix No. Supplier's Mix No. Date of Design Approval Date Expiry Date
10mm Wearing Course 10WC/KWA/HD/RAP15/LIME/002 10WC/KWA/HD/RAP15/LIME/002 21-Jul-2021 15-Sep-2021 14-Sep-2024
20mm Wearing Course 20WC/KWA/HD/RAP15/LIME/002 20WC/KWA/HD/RAP15/LIME/002 5-Jul-2021 15-Sep-2021 14-Sep-2024
28mm Base Course 28BC/KWA/HD/RAP15/LIME/002 28BC/KWA/HD/RAP15/LIME/002 21-Jun-2021 15-Sep-2021 14-Sep-2024
37.5mm Base Course 40BC/KWA/HD/RAP15/LIME/002 40BC/KWA/HD/RAP15/LIME/002 15-Jul-2021 15-Sep-2021 14-Sep-2024
37.5mm Roadbase (recipe mix) 40RB/KWA/HD/RAP15/LIME/001 40RB/KWA/HD/RAP15/LIME/001 8-Aug-2018 -- --

Remark: Mix design details are tabled in the appropriate spreadsheets.


Index
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(Normal Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler Hui Dong Quarry, China Crushed rock filler for WC, BC & RB
(passing 75μm BS sieve) Hydrated Lime - Great Wall Brand, China Mixture of crushed rock filler and hydrated lime for FC

2. Mix Designs :

Bituminous Material 10mm Wearing Course 20mm Wearing Course 28mm Base Course 37.5mm Base Course 37.5mm Roadbase (recipe mix)
HyD Mix No. 10WC/KWA/HD/002 20WC/KWA/HD/002 28BC/KWA/HD/002 40BC/KWA/HD/002 40RB/KWA/HD/001
Supplier's Mix No. 10WC/KWA/HD/002 20WC/KWA/HD/002 28BC/KWA/HD/002 40BC/KWA/HD/002 40RB/KWA/HD/001
Date of Design 10-Mar-2020 12-Mar-2020 9-Jan-2020 17-Mar-2020 16-Feb-2017
Approval Date 26-May-2020 26-May-2020 26-May-2020 26-May-2020 --
Expiry Date 25-May-2023 25-May-2023 25-May-2023 25-May-2023 --
Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Data GS Requirement*
Binder content ( % ) 6.0 5.5 - 6.5 5.0 4.5 - 5.5 4.5 4.0 - 5.0 4.1 3.6 - 4.6 3.5 3.0 - 4.0
B.S. Sieve (mm) % Passing % Passing % Passing % Passing % Passing
50 100 100 100 100
37.5 100 100 96 92 - 100 98 90 - 100
28 100 100 96 92 - 100 93 86 - 100 89 70 - 94
20 96 92 - 100 87 80 - 94 81 74 - 88 71 62 - 84
14 100 100 88 81 - 95 75 68 - 82 69 62 - 76 -- --
10 96 92 - 100 82 75 - 89 67 60 - 74 62 55 - 69 57 49 - 67
5 74 67 - 81 68 61 - 75 52 45 - 59 50 43 - 57 46 37 - 55
2.36 53 46 - 60 49 42 - 56 37 30 - 44 37 30 - 44 37 27 - 43
1.18 38 31 - 45 35 28 - 42 28 21 - 35 29 22 - 36 -- --
0.600 26 21 - 31 25 20 - 30 20 15 - 25 21 16 - 26 19 13 - 28
0.300 17 12 - 22 17 12 - 22 13 8 - 18 14 9 - 19 13 7 - 21
0.150 11 8 - 14 11 8 - 14 9 6 - 12 9 6 - 12 -- --
0.075 6.5 4.5 - 8.5 7.0 5.0 - 9.0 5.5 3.5 - 7.5 6.5 4.5 - 8.5 6.5 2.0 - 8.0
9.5# 10.0# 8.5# 9.5# 8.0@

