S.P. Singla Constructions Pvt.

Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama

Daily Progress Report


Month : November 2021
Date: 21-Feb-22
Total Target Achieve Till Achieve Total Balance as
Strucuture / Activity Unit Scope Month Previous Month Achieved on date Remarks

Foundation
Casting status including False Steining
A-1 Rmt 38.7 38.7 0 38.7 0.0 completed
P1 Rmt 56.7 56.7 0 56.7 0.0 completed
P2 Rmt 56.7 56.7 0 56.7 0.0 completed
P3 Rmt 56.7 56.7 0 56.7 0.0 completed
P4 Rmt 53.7 53.7 0 53.7 0.0 completed
P5 Rmt 56.7 56.6 0 56.6 completed
P6 Rmt 53.7 55.1 0 55.1 completed
P7 Rmt 53.7 53.7 0 53.7 0.0 completed
P8 Rmt 53.7 53.7 0 53.7 0.0 completed
P9 Rmt 53.7 53.7 0 53.7 0.0 completed
P10 Rmt 53.6 53.6 0 53.6 0.0 completed
P11 Rmt 53.575 50.8 0 50.8 2.8
P12 Rmt 59.7 58.1 3 61.1 -1.4
P13 Rmt 51.5 51.5
P13A Rmt 57.2 54.515 3 57.515 -0.3
P14 Rmt 51.5 0.0 0 0.0 51.5
P15 Rmt 56.7 56.7 0 56.7 0.0 completed
P16 Rmt 56.7 56.7 0 56.7 0.0 completed
A-2 Rmt 38.7 38.7 0 38.7 0.0 completed
Sinking status including False Steining

Required
Founding Placing R.L
Level
A-1 F.L 3 43.505 2.9 0.00 2.9 completed
P1 F.L -18 42.227 -18.1 0.00 -18.1 0.1 completed
P2 F.L -18 38.158 -17.9 0.00 -17.9 -0.1 completed
P3 F.L -18 39.875 -18.2 0.00 -18.2 0.2 completed
P4 F.L -18 38.545 -18.0 0.00 -18.0 0.0 completed
P5 F.L -18 34.795 -18.0 0.00 -18.0 0.0 completed
P6 F.L -18 34.985 -18.0 0.00 -18.0 0.0 completed
P7 F.L -18 35.500 -18.0 0.00 -18.0 0.0 completed
P8 F.L -18 34.741 -18.0 0.00 -18.0 0.0 completed
P9 F.L -18 34.513 -18.0 0.00 -18.0 0.0 completed
P10 F.L -18 34.795 -18.0 0.00 -17.981 completed
P11 F.L -18 -9.3 0.00 -9.3 -8.7
P12 F.L -24 -18.9 0.00 -18.9 -5.1
P13 F.L -21.5 0.00 -21.5
P13A F.L -21.5 -15.619 -2.020 -17.639 -3.861
P14 F.L -21.5 0.0 0.00 0.0 -21.5
P15 F.L -18 41.215 -18.205 0.00 -18.205 0.2 completed
P16 F.L -18 42.789 -18.0 0.00 -18.0 0.0 completed
A-2 F.L 3 42.230 2.9 0.00 2.9 0.1 completed
Sub-Structure
A-1,P-1,P-2,P-3,P-4,P-5,P-6,P-
Bottom Plug Nos 19 14 0 14.0 5.0 7,P-8,P-9,P-10,A-2,P-15,P-16
Completed

A-1,P-1,P-2,P-3,P-4,P-5,P-6,P-
Well Cap Nos 19 14 0 14.0 5.0 7,P-8,P-9,P-10,A-2,P-15,P-16
Completed

- Abtment Shaft Nos 2 2.0 0 2.0 0.0 A-1 & A-2 shaft completed

- Lower Pylon Mtr 336.224 223.22 7.173 230.39 105.8


- Abtm Cap Nos 2 2.0 0 2.0 0.0 A-1 & A-2 Cap completed

P-1 ,P2,P-3,P-4,P-5,P-15 & P-16


- Pier Table Nos 15 8.000 0 8.000 7.0 Completed

Super Structure
- Casting of Box Segment
Simaria Site
M1 Nos 48 48.0 0 48.0 0.0
MODIFICATION OF MOULD IS IN
Modified M1=EXP JOINT SEG Nos 9 0.0 PROGRESS
SET-1 M2 Nos 68 45.0 2 47.0 21.0
SET-2 M3 Nos 55 44.0 2 46.0 9.0
SET-3 M4 Nos 55 23.0 1 24.0 31.0
SET-4 M5 Nos 36 9.0 2 11.0 25.0
cast-in-situ Nos 9 0.0 0 0.0 9.0
P-13A Seg on Long Line Bed Nos 24 24.0
Aunta Site
Total Target Achieve Till Achieve Total Balance as
Strucuture / Activity Unit Remarks
Scope Month Previous Month Achieved on date

M1 Nos 64 64.0 0 64.0 0.0


SET-4 Modified M1=M2/M3 SET-4 Nos 30 7.0 1 8.0 22.0
SET-1 M2 Nos 65 53.0 2 55.0 10.0
SET-2 M3 Nos 60 52.0 2 54.0 6.0
SET-3 M4 Nos 55 37.0 0 37.0 18.0
EXP JOINT M M5 Nos 21 21.0
cast-in-situ Nos 5
Total Nos 604 382.0 12 394.0 210.0
- Erection of Segment Nos 590 118.0 16 134.0 456.0
- Upeer Pylon Rmt 257.75 118.848 0 118.848 138.9
Cumulative as on date M-15 M-20 M-25 M-30 M-35 M-45 M-55
Concrete Qty(In
cum)
109842.4 4160.7 25.5 7292.5 2054.2 51950.5 5671.2 38687.9
BOQ For The Month Cummulative 2/21/2022
No. (Rolling Prog)
Description of Activity Unit Scope Weightage Unit Rate Cummul till Cum till
in (Crs.) Planned Actual previous month date

