HIRA Registration No. : RDMP BALIKPAPAN PROJECT Prepared by: Reviewed by: Reviewed by: Approved by : Risk Category
Revision No. : 004
Revision Purpose : Change to activity wise High 15 - 25
Moderate to High 10 – 12
Node (Unit) : Electrical (ELC) Moderate 5–9
Date : 30-May-20 Low to Moderate 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
61_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
N Hazard identification OS 2 Scaffolding collapse - Property damage 1 Financial (F) ELC-F-1.6.2.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H Y Elimination N/A 2 1 2 L Elimination N/A SM/ CM
continually reviewed - Tools & equipment 09 / 2016 Isolation N/A Isolation N/A
damage 2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
Engineering - Provide pulley to lift and lowering material and tools Engineering
PPE Use specific PPE: mechanical protection hand gloves, coverall PPE N/A
N Area risk 8 Limited working space OS 1 Improper body position due to Personal Injury, 1 Safety (SA) ELC-SA-1.8.1.1 Y 1. Manpower Minister Regulation 5 / 2 2 4 L-M N Elimination N/A 1 1 1 L Elimination N/A SM / CM
assessment/surveys limited movement space Illness 2018 Isolation N/A Isolation N/A
2. Health Minister Regulation 70 / Risk Reduction - N/A Risk Reduction - N/A
2016 Substitution Substitution
62_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A Area risk 2 Extreme weather OS 1 Heavy rain, storm, tsunami will Injury 1 Safety (SA) ELC-SA-3.2.1.1 Y 1.Health Minister Regulation No. 48 4 2 8 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys directly expose to the activity at /2016
Isolation N/A Isolation N/A
over or near water/sea 2. Health Minister Regulation No 10 / Risk Reduction - N/A Risk Reduction - N/A
2018 Substitution Substitution
Risk Reduction - - Provide windsock
Risk Reduction - N/A
Engineering - Anemometer provided Engineering
Risk Reduction - Process All workers stop work if the weather seems unsupportive Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, PTW, JSA, Daily TBM. Risk Reduction - To provide site specific procedure
Administrative - Weather forecast to be considered. Administrative for working near or over water.
PPE Mandatory PPE and Sepecific PPE ( Fullbody harness ) PPE N/A
N Area risk OS 2 Unstable ladder and collpase Injury 1 Safety (SA) ELC-SA-4.4.2.1 Y 1. Manpower Minister Regulation No. 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
assessment/surveys 09 / 2016 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Ladder erected on firm base and secured at the top Risk Reduction - N/A
Engineering - Ladder angle with ratio 1:4 Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - Method statement, JSA, PTW, Daily TBM Administrative
- Iadder inspection
- Ladders to be used only for short duration work when no other means of
access is feasible
- Three points of contact to be maintained when working from a ladder
- No over-reaching when working from the ladder – get down and reposition it
- Pre-use check
- Buddy system
PPE Mandatory PPE and Sepecific PPE ( Fullbody harness ) PPE N/A
N Area risk 5 Working at height hazards ( OS 1 - Falls from MEWP - Fatality 1 Safety (SA) ELC-SA-4.5.1.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
assessment/surveys by using MEWP ) - Striking against fixed structure 09 / 2016 Isolation N/A Isolation N/A
- Striking electrical power line 2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
- Overturning platform 1 / 1980 Substitution Substitution
Risk Reduction - Provide specific access for MEWPs Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
64_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Mandatory PPE and Sepecific PPE ( Fullbody harness ) PPE N/A
5 Cable Tray at brownfield area Refer to Cable Tray
N Area risk 1 Toxic gas/Flammable gas PS 1 Exposed to flammable or toxic - Injury 1 Safety (SA) ELC-SA-5.1.1.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
assessment/surveys leakage hazard gas release and lead to injury - fatality / 1980 Isolation N/A Isolation N/A
or fire Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM.
- Emergency response training.
- Nearest assembly point and windsock location.
