FILINVEST AXIS TOWER 4 – RALGO PUNCHLIST

26th FLOOR

25th FLOOR

2ND FLOOR
14th FLOOR
15th FLOOR
11th FLOOR

- PULLBOX / ELECTRICAL BOX COVER PLATE - ORGANIZE / ARRANGE NEATLY ALL THERMOSTAT WIRING

- CONFLICT INSTALLATION SPRINKLER DROPPING AND DUMPER (DUCTING)


- ADJUST DUCTING HEIGHT NOT TO CONFLICT ON THE REQUIRED CEILING HEIGHT

- TAPPING OF WIRE TO FCU NEAR COMMON AREA