Project Progress (INR Crores) Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv
Amount (INR Crores) 10.637 3.499 284.497 287.997 Cummulative (FTM) 2/1/2022 2/2/2022 2/3/2022 2/4/2022 2/5/2022 2/6/2022 2/7/2022 2/8/2022 2/9/2022 2/10/2022 2/11/2022 2/12/2022 2/13/2022 2/14/2022 2/15/2022 2/16/2022 2/17/2022 2/18/2022 2/19/2022 2/20/2022 2/21/2022
V01 General Plan Achiv 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Construction of Jetty Nos. 1.00 1.0% 4.61 0.626 0.63 - -
2 Floating cassion
3 Fabrication of floating cassion Nos. 5.00 0.6% 0.52 5.000 5.00 - -
4 Placing of floating cassion at locations Nos. 5.00 0.2% 0.22 2.00 3.000 3.00 - -
5 Working Platform Islands with Balli Piles Nos. 4.00 0.1% 0.07 4.000 4.00 - -
V02 Well Foundation
Well foundation (Including all activity)
Steining : 0 m to 10 m R Mtr 180.00 4.0% 0.10 10.00 170.00 170.00 - -
Steining : 10 m to 20 m R Mtr 180.00 4.0% 0.10 170.00 170.00 - -
Steining : 20 m to 30 m R Mtr 180.00 5.0% 0.13 167.17 167.17 - -
Steining : 30 m to 40 m R Mtr 177.40 6.0% 0.16 98.49 98.49 - -
Steining : 40 m to FL R Mtr 123.20 4.5% 0.17 5.800 5.80 - -
Bottom Plug of well NO 18.00 2.4% 0.62 2.00 14.00 14.00 - -
Well Cap -
Casting of well Cap NO 18.00 8.0% 2.06 14.00 14.00 - -
V03 SUB-STRUCTURE
1 PIER/LOWER PYLON
a Lower Pylon M55/20 Concrete m3 8,078.00 3.2% 0.00 546.00 176.0000 5,868.50 6,044.50 - 176.00 108.00 68.00
b Lower Pylon Fe500D Grade MT 1,817.55 2.5% 0.01 111.46 29.8200 1,158.707 1,188.53 - 29.82 17.70 12.12
2 ABUTMENT, B/Wall , W/Wall , SEI SMIC
ARRESTE RS etc,
a Abutment M55/20 Concrete m3 859.30 0.3% 0.00 441.200 441.20 - -
b Abutment Fe500D Grade MT 128.90 0.2% 0.01 59.3970 59.40 - -
V04 CONCRETE WORK FOR SUPERSTRUCTURE
1 UPPER PYLONS
a Upper Pylon M55/20 Concrete m3 2,176.00 1.0% 0.00 107.00 47.00 679.0000 726.00 - 47.00 27.00 20.00
b Upper Pylon Fe500D Grade MT 435.20 0.6% 0.01 46.76 11.00 284.402 295.40
- 11.00 6.00 5.00
2 SEGMENTS + Pier Table
a Segment: M55/20 Concrete -Precasting m3 47,558.00 13.0% 0.00 1,478.00 822.16 29,729.313 30,551.47 - 822.16 69.49 69.05 69.17 69.291 65.15 70.79 69.05 70.461 204.55 65.15
a Segment Erection m3 47,558.00 8.5% 0.00 1,893.00 891.86 13,097.08 13,988.94 - 891.86 143.17 112.38 132.50 227.51 142.63 133.67
b Segment Fe500D grade MT 8,560.00 11.8% 0.01 287.00 147.67 5,022.636 5,170.31 - 147.67 13.88 10.57 13.06 13.816 12.05 11.59 10.57 13.175 36.96 11.99
V05 PRESTRESSING STEEL

1 On Transverse Stressing MT 480.00 1.0% 0.01 302.7721 302.77 - -


2 On Longitudinal Stressing MT 2,378.00 4.5% 0.01 241.2260 241.23 - -
3 Stay Cables of parallel strand system of MT 740.00 9.5% 0.06 584.952 584.95 -
15.7 mm dia. -Supply Part -
Stay Cables of parallel strand system of
4 MT 740.00 4.1% 0.03 15.48 3.5000 153.754 157.25 3.50
15.7 mm dia. -Ins tallation Part - 3.50
V06 BEARINGS AND JOINTS - - 3.499

% WORKDONE
62.068 322.56
ACH IEVED ON 4 64 Cr

322.56
###
###
-440,055,075.12

2,844,970,792.83

###
2,628,865,096.93
Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv Plan Achiv
2/22/2022 2/23/2022 2/24/2022 2/25/2022 2/26/2022 2/27/2022 2/28/2022
22 23 24 25 26 27 28
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama

Daily Progress Report


Month : November 2021
21-Feb-22
Location Activity / Work Details Photograph Remarks

A-1 Abutment cap casting Completed.

Cast-in-situ between Stagging work is in Progress.


Seg B/w A01-P01

P1 Erection of S18CE & S18CK Completed.

P-2 Grouting of P-2 S15BE & P-2S15BK Completed.

P-3 Erection of P-3S11AE & P-3S11AK completed.

P-4 Auto Launching for erection of P-4 S5AE and P-4S5AE is in


Progress.

P-5 Erection of Erection Tackle is in Progress.

P-6 Upper pylon 3rd Lift Reinforcement work is in Progress.

P-7 Lower Pylon 4th Lift Shuttering work is in Progress.

