PM - Measreading Entry List - Change (Training Manual) : Project Name: Imss Implementation at Uprvunl Project Id: 6820-02

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

`

PM_ MeasReading Entry List_Change (Training


Manual)
Project Name: IMSS Implementation at UPRVUNL
Project ID: 6820-02

Document Version / Details: Ver. 1.0/ 28-Oct-2020


PM_ Measuring Reading Entry List_Change (Training Manual)

Record of Release

Version Modified By Reviewed By Authorized By Release Date Modifications Done


No.
1.0 Nishant Rathore Amit Jindal Imtiyaz Ahmad 28.10.2020 Initial Release

LTI & UPRVUNL Confidential Page 2 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

Table of Contents
1. PM – Measuring Entry List ............................................................................................................. 4
1.1. Prerequisites (If applicable) .................................................................................................... 4
1.2. Purpose & Understanding ....................................................................................................... 4
1.3.1. Select the user info icon ...................................................................................................... 4
1.3.1. Click on App Finder .......................................................................................................... 4
1.3.2. Search in the catalog for the relevant application ......................................................... 4
1.3.3. Select the create equipment Fiori app ........................................................................... 5
1.4. Measuring Entry List ................................................................................................................ 5
1.4.1. Change Measuring Entry List: Select the Fiori app ................................................................ 6
1.4.2. Change Measuring Entry List: Enter the entry list number ................................................... 6
1.4.3. Change Measuring Entry List: Enter the measuring point number ...................................... 7
1.4.4. Change Measuring Entry List: Click on save to save changes ............................................... 7
1.4.5. Change Measuring Entry List: Check the message ................................................................ 8

LTI & UPRVUNL Confidential Page 3 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

1. PM – Measuring Entry List


1.1. Prerequisites (If applicable)
Measuring Entry List should be created.

1.2. Purpose & Understanding


Measuring Entry List will contain the list of measuring point for which entry list is to be created.
1.3.1. Select the user info icon

Step Action
(1) Click .

1.3.1. Click on App Finder

Step Action
(1) Click .

1.3.2. Search in the catalog for the relevant application

Step Action
(1) The Search in catalog field is filled out.

LTI & UPRVUNL Confidential Page 4 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

1.3.3. Select the create equipment Fiori app

Step Action

(1)

Clicking the entry Create Equipment


selects it.

1.4. Measuring Entry List


Business Process ID Business Process Description Sub Process Description Prepared By Reviewed by Approved by Version

PM-02-12 Equipment Phase In Equipment Phase In Nishant Rathore Chandrasekar Raman Imtiyaz Ahmad 1.0

Equipment Phase In Manual Steps Steps in SAP Steps Outside SAP Custom

Measurement
Master Data Controller

Points/Counters

Bill of Materials
Equipment Master- Assign Class and Equipment
Create Characteristics Update
End
Attach Documents

Task List and


Maintenance Plan

Material
Materials

Number/ Purchase
Purchase Order Goods Receipt
Master Requisition
Start Creation Process
Process Process
(MM-02-04) (MM-03-02)
Process (MM-02-01)
(MM-01-01)
Finance

Asset Master
Assign Equipment
Creation Process
number to Asset

LTI & UPRVUNL Confidential Page 5 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

1.4.1. Change Measuring Entry List: Select the Fiori app

Step Action
Clicking the entry Change MeasReading Entry

(1)

List selects it.

1.4.2. Change Measuring Entry List: Enter the entry list number

LTI & UPRVUNL Confidential Page 6 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

Step Action
(1) The MeasReading entry List field is filled out.

1.4.3. Change Measuring Entry List: Enter the measuring point number

Step Action
(1) The field is filled out.

1.4.4. Change Measuring Entry List: Click on save to save changes

Step Action
(1) Click Save .

LTI & UPRVUNL Confidential Page 7 of 8


PM_ Measuring Reading Entry List_Change (Training Manual)

1.4.5. Change Measuring Entry List: Check the message

LTI & UPRVUNL Confidential Page 8 of 8

You might also like