Daily Progress Report: S.P. Singla Constructions Pvt. LTD
Daily Progress Report: S.P. Singla Constructions Pvt. LTD
Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Foundation
Casting status including False Steining
A-1 Rmt 38.7 38.7 0 38.7 0.0 completed
P1 Rmt 56.7 56.7 0 56.7 0.0 completed
P2 Rmt 56.7 56.7 0 56.7 0.0 completed
P3 Rmt 56.7 56.7 0 56.7 0.0 completed
P4 Rmt 53.7 53.7 0 53.7 0.0 completed
P5 Rmt 56.7 56.6 0 56.6 completed
P6 Rmt 53.7 55.1 0 55.1 completed
P7 Rmt 53.7 53.7 0 53.7 0.0 completed
P8 Rmt 53.7 53.7 0 53.7 0.0 completed
P9 Rmt 53.7 53.7 0 53.7 0.0 completed
P10 Rmt 53.6 53.6 0 53.6 0.0 completed
P11 Rmt 53.575 50.8 0 50.8 2.8
P12 Rmt 59.7 58.1 3 61.1 -1.4
P13 Rmt 51.5 51.5
P13A Rmt 57.2 54.515 3 57.515 -0.3
P14 Rmt 51.5 0.0 0 0.0 51.5
P15 Rmt 56.7 56.7 0 56.7 0.0 completed
P16 Rmt 56.7 56.7 0 56.7 0.0 completed
A-2 Rmt 38.7 38.7 0 38.7 0.0 completed
Sinking status including False Steining
Required
Founding Placing R.L
Level
A-1 F.L 3 43.505 2.9 0.00 2.9 completed
P1 F.L -18 42.227 -18.1 0.00 -18.1 0.1 completed
P2 F.L -18 38.158 -17.9 0.00 -17.9 -0.1 completed
P3 F.L -18 39.875 -18.2 0.00 -18.2 0.2 completed
P4 F.L -18 38.545 -18.0 0.00 -18.0 0.0 completed
P5 F.L -18 34.795 -18.0 0.00 -18.0 0.0 completed
P6 F.L -18 34.985 -18.0 0.00 -18.0 0.0 completed
P7 F.L -18 35.500 -18.0 0.00 -18.0 0.0 completed
P8 F.L -18 34.741 -18.0 0.00 -18.0 0.0 completed
P9 F.L -18 34.513 -18.0 0.00 -18.0 0.0 completed
P10 F.L -18 34.795 -18.0 0.00 -17.981 completed
P11 F.L -18 -9.3 0.00 -9.3 -8.7
P12 F.L -24 -18.9 0.00 -18.9 -5.1
P13 F.L -21.5 0.00 -21.5
P13A F.L -21.5 -15.619 -2.020 -17.639 -3.861
P14 F.L -21.5 0.0 0.00 0.0 -21.5
P15 F.L -18 41.215 -18.205 0.00 -18.205 0.2 completed
P16 F.L -18 42.789 -18.0 0.00 -18.0 0.0 completed
A-2 F.L 3 42.230 2.9 0.00 2.9 0.1 completed
Sub-Structure
A-1,P-1,P-2,P-3,P-4,P-5,P-6,P-
Bottom Plug Nos 19 14 0 14.0 5.0 7,P-8,P-9,P-10,A-2,P-15,P-16
Completed
A-1,P-1,P-2,P-3,P-4,P-5,P-6,P-
Well Cap Nos 19 14 0 14.0 5.0 7,P-8,P-9,P-10,A-2,P-15,P-16
Completed
- Abtment Shaft Nos 2 2.0 0 2.0 0.0 A-1 & A-2 shaft completed
Super Structure
- Casting of Box Segment
Simaria Site
M1 Nos 48 48.0 0 48.0 0.0
MODIFICATION OF MOULD IS IN
Modified M1=EXP JOINT SEG Nos 9 0.0 PROGRESS
SET-1 M2 Nos 68 45.0 2 47.0 21.0
SET-2 M3 Nos 55 44.0 2 46.0 9.0
SET-3 M4 Nos 55 23.0 1 24.0 31.0
SET-4 M5 Nos 36 9.0 2 11.0 25.0
cast-in-situ Nos 9 0.0 0 0.0 9.0
P-13A Seg on Long Line Bed Nos 24 24.0
Aunta Site
Total Target Achieve Till Achieve Total Balance as
Strucuture / Activity Unit Remarks
Scope Month Previous Month Achieved on date
Project Progress (INR Crores) Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv
Amount (INR Crores) 10.637 3.499 284.497 287.997 Cummulative (FTM) 2/1/2022 2/2/2022 2/3/2022 2/4/2022 2/5/2022 2/6/2022 2/7/2022 2/8/2022 2/9/2022 2/10/2022 2/11/2022 2/12/2022 2/13/2022 2/14/2022 2/15/2022 2/16/2022 2/17/2022 2/18/2022 2/19/2022 2/20/2022 2/21/2022
V01 General Plan Achiv 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Construction of Jetty Nos. 1.00 1.0% 4.61 0.626 0.63 - -
2 Floating cassion
3 Fabrication of floating cassion Nos. 5.00 0.6% 0.52 5.000 5.00 - -
4 Placing of floating cassion at locations Nos. 5.00 0.2% 0.22 2.00 3.000 3.00 - -
5 Working Platform Islands with Balli Piles Nos. 4.00 0.1% 0.07 4.000 4.00 - -
V02 Well Foundation
Well foundation (Including all activity)
Steining : 0 m to 10 m R Mtr 180.00 4.0% 0.10 10.00 170.00 170.00 - -
Steining : 10 m to 20 m R Mtr 180.00 4.0% 0.10 170.00 170.00 - -
Steining : 20 m to 30 m R Mtr 180.00 5.0% 0.13 167.17 167.17 - -
Steining : 30 m to 40 m R Mtr 177.40 6.0% 0.16 98.49 98.49 - -
Steining : 40 m to FL R Mtr 123.20 4.5% 0.17 5.800 5.80 - -
Bottom Plug of well NO 18.00 2.4% 0.62 2.00 14.00 14.00 - -
Well Cap -
Casting of well Cap NO 18.00 8.0% 2.06 14.00 14.00 - -
V03 SUB-STRUCTURE
1 PIER/LOWER PYLON
a Lower Pylon M55/20 Concrete m3 8,078.00 3.2% 0.00 546.00 176.0000 5,868.50 6,044.50 - 176.00 108.00 68.00
b Lower Pylon Fe500D Grade MT 1,817.55 2.5% 0.01 111.46 29.8200 1,158.707 1,188.53 - 29.82 17.70 12.12
2 ABUTMENT, B/Wall , W/Wall , SEI SMIC
ARRESTE RS etc,
a Abutment M55/20 Concrete m3 859.30 0.3% 0.00 441.200 441.20 - -
b Abutment Fe500D Grade MT 128.90 0.2% 0.01 59.3970 59.40 - -
V04 CONCRETE WORK FOR SUPERSTRUCTURE
1 UPPER PYLONS
a Upper Pylon M55/20 Concrete m3 2,176.00 1.0% 0.00 107.00 47.00 679.0000 726.00 - 47.00 27.00 20.00
b Upper Pylon Fe500D Grade MT 435.20 0.6% 0.01 46.76 11.00 284.402 295.40
- 11.00 6.00 5.00
2 SEGMENTS + Pier Table
a Segment: M55/20 Concrete -Precasting m3 47,558.00 13.0% 0.00 1,478.00 822.16 29,729.313 30,551.47 - 822.16 69.49 69.05 69.17 69.291 65.15 70.79 69.05 70.461 204.55 65.15
a Segment Erection m3 47,558.00 8.5% 0.00 1,893.00 891.86 13,097.08 13,988.94 - 891.86 143.17 112.38 132.50 227.51 142.63 133.67
b Segment Fe500D grade MT 8,560.00 11.8% 0.01 287.00 147.67 5,022.636 5,170.31 - 147.67 13.88 10.57 13.06 13.816 12.05 11.59 10.57 13.175 36.96 11.99
V05 PRESTRESSING STEEL
% WORKDONE
62.068 322.56
ACH IEVED ON 4 64 Cr
322.56
###
###
-440,055,075.12
2,844,970,792.83
###
2,628,865,096.93
Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv
2/22/2022 2/23/2022 2/24/2022 2/25/2022 2/26/2022 2/27/2022 2/28/2022
22 23 24 25 26 27 28
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
P-14 4th lift(Height upto 14.3 mtr) ,Reinforcement and Shuttering work
is in Progress.