Marshall Properties Marshall Properties Marshall Properties Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 3.8 3.0 - 5.0 4.2 3.0 - 5.0 3.7 3.0 - 5.0 4.2 3.0 - 5.0 -- --
Voids in mineral aggregate, VMA (%) 16.4 ≧16 14.5 ≧14 13.3 ≧13 12.9 ≧12.5 -- --
Marshall stability (kN) 10.7 ≧10 12.3 ≧10 15.3 ≧10 14.6 ≧10 -- --
Flow (mm) 3.3 ≦4.0 2.8 ≦4.0 3.3 ≦4.0 2.9 ≦4.0 -- --
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.
@
The precentage passing the 0.075mm BS test sieve shall not exceed 8.0%.

Normal Mix
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(RAP Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler
Hui Dong Quarry, China Crushed rock filler
(passing 75μm BS sieve)

2. Mix Designs :

Bituminous Material 10mm Wearing Course 20mm Wearing Course 28mm Base Course 37.5mm Base Course 37.5mm Roadbase (recipe mix)
HyD Mix No. 10WC/KWA/HD/RAP15/002 20WC/KWA/HD/RAP15/002 28BC/KWA/HD/RAP15/002 40BC/KWA/HD/RAP15/002 40RB/KWA/HD/RAP15/001
Supplier's Mix No. 10WC/KWA/HD/RAP15/002 20WC/KWA/HD/RAP15/002 28BC/KWA/HD/RAP15/002 40BC/KWA/HD/RAP15/002 40RB/KWA/HD/RAP15/001
Date of Design 10-Dec-2019 13-Nov-2019 17-Dec-2019 2-Jan-2020 16-Feb-2017
Approval Date 13-Mar-2020 13-Mar-2020 13-Mar-2020 13-Mar-2020 --
Expiry Date 12-Mar-2023 12-Mar-2023 12-Mar-2023 12-Mar-2023 --
Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Data GS Requirement*
Binder content ( % ) 6.0 5.5 - 6.5 5.0 4.5 - 5.5 4.5 4.0 - 5.0 4.1 3.6 - 4.6 3.5 3.0 - 4.0
B.S. Sieve (mm) % Passing % Passing % Passing % Passing % Passing
50 100 100 100 100
37.5 100 100 96 92 - 100 98 90 - 100
28 100 100 96 92 - 100 93 86 - 100 89 70 - 94
20 96 92 - 100 87 80 - 94 81 74 - 88 71 62 - 84
14 100 100 88 81 - 95 75 68 - 82 69 62 - 76 -- --
10 96 92 - 100 82 75 - 89 67 60 - 74 62 55 - 69 59 49 - 67
5 74 67 - 81 68 61 - 75 52 45 - 59 50 43 - 57 47 37 - 55
2.36 53 46 - 60 49 42 - 56 37 30 - 44 37 30 - 44 37 27 - 43
1.18 38 31 - 45 35 28 - 42 28 21 - 35 29 22 - 36 -- --
0.600 26 21 - 31 25 20 - 30 20 15 - 25 21 16 - 26 20 13 - 28
0.300 17 12 - 22 17 12 - 22 13 8 - 18 14 9 - 19 14 7 - 21
0.150 11 8 - 14 11 8 - 14 9 6 - 12 9 6 - 12 -- --
0.075 6.5 4.5 - 8.5 7.0 5.0 - 9.0 5.5 3.5 - 7.5 6.5 4.5 - 8.5 6.5 2.0 - 8.0
9.5# 10.0# 8.5# 9.5# 8.0@
(including 15% RAP) (including 15% RAP) (including 15% RAP) (including 15% RAP) (including 15% RAP)
Marshall Properties Marshall Properties Marshall Properties Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 4.4 3.0 - 5.0 4.4 3.0 - 5.0 3.6 3.0 - 5.0 4.0 3.0 - 5.0 -- --
Voids in mineral aggregate, VMA (%) 17.2 ≧16 14.9 ≧14 13.3 ≧13 12.8 ≧12.5 -- --
Marshall stability (kN) 10.2 ≧10 12.7 ≧10 14.7 ≧10 16.5 ≧10 -- --
Flow (mm) 2.7 ≦4.0 2.9 ≦4.0 2.9 ≦4.0 3.1 ≦4.0 -- --
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.
@
The precentage passing the 0.075mm BS test sieve shall not exceed 8.0%.

