Professional Documents
Culture Documents
Koc Approvals Contractor Revision
Koc Approvals Contractor Revision
(SCALE 1:4000)
CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE
CLIENT:
MAIN CONTRACTOR:
SUB- CONTRACTOR:
PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
AT SOUTH KUWAIT
CONTRACT No. 17051790
DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR 12"-HP-060A
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE REV AMENDMENTS DRAWN CHECKED APPR'D DATE FROM MF/C3 TO MF/C5
(CHAINAGE: 0+000 TO 1+000)
A -
SHEET 01 OF 02 SHEET - OF -
A1
KEY PLAN
(SCALE 1:4000)
CONTRACTOR REVISION
KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE
CLIENT:
MAIN CONTRACTOR:
SUB- CONTRACTOR:
PROJECT TITLE:
UPGRADATION OF GAS & CONDENSATE NETWORK
AT SOUTH KUWAIT
CONTRACT No. 17051790
DRAWING TITLE:
SOUTH KUWAIT
PIPELINE PROFILE DRAWINGS FOR 12"-HP-060A
REF. DWGS NO. REFERENCE DRAWINGS TITLE REF. DWGS NO. REFERENCE DRAWINGS TITLE REV AMENDMENTS DRAWN CHECKED APPR'D DATE REV AMENDMENTS DRAWN CHECKED APPR'D DATE FROM MF/C3 TO MF/C5
(CHAINAGE: 1+000 TO 1+545)
A -
SHEET 02 OF 02 SHEET - OF -
A1