Foundation
- Well Sinking A-1 hrs 452 0 452
- Well Sinking P-1 hrs 602 0 602
- Well Sinking P-2 hrs 890 0 890
- Well Sinking P-3 hrs 452 0 452
- Well Sinking P-4 hrs 794 0 794
- Well Sinking P-5 hrs 408 0 408
- Well Sinking P-6 hrs 554 0 554
- Well Sinking P-7 hrs 30 0 30
- Well Sinking P-8 hrs 401 0 401
- Well Sinking P-9 hrs 224 0 224
- Well Sinking P-10 hrs 270 0 270
- Well Sinking P-11 hrs 211 0 211
- Well Sinking P-12 hrs 284 0 284
- Well Sinking P-13 hrs 0 0 0
- Well Sinking P-14 hrs 0 0 0
- Well Sinking P-15 hrs 544 0 544
- Well Sinking P-16 hrs 627 0 627
- Well Sinking A-2 hrs 212 0 212
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Datewise Concrete Consumption
Month : November 2021
Sub-Structure 0 0 0
- Abtment Shaft Cum M-45 100 0 100
- Lower Pylon Cum M-55 6191.5 176 6367.5 108 68
- Abtm Cap Cum M-45 0 0 0
- Pier Table Cum M-55 3264 0 3264
Super-Structure 0 0 0
- Casting of Box Segment Cum M-55 20868.9558157 813.661 21682.6169104398 69.48803 65 69.16611 65 65.15 70.79 69.054 70.46096 204.552 65
- Upper Pylon Cum M-55 536.5 47 583.5 20 27
- Test Pile Cum M-45 525.5 0 525.5
- Miscellaneous Work Cum M-15 3646.15 0 3646.15
- Miscellaneous Work Cum M-20 25.5 0 25.5
- Miscellaneous Work Cum M-25 2174.75 0 2174.75
- Miscellaneous Work Cum M-30 1061.9 0 1061.9
- Miscellaneous Work Cum M-35 67.5 0 67.5
- Miscellaneous Work Cum M-55 10.1 0 10.1
M-15 Cum 4160.7 0 4160.7
M-20 Cum 25.5 0 25.5
Concrete
Survey
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Casting Yard
Work Description
Long Line bed-1 outer track raft u/s shuttering work 30m ready for concrete. ###
Long Line bed-1 soffit shutter fixing is in progress.
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Fabrication Yard
Work Description
soffit plate fitting,welding,grinding & shifting to casting bed ###
###
Labour ###
Skilled (Nos) 9 ###
Semi Skilled (Nos) 4
Unskilled (Nos) 3
Machinery Involve ###
Hydra 16MT (hrs) 5 ###
Hydra 14MT (hrs) 9 ###
###
Sone Bridge
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
S.P. Singla Constructions Pvt. Ltd
Koilwar - Bhojpur Road Project, Package-II
Daily Progress Report_Work Details
Month : November 2021
Date: 21-Feb-22
###
###
###
Major Bridge (Nagri / Gangi / Bitauli)
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Minor Bridge
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
VUP / PUP
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Culverts (Box / Slab / Pipe)
Work Description
###
###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
S P SINGLA CONSTRUCTION PVT LTD
MACHINERY/EQUIPEMENT DETAIL
DATE: -09-01-2021
Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks
A CRANES
16 Crawler Cranes SPS CRN/CRL/80MT/10 80 MT ABG Cranes Pvt. Ltd. AUNTA SITE
B HYDRA
1 HYDRA-1 SPS CRN/HYD/14MT/32 14MT ESCORTS LTD CASTING YARD SIMARIA SITE
2 HYDRA -2 SPS CRN/HYD/14MT/40 14MT ESCORTS LTD WELL LOCATION SIMARIA SITE
3 HYDRA -3 SPS CRN/HYD/14MT/37 14MT ESCORTS LTD WELL LOCATION SIMARIA SITE
4 Hydra -1 SPS CRN/HYD/12MT/2 PB 13R 6504 12MT Escort Const. Ltd. AUNTA SITE
C EXCAVATOR
D Backhoe Loader
