CONTRACTOR:B.G.M CONSTRUCTION
CLIENT:N/S/L/S/CITY MAT SLAB BAR SCHEDULE
LOCATION:A/A N/S/L/S/C WEREDA 03
CONSULTANT: A/A CON/BUREAU
No. of No. of
Description Shape Dia. Length bar Memb Ø6 Ø8 Ø10
Ground floor slab
Total length(m)
2556.4
Weight per meter(Kg/m)
0.395
Total Weight(Kg)
1009.778
No.of No.of
Description Shape Dia. Length bar Mem
SECOND FLOOR SUSPENDED BEAMS
ON AXIS A
Top bar 16 7.305 3 1
>> 16 12.000 2 1
>> 16 6.805 2 1
Negative bar 16 1.955 1 1
>> 16 2.660 1 3
>> 16 2.660 2 2
>> 16 1.955 2 1
Bottom bar 14 8.425 3 2
>> 14 8.500 3 1
STIRRUP 8 1.200 336 1
ON AXIS B &C
Top bar 16 6.805 3 2
>> 16 12 3 2
>> 16 9 3 2
>> 16 6.805 3 2
Negative bar 16 1.955 1 2
>> 16 2.660 1 14
>> 16 1.955 1 2
Bottom bar 14 8.425 3 4
>> 14 8.500 3 4
Stirrup 8 1.2 479 4
ON AXIS D
Top bar 16 7.305 2 1
>> 16 12 2 1
>> 16 6.805 2 1
Negative bar 16 1.955 1 1
>> 16 2.660 2 5
>> 16 1.955 2 1
Bottom bar 14 8.425 3 2
>> 14 8.500 3 1
STIRRUP 8 1.2 330 1
ON AXIS 1&9 b /n C&D
Top bar 16 7.510 3 2
Negative bar 16 2.555 2 2
>> 16 2.955 2 2
Bottom bar 14 6.750 4 2
STIRRUP 8 1.200 158 2
ON AXIS 1&9 b /n B&C at stair landing
beam
Top bar 16 4.340 3 2
Bottom bar 14 4.340 3 2
STIRRUP 8 1.200 24 5
ON AXIS 2&8 b/n B, C & D
Top bar 16 10.740 3 2
Negative bar 20 3.100 2 2
>> 20 2.955 2 2
Bottom bar 16 9.980 4 2
STIRRUP 8 1.200 153 2
ON AXIS 4, 5 &6 b/n A,B,C & D
Top bar 16 8.77 3 3
>> 16 8.77 3 3
Negative bar 20 2.955 2 3
>> 20 3.100 2 6
>> 20 2.955 2 3
Bottom bar 16 9.955 4 3
>> 16 6.825 4 3
Stirrup 8 1.2 287 3
ON AXIS 7 b/n A,B,C & D
Top bar 20 8.77 3 1
>> 20 8.77 3 1
Negative bar 16 2.955 2 1
>> 16 3.100 2 2
>> 16 2.955 2 1
Bottom bar 16 9.955 4 1
>> 16 6.825 4 1
STIRRUP 8 1.2 278 1
ON AXIS 3 b/n A,B,C & D
Top bar 20 8.77 3 1
>> 20 8.77 3 1
Negative bar 16 2.955 2 1
>> 16 3.100 2 2
>> 16 2.955 2 1
Bottom bar 16 9.955 4 1
>> 16 6.825 4 1
STIRRUP 8 1.2 244 1
Total length(m)
Weight per meter(Kg/m)
Total Weight(Kg)
____________________________________________________________
______________________________________
________________________________________________
C_________________
21.915
24
13.61
1.955
7.98
10.64
3.91
50.55
25.50
403.20
40.83
72
54
40.83
3.91
37.24
3.91
101.10
102.00
2299.20
14.61
24
13.61
1.955
26.6
3.91
50.55
25.50
396.00
45.06
10.22
11.82
54.00
379.20
26.04
26.04
144.00
64.44
12.4
11.82
79.84
367.20
78.93
78.93
17.73
37.2
17.73
119.46
81.9
1033.20
26.31
26.31
5.91
12.4
5.91
39.82
27.3
333.6
26.31
26.31
5.91
12.4
5.91
39.82
