This document contains observations from a bridge site survey conducted by the Department of Civil Engineering at Tribhuvan University, Institute of Engineering. It includes the station identification, sighted faces, horizontal circle readings, and mean horizontal angles calculated from the readings for multiple observation points around the bridge.
This document contains observations from a bridge site survey conducted by the Department of Civil Engineering at Tribhuvan University, Institute of Engineering. It includes the station identification, sighted faces, horizontal circle readings, and mean horizontal angles calculated from the readings for multiple observation points around the bridge.
This document contains observations from a bridge site survey conducted by the Department of Civil Engineering at Tribhuvan University, Institute of Engineering. It includes the station identification, sighted faces, horizontal circle readings, and mean horizontal angles calculated from the readings for multiple observation points around the bridge.
SURVEY INSTRUCTION COMMITTEE SURVEY CAMP (072 Batch) GROUP 20
BRIDGE SITE HCR OBSERVATION
Inst. Stn Sighted HCR Observation Mean Horizontal Angle
Face & HI to D M S D M S L 0 0 0 A R 180 0 19 L 47 28 3 C E 47 28 19 R 227 28 54 L 105 22 42 G 105 23 1 R 285 23 39 L 0 0 0 C R 179 59 58 L 94 1 23 G E 94 1 57 R 274 2 29 L 138 32 51 F 138 33 10 R 318 33 27 L 0 0 0 F R 179 59 53 L 70 16 19 G 70 16 47 R 250 17 8 E L 98 21 11 C 98 21 42 R 278 22 6 L 171 14 18 A 171 14 48 R 351 15 11 L 0 0 0 G R 180 0 19 F L 65 10 9 E 65 10 36 R 245 11 22 L 0 0 0 E R 180 0 13 A L 59 36 58 C 59 37 12 R 239 37 39