RAP Mix
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(RAP Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler
Hui Dong Quarry, China Crushed rock filler
(passing 75μm BS sieve)

2. Mix Designs :

Bituminous Material 10mm Wearing Course 20mm Wearing Course 28mm Base Course 37.5mm Base Course
HyD Mix No. 10WC/KWA/HD/RAP20/002 20WC/KWA/HD/RAP20/002 28BC/KWA/HD/RAP20/002 40BC/KWA/HD/RAP20/002
Supplier's Mix No. 10WC/KWA/HD/RAP20/002 20WC/KWA/HD/RAP20/002 28BC/KWA/HD/RAP20/002 40BC/KWA/HD/RAP20/002
Date of Design 19-Mar-2020 29-Oct-2019 2-Sep-2019 16-Apr-2020
Approval Date 24-Jul-2020 31-Dec-2019 31-Dec-2019 24-Jul-2020
Expiry Date 23-Jul-2023 30-Dec-2022 30-Dec-2022 23-Jul-2023
Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement*
Binder content ( % ) 6.0 5.5 - 6.5 5.0 4.5 - 5.5 4.5 4.0 - 5.0 4.1 3.6 - 4.6
B.S. Sieve (mm) % Passing % Passing % Passing % Passing
50 100 100
37.5 100 100 96 92 - 100
28 100 100 96 92 - 100 93 86 - 100
20 96 92 - 100 87 80 - 94 81 74 - 88
14 100 100 88 81 - 95 75 68 - 82 69 62 - 76
10 96 92 - 100 82 75 - 89 67 60 - 74 62 55 - 69
5 74 67 - 81 68 61 - 75 52 45 - 59 50 43 - 57
2.36 53 46 - 60 49 42 - 56 37 30 - 44 37 30 - 44
1.18 38 31 - 45 35 28 - 42 28 21 - 35 29 22 - 36
0.600 26 21 - 31 25 20 - 30 20 15 - 25 21 16 - 26
0.300 17 12 - 22 17 12 - 22 13 8 - 18 14 9 - 19
0.150 11 8 - 14 11 8 - 14 9 6 - 12 9 6 - 12
0.075 6.5 4.5 - 8.5 7.0 5.0 - 9.0 5.5 3.5 - 7.5 6.5 4.5 - 8.5
9.5# 10.0# 8.5# 9.5#
(including 20% RAP) (including 20% RAP) (including 20% RAP) (including 20% RAP)
Marshall Properties Marshall Properties Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 3.6 3.0 - 5.0 3.9 3.0 - 5.0 4.5 3.0 - 5.0 4.0 3.0 - 5.0
Voids in mineral aggregate, VMA (%) 16.3 ≧16 14.5 ≧14 14.0 ≧13 12.9 ≧12.5
Marshall stability (kN) 11.5 ≧10 12.0 ≧10 12.8 ≧10 14.4 ≧10
Flow (mm) 3.4 ≦4.0 2.9 ≦4.0 3.6 ≦4.0 3.5 ≦4.0
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.

