A. Bentang 45 m P2 - P3
B. Bentang 40 m P3 - P4 Variasi
1.144,41 P2 - P3
2.288,83 Asumsi P30 - P31
Luas RC Plate Girder span 40 m Variasi
RC Plate
Volume Total Keterangan
No. Panjang (m) Lebar 1 (m) Lebar 2 (m) Luas (m2) Jumlah (n)
(m2)
1 1,69 1,00 1,69 335,00 566,15 Type 1
2 1,69 0,80 1,35 10,00 13,52 Type 2
3 1,69 0,85 1,60 2,07 10,00 20,69 Type 3
4 1,44 1,00 1,44 162,00 233,28 Type 4
5 1,14 0,80 0,91 4,00 3,65 Type 5
6 1,44 0,89 1,53 1,28 4,00 5,12 Type 6
842,41 P3 - P4
Luas RC Plate Girder span 20 m
RC Plate
Volume Total Keterangan
No. Panjang (m) Lebar 1 (m) Lebar 2 (m) Luas (m2) Jumlah (n)
(m2)
1 2,15 1,00 2,15 247,00 531,05 Type 1
2 2,15 0,80 1,72 26,00 44,72 Type 2