65_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: mechanical protection hand gloves PPE N/A
8 Cathodic Protection Installation N Hazard identification 1 Slip, trip, falls hazard OS 1 slip, trip and falls at work area Injury 1 Safety (SA) ELC-SA-8.1.1.1 Y Government Regulation No 11 Thn 2 2 4 L-M N Elimination Practice good housekeeping 1 1 1 L Elimination N/A SM/CM
(By Excavation) continually reviewed due to poor housekeeping, 1979 Isolation N/A Isolation N/A
scattered materials Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide sufficient trash bins Risk Reduction - N/A
Engineering - Provide temporary disposal storage (if required) Engineering
- Agreement with licensed third party to pick up and disposal
- Provide tools box
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - Method statement, PTW, JSA, Daily TBM Administrative
- Safety bulletin (good housekeeping)
Specific PPE N/A Specific PPE N/A
N Hazard identification 2 Manual handling hazard H 1 Lifting heavy load by manual Personal Injury 1 Health (H) ELC-H-8.2.1.1 Y 1. Manpower Minister Regulation 5 / 2 2 4 L-M N Elimination N/A 2 1 2 L Elimination N/A SM / CM
continually reviewed lifting lead to low back pain 2018 Isolation N/A Isolation N/A
2. Health Minister Regulation 70 / Risk Reduction - - Using lifting aid for manual handling such as forklift, hoist, etc. Risk Reduction - N/A
2016 Substitution - Manual lifting by more than one person (team work lifting) Substitution
3. Health Minister Regulation 48 / Risk Reduction - N/A Risk Reduction - N/A
2016 Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative
- Method statement, PTW, JSA, Daily TBM
- Health bulletin (manual lifting technique)
- Work rotation (mini break)
- Apply maximum weight load 23 kg (male) and 18 kg (female) (ref.NIOSH)
- Reguler stretching/exercise before start working
- Risk assessment to consider following factor:
1. individual capability
2. nature of the load
3. environmental conditions
4. adequacy of training
5. carrying distance
- Pre-employment health assessment (MCU)
- Lifting aid for manual handling shall be pass the inspection
N Work process reviews/task- OS 2 Electric shock due to contact Fatality 1 Safety (SA) ELC-SA-9.1.2.1 N Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 3 1 3 L Elimination N/A SM / CM
based risk assessment with live conductors 12 / 2015 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide rubber mat at substation (switchgear/MCC room) Risk Reduction - N/A
Engineering - Provide voltage testing stick (with insulator) Engineering
- Bonding & grounding system
- Provide first aid kit & defribilator at substation
66_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: mechanical protection hand gloves PPE N/A
N Hazard identification 3 Falling from height hazard OS 1 - Scaffolding Colapse Injury to Fatality 1 Safety (SA) ELC-SA-10.3.1.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
continually reviewed - Slips and Trips from 09 / 2016 Isolation N/A Isolation N/A
scaffolding 2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
- Dropped Object 1 / 1980 Substitution Substitution
- Fall from height Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
- Collided by overhead objects Engineering - Provide pulley to lift and lowering material and tools Engineering
- Pinched - Provide safe access to pipe rack (top elevation)
- Provide edge protection/guardrail at pipe rack (top elevation)
- Provide cantilever
PPE Use specific PPE: hand gloves, rubber boot. PPE N/A
12 Motor solo run test N Work process reviews/task- 1 Rotating Part OS 1 contact with rotating parts of Personal Injury 1 Safety (SA) ELC-SA-12.1.1.1 Y 1. Manpower Minister Regulation No. 3 2 6 M N Elimination N/A 2 1 2 L Elimination N/A SM / CM
based risk assessment motor during the test 1 / 1980 Isolation N/A Isolation N/A
2. Manpower Minister 174 / 1986 Risk Reduction - N/A Risk Reduction - N/A
No.104 KPTS 1986 Substitution Substitution
Risk Reduction - - Emergency stop Risk Reduction - N/A
Engineering - Guarding installation Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - Method statement, JSA, PTW, Daily TBM, signage, PTW Administrative
PPE mechanical protection hand gloves PPE N/A
N Hazard identification 2 Electricity hazard OS 1 - Electrocution Injury 1 Safety (SA) ELC-SA-12.2.1.1 Y Manpower Minister Regulation No 33 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
continually reviewed - Fire tahun 2015 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Bonding and grounding Risk Reduction - N/A
Engineering - Fire extinguisher Engineering
- Proper testing kit with isolator
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
67_Electrical (ELC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Specific PPE - Insulated rubber gloves during testing Specific PPE N/A
N Hazard identification OS 2 - Electrocution Property damage 1 Financial (F) ELC-F-12.2.2.1 Y Manpower Minister Regulation No 33 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
continually reviewed - Fire tahun 2015 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Bonding and grounding Risk Reduction - N/A
Engineering - Fire extinguisher Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Provide site specific procedure for
Administrative - 26071-100-GPP-GHX-00006-000 Electrical Equipment and Assured Administrative electrical safety
Grounding Procedure
- Premobilization inspection
- Method statement, JSA, PTW, Daily TBM.
- Color code inspection and valid JO pass inspection
- Inspection tagging & do not use tagging
- Trained fire watcher
- Warning sign
- Never use an aluminium or steel ladder together with live electrical cable/tools
- Safety bulletin (electrical safety)
- Trained emergency response team
68_Electrical (ELC)