RAP Mix
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(Polymer Modified Mix)

1. Source and Type of Constituent Materials :

Constituent Material Type


Source
10PMFC/KWA/HD/PG/002 CC/KWA/HD/PG/002 10PMSMA/KWA/HD/PG/ITE/75/002 6PMSMA/KWA/HD&BQ/PG/ITE/75/002
Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade PG76
Coarse Aggregate Hui Dong Quarry, China Crushed rock (Granite) Not applicable Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate Hui Dong Quarry, China Crushed rock (Granite) Crushed rock (Granite)
(passing 5mm BS sieve) Bontique Quarry, China Not applicable Not applicable Crushed rock (Limestone)
Filler Hui Dong Quarry, China
Mixture of crushed rock filler and hydrated lime
(passing 75μm BS sieve) Hydrated Lime - Great Wall Brand, China
Fibre Asia Fiber Company Ltd (China) Not applicable Cellulose Fibre - Iterlong

2. Mix Designs :

Bituminous Material 10mm Polymer Modified Friction Course 3.35mm Polymer Modified Cushion Course 10mm Polymer Modified Stone Mastic Asphalt 6mm Polymer Modified Stone Mastic Asphalt

HyD Mix No. 10PMFC/KWA/HD/PG/002 CC/KWA/HD/PG/002 10PMSMA/KWA/HD/PG/ITE/75/002 6PMSMA/KWA/HD&BQ/PG/ITE/75/002


Supplier's Mix No. 10PMFC/KWA/HD/PG/002 CC/KWA/HD/PG/002 10PMSMA/KWA/HD/PG/ITE/75/002 6PMSMA/KWA/HD&BQ/PG/ITE/75/002
Date of Design 29-Jul-2019 2-Oct-2019 12-Aug-2019 24-Sep-2021
Approval Date 31-Dec-2019 31-Dec-2019 2-Dec-2019 4-Nov-2021
Expiry Date 30-Dec-2022 30-Dec-2022 1-Dec-2022 3-Nov-2024
Design Grading PS Requirement* Design Grading PS Requirement* Design grading PS Requirement* Design grading PS Requirement*
Polymer modified binder content (%) 5.5 5.0 - 6.0 9.5 9.0 - 10.0 6.3 5.6 - 6.6 6.1 5.4 - 6.4
B.S. Sieve (mm) % passing % passing % Passing % Passing
14 100 100 100 100 100 100
10 96 92 - 100 96 92 - 100 98 94 - 100
6.3 -- -- 100 100 -- -- -- --
5 24 17 - 31 -- -- 28 21 - 35 80 73 - 87
3.35 -- -- 95 91 - 99 -- -- -- --
2.36 10 3 - 17 -- -- 23 16 - 30 22 15 - 29
1.18 -- -- 57 50 - 64 -- -- 16 9 - 23
0.300 -- -- 33 28 - 38 -- -- -- --
0.075 2.5 0.5 - 4.5 15.0 13.0 - 17.0 11.0 9.0 - 13.0 7.0 5.0 - 9.0
# # # #
5.5 18.0 14.0 10.0
(including 1.5% hydrated lime) (including 2% hydrated lime) (including 2% hydrated lime) (including 2% hydrated lime)
Marshall Properties Marshall Properties Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 22.2 ≧20 -- -- 3.7 3.5 - 4.5 8.2 7.0 - 10.0
Voids in mineral aggregate, VMA (%) -- -- -- -- 17.4 ≧17 20.9 ≧17
Marshall stability (kN) -- -- -- -- 11.5 ≧6 12.4 ≧6
Binder draindown ( % ) -- -- -- -- 0.1 ≦0.3 0.05 ≦0.3
Marshall quotient (kN/mm) -- -- 0.8 0.7 - 1.2 -- -- -- --
Binder drainage test Pass Tmax > Binder content -- -- -- -- -- --
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.