1 CAT BACK HOE LOADER(JCB) M/S DHIRAJ KUMAR CASTING YARD SIMARIA SITE
3 Backhoe Loader SPS BHL/JCB/1.5MT/10 1.5MT JCB India Limited AUNTA SITE
E LOADER
F TRANSIT MIXER
1 TRANSIT MIXER SPS TMX/2516/6 CUM/44 BR01GA 6326 Tata (SSIPL mixing drum) SIMARIA SITE
2 TRANSIT MIXER SPS TMX/2516/6 CUM/46 BR01GA 6328 Tata (SSIPL mixing drum) SIMARIA SITE
3 TRANSIT MIXER SPS TMX/2518/7 CUM/99 BR01GG 8489 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE
4 TRANSIT MIXER SPS TMX/2516/6 CUM/50 BR01GA 8652 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE
5 Transit Mixers SPS TMX/2516/6CUM/26 BR 1GA 0933 Tata (SSIPL mixing drum) AUNTA SITE
6 Transit Mixers SPS TMX/2516/6CUM/55 HR 55N 5842 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
7 Transit Mixers SPS TMX/2518/7CUM/100 BR 01GG 8490 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
8 Transit Mixers SPS TMX/2518/7CUM/87 BR 01GE 9233 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
9 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1622120 6 CUM Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
10 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1621/993 6 CUM Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
12 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd. FITTED ON HIRE BOAT
G BOOM PLACER
1 BOOM PLACER SPS BPL/S36X/96CPH/15 BR01GH 2094 Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 BOOM PLACER MOUNTED ON BARGE SPS CPB/SPB32/32MTR/4 Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
3 Boom Placers SPS BPL/S36X/96CPH/14 BR 01GH 2096 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
H CONCRETE PUMP
2 CONCRETE PUMP SPS CCP/LIN/35CPH/22 AQUARIUS INDIA PVT.LTD SIMARIA (RIVER) SITE
I BATCHING PLANT
1 BATCHING PLANT SPS BPT/STS/60CPH/63 60CUM/HR Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 Batching Plant SPS BPT/STS/30CPH/36 30CUM/HR Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
3 Batching Plant SPS BPT/STS/30CPH/61 30CUM/HR Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
1 CEMENT SILO SPS SLO/CMT/125MT/90CUM/9 AKONA ENGINEERING PVT LTD SIMARIA SITE
2 Cement/Fly ash Feeding System SPS CFS/SS/DUAL/1 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
K CHILLING PLANT
1 CHILLING PLANT SPS CPT/SS/90TR/1 Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE Tank Capacity 15000 Ltrs.
3 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE Tank Capacity 15000 Ltrs.
4 Chilling Plant 70TR SPS CPT/SS/70TR/2 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
5 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.
6 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.
L GANTRY
1 GANTRY CRANE 30 MT SPS CRN/GRY/25 MTR/30 MT/39 A. P. INDUSTRIES CASTING YARD SIMARIA SITE
2 GANTRY CRANE 200 MT SPS CRN/GRY/25 MTR/200 MT/40 A. P. INDUSTRIES CASTING YARD SIMARIA SITE
M STEEL TUG
N BOAT
1 Steel Boat SPS L-9.9, W-5.5,H-1.5 MTR. Self made AUNTA SITE
O TRACTOR
1 TRACTOR WITH TROLLY M/S NANDKISHOR SINGH B.R -01GD-1724 SIMARIA SITE
2 TRACTOR WITH TROLLY M/S RAJLAXMI CONSTRUCTION B.R -45G-3533 SIMARIA SITE
3 TRACTOR WITH TROLLY M/S K.P AND SONS WB-39A-0727 SIMARIA SITE