P-8 lower pylon 3rd lift Reinforcement work is in Progress.


S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama

Daily Progress Report


Month : November 2021
21-Feb-22

P-9 Truss erection is in Progress.

P-10 Pier Table Reinforcement and Shuttering work is in Progress.

P-11 Sludge cleaning/Graving is in Progress ,Out of 26 mtr ,17 mtr


sludge clean ,9 mtr remain to clean.

P-12 Sludge cleaning/Graving Work stop due to unavailable of crane


with Barge.

P-13 Arrangement for erection of another 3 mtr caission on 9.3 mtr


caission is in Progress..

P-13A False steining 2nd Lift Sinking work is in progress.

P-14 4th lift(Height upto 14.3 mtr) ,Reinforcement and Shuttering work
is in Progress.

P-15 Shuttering and Reinforcment work of stitch Portion is in Progress.

P-16 Dismentling of Launcher is in Progress

A-2 Abutment cap Casting Completed


S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Datewise Progress Report
Month : November 2021
Upto
Achieved Cumm.
Strucuture / Activity Unit Previous in month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Achieved Remarks
Achieved
Foundation
Casting status including False
Steining

A-1 Rmt 38.7 0 38.7 Completed


P1 Rmt 56.7 0 56.7 Completed
P2 Rmt 56.7 0 56.7 Completed
P3 Rmt 56.7 0 56.7 Completed
P4 Rmt 53.7 0 53.7 Completed
P5 Rmt 56.575 0 56.575
P6 Rmt 55.075 0 55.075
P7 Rmt 53.7 0 53.7
P8 Rmt 53.7 0 53.7
P9 Rmt 53.7 0 53.7
P10 Rmt 53.575 0 53.575
P11 Rmt 50.8 0 50.8
P12 Rmt 58.05 3 3 61.05
P13 Rmt 0
P13A Rmt 54.515 3 3 57.515
P14 Rmt 0 0 0
P15 Rmt 56.7 0 56.7 Completed
P16 Rmt 56.7 0 56.7 Completed
A-2 Rmt 38.7 0 38.7 Completed
Sinking status including False
Steining
A-1 F.L 3 0 2.902 Sinking completed
P-1 F.L -18.09 0 -18.09 Sinking completed
P-2 F.L -17.936 0 -17.936 Sinking completed
P-3 F.L -18.234 0 -18.234 Sinking completed
P-4 F.L -17.983 0 -17.983 Sinking completed
P-5 F.L -18.024 0 -18.024
P-6 F.L -17.968 0 -17.968
P-7 F.L -17.983 0 -17.983
P-8 F.L -18.045 0 -18.045
P-9 F.L -17.965 0 -17.965
P-10 F.L -17.981 0 -17.981
P-11 F.L -9.314 0 -9.314
P-12 F.L -18.917 0 -18.917
P-13 F.L
P-13A F.L -15.619 -2.02 0.4 0.5 0.3 0.1 0.18 0.540 24.425
P-14 F.L 0 0 0
P-15 F.L -18.205 0 -18.205 Sinking completed
P-16 F.L -18.000 0 -18 Sinking completed
A-2 F.L 3 0 2.914 Sinking completed
Sub-Structure
Bottom Plug Nos 14 0 14
Well cap Nos 14 0 14
- Abtment Shaft Nos 2 0 2
- Lower Pylon
P-1 Mtr 20.222 0 20.222
P-2 Mtr 20.222 0 20.222
P-3 Mtr 20.222 0 20.222
P-4 Mtr 20.222 0 20.222
P-5 Mtr 20.222 0 20.222
P-6 Mtr 20.222 0 20.222
P-7 Mtr 12 4.173 4.173 16.173
P-8 Mtr 9 3 3 12
P-9 Mtr 20.222 0 20.222
P-10 Mtr 20.222 0 20.222
P-11 Mtr 0 0 0
P-12 Mtr 0 0 0
P-13 Mtr 0 0 0
P-14 Mtr 0 0 0
P-15 Mtr 20.222 0 20.222
P-16 Mtr 20.222 0 20.222
7.173
- Abtm Cap Nos 2 0 2
P-1,P-2,P-15 & P-16 Pier Table
- Pier Table Nos 8 0 8 Casting Completed
Upper Pylon Mtr 118.848 10.65 3.562 4.915 2.173 129.498
Sup-Structure
- Casting of Box Segment
SIMARIA SITE
M1 Nos 48 0 48
Modified M1=EXP JOINT SEG Nos 0
M2 Nos 45 2 1 1 47
M3 Nos 44 2 1 1 46
M4 Nos 23 1 1 24
M5 Nos 9 2 1 1 11
cast-in-situ Nos 0 0
P-13A Seg on Long Line Bed Nos 0 0
AUNTA SITE
M1 Nos 64 0 64
Modified M1=M2/M3 SET-4 Nos 7 1 1 8
M2/M-3-SET-1 Nos 53 2 1 1 55
M2/M-3-SET-2 Nos 52 2 1 1 54
M2/M-3-SET-3 Nos 37 0 37
M5 Nos 0 0 0
cast-in-situ Nos
Total Nos 382 12 394
- Erection of Segment Nos 118 16 2 2 2 4 2 2 2 134
S.P. Singla Constructions Pvt. Ltd
Koilwar - Bhojpur Road Project, Package-II
Datewise Progress Report
Month : November 2021 30 Total Day 9
Upto
Strucuture / Activity Unit Previous Achieved 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 Cumm. Remarks
in month Achieved
Achieved

