Professional Documents
Culture Documents
UTILITIES Annie Assignment 13 Utilization Equipment
UTILITIES Annie Assignment 13 Utilization Equipment
C – Through Fittings
T – Through Fittings w/ 90° take off
E – end of run to types of motors, transformers, equipments
LL/LR - 90° turns where mounting is not suitable for LB
LB – when run of conduit comes must run thru wall/ceiling
ELECTRICAL BOXES
Outlet Box – cable ends
Utility Box – outlets, switches
Junction Box – joining, splicing
Pull Box – facilitates pulling
Cut-out Box – metal box
PLATES Lighting Outlets/Switches
JPT REVIEW CENTER, INC.
Receptacle/Convenience Outlets