9 TRACTOR WITH TROLLY M/s Mahesh Singh BR 52G 0230 AUNTA SITE
P GEN/SET
1 KIRLOSKAR GEN SET SPS GEN/SNT/250KVA/2 Kirloskar BESIDE M1 PLANT SIMARIA SITE
3 KIRLOSKAR GEN SET SPS GEN/SNT/125KVA/28 Kirloskar CASTING YARD SIMARIA SITE
11 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/31 Kirloskar CASTING YARD GANTRY 30 MT SIMARIA
SITE
13 KIRLOSKAR GEN SET SPS GEN/SNT/62.5 KVA/143 Kirloskar Transfer to Hathidah Site
21 125 KVA DG SPS GEN/SNT/125KVA/3 Tata Cummins India Limited Near Workshop
1 AIR COMPRESSOR ACR/XA/310/19 Atlas Copco India Ltd. CASTING YARD SIMARIA SITE
R BOLERO/SCORPIO
S MULTI AXLE
1 Trailers/Platforms HMT/TII/130MT/13-A
2 Trailers/Platforms HMT/TII/130MT/13-B
T HORSE
1 VOLVO HOR/VOL/150MT/12
4 P6
UPPER PYLON 1st LIFT Nos. 1 1 2/6/2022 2/10/2022
UPPER PYLON 2nd LIFT Nos. 1 1 2/13/2022 2/17/2022
UPPER PYLON 3rd LIFT Nos. 1 2/28/2022
5 P7
Lower PYLON 3rd LIFT Nos. 1 1 2/2/2022 2/3/2022
Lower PYLON 4th LIFT Nos. 1 2/20/2022
6 P-8
Lower PYLON 2nd LIFT Nos. 1 1 2/7/2022
Lower PYLON 3rd LIFT Nos. 1
Lower PYLON 4th LIFT Nos. 1
7 P-9
PT TRUSS ERECTION AND BOTTOM SOFFIT
8 P-10
Stage-1 Nos. 1 2/25/2022
9 P-11
Tilt and Shift Correction
10 P-12
FALSE Steining Nos. 1 1 2/4/2022 2/9/2022
Bottom Plug Nos. 1 2/28/2022
11 P-13
PLACING OF CAISSION(9.3 MTR) AT LOCATION BY 05/02/2022,JOINTING OF ONE ANOTHER 3 MTR
CASSION ,GROUNDING OF CASSION AND 4TH LIFT CASTING
12 P-13 A
False wall L-2 Nos. 1 1 2/10/2022 2/12/2022
Bottom Plug Nos. 1 2/25/2022
13 P-14
PLACING OF CAISSION(9.3 MTR) AT LOCATION BY 02/02/2022 ,GROUNDING OF CASSION AND 4TH LIFT & 5TH
LIFT CASTING
14 P-15
SEGMENT LAUNCHING Nos. 2 2
S P SINGLA CONSTRUCTION PVT LTD
MACHINERY/EQUIPEMENT DETAIL
2/21/2022
Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks
A CRANES
1 MINITAWK 65 TON CRANE M/S R.N MOTORS Near Bank of River at P-15 FOR JETTY
WORK
B HYDRA
4 Hydra -1 SPS CRN/HYD/12MT/2 PB 13R 6504 12MT Escort Const. Ltd. AUNTA SITE
C EXCAVATOR
D Backhoe Loader
1 CAT BACK HOE LOADER(JCB) M/S DHIRAJ KUMAR CASTING YARD SIMARIA SITE
2 Backhoe Loader SPS BHL/JCB/1.5MT/10 1.5MT JCB India Limited AUNTA SITE
E LOADER
F TRANSIT MIXER
1 TRANSIT MIXER SPS TMX/2516/6 CUM/44 BR01GA 6326 Tata (SSIPL mixing drum) SIMARIA SITE
2 TRANSIT MIXER SPS TMX/2516/6 CUM/46 BR01GA 6328 Tata (SSIPL mixing drum) SIMARIA SITE
3 TRANSIT MIXER SPS TMX/2518/7 CUM/99 BR01GG 8489 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE
4 TRANSIT MIXER SPS TMX/2516/6 CUM/50 BR01GA 8652 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE
5 Transit Mixers SPS TMX/2516/6CUM/26 BR 1GA 0933 Tata (SSIPL mixing drum) AUNTA SITE
6 Transit Mixers SPS TMX/2516/6CUM/55 HR 55N 5842 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
7 Transit Mixers SPS TMX/2518/7CUM/100 BR 01GG 8490 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
8 Transit Mixers SPS TMX/2518/7CUM/87 BR 01GE 9233 Ashok Leyland (SSIPL mixing drum) AUNTA SITE
9 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1622120 6 CUM Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
10 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1621/993 6 CUM Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd. FITTED ON BOAT