Foundation
- Well Sinking A-1 hrs 452 0 452
- Well Sinking P-1 hrs 602 0 602
- Well Sinking P-2 hrs 890 0 890
- Well Sinking P-3 hrs 452 0 452
- Well Sinking P-4 hrs 794 0 794
- Well Sinking P-5 hrs 408 0 408
- Well Sinking P-6 hrs 554 0 554
- Well Sinking P-7 hrs 30 0 30
- Well Sinking P-8 hrs 401 0 401
- Well Sinking P-9 hrs 224 0 224
- Well Sinking P-10 hrs 270 0 270
- Well Sinking P-11 hrs 211 0 211
- Well Sinking P-12 hrs 284 0 284
- Well Sinking P-13 hrs 0 0 0
- Well Sinking P-14 hrs 0 0 0
- Well Sinking P-15 hrs 544 0 544
- Well Sinking P-16 hrs 627 0 627
- Well Sinking A-2 hrs 212 0 212
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Datewise Concrete Consumption
Month : November 2021

Grade of Upto Concrete


Strucuture / Activity Unit Previous This Total achieved 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Remarks
Concrete
Concrete Qty month

Ganga Bridge 6 Lane


Foundation
- Well Curb Cum M-35 2241.28 0 2241.28
- Well Steining A-1 Cum M-35 2184.42 0 2184.42
- Well Steining P-1 Cum M-35 2758.42 0 2758.42
- Well Steining P-2 Cum M-35 2725.92 0 2725.92
- Well Steining P-3 Cum M-35 2805.42 0 2805.42
- Well Steining P-4 Cum M-35 2795.92 0 2795.92
- Well Steining P-5 Cum M-35 2781.42 0 2781.42
- Well Steining P-6 Cum M-35 2628.42 0 2628.42
- Well Steining P-7 Cum M-35 2760 0 2760
- Well Steining P-8 Cum M-35 2395.92 0 2395.92
- Well Steining P-9 Cum M-35 2577.42 0 2577.42
- Well Steining P-10 Cum M-35 2702.92 0 2702.92
- Well Steining P-11 Cum M-35 2526.92 0 2526.92
- Well Steining P-12 Cum M-35 3069.92 28 3097.92 28
- Well Steining P-13 Cum M-35 0 0 0
- Well Steining P-13 A Cum M-35 4643 0 4643
- Well Steining P-14 Cum M-35 0 45 45 45
- Well Steining P-15 Cum M-35 2752.42 0 2752.42
- Well Steining P-16 Cum M-35 2745.17 0 2745.17
- Well Steining A-2 Cum M-35 2183.92 0 2183.92
- False Steining Cum M-35 377.5 0 377.5
- Bottom Plugging Cum M-25 5098 0 5098
- Well cap Cum M-45 4200.7 0 4200.7

Sub-Structure 0 0 0
- Abtment Shaft Cum M-45 100 0 100
- Lower Pylon Cum M-55 6191.5 176 6367.5 108 68
- Abtm Cap Cum M-45 0 0 0
- Pier Table Cum M-55 3264 0 3264
Super-Structure 0 0 0
- Casting of Box Segment Cum M-55 20868.9558157 813.661 21682.6169104398 69.48803 65 69.16611 65 65.15 70.79 69.054 70.46096 204.552 65
- Upper Pylon Cum M-55 536.5 47 583.5 20 27
- Test Pile Cum M-45 525.5 0 525.5
- Miscellaneous Work Cum M-15 3646.15 0 3646.15
- Miscellaneous Work Cum M-20 25.5 0 25.5
- Miscellaneous Work Cum M-25 2174.75 0 2174.75
- Miscellaneous Work Cum M-30 1061.9 0 1061.9
- Miscellaneous Work Cum M-35 67.5 0 67.5
- Miscellaneous Work Cum M-55 10.1 0 10.1
M-15 Cum 4160.7 0 4160.7
M-20 Cum 25.5 0 25.5
Concrete

M-25 Cum 7292.5 0 7292.5


M-30 Cum 2054.2 0 2054.2
M-35 Cum 51877.45 73 51950.45 45 28
M-45 Cum 5671.15 0 5671.15
M-55 Cum 37651.219261 1036.661 38687.8803556269 177.488 133 89.1661 65 27 65.15 70.79 69.054 70.461 204.552 65
PNC - SPSCPL (JV)
S.P. Singla Constructions Pvt. Ltd
Koilwar - Bhojpur Road Project, Package-II
Daily Progress Report_Work Details
Month : November 2021
Date: 21-Feb-22

Str. / Work / Chainage Activity / Work Details Remarks

Survey
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###

###
###
Casting Yard
Work Description
Long Line bed-1 outer track raft u/s shuttering work 30m ready for concrete. ###
Long Line bed-1 soffit shutter fixing is in progress.

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Fabrication Yard
Work Description
soffit plate fitting,welding,grinding & shifting to casting bed ###

###
Labour ###
Skilled (Nos) 9 ###
Semi Skilled (Nos) 4
Unskilled (Nos) 3
Machinery Involve ###
Hydra 16MT (hrs) 5 ###
Hydra 14MT (hrs) 9 ###
###
Sone Bridge
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
S.P. Singla Constructions Pvt. Ltd
Koilwar - Bhojpur Road Project, Package-II
Daily Progress Report_Work Details
Month : November 2021
Date: 21-Feb-22

###
###
###
Major Bridge (Nagri / Gangi / Bitauli)
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Minor Bridge
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
VUP / PUP
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
Culverts (Box / Slab / Pipe)
Work Description
###

###
Labour ###
Skilled (Nos) ###
Semi Skilled (Nos)
Unskilled (Nos)
Machinery Involve ###
###
###
###
S P SINGLA CONSTRUCTION PVT LTD