27.3
292.8 292.8
5648.40 435.24 1493.535 202.12
0.395 1.21 1.58 2.47
2231.118 526.6404 2359.785 499.2364
Project :_____ G+2 CLASS ROOM CONSTRUCTION PROJECT____________________________________
Client :___Oromia Education Bureau______________________________________________________________
Consultant :___Engineering Coorporation Of Oromia________________________________________________
Month:__November__________________ Year________2020 G.C_________________
1 21.915
1 24
1 13.61
1 1.955
3 7.98
2 10.64
1 3.91
2 50.55
1 25.50
1 403.20
2 40.83
2 72
2 54
2 40.83
2 3.91
14 37.24
2 3.91
4 101.10
4 102.00
2 1149.60
1 14.61
1 24
1 13.61
1 1.955
5 26.6
1 3.91
2 50.55
1 25.50
1 396.00
2 45.06
2 10.22
2 11.82
2 54.00
2 379.20
2 26.04
2 26.04
2 57.60
2 64.44
2 12.4
2 11.82
2 79.84
2 367.20
3 78.93
3 78.93
3 17.73
6 37.2
3 17.73
3 119.46
3 81.9
3 1033.20
1 26.31
1 26.31
1 5.91
2 12.4
1 5.91
1 39.82
1 27.3
1 333.6
1 26.31
1 26.31
1 5.91
2 12.4
1 5.91
1 39.82
1 27.3
1 292.8 292.8
4412.40 435.24 1493.535 202.12
er meter(Kg/m) 0.395 1.21 1.58 2.47
1742.898 526.6404 2359.785 499.2364
PROJECT: B+G+7 OFFICE BULDING CONTRACTOR:B.G.M CONSTRUCTION
CLIENT : N/S/L/S/CITY MAT BEAM BAR SCHEDULE
LOCATION:A/A N/S/L/S/C WEREDA 03
CONSULTANT : A/A CON/BUREAU
Description Shape Dia. Length No.of bar No.of Mem Ø6 Ø8 Ø10 Ø12 Ø14 Ø16
GROUND FLOOR BEAMS
ON AXIS A
Top bar 14 7.275 3 1 21.83
>> 14 12.000 3 1 36.00
>> 14 6.775 3 1 20.33
Bottom bar 14 8.425 2 2 33.70
>> 14 8.500 2 1 17.00
STIRRUP 8 1.300 121 1 157.30
ON AXIS B &C
Top bar 14 6.775 2 2 27.10
>> 14 12.000 2 2 48.00
>> 14 9.000 2 2 36.00
>> 14 6.775 2 2 27.10
Bottom bar 14 8.425 2 4 67.40
>> 14 8.500 2 4 68.00
Stirrup 8 1.300 161 2 418.60
CONTRACTOR ---------------
PROJECT: B+G+7 OFFICE BULDING CONTRACTOR:B.G.M CONSTRUCTION
CLIENT : N/S/L/S/CITY MAT BEAM BAR SCHEDULE
LOCATION:A/A N/S/L/S/C WEREDA 03
CONSULTANT : A/A CON/BUREAU
Description Shape Dia. Length No.of bar No.of Mem Ø6 Ø8 Ø10 Ø12 Ø14 Ø16
ON AXIS D
Top bar 14 6.775 3 1 20.33
>> 14 12.000 3 1 36.00
>> 14 7.275 3 1 21.83
Bottom bar 14 8.425 2 2 33.70
>> 14 8.500 2 1 17.00
STIRRUP 8 1.300 121 1 157.30
ON AXIS 1&2
Top bar 14 10.580 2 2 42.32
Negative bar 14 3.100 2 2 12.40
>> 14 2.925 2 2 11.70
Bottom bar 14 9.880 3 2 59.28
STIRRUP 8 1.300 47 2 122.20
ON AXIS 3,4,5,6&7
Top bar 14 8.740 3 5 131.10
>> 14 8.740 3 5 131.10
Bottom bar 14 10.055 3 5 150.83
>> 14 6.825 3 5 102.38
CONTRACTOR ---------------
