Roshan Kumar Yadav - Ee

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ROSHAN KUMAR YADAV

Electrical Project Engineer

Profile summary : Personal Data :


Ambitious Electrical Engineer with record of exceeding both company and personal goal. B.E. in Address
Electrical Engineering offering 8+ years of industrial project experience and proficient in Bajrang Para Kohka,
electrical installation, testing, commissioning, troubleshooting, maintenance. Comfortable Bhilai Durg, CG 490028
handling multiple projects simultaneously with little to no supervision.
Phone
Projects : +91-9407701299

❖ Executive II - March/2017 – Current DOB


Bhilai Engineering Corporation Limited 22-aug-1991
Onsite – COB Package 02, NMDC Limited, Chhattisgarh
Passport No.
❖ Executive I - Aug/2013 – March/2017 J8938144
Bhilai Engineering Corporation Limited
Onsite – COB 11, Bhilai Steel Plant, Chhattisgarh E-mail
roshany383@gmail.com
❖ GET - March/2013 – Aug /2013
Bhilai Engineering Corporation Limited LinkedIn
Onsite - Raurkela Steel Plant, Odisha www.linkedin.com/in/
RoshanKumarYadav
Work Experience :
• Electrical Erection, Commissioning, Troubleshooting of: Skills :
Transformer, HT/LT motor, HT/LT power distribution, MCC, CT/PT, ACB/VCB, VFD,
EOT Cranes , Hoist, Compressor, UPS, Conveyor System, Various Limit Switches, Electrical installation
Lighting, Cable Laying and Earthing. Equipment testing
• Assist in testing of transformer, HT/LT cable, motors, circuit breaker.
• Preventive and Breakdown maintenance of all electrical equipment’s of Coke-oven Commissioning
battery, CDCP, heavy machines, PEC and Conveyor system. Troubleshooting
• Determined most effective approaches to new projects by reading and analysing power
distribution system feature such as single line drawing, P&ID, loops, control and Maintenance
electrical equipment layouts. Project Coordination
• Distributed HT/LT power according to prepared list of facility electrical equipment and
Time management
circuit.
• Completed Coke-conveyor system a part of project individually. Conveyor system
• Perform task under project manager, senior engineers as a team member as well as Earthing
individual.
• Provided onsite engineering and technical services during installation and fielding Lighting
processes.
• Identified specific cables, connectors, fuses, circuit breaker and other electrical devices
as per requirement.
• Monitored installation of materials and equipment for compliance with drawings and Languages :
specifications.
• Supervised work of contracted employees to keep on task for timely completion. English
• Completed daily construction task while providing safe working condition, staying on Hindi
budget and meeting project deadlines.
• Demonstrated respect, friendliness and willingness to help wherever needed.
• Coordinating projects with other departments, vendors, sub-vendors, contractors and bill
checking of contractors , safety, housekeeping.

Education :
Aug/2008 – B.E. in Electrical Engineering
Jul/2012 Rungta collage of engineering and technology, Bhilai
CGPA – 8.25 Percentage – 78.37%

You might also like