AUNTA SIMARIA SIX LANE GANGA BRIDGE MOKAM,BIHAR

MACHINERY/EQUIPEMENT DETAIL

DATE: -09-01-2021
Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks

A CRANES

1 440 P& H CRANE NO-1 M/S MUSKAN CRANE P-15

2 440 P& H CRANE NO-2 M/S MUSKAN CRANE P-11

3 MINITAWK 65 TON CRANE M/S R.N MOTORS P-15

4 440 P& H CRANE M/S RAJLIFTER P-9

5 440 P& H CRANE M/S RAJLIFTER AUNTA SITE

6 KOBELCO 335 CRANE SPS CRL/CRN/35 MT/04 35 MT KOBELCO P-16

7 TIL CRANE SPS CRN/TIL/40MT/02 40 MT GROVE TIL P-16

8 Crawler Crane 955 Ahuja Earth Movers P2

9 Crawler Crane 955 Oriental Infrastructure P3

10 Crawler Crane 440 Balajee Cranes P3

11 Crawler Crane 440 M/s ABCO Construction P2

12 Crawler Crane 440 Parag Crane Services P-1

13 Crawler Crane 440 R R Carriers P3

14 Crawler Crane 440 Raj Lifters Pvt. Ltd P-1

15 Crawler Crane 335 Muskan Cranes P-6

16 Crawler Cranes SPS CRN/CRL/80MT/10 80 MT ABG Cranes Pvt. Ltd.  AUNTA SITE

17 Stationary/Fixed Tower Cranes CRN/STC/3MT/8 3 MT Alpha Services AUNTA SITE

18 TYRE MOUNTE CRANE RSV CRANE SERVICE 80 MT SIMARIYA SITE

19 Stationary/Fixed Tower Cranes CRN/STC/3MT/9 3 MT Alpha Services AUNTA SITE

B HYDRA

1 HYDRA-1 SPS CRN/HYD/14MT/32 14MT ESCORTS LTD CASTING YARD SIMARIA SITE

2 HYDRA -2 SPS CRN/HYD/14MT/40 14MT ESCORTS LTD WELL LOCATION SIMARIA SITE

3 HYDRA -3 SPS CRN/HYD/14MT/37 14MT ESCORTS LTD WELL LOCATION SIMARIA SITE

4 Hydra -1 SPS CRN/HYD/12MT/2 PB 13R 6504 12MT Escort Const. Ltd.  AUNTA SITE

5 Hydra -1 SPS CRN/HYD/14MT/39 14MT Escorts Limited   AUNTA SITE

6 Hydra 14 Ton Kishan Fabrication Works AUNTA SITE

7 Hydra 14 Ton Bhagwan Singh AUNTA SITE

8 Hydra 14 Ton Pankesh Kumar AUNTA SITE

C EXCAVATOR

1 EXCAVATOR ( TATA HITACHI ) EXC/TAT/7MT/1 SIMARIA SITE

2 EXCAVATOR POKLANE SPS EXC/TAT/20MT/12 20MT Tata Hitachi   A1-P4

D Backhoe Loader

1 CAT BACK HOE LOADER(JCB) M/S DHIRAJ KUMAR CASTING YARD SIMARIA SITE

2 Backhoe Loader Harshvardhan Enterprises NL 01K 1317 AUNTA SITE

3 Backhoe Loader SPS BHL/JCB/1.5MT/10 1.5MT JCB India Limited AUNTA SITE

E LOADER

1 LOADER SPS WLR/HMT/2.5CUM/2 2.5CUB HINDUSTAN LTD SIMARIA SITE

F TRANSIT MIXER

1 TRANSIT MIXER SPS TMX/2516/6 CUM/44 BR01GA 6326 Tata (SSIPL mixing drum) SIMARIA SITE

2 TRANSIT MIXER SPS TMX/2516/6 CUM/46 BR01GA 6328 Tata (SSIPL mixing drum) SIMARIA SITE

3 TRANSIT MIXER SPS TMX/2518/7 CUM/99 BR01GG 8489 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE

4 TRANSIT MIXER SPS TMX/2516/6 CUM/50 BR01GA 8652 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE

5 Transit Mixers SPS TMX/2516/6CUM/26 BR 1GA 0933 Tata (SSIPL mixing drum) AUNTA SITE

6 Transit Mixers SPS TMX/2516/6CUM/55 HR 55N 5842 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

7 Transit Mixers SPS TMX/2518/7CUM/100 BR 01GG 8490 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

8 Transit Mixers SPS TMX/2518/7CUM/87 BR 01GE 9233 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

9 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1622120 6 CUM Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

10 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1621/993 6 CUM Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

12 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd.  FITTED ON HIRE BOAT

G BOOM PLACER

1 BOOM PLACER SPS BPL/S36X/96CPH/15 BR01GH 2094 Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 BOOM PLACER MOUNTED ON BARGE SPS CPB/SPB32/32MTR/4 Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

3 Boom Placers SPS BPL/S36X/96CPH/14 BR 01GH 2096 Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

H CONCRETE PUMP

1 Concrete Pumps SPS CCP/LIN/65CPH/31 Putzmeister India Pvt.Ltd.(Aquarius)  AUNTA SITE

2 CONCRETE PUMP SPS CCP/LIN/35CPH/22 AQUARIUS INDIA PVT.LTD SIMARIA (RIVER) SITE

I BATCHING PLANT

1 BATCHING PLANT SPS BPT/STS/60CPH/63 60CUM/HR Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 Batching Plant SPS BPT/STS/30CPH/36 30CUM/HR Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

3 Batching Plant SPS BPT/STS/30CPH/61 30CUM/HR Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

J CEMENT FEEDING SYSTEM

1 CEMENT SILO SPS SLO/CMT/125MT/90CUM/9 AKONA ENGINEERING PVT LTD SIMARIA SITE

2 Cement/Fly ash Feeding System SPS CFS/SS/DUAL/1 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE

K CHILLING PLANT

1 CHILLING PLANT SPS CPT/SS/90TR/1 Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE Tank Capacity 15000 Ltrs.

3 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE Tank Capacity 15000 Ltrs.

