PM - Class - Change (Training Manual) : Project Name: IMSS Implementation at UPRVUNL Project ID: 6820-02
PM - Class - Change (Training Manual) : Project Name: IMSS Implementation at UPRVUNL Project ID: 6820-02
Record of Release
Table of Contents
1. PM – Class .................................................................................................................................. 4
1.1 Prerequisites (If applicable) .................................................................................................... 4
1.2 Purpose & Understanding ....................................................................................................... 4
1.3 App Finder ................................................................................................................................ 4
1.3.1. Select the user info icon ...................................................................................................... 4
1.3.2 Click on App Finder .......................................................................................................... 4
1.3.3 Search in the catalog for the relevant application ......................................................... 5
1.3.4 Select the create equipment Fiori app ........................................................................... 5
1.4. Class Change ............................................................................................................................ 6
1.4.1. Change Class: Select the Fiori app tile .................................................................................... 6
1.4.2. Change Class: Select the change option ................................................................................. 7
1.4.3. Change Class: Select the character tab .................................................................................. 7
1.4.4. Change Class: Enter any changes required ............................................................................ 8
1.4.5. Change Class: Enter any changes required ............................................................................ 8
1.4.6. Change Class: Save the changes for the class ........................................................................ 9
1. PM – Class
1.1 Prerequisites (If applicable)
Class should be changed.
Class and Characteristics masters will be used to structure the specifications and they are linked to
Equipment. External numbers are to be used for class and characteristics.
A set of characteristics are assigned to the class. As an example, Specifications for Lifts, A/Cs and
vehicles are grouped to form a class for that type of Equipment.
Step Action
(1) Click .
Step Action
(1) Click .
Step Action
(1) The Search in catalog field is filled out.
Step Action
(1)
PM-02-12 Equipment Phase In Equipment Phase In Nishant Rathore Chandrasekar Raman Imtiyaz Ahmad 1.0
Equipment Phase In Manual Steps Steps in SAP Steps Outside SAP Custom
Measurement
Master Data Controller
Points/Counters
Bill of Materials
Equipment Master- Assign Class and Equipment
Create Characteristics Update
End
Attach Documents
Material
Materials
Number/ Purchase
Purchase Order Goods Receipt
Master Requisition
Start Creation Process
Process Process
(MM-02-04) (MM-03-02)
Process (MM-02-01)
(MM-01-01)
Finance
Asset Master
Assign Equipment
Creation Process
number to Asset
Step Action
(1)
Step Action
(1) Click .
Step Action
Step Action
(1) The field is filled out.
Step Action
(1) Click Save .