PN2016-14 / SO / CNS/ FAL/L3/112
December 04, 2021
(C-E CONSTRUCTION CORPORATION
217 Romualdez St. cor Gen Kalentong St.
Mandaluyong City
Attention; JOSEPH KABIGTING
CECON - Project Manager
Thea + gUUUS MORAL
CECON - Architect
subject FILINVEST TOWER FOUR - WALKTHRU INSPECTION WITH SHAREPRO
(IN REFERENCE WITH PRO-OFFICE COMMON PUNCHLISTS AT TYPICAL
FLOOR)
Gentlemen,
We have conducted an inspection yesterday morning (December 3, 2021) at 12F and 1F of Tower
Four with SHAREPRO ~ Arch. Keith Antonio and Engr. Mark Saturnino, ATMCI ~ Arch. Ana Gondra,
CECON Team headed by Arch. Jullus Moral and other tradecon representatives. This is to identify
thoroughly the common punchlists that are mostly visible and unacceptable with Pro Office team.
With the numerous punchlists on 14F and 15F which was used as reference and this was also
repetitive on 12F and 11F.
With this, we are requesting to put enough manpower to properly address all concern items and to
continue the inspection of Pro Office in the most acceptable manner.
‘Attached herewith are the common punchlists that we have seen during the inspection.
We are looking forward for your kind and prompt act
‘Thank you.
Very truly yours,
ASIAN TECHNICON MANAGERS AND CONSULTANTS, INC.
JOELV. KAY
Site Archit
Noted by:
+ ati ‘A. GONDRA
“4405 2
Resident Construction Manager ’ _NOI3a>
‘Suite 201, Golden Rock Building. 16 Saiodo St, Legaspi Vilage. Makati City, Philipines
Tel Nos:848-2948. 848.2949 TaxNo: 844-2513
Mail: consul @sionisnion.com, Website: www asentceInicon caii
ASIAN | RaLcg ?b
TECHNICON
MANAGERS & ‘
CONSULTANTS, INC.
TOWER 4- 12F AND 11F
INSPECTION WALKTHRU MEETING — DECEMBER 03, 2021
COMMON PUNCHLISTS WITH FAL
1
2
4
LIFT LOBBY AREA COMMON AREA
IMPROVE GROUTING APPLICATION OF WALL TILES AND CLEANING
CLEANING OF ELEVATOR JABS
RUST STAINS ON FLOOR TILES SUBJECT FOR REPLACEMENT
UNEVEN SURFACE AND IMPROVE PAINTING OF CEILING
UNEVEN LIGHT DISTRIBUTION OF COVE LIGHT AT COVE CEILING
~_, UNEVEN FLOOR (RESALTE) TILE INSTALLATIONS NEAR CW3
TENANT AREAS
~ _ UNEVEN SLAB CONCRETE SURFACE / CONCRETE BULGING / LAITANCES
+ CRACKS ON UNDERSLAB AND BEAMS
~ _ RECTIFICATION OF FLOORING (AREA USED FOR TOWER CRANE )
~ | HOUGH / UNEVEN WALL PAINT, WITH CONCRETE LAINTANCES
= PULLBOX./ ELECL BOX COVER PLATE - pote
- ORGANIZE / ARRANGE NEATLY ALL THERMOSTAT WIRING - Poss’
~ CONFLICT INSTALLATION SPRINKLER DROPPING AND DUMPER (OUCTING) - On GOI (
~ ADJUST DUCTING HEIGHT NOT TO CONFLICT ON THE REQUIRED CEILING HEIGHT. Do 9\E
~ _ TAPPING OF WIRE TO FCU NEAR COMMON AREA - Doe
VESTIBULE AREA
= SQUARENESS OF WALL AT VESTIBULE ENTRY
~ _ GROUTING OF TILES AT WALL TERMINATIONS
~~ PROVIDE PROPER SEALANT ON JAMB AND WALL TERMINATIONS
~ _ REMOVE PAINT STAINS ON ALUMINUM DOOR JAMB
BALCONY AREA
CLEANING OF TILES AND GROUTING
= _ SEALANT AT GLASS DOOR THRESHOLD
> UNEVEN SEALANT APPLICATION ON ACP CEILING AND WALL
= SCRATCHES ON ACP CEILING AND WALLS
UTILITY AREAS
5.1 - MALE & FEMALE TOILETS
+ CEILING WITH WATER MARKS
+ MANHOLE TERMINATION FINISH TO RECTIFY
~ IMPROVE PAINTING OF COVE CEILINGS,
~ IMPROVE SEALANT APPLICATION AND TERMINATION FINISH TO CEILING, WITH PAINT STAINS
~ UNEVEN DISTRIBUTION OF STRIP LIGHT AT COVE CEILING
CLEANING OF FLOOR TILES
~ WALL TILE ACCENT WITH PAINT STAINS
IMPROVE FINISH OF SHADOW LINE
GROUTING FINISHES, FIXING AND ALIGNMENT OF SENSORS FOR URINALS
Suite 201, Golden Rock Builtng, 164 Salcedo St, Legaspi Vilage. Makati Cy, Philippines
‘Tel Nos: $48-2048, 848-2040. Pax No: 848.2513
E-Mail: consuli@asintechnicon.com Website: www asisstechnicon com
SsTall
T=.
ASIAN
TECHNICON
AANAGERS &
‘CONSULTANTS. INC.
~ CLEANING / PAINT STAINS ON DOOR HINGES
5.2 - PWD MALE & FEMALE
~ IMPROVE GROUTING AND TERMINATION FINISH OF SENSORS UNDER LAVATORY AND FAUCET
= CLEANING OF FLOOR TILES.
= MANHOLE TERMINATION FINISH TO RECTIFY
5.3 - ELECTRICAL ROOM
- REPAINTING OF STEEL DOOR JAMB
~ RECTIFY DOOR HANDLE (DUMMY TRIM) INSTALLATION
= CLEANING OF ELECTRICAL BOX AND EQUIPMENTS
~ CLEANING OF FLOORING, WITH PAINT STAINS.
~ CLEANING OF FIRE SEAL, WITH PAINT STAINS (ALL STEEL DOORS)
5.4 - JANITORIAL ROOM
= CLEANING OF WAL & FLOOR TLE GROUTING
DAMAGED TILES AT DOOR JAMB
5.5- MDF ROOM
CLEANING OF FLOORING, WITH PAINT STAINS.
~ CLEANING OF ELECTRICAL BOX
5.6 - PLUMBING ROOM
~ CLEANING OF FLOORING, WITH PAINT STAINS
~ CLEANING / REPAINTING OF ALL VERTICAL PIPE BRACKET SUPPORT
5.7 -GARBAGE ROOM
= FAUCET / VALVE HANDLE WITH PAINT STAIN
~ CLEANING OF FLOORING, WITH PAINT STAINS
5.8- UTILITY HALLWAY
~ IMPROVE SHADOW LINE FINISH, WITH GAP.
~ CLEANING OF DOOR HINGES (ALL STEEL DOORS)
PREPARED BY: NOTE!
JOELY, Y
armci{ gitArchitect
nah
“ic tpnesrn a. conona
ATMCI - Resident Construction Manager