4 Chilling Plant 70TR SPS CPT/SS/70TR/2 Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

5 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.

6 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.

L GANTRY

1 GANTRY CRANE 30 MT SPS CRN/GRY/25 MTR/30 MT/39 A. P. INDUSTRIES CASTING YARD SIMARIA SITE

2 GANTRY CRANE 200 MT SPS CRN/GRY/25 MTR/200 MT/40 A. P. INDUSTRIES CASTING YARD SIMARIA SITE

3 GANTRY SPS CRN/GRY/25MTR/40MT/37 A.P INDUSTRIES   CASTING YARD AUNTA SITE

4 GANTRY SPS CRN/GRY/25MTR/200MT/43 A.P INDUSTRIES   CASTING YARD AUNTA SITE


Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks

M STEEL TUG

1 M/S KUNDU SHIPPING STEEL TUG MIN DISARI SIMARIA SITE

2 M/S KUNDU SHIPPING STEEL TUG MIN DUHATI SIMARIA SITE

N BOAT

1 Steel Boat SPS L-9.9, W-5.5,H-1.5 MTR. Self made AUNTA SITE

2 Steel Boat Radha Krishna Enterprises - In River AUNTA SITE

3 Steel Boat Radha Krishna Enterprises - In River AUNTA SITE

O TRACTOR

1 TRACTOR WITH TROLLY M/S NANDKISHOR SINGH B.R -01GD-1724 SIMARIA SITE

2 TRACTOR WITH TROLLY M/S RAJLAXMI CONSTRUCTION B.R -45G-3533 SIMARIA SITE

3 TRACTOR WITH TROLLY M/S K.P AND SONS WB-39A-0727 SIMARIA SITE

4 TRACTOR WITH TROLLY Suraj Traders BR 09GA 4381 AUNTA SITE

5 TRACTOR WITH TROLLY Ram Kumar BR 01 6901 AUNTA SITE

6 TRACTOR WITH TROLLY Chanda Kumari BR 09F 0728 AUNTA SITE

7 TRACTOR WITH TROLLY Bhagwan Singh BR 09CA 4676 AUNTA SITE

8 TRACTOR WITH TROLLY Ranjeet Kumar BR 52A 9107 AUNTA SITE

9 TRACTOR WITH TROLLY M/s Mahesh Singh BR 52G 0230 AUNTA SITE

10 TRACTOR WITH TROLLY Divakar Kumar BR 01GD 2138 AUNTA SITE

11 TRACTOR WITH TROLLY Om Prakash Sharma BR 09H 6134 AUNTA SITE

12 TRACTOR WITH TROLLY Mandavi Devi BR 01GC 3256 AUNTA SITE

13 TRACTOR WITH TROLLY Nitesh Kumar BR 01GC 6680 AUNTA SITE

P GEN/SET

1 KIRLOSKAR GEN SET SPS GEN/SNT/250KVA/2 Kirloskar   BESIDE M1 PLANT SIMARIA SITE

2 KIRLOSKAR GEN SET SPS GEN/SNT/200KVA/2 Kirloskar   SIMARIA SITE

3 KIRLOSKAR GEN SET SPS GEN/SNT/125KVA/28 Kirloskar   CASTING YARD SIMARIA SITE

4 CASTING YARD GANTRY 200 MT SIMARIA


KIRLOSKAR GEN SET SPS GEN/SNT/125KVA/78 Kirloskar   SITE

5 TATA GEN SET SPS GEN/OPN/62.5KVA/81 TATA WORKSHOP

6 KIRLOSKAR GEN SET SPS GEN/SNT/62.5KVA/67 Kirloskar   WORKSHOP

7 KIRLOSKAR GEN SET SPS GEN/SNT/82.5KVA/19 Kirloskar   P-16 SIMARIA SITE

8 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/33 Kirloskar   P-10

9 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/35 Kirloskar   P-9

10 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/34 Kirloskar   Breakdown(Accident)

11 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/31 Kirloskar   CASTING YARD GANTRY 30 MT SIMARIA
SITE