PROJECT: B+G+7 OFFICE BULDING CONTRACTOR:B.G.M CONSTRUCTION
CLIENT : N/S/L/S/CITY MAT BEAM BAR SCHEDULE
LOCATION:A/A N/S/L/S/C WEREDA 03
CONSULTANT : A/A CON/BUREAU
Description Shape Dia. Length No.of bar No.of Mem Ø6 Ø8 Ø10 Ø12 Ø14 Ø16
STIRRUP 8 1.300 78 5 507.00
ON AXIS 8&9
Top bar 14 10.580 2 2 42.32
Negative bar 14 2.925 2 2 11.70
>> 14 3.100 2 2 12.40
Bottom bar 14 9.880 3 2 59.28
STIRRUP 8 1.300 47 2 122.20
CONTRACTOR ---------------
PROJECT: B+G+7 OFFICE BULDING CONTRACTOR: B.G.M CONSTRUCTION
CLIENT: N/S/L/S/CITY SHEARWALL BAR SCHEDULE
LOCATION: A/A N/S/L/S/C WEREDA 03
CONSULTANT: A/A CONSTRUCTION BUREAU
Month:__November__________________ Year________2020 G.C_________________
No.of No.of no of
Description Shape Dia. Length Bar Mem footing Ø6 Ø8 Ø10 Ø12 Ø14
FOOTING
F1 14 3.2 17 2 10 1088
F2 12 2.6 13 2 14 946.4
F3 12 2 30 7 8 3360
No.of No.of no of
COLUMN Shape Dia. Length Bar Mem column
C1 16 11.9 32 1 18
14 3.475 8 1 18 500.4
C2 16 11.42 32 1 4
14 3.475 8 1 4 111.2
C3 16 7.53 16 1 6
14 7.365 16 1 6 707.04
C4 16 11.42 28 1 4
14 3.475 8 1 4 111.2
Stirrup
C1 8 1.52 66 1 18 1805.76
8 1.14 26 1 18 533.52
C2 8 1.52 64 1 4 389.12
8 1.14 9 1 4 41.04
C3 8 1.52 62 1 6 565.44
C4 8 1.52 64 1 4 389.12
6854.40
1461.76
722.88
1279.04
10318.08
16302.57
Executed
Contract previous
A-SUB STRUCTURE
1 EXCAVATION & EARTH WORK - -
1.3 Ditto but 150<x<300cm 1,125.50 350.00 393,925.00 1,622.79 567,976.50 1,622.79 567,976.50
1.4 Ditto but 300<x<450cm M3 1,125.50 80.00 90,040.00 681.57 54,525.74 681.57 54,525.74
1.5 Ditto but for soft rock excavation M3 225.10 0.25 56.28 - - -
1.6 Ditto but for hard rock excavation M3 337.70 0.25 84.43 - - -
Excavation for foundation trench excavation
1.7 in ordinary soil to adepth of 100cm from M3 2,705.10 0.25 676.28 - - -
reduced ground level.
Excavation for isolated footing in ordinary
1.8 soil to depth not exceeding 150cm starting 654.50 350.00 229,075.00 - - -
from reduced ground level
1.9 Ditto but for soft rock excavation 130.90 0.25 32.73 - - -
CONTRACTOR----------------- SUPERVISOR----------------------
PROJECT:- B+G+7 OFFICE BULDING
CLIENT :- N/S/L/S/CITY
CONSULTANT:- A/A CONSTRUCTION BUREAU
CONTRACTOR:- B.G.M CONSTRUCTION
Month:__November__________________ Year________2020 G.C_________________
LOCATION:- A/A N/S/L/S/C WEREDA 03
Back fill around trench foundation, footing
with selected soil from out site well compacted
1.11 761.10 80.00 60,888.00 - - -
,rolled & compressed in layer not exceeding
20cm.