Polymer Modified Mix


Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(Special Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler Hui Dong Quarry, China
Mixture of crushed rock filler and hydrated lime
(passing 75μm BS sieve) Hydrated Lime - Great Wall Brand, China
Fibre Asia Fiber Company Ltd (China) Cellulose Fibre - Iterlong

2. Mix Designs :

Bituminous Material 20mm Stone Mastic Asphalt 10mm Stone Mastic Asphalt

HyD Mix No. 20SMA/KWA/HD/ITE/75/002 10SMA/KWA/HD/ITE/75/002


Supplier's Mix No. 20SMA/KWA/HD/ITE/75/002 10SMA/KWA/HD/ITE/75/002
Date of Design 23-Apr-2020 7-May-2020
Approval Date 24-Jul-2020 24-Jul-2020
Expiry Date 23-Jul-2023 23-Jul-2023
Design grading PS Requirement* Design grading PS Requirement*
Binder content ( % ) 6.3 5.6 - 6.6 6.3 5.6 - 6.6
B.S. Sieve (mm) % Passing % Passing
28 100 100
20 96 92 - 100
14 88 81 - 95 100 100
10 71 64 - 78 96 92 - 100
5 22 15 - 29 32 25 - 39
2.36 17 10 - 24 25 18 - 32
1.18 -- -- -- --
0.600 14 9 - 19 -- --
0.300 13 8 - 18 -- --
0.150 -- -- -- --
0.075 8.5 6.5 - 10.5 8.5 6.5 - 10.5
# #
11.5 11.5
(including 2% hydrated lime) (including 2% hydrated lime)
Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 3.6 3.0 - 4.5 3.6 3.0 - 4.5
Voids in mineral aggregate, VMA (%) 17.4 ≧17 17.4 ≧17
Marshall stability (kN) 7.1 ≧6 7.4 ≧6
Flow (mm) 4.0 ≦4 3.9 ≦4
Binder draindown ( % ) 0.18 ≦0.3 0.10 ≦0.3
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.

Special Mix
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(Lime Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler Hui Dong Quarry, China
Mixture of crushed rock filler and hydrated lime
(passing 75μm BS sieve) Hydrated Lime - Great Wall Brand, China

2. Mix Designs :

Bituminous Material 37.5mm Roadbase (recipe mix)

HyD Mix No. 40RB/KWA/HD/LIME/001


Supplier's Mix No. 40RB/KWA/HD/LIME/001
Date of Design 9-Aug-2018
Approval Date --
Expiry Date --
Design Data PS Requirement*
Binder content ( % ) 3.5 3.0 - 4.0
B.S. Sieve (mm) % Passing
50 100 100
37.5 98 90 - 100
28 89 70 - 94
20 71 62 - 84
14 -- --
10 57 49 - 67
5 46 37 - 55
2.36 37 27 - 43
1.18 -- --
0.600 19 13 - 28
0.300 13 7 - 21
0.150 -- --
0.075 5.5 2.0 - 8.0
8.0@
(including 1.5% hydrated lime)
Marshall Properties
Air voids in mix, VIM (%) -- --
Voids in mineral aggregate, VMA (%) -- --
Marshall stability (kN) -- --
Flow (mm) -- --
Hydrated lime ( % ) 1.5 ≧1.5
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.
@
The precentage passing the 0.075mm BS test sieve shall not exceed 8.0%.

Lime Mix
Updated as at 07 January 2022
Summary of Provisionally Approved Mix Designs
K. Wah Asphalt Limited
(RAP with Lime Mix)

1. Source and Type of Constituent Materials :

Constituent Material Source Type


Bitumen Dongguan Taihe Asphalt Products Co., Ltd Grade 60/70 pen
Coarse Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(retained on 5mm BS sieve)
Fine Aggregate
Hui Dong Quarry, China Crushed rock (Granite)
(passing 5mm BS sieve)
Filler Hui Dong Quarry, China
Mixture of crushed rock filler and hydrated lime
(passing 75μm BS sieve) Hydrated Lime - Great Wall Brand, China