12 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/10 Kirloskar   P-11

13 KIRLOSKAR GEN SET SPS GEN/SNT/62.5 KVA/143 Kirloskar   Transfer to Hathidah Site

14 35 KVA DG SPS GEN/SNT/35KVA/1 Kirloskar   Near Workshop

15 45 KVA DG SPS GEN/SNT/45KVA/2 Ashok Leyland   Near Workshop

16 62.5 KVA DG SPS GEN/SNT/62.5KVA/55 Kirloskar   Fabrication Yard

17 62.5 KVA DG SPS GEN/SNT/62.5KVA/129 Kirloskar   40MT Gantry

18 62.5 KVA DG SPS GEN/SNT/62.5KVA/141 Kirloskar   P-1

19 62.5 KVA DG SPS GEN/SNT/62.5KVA/142 Kirloskar   Near Workshop


AUNTA SITE
20 62.5 KVA DG SPS GEN/SNT/62.5KVA/144 Kirloskar   Batching Plant

21 125 KVA DG SPS GEN/SNT/125KVA/3 Tata Cummins India Limited  Near Workshop

22 125 KVA DG SPS GEN/SNT/125KVA/30 Kirloskar   200MT Gantry

23 125 KVA DG SPS GEN/SNT/125KVA/67 Kirloskar   Fabrication Yard

24 125 KVA DG SPS GEN/SNT/125KVA/79 Kirloskar   Casting yard

25 200 KVA DG SPS GEN/SNT/200KVA/3 Kirloskar   Batching Plant

Q AIR COMPRESSOR MACHINE

1 AIR COMPRESSOR ACR/XA/310/19 Atlas Copco India Ltd.  CASTING YARD SIMARIA SITE

2 Air Compressors ACR/XA176/8 Atlas Copco India Ltd.  AUNTA SIDE

R BOLERO/SCORPIO

1 BOLERO M/S PANKAJ SINGH BR-3P-1980

2 MAHINDRA PICK UP(CAMPER) M/S SANJEET KUMAR BR09GA6593

3 MAHINDRA PICK UP(CAMPER) M/S INDU DEVI BR046A2786


SIMARIA SITE
4 SCORPIO(SPM SIR) M/S SUDHA KUMARI BR01PS-3467

5 MAHINDRA SCORPIO M/S SYAMSUNDER PRASAD SINGH BR50P1131

6 MAHINDRA SCORPIO M/S SURAJ TRADERS BR09PA7676

7 Scorpio Sarita Kumari BR 01PF 7912

8 Scorpio Rakesh Singh BR 02PA 3721

9 Scorpio Ajit Kumar Sharma BR 09A 3528

10 Scorpio M/s Manish Kumar BR 09M 2038

11 Scarpio Ram Lalan A/F

12 Scarpio Rajkishor BR 01AZ 0520

13 Campher Rahul Kumar Pandey BR 01GF 1942


AUNTA SITE
14 Campher Rahul Kumar Pandey BR 01GG 0612

S MULTI AXLE

1 Trailers/Platforms HMT/TII/130MT/13-A

2 Trailers/Platforms HMT/TII/130MT/13-B

T HORSE

1 VOLVO HOR/VOL/150MT/12

TATA TRAILOR HOR/TAT/35MT/7


SIX LANE OF AUNTA-SIMARIA GANGA BRIDGE PROJECT
TARGET VS ACHIEVEMENT FOR MONTH OF FEBRUARY 2022
PLANNED IN THE PLANNED ACHIEVED
SR NO ACTIVITY UNITS ACHIEVED REMARKS
MONTH DATE DATE
1 P3
SEGMENT LAUNCHING Nos. 12 8
2 P4
SEGMENT LAUNCHING Nos. 12 6
3 P5
UPPER PYLON 5th LIFT Nos. 1 1 2/20/2022 2/8/2022
Erection of Erection Tackle

4 P6
UPPER PYLON 1st LIFT Nos. 1 1 2/6/2022 2/10/2022
UPPER PYLON 2nd LIFT Nos. 1 1 2/13/2022 2/17/2022
UPPER PYLON 3rd LIFT Nos. 1 2/28/2022
5 P7
Lower PYLON 3rd LIFT Nos. 1 1 2/2/2022 2/3/2022
Lower PYLON 4th LIFT Nos. 1 2/20/2022
6 P-8
Lower PYLON 2nd LIFT Nos. 1 1 2/7/2022
Lower PYLON 3rd LIFT Nos. 1
Lower PYLON 4th LIFT Nos. 1
7 P-9
PT TRUSS ERECTION AND BOTTOM SOFFIT
8 P-10
Stage-1 Nos. 1 2/25/2022
9 P-11
Tilt and Shift Correction

10 P-12
FALSE Steining Nos. 1 1 2/4/2022 2/9/2022
Bottom Plug Nos. 1 2/28/2022
11 P-13
PLACING OF CAISSION(9.3 MTR) AT LOCATION BY 05/02/2022,JOINTING OF ONE ANOTHER 3 MTR
CASSION ,GROUNDING OF CASSION AND 4TH LIFT CASTING

12 P-13 A
False wall L-2 Nos. 1 1 2/10/2022 2/12/2022
Bottom Plug Nos. 1 2/25/2022
13 P-14
PLACING OF CAISSION(9.3 MTR) AT LOCATION BY 02/02/2022 ,GROUNDING OF CASSION AND 4TH LIFT & 5TH
LIFT CASTING

