Professional Documents
Culture Documents
Dzy532-501-09gy Chemical Flushing For CS Pipes
Dzy532-501-09gy Chemical Flushing For CS Pipes
Dzy532-501-09gy Chemical Flushing For CS Pipes
CHEMICAL_FLUSHING_PROCEDURE
管路化学冲洗工艺
标记 数量 修改单号 签名 日期 标记 数量 修改单号 签名 日期
Symb. Qty. Rev.No. Signat. Date Symb. Qty. Rev.No. Signat. Date
工 程 “海洋骄傲”轮改装工程 图 号
Project TSJOC SRKP phase 1 Development Project Draw .No. DZY532-501-09GY
图 名 CHEMICAL_FLUSHING_PROCEDURE 设计 Design 3
Subject 管路化学冲洗工艺 校对 Check
工程号 标检 Stad.Ch
Project 设计阶段
D07038019B62 Design Phase 设计
No. 审核 Verify
比例 Scale — 质量 kg —
1
Contents
Page
2
1.0 Purpose
1.1 This procedure serves as a guideline in chemical flushing of carbon steel pipes
internal to remove surface contamination by means of a chemical dissolution, most
typically by an acid solution.
2.0 Scope
2.1 Applicable to carbon steels piping system that requires chemical flushing.
3.0 References
• Filter
• Air compressor
5.1 Personal safety equipment such as rain gear, rubber boots, rubber gloves, safety
glasses and visor shall be used when handling chemicals.
5.2 All cleaning should be worked from top level down to each unit. Water flowing
down to the lower may hamper any job on going below. As such, lower level has
to be cleared prior to proceeding.
5.3 Working area shall be secured and necessary safety precautions shall be
maintained at all times.
5.4 Canvas around the pipe system and on the ground shall be placed to avoid any
spillage.
3
5.6 Appointed contractor shall complete permit obtained from MODEC Safety Officer
before transporting chemical on site.
5.7 Any chemical flushing works shall be highlighted in daily VSCC meeting and
agreed by the Project Manager before commencing.
5.9 All chemicals from the washing down of the pipes shall be collected and disposed
in accordance to local rules and regulations.
6.1 Prior to proceed, the piping system shall be completed and pressure tested prior to
chemical flushing. Submit a package with P&ID drawings attached indicating the
inlet and outlet to Owner Rep.
6.3 Connect flushing hoses and inline valves to flanges in accordance to the looping
diagram.
6.4 Connect the supply flushing hoses between the pump and the system piping at the
lowest elevation and return flushing hoses from the highest elevation.
6.6 Open all valves required for water circulation and start the flushing pump.
6.7 Check for any water leaks along the piping system and rectify if necessary.
7.1.1 Add in the cleaning water tank 25% (adjusting the concentration properly to the site
situation) DI-96 rust remover (which is neutral).
7.1.2 Circulate for 20 hours at room temperature. Use a wooden hammer to strike for
shocks along the pipeline regularly to make the scale come off more quickly.
7.2.1 Add 15% DI-95 water-base anti-rust agent in the cleaning water tank and clean the
pipeline repeatedly. Normally twice cleaning is carried out, in which the first takes
4
about 2 hours and the second takes the cleanness of filter paper surface as the
standard.
7.2.2 Check on regular basis for changes in filter paper. Filter paper is satisfactory when
no trace of foreign matter is found in appearance inspection.
7.3.1 Blow compressed air that is filtered and dry into the pipeline.
7.3.2 Remove the connecting flange at the low point of pipeline and empty all residual
liquid in it.
8.0 Inspection