Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

13.

TIME AND WORK | MUDRAA

1. A can do a work in 12 days and B can do 9. Pipe A can fill an empty tank in 20 minutes
the same work in 36 days. In how many days and pipe B can empty the tank in 25 minutes.
can they complete the work, working If both the pipes are opened simultaneously,
together? then how much time will they take to fill the
1) 15 2) 9 3) 24 4) 18 5) 12 tank?
1) 120mins 2) 100mins 3) 60mins 4) 80mins
2. R and S can do a work in 12 and 18 days 5) none of these
respectively. If R joins s after 8 days, then in
how many days will the total work be 10. Three pipes of which two are filling and
completed? third is draining, are fitted to a tank. The two
1) 12 2) 11 3) 13 4) 10 5) 15 filling pipes can fill an empty tank in 30
minutes and 40 minutes and draining pipe
3. A and B can do a work in 12 and 18 days empties the full tank in 60 minutes. In how
respectively, A and B start the work together many minutes is the tank completely full
and work for 4 days and then, A leaves. In when all the three pipes are opened
what time, from the day A left, can B do the simultaneously when the tank was half
remaining work? empty?
1) 15 2) 6 3) 8 4) 18 5) 12 1) 12 2) 36 3) 24 4) 30 5) 18

4. A can do a work in 15 days and B in 30 11. Twenty-five men can do a work in 12


days. If A, B and C can do the same work in 6 days. In how many days can 15 men do a
days, then in how many days can C alone do work which is two and a half times the
the work? previous work?
1) 15 2) 10 3) 12 4) 18 5) 24 1) 50 2) 60 3) 55 4) 65 5) 75

5. A and B can do a work in 12 days, B and C 12. Sixteen men can complete a work in 22
in 15 days and A and C in 20 days. In how days working 12 hours a day. In how many
many days can A,B and C together do the days 24 men complete the same work
work? working 16 hours a day?
1) 9 2) 12 3) 10 4) 5 5) 15 1) 11 2) 22 3) 33 4) 16 5) 11 ½

6. A is twice as efficient as B and B can 13. 18 workers can lay a road in 24 days
complete a certain work in 24 days. In how working 12 hours a day. In how many days
many days can A and B together complete the can 54 workers lay a road which has one-
same work? third more in length than earlier one, working
1) 15 2) 10 3) 14 4) 8 5) 12 8 hours a day?
1) 12 2) 32 3) 24 4) 16 5) 20
7. A, B and C can do a work in 10 days, 15
days and 20 days respectively. They worked 14. Five men or six women can complete a
together and completed the work, earning work in 15 days. In how many days can 15
Rs.312. what is the share of C? men and twelve women together complete
1) Rs.138 2) Rs.98 3) Rs. 112 4) Rs.72 the work?
5) Rs.108 1) 6 2) 3 3) 4 4) 2 5) 5

8. Kiran and Varun can do a work in 12 days 15. Twelve men or sixteen women can do a
and 15 days respectively. With the help of work in 18 days. In how many days can nine
Pavan they complete the work in 6 days and men and 24 women do the work?
earn Rs.120. What is the share of Pavan? 1) 12 2) 8 3) 10 4) 14 5) 18
1) Rs.18 2) Rs.12 3) Rs.15 4) Rs.21
5) Rs.24

mudraacareers.in follow us at facebook.com/mudraacareerguidance

You might also like