14 P-15
SEGMENT LAUNCHING Nos. 2 2
S P SINGLA CONSTRUCTION PVT LTD

AUNTA SIMARIA SIX LANE GANGA BRIDGE MOKAM,BIHAR

MACHINERY/EQUIPEMENT DETAIL

2/21/2022
Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks

A CRANES

1 MINITAWK 65 TON CRANE M/S R.N MOTORS Near Bank of River at P-15 FOR JETTY
WORK

2 335 P& H CRANE M/S RAJLIFTER P-3

3 440 P& H CRANE M/S RAJLIFTER p-11

4 KOBELCO 335 CRANE SPS CRL/CRN/35 MT/04 35 MT KOBELCO P-5

5 TIL CRANE SPS CRN/TIL/40MT/02 40 MT GROVE TIL P-16

6 Crawler Crane 440 Balajee Cranes febrication

7 Crawler Crane 440 M/s ABCO Construction P-1

8 Crawler Crane 335 Muskan Cranes

9 Crawler Cranes SPS CRN/CRL/80MT/10 80 MT ABG Cranes Pvt. Ltd.  P-3

10 Stationary/Fixed Tower Cranes CRN/STC/3MT/8 3 MT Alpha Services P-2

11 TYRE MOUNTE CRANE RSV CRANE SERVICE 50 MT febrication

12 TYRE MOUNTE CRANE M/S RAJLIFTER 50 MT Steel yard (Store)

13 Stationary/Fixed Tower Cranes CRN/STC/3MT/9 3 MT Alpha Services P-1

B HYDRA

1 HYDRA-1 SPS CRN/HYD/14MT/32 14MT ESCORTS LTD p-16

2 HYDRA -2 SPS CRN/HYD/14MT/40 14MT ESCORTS LTD simariya casting yard

3 HYDRA -3 SPS CRN/HYD/14MT/37 14MT ESCORTS LTD p-10

4 Hydra -1 SPS CRN/HYD/12MT/2 PB 13R 6504 12MT Escort Const. Ltd.  AUNTA SITE

5 Hydra -1 SPS CRN/HYD/14MT/39 14MT Escorts Limited   AUNTA SITE

6 Hydra 14 Ton Balajee Cranes AUNTA SITE

C EXCAVATOR

2 EXCAVATOR POKLANE SPS EXC/TAT/20MT/12 20MT Tata Hitachi   A1-P4

D Backhoe Loader

1 CAT BACK HOE LOADER(JCB) M/S DHIRAJ KUMAR CASTING YARD SIMARIA SITE

2 Backhoe Loader SPS BHL/JCB/1.5MT/10 1.5MT JCB India Limited AUNTA SITE

E LOADER

1 LOADER SPS WLR/HMT/2.5CUM/2 2.5CUB HINDUSTAN LTD SIMARIA SITE

F TRANSIT MIXER

1 TRANSIT MIXER SPS TMX/2516/6 CUM/44 BR01GA 6326 Tata (SSIPL mixing drum) SIMARIA SITE

2 TRANSIT MIXER SPS TMX/2516/6 CUM/46 BR01GA 6328 Tata (SSIPL mixing drum) SIMARIA SITE

3 TRANSIT MIXER SPS TMX/2518/7 CUM/99 BR01GG 8489 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE

4 TRANSIT MIXER SPS TMX/2516/6 CUM/50 BR01GA 8652 Ashok Leyland (SSIPL mixing drum) SIMARIA SITE

5 Transit Mixers SPS TMX/2516/6CUM/26 BR 1GA 0933 Tata (SSIPL mixing drum) AUNTA SITE

6 Transit Mixers SPS TMX/2516/6CUM/55 HR 55N 5842 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

7 Transit Mixers SPS TMX/2518/7CUM/100 BR 01GG 8490 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

8 Transit Mixers SPS TMX/2518/7CUM/87 BR 01GE 9233 Ashok Leyland (SSIPL mixing drum) AUNTA SITE

9 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1622120 6 CUM Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

10 TRANSIT MIXER MOUNTED ON BARGE SPS 04/1341/1621/993 6 CUM Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd.  FITTED ON BOAT

11 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd.  FITTED ON HIRE BOAT

12 TRANSIT MIXER MOUNTED ON BOAT SPS 6 CUM Schwing Stetter (India) Pvt. Ltd.  FITTED ON HIRE BOAT

G BOOM PLACER

1 BOOM PLACER SPS BPL/S36X/96CPH/15 BR01GH 2094 Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 BOOM PLACER MOUNTED ON BARGE SPS CPB/SPB32/32MTR/4 Schwing Stetter (India) Pvt. Ltd.  SIMARIA (RIVER) SITE

3 Boom Placers SPS BPL/S36X/96CPH/14 BR 01GH 2096 Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

H CONCRETE PUMP

1 Concrete Pumps SPS CCP/LIN/65CPH/31 Putzmeister India Pvt.Ltd.(Aquarius)  SIMARIA SITE

2 CONCRETE PUMP SPS CCP/LIN/35CPH/22 AQUARIUS INDIA PVT.LTD SIMARIA (RIVER) SITE

I BATCHING PLANT

1 BATCHING PLANT SPS BPT/STS/60CPH/63 60CUM/HR Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 Batching Plant SPS BPT/STS/30CPH/36 30CUM/HR Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

3 Batching Plant SPS BPT/STS/30CPH/61 30CUM/HR Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

J CEMENT FEEDING SYSTEM

1 CEMENT SILO SPS SLO/CMT/125MT/90CUM/9 AKONA ENGINEERING PVT LTD SIMARIA SITE

2 Cement/Fly ash Feeding System SPS CFS/SS/DUAL/1 Schwing Stetter (India) Pvt. Ltd. AUNTA SITE

K CHILLING PLANT

1 CHILLING PLANT SPS CPT/SS/90TR/1 Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE

2 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE Tank Capacity 15000 Ltrs.

3 INSULATED WATER TANK FOR CHILLING PLANT SPS Schwing Stetter (India) Pvt. Ltd.  SIMARIA SITE Tank Capacity 15000 Ltrs.

4 Chilling Plant 70TR SPS CPT/SS/70TR/2 Schwing Stetter (India) Pvt. Ltd.  AUNTA SITE

5 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.

6 INSULATED WATER TANK FOR CHILLING PLANT SPS AUNTA SITE Tank Capacity 15000 Ltrs.

L GANTRY

1 GANTRY CRANE 30 MT SPS CRN/GRY/25 MTR/30 MT/39 A. P. INDUSTRIES CASTING YARD SIMARIA SITE

2 GANTRY CRANE 200 MT SPS CRN/GRY/25 MTR/200 MT/40 A. P. INDUSTRIES CASTING YARD SIMARIA SITE

3 GANTRY SPS CRN/GRY/25MTR/40MT/37 A.P INDUSTRIES   CASTING YARD AUNTA SITE

4 GANTRY SPS CRN/GRY/25MTR/200MT/43 A.P INDUSTRIES   CASTING YARD AUNTA SITE

5 GANTRY SPS CRN/GRY/25MTR/40MT/41 A.P INDUSTRIES   CASTING YARD AUNTA SITE


Sr. No. Equipment Description PARTY NAME PNM CODES/Assest Code Regd No. RATED CAP Make . Remarks

M STEEL TUG

1