Siegel Robert Automotive Layered Process Audit Checklist
Siegel Robert Automotive Layered Process Audit Checklist
Process Audit:
Auditor:
All questions are to be answered with a checkmark "Y" or no "N" in the Please write the actual dates in the corresponding
corresponding day's box. Non-conformances are to have corrective action Shift: __________ columns!
recorded in the space provided and identified with the date (MM/DD/YY)
Mon Tues Wed Thurs Fri Sat Sun
These Items Are to be Checked Every
Item No. Audit Area Corrective Action Taken
Audit
Section 1: Operator Instructions
Are operator instructions accessible at the work
1 stations and made available without disruption to the
work being performed?
Do operators undersatnd their work instructions and is
2 the work being performed follow the work instructions
step by step?
Do all operators performing containment activities
3 have work instructions and have they been trained to
the work instructions?
Do all operators have a clear understanding of their
jobs? Do they know the 'right' things to do, are they
4 doing them correctly, and can they demonstrate their
knowledge of what is a quality part?
Are operators filling out required forms and
5 documentation and turning them into their supervisors
per their work instructions?
All questions are to be answered with a checkmark "Y" or no "N" in the Please write the actual dates in the corresponding
corresponding day's box. Non-conformances are to have corrective action Shift: __________ columns!
recorded in the space provided and identified with the date (MM/DD/YY)
Mon Tues Wed Thurs Fri Sat Sun
These Items Are to be Checked Every
Item No. Audit Area Corrective Action Taken
Audit
Is suspect product properly identified per work
4 instructions and procedure QP-9.
Siegel Robert Automotive Layered Process Audit Checklist
All questions are to be answered with a checkmark "Y" or no "N" in the Please write the actual dates in the corresponding
corresponding day's box. Non-conformances are to have corrective action Shift: __________ columns!
recorded in the space provided and identified with the date (MM/DD/YY)
Mon Tues Wed Thurs Fri Sat Sun
These Items Are to be Checked Every
Item No. Audit Area Corrective Action Taken
Audit
Section 3: Process Monitoring and Process Control
Are Process Analysis Boards (PAB) filled out
1 completely and correctly?
Are Process Analysis Board (PAB) charts filled out
2 correctly and up-to-date?
Revision: 9/30/04
Siegel Robert Automotive Error Proofing Layered Process Audit Checklist
Item No. These Items Are to be Checked Every Shift Audit Area Corrective Action Taken
Section 1: General
Are operators aware of the function and importance of
1 any error proofing devices at their station?
All questions are to be answered with a checkmark "Y" or no "N" in the Please write the actual dates in the corresponding
corresponding day's box. Non-conformances are to have corrective action Shift: __________ columns!
recorded in the space provided and identified with the date (MM/DD/YY)
Mon Tues Wed Thurs Fri Sat Sun
Item No. These Items Are to be Checked Every Shift Audit Area Corrective Action Taken
Revision: 9/30/04
Assigned Management category Assigned Management personnel
First layer of Management Moulding Shift Engineer
Metalizing Shift Engineer
STI Shift Engineer
First layer of Management Domestic Assly Shift Engineer
Incoming Quality Engineer
Store Incharge
Logistics Incharge
Department
Audit Assigment Moulding Metalizing STI Assembly Domestic Assembly Incoming Store
Own Department 1 Per Day
Assigned
Management
Category
Assigned
Management
Category
First Layer of
Supervisors
Management
Third Layer of
Corporate SRA
Management
A sse m b ly
M o ld in g
P la tin g
P a in t
Assigned Assigned
Management Management Audit
Category Personnel Assignment
Mold Supervis or /
Own Department 1 Per Day
Manager
A sse m b ly
M o ld in g
P la tin g
P a in t
Assigned Assigned
Management Management Audit
Category Personnel Assignment
Mold Supervis or /
Own Department 1 Per Day
Manager
Plating Supervis or /
Own Department 1 Per Day
Manager
e is no supervisor, then the area manager shall be considered the first layer of manageme
P la tin g
P a in t
A sse m b ly
D o ck A u d its
D ock A u d i
A sse m b ly
P la tin g
P a in t
er Day
1 Per Day
1 Per Day
1 Per Day
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Week
1 Per Quarter
1 Per Quarter
1 Per Quarter
t layer of management.