11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd. FITTED ON HIRE BOAT
12 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd. FITTED ON HIRE BOAT
G BOOM PLACER
1 BOOM PLACER SPS BPL/S36X/96CPH/15 BR01GH 2094 Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 BOOM PLACER MOUNTED ON BARGE SPS CPB/SPB32/32MTR/4 Schwing Stetter (India) Pvt. Ltd. SIMARIA (RIVER) SITE
3 Boom Placers SPS BPL/S36X/96CPH/14 BR 01GH 2096 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
H CONCRETE PUMP
2 CONCRETE PUMP SPS CCP/LIN/35CPH/22 AQUARIUS INDIA PVT.LTD SIMARIA (RIVER) SITE
I BATCHING PLANT
1 BATCHING PLANT SPS BPT/STS/60CPH/63 60CUM/HR Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 Batching Plant SPS BPT/STS/30CPH/36 30CUM/HR Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
3 Batching Plant SPS BPT/STS/30CPH/61 30CUM/HR Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
1 CEMENT SILO SPS SLO/CMT/125MT/90CUM/9 AKONA ENGINEERING PVT LTD SIMARIA SITE
2 Cement/Fly ash Feeding System SPS CFS/SS/DUAL/1 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
K CHILLING PLANT
1 CHILLING PLANT SPS CPT/SS/90TR/1 Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE
2 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE Tank Capacity 15000 Ltrs.
3 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd. SIMARIA SITE Tank Capacity 15000 Ltrs.
4 Chilling Plant 70TR SPS CPT/SS/70TR/2 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE
5 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.
6 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.
L GANTRY
1 GANTRY CRANE 30 MT SPS CRN/GRY/25 MTR/30 MT/39 A. P. INDUSTRIES CASTING YARD SIMARIA SITE
2 GANTRY CRANE 200 MT SPS CRN/GRY/25 MTR/200 MT/40 A. P. INDUSTRIES CASTING YARD SIMARIA SITE
M STEEL TUG
N BOAT
O TRACTOR
1 TRACTOR WITH TROLLY M/S NANDKISHOR SINGH B.R -01GD-1724 SIMARIA SITE
2 TRACTOR WITH TROLLY M/S RAJLAXMI CONSTRUCTION B.R -45G-3533 SIMARIA SITE
3 TRACTOR WITH TROLLY M/S K.P AND SONS WB-39A-0727 SIMARIA SITE
P GEN/SET
1 KIRLOSKAR GEN SET SPS GEN/SNT/250KVA/2 Kirloskar BESIDE M1 PLANT SIMARIA SITE
21 125 KVA DG SPS GEN/SNT/125KVA/3 Tata Cummins India Limited Near Workshop
3 Air Compressors ACR/XA176/8 Atlas Copco India Ltd. CASTING YARD SIMARIA SITE
R BOLERO/SCORPIO
S MULTI AXLE
1 Trailers/Platforms HMT/TII/130MT/13-A
2 Trailers/Platforms HMT/TII/130MT/13-B
T HORSE
1 VOLVO HOR/VOL/150MT/12
3 P2
4 P3
5 P4
6 P5
7 P6
8 P7
9 P8
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Daily Progress Report
Water Level
Mesurem Temp. Water Level as
Month : Feb 2020 ent ( Co )
Pre.Day
on DPR Date
Rain (mm) Weather
(Ganga)
Achieve
Total Achieve Total Balance as
Strucuture / Activity Unit Till Remarks
Scope Month Achieved on date
Previous
Foundation
Casting status including False Steining
A-1 Rmt 38.7 38.7 0 38.7 0.0 completed
P1 Rmt 56.7 56.7 0 56.7 0.0 completed
P2 Rmt 56.7 56.7 0 56.7 0.0 completed
P3 Rmt 56.7 56.7 0 56.7 0.0 completed
P4 Rmt 53.7 53.7 0 53.7 0.0 completed
P5 Rmt 53.7 56.6 0 56.6 -2.9 2 FS Balance
P6 Rmt 53.7 55.1 0 55.1 -1.4 2 FS Balance
NOTE:-