Img20211215 15465783

You might also like

Download as pdf
Download as pdf
You are on page 1of 3
a RALCO es, ASIAN A. te TECHNICON ! (MANAGERS & ene ones, we. ae PN2016-14 / SO / CNS/ FAL/L3/112 December 04, 2021 (C-E CONSTRUCTION CORPORATION 217 Romualdez St. cor Gen Kalentong St. Mandaluyong City Attention; JOSEPH KABIGTING CECON - Project Manager Thea + gUUUS MORAL CECON - Architect subject FILINVEST TOWER FOUR - WALKTHRU INSPECTION WITH SHAREPRO (IN REFERENCE WITH PRO-OFFICE COMMON PUNCHLISTS AT TYPICAL FLOOR) Gentlemen, We have conducted an inspection yesterday morning (December 3, 2021) at 12F and 1F of Tower Four with SHAREPRO ~ Arch. Keith Antonio and Engr. Mark Saturnino, ATMCI ~ Arch. Ana Gondra, CECON Team headed by Arch. Jullus Moral and other tradecon representatives. This is to identify thoroughly the common punchlists that are mostly visible and unacceptable with Pro Office team. With the numerous punchlists on 14F and 15F which was used as reference and this was also repetitive on 12F and 11F. With this, we are requesting to put enough manpower to properly address all concern items and to continue the inspection of Pro Office in the most acceptable manner. ‘Attached herewith are the common punchlists that we have seen during the inspection. We are looking forward for your kind and prompt act ‘Thank you. Very truly yours, ASIAN TECHNICON MANAGERS AND CONSULTANTS, INC. JOELV. KAY Site Archit Noted by: + ati ‘A. GONDRA “4405 2 Resident Construction Manager ’ _NOI3a> ‘Suite 201, Golden Rock Building. 16 Saiodo St, Legaspi Vilage. Makati City, Philipines Tel Nos:848-2948. 848.2949 TaxNo: 844-2513 Mail: consul @sionisnion.com, Website: www asentceInicon ca ii ASIAN | RaLcg ?b TECHNICON MANAGERS & ‘ CONSULTANTS, INC. TOWER 4- 12F AND 11F INSPECTION WALKTHRU MEETING — DECEMBER 03, 2021 COMMON PUNCHLISTS WITH FAL 1 2 4 LIFT LOBBY AREA COMMON AREA IMPROVE GROUTING APPLICATION OF WALL TILES AND CLEANING CLEANING OF ELEVATOR JABS RUST STAINS ON FLOOR TILES SUBJECT FOR REPLACEMENT UNEVEN SURFACE AND IMPROVE PAINTING OF CEILING UNEVEN LIGHT DISTRIBUTION OF COVE LIGHT AT COVE CEILING ~_, UNEVEN FLOOR (RESALTE) TILE INSTALLATIONS NEAR CW3 TENANT AREAS ~ _ UNEVEN SLAB CONCRETE SURFACE / CONCRETE BULGING / LAITANCES + CRACKS ON UNDERSLAB AND BEAMS ~ _ RECTIFICATION OF FLOORING (AREA USED FOR TOWER CRANE ) ~ | HOUGH / UNEVEN WALL PAINT, WITH CONCRETE LAINTANCES = PULLBOX./ ELECL BOX COVER PLATE - pote - ORGANIZE / ARRANGE NEATLY ALL THERMOSTAT WIRING - Poss’ ~ CONFLICT INSTALLATION SPRINKLER DROPPING AND DUMPER (OUCTING) - On GOI ( ~ ADJUST DUCTING HEIGHT NOT TO CONFLICT ON THE REQUIRED CEILING HEIGHT. Do 9\E ~ _ TAPPING OF WIRE TO FCU NEAR COMMON AREA - Doe VESTIBULE AREA = SQUARENESS OF WALL AT VESTIBULE ENTRY ~ _ GROUTING OF TILES AT WALL TERMINATIONS ~~ PROVIDE PROPER SEALANT ON JAMB AND WALL TERMINATIONS ~ _ REMOVE PAINT STAINS ON ALUMINUM DOOR JAMB BALCONY AREA CLEANING OF TILES AND GROUTING = _ SEALANT AT GLASS DOOR THRESHOLD > UNEVEN SEALANT APPLICATION ON ACP CEILING AND WALL = SCRATCHES ON ACP CEILING AND WALLS UTILITY AREAS 5.1 - MALE & FEMALE TOILETS + CEILING WITH WATER MARKS + MANHOLE TERMINATION FINISH TO RECTIFY ~ IMPROVE PAINTING OF COVE CEILINGS, ~ IMPROVE SEALANT APPLICATION AND TERMINATION FINISH TO CEILING, WITH PAINT STAINS ~ UNEVEN DISTRIBUTION OF STRIP LIGHT AT COVE CEILING CLEANING OF FLOOR TILES ~ WALL TILE ACCENT WITH PAINT STAINS IMPROVE FINISH OF SHADOW LINE GROUTING FINISHES, FIXING AND ALIGNMENT OF SENSORS FOR URINALS Suite 201, Golden Rock Builtng, 164 Salcedo St, Legaspi Vilage. Makati Cy, Philippines ‘Tel Nos: $48-2048, 848-2040. Pax No: 848.2513 E-Mail: consuli@asintechnicon.com Website: www asisstechnicon com Ss Tall T=. ASIAN TECHNICON AANAGERS & ‘CONSULTANTS. INC. ~ CLEANING / PAINT STAINS ON DOOR HINGES 5.2 - PWD MALE & FEMALE ~ IMPROVE GROUTING AND TERMINATION FINISH OF SENSORS UNDER LAVATORY AND FAUCET = CLEANING OF FLOOR TILES. = MANHOLE TERMINATION FINISH TO RECTIFY 5.3 - ELECTRICAL ROOM - REPAINTING OF STEEL DOOR JAMB ~ RECTIFY DOOR HANDLE (DUMMY TRIM) INSTALLATION = CLEANING OF ELECTRICAL BOX AND EQUIPMENTS ~ CLEANING OF FLOORING, WITH PAINT STAINS. ~ CLEANING OF FIRE SEAL, WITH PAINT STAINS (ALL STEEL DOORS) 5.4 - JANITORIAL ROOM = CLEANING OF WAL & FLOOR TLE GROUTING DAMAGED TILES AT DOOR JAMB 5.5- MDF ROOM CLEANING OF FLOORING, WITH PAINT STAINS. ~ CLEANING OF ELECTRICAL BOX 5.6 - PLUMBING ROOM ~ CLEANING OF FLOORING, WITH PAINT STAINS ~ CLEANING / REPAINTING OF ALL VERTICAL PIPE BRACKET SUPPORT 5.7 -GARBAGE ROOM = FAUCET / VALVE HANDLE WITH PAINT STAIN ~ CLEANING OF FLOORING, WITH PAINT STAINS 5.8- UTILITY HALLWAY ~ IMPROVE SHADOW LINE FINISH, WITH GAP. ~ CLEANING OF DOOR HINGES (ALL STEEL DOORS) PREPARED BY: NOTE! JOELY, Y armci{ gitArchitect nah “ic tpnesrn a. conona ATMCI - Resident Construction Manager Suite 201, Golden Rock Building. 168 Salcoda St, Legaspi Village Makati City, Pippi Tol Now: 848-2048. B48-2049. Pax No, 62519 Mai: consult@asiantechnicin.com Website: ww asianishnicon com

You might also like