Professional Documents
Culture Documents
NEE 4101 - Bautista PLC Laboratory 2 - Latching
NEE 4101 - Bautista PLC Laboratory 2 - Latching
Perform the following ladder diagrams given below and observe the behaviour of the given circuits below.
RUN 1:
OBSERVATIONS:
We can observe that these ladder diagram implies that with the use of start and stop button we can adjust
The flow of the current from the source to the load you can dictate if you want to energize or not the load.
RUN 2:
OBSERVATIONS:
In Run 2 is the PB is press the current will flow straignt to the load and when the PB is closed the
current will still goes through the load but instead in will go on the load that is parallel with the PB