Download as pdf
Download as pdf
You are on page 1of 5
il PROJECT: LEVEL 7thiFi PUNCH LIST ITEMS AS Of 05 - AUGUST - 20: ‘ilinvest Axis Tower - 4 24 PLINO: AR-1-001 LOCATION: ‘Northgate Cybezone,Filnvest City, Alabang, Muntiniupa Page no: of__ CONTRACT PACKAGE CONTRACTOR ‘CE CONIDALKIA ITEM ACTIVITY Area REMARKS NO. Pictures Description [Responsible] Area/Location 1 -Rectify wall tiles, with hole ‘TRASS | Lift Lobby Area pone 2 -Rectify groove & terminations TRASS | Lit Lobby Area | pone 3 -Replace damagedicracked walltile | TRACE | Lit Lobby Area 4 -Rectify connections with proper ftings | > py | Tenant Area pene 5 -Rectity sloping of ACU drain Fopy | Tenant Area on —+> 6 ‘Balance perimeter sealant on AGD jamb] Dax 21 4| Vestibule Area 7 Peal -Balance sealant on ACP IDALK1A| Balcony Area at STMCHE-OPN-38/79 Revision 00, As of 05-aucust-2021 7 PUNCH LIST ITEMS PROJECT: LEVEL 7th/Filinvest Axis Tower - 4 LOCATION: Northgate C) ne, Filinvest City, Alabang, Muntiniug Page no:__of__ CONTRACT PACKAGE CONTRACTOR CE CON/DALKIA. TEM activity Area REMARKS NO. not applicable upgraded with PIBCY F (Pressure 8 No manual balancing vaive RAL

You might also like