2. Mix Designs :

Bituminous Material 10mm Wearing Course 20mm Wearing Course 28mm Base Course 37.5mm Base Course 37.5mm Roadbase (recipe mix)
HyD Mix No. 10WC/KWA/HD/RAP15/LIME/002 20WC/KWA/HD/RAP15/LIME/002 28BC/KWA/HD/RAP15/LIME/002 40BC/KWA/HD/RAP15/LIME/002 40RB/KWA/HD/RAP15/LIME/001
Supplier's Mix No. 10WC/KWA/HD/RAP15/LIME/002 20WC/KWA/HD/RAP15/LIME/002 28BC/KWA/HD/RAP15/LIME/002 40BC/KWA/HD/RAP15/LIME/002 40RB/KWA/HD/RAP15/LIME/001
Date of Design 21-Jul-2021 5-Jul-2021 21-Jun-2021 15-Jul-2021 8-Aug-2018
Approval Date 15-Sep-2021 15-Sep-2021 15-Sep-2021 15-Sep-2021 --
Expiry Date 14-Sep-2024 14-Sep-2024 14-Sep-2024 14-Sep-2024 --
Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Grading GS Requirement* Design Data GS Requirement*
Binder content ( % ) 6.0 5.5 - 6.5 5.0 4.5 - 5.5 4.5 4.0 - 5.0 4.1 3.6 - 4.6 3.5 3.0 - 4.0
B.S. Sieve (mm) % Passing % Passing % Passing % Passing % Passing
50 100 100 100 100
37.5 100 100 96 92 - 100 98 90 - 100
28 100 100 96 92 - 100 93 86 - 100 89 70 - 94
20 96 92 - 100 87 80 - 94 81 74 - 88 71 62 - 84
14 100 100 88 81 - 95 75 68 - 82 69 62 - 76 -- --
10 96 92 - 100 82 75 - 89 67 60 - 74 62 55 - 69 59 49 - 67
5 74 67 - 81 68 61 - 75 52 45 - 59 50 43 - 57 47 37 - 55
2.36 53 46 - 60 49 42 - 56 37 30 - 44 37 30 - 44 37 27 - 43
1.18 38 31 - 45 35 28 - 42 28 21 - 35 29 22 - 36 -- --
0.600 26 21 - 31 25 20 - 30 20 15 - 25 21 16 - 26 20 13 - 28
0.300 17 12 - 22 17 12 - 22 13 8 - 18 14 9 - 19 14 7 - 21
0.150 11 8 - 14 11 8 - 14 9 6 - 12 9 6 - 12 -- --
0.075 6.5 4.5 - 8.5 7.0 5.0 - 9.0 5.5 3.5 - 7.5 6.5 4.5 - 8.5 5.8 2.0 - 8.0
# # # # @
9.5 10.0 8.5 9.5 8.0
(including 15% RAP & 1.5% hydrated Lime) (including 15% RAP & 1.5% hydrated Lime) (including 15% RAP & 1.5% hydrated Lime) (including 15% RAP & 1.5% hydrated Lime) (including 15% RAP & 1.5% hydrated Lime)
Marshall Properties Marshall Properties Marshall Properties Marshall Properties Marshall Properties
Air voids in mix, VIM (%) 3.9 3.0 - 5.0 4.0 3.0 - 5.0 3.9 3.0 - 5.0 4.4 3.0 - 5.0 -- --
Voids in mineral aggregate, VMA (%) 16.9 ≧16 14.6 ≧14 13.6 ≧13 13.1 ≧12.5 -- --
Marshall stability (kN) 11.6 ≧10 11.9 ≧10 11.1 ≧10 12.9 ≧10 -- --
Flow (mm) 3.3 ≦4.0 3.1 ≦4.0 3.1 ≦4.0 3.2 ≦4.0 -- --
Hydrated Lime (%) 1.5 ≧1.5 1.5 ≧1.5 1.5 ≧1.5 1.5 ≧1.5 1.5 ≧1.5
* For reference only
#
The percentage passing the 0.075mm BS sieve shall not deviate from the approved design value by more than 3%.
@
The precentage passing the 0.075mm BS test sieve shall not exceed 8.0%.

RAP with Lime Mix