3 CONCRETE WORK - - -
5cm lean concrete quality C-5 with minimum
- - - -
cement content of 150kg/m³, of concrete :
3.1 Footings (Mat slab) M2 527.10 15.00 7,906.50 876.96 13,154.40 876.96 13,154.40
CONTRACTOR----------------- SUPERVISOR----------------------
PROJECT:- B+G+7 OFFICE BULDING
CLIENT :- N/S/L/S/CITY
CONSULTANT:- A/A CONSTRUCTION BUREAU
CONTRACTOR:- B.G.M CONSTRUCTION
Month:__November__________________ Year________2020 G.C_________________
LOCATION:- A/A N/S/L/S/C WEREDA 03
3.2 Masonry M2 125.60 15.00 1,884.00 - - -
CONTRACTOR----------------- SUPERVISOR----------------------
PROJECT:- B+G+7 OFFICE BULDING
CLIENT :- N/S/L/S/CITY
CONSULTANT:- A/A CONSTRUCTION BUREAU
CONTRACTOR:- B.G.M CONSTRUCTION
Month:__November__________________ Year________2020 G.C_________________
LOCATION:- A/A N/S/L/S/C WEREDA 03
Reinforced concrete quality C-25,360 kg of
cement/m3 filled in to form work and vibrated
- - - -
around reinforcement (Formwork and
reinforcement measured separately)
3.3 In footings (mat slab) M3 335.10 2,200.00 737,220.00 337.18 741,796.00 337.18 741,796.00
3.4 In foundation columns M3 52.90 4,200.00 222,180.00 43.32 181,927.20 43.32 181,927.20
3.5 In basement beams M3 90.90 4,200.00 381,780.00 216.86 910,812.00 216.86 910,812.00
3.6 In 13cm thick basement floor Rc slab M3 750.40 15.00 11,256.00 - - -
3.7 In stair case and landing M3 5.20 5,200.00 27,040.00 - - -
3.8 In Shear wall (25cm thick) M3 14.50 5,200.00 75,400.00 48.94 254,490.60 48.94 254,490.60
3.9 In shear wall for basement(25cm thick) M3 225.30 220.00 49,566.00 57.36 12,619.20 57.36 12,619.20
Provide cut and fix in position sawn zigiba
- - - -
wood or equivalent formwork.
3.1 In footings (mat slab) M2 398.40 150.00 59,760.00 80.90 12,135.00 80.90 12,135.00
3.11 To foundation columns M2 302.40 150.00 45,360.00 247.52 37,128.00 247.52 37,128.00
3.12 To Shear wall M2
1,367.90 0.25 341.98 673.28 168.32 673.28 168.32
3.13 To basement beams M2
454.30 450.00 204,435.00 584.60 263,070.00 584.60 263,070.00
3.14 To 13cm thick basement floor Rc slab M2
1,500.70 0.15 225.11 - - -
3.15 To stair case and landing M2 30.50 750.00 22,875.00 49.45 37,085.18 49.45 37,085.18
1.11 To ground floor beam M2 70.40 450.00 31,680.00 315.67 142,051.50 315.67 142,051.50
1.17 To ground floor slab M2 675.68 100.00 67,568.00 805.09 80,508.75 805.09 80,508.75
Reinforcment steel bar according to the
structural drawing. price include cutting, bend, - - - -
placing in position
3.16 Dia 8 mm deformed bar KG 3,843.90 46.00 176,819.40 #REF! #REF! #REF! #REF!
3.17 Dia 10 mm deformed bar KG 1,777.00 35.00 62,195.00 - - - -
3.18 Dia 12 mm deformed bar KG 237.80 225.00 53,505.00 #REF! #REF! #REF! #REF!
3.19 Dia 14 mm deformed bar KG 3,323.20 32.00 106,342.40 #REF! #REF! #REF! #REF!
3.2 Dia 16 mm deformed bar KG - 55.03 - #REF! #REF! #REF! #REF!
3.21 Dia 20 mm deformed bar KG 3,846.40 0.15 576.96 #REF! #REF! #REF! #REF!
3.22 Dia 24 mm deformed bar KG 27,826.10 32.00 890,435.20 Err:509 Err:509 Err:509 Err:509
TOTAL CARRIED TO SUMMARY 3,236,351.54 #REF! #REF!
CONTRACTOR----------------- SUPERVISOR----------------------
PROJECT:- B+G+7 OFFICE BULDING
CLIENT :- N/S/L/S/CITY
CONSULTANT:- A/A CONSTRUCTION BUREAU
CONTRACTOR:-B.G.M CONSTRUCTION
LOCATION:-A/A N/S/L/S/C WEREDA 03
SUB STRUCTURE
1
EXCAVATION 1,716,919.80 1,374,032.52 1,374,032.52
2
MASONRY WORK 256,189.00 -
3
CONCRETE WORK 3,236,351.54 #REF! #REF!
4 VARATION( SHORING
WORK ORDER) 1,241,702.08 1,183,133.30 1,183,133.30
CONTRACTOR------------------------ SUPERVISOR-----------------------
PROJECT:- B+G+7 OFFICE BULDING
CLIENT :- N/S/L/S/CITY
CONSULTANT:- A/A CONSTRUCTION BUREAU
CONTRACTOR:-B.G.M CONSTRUCTION
LOCATION:-A/A N/S/L/S/C WEREDA 03
GRAND SUMMARY
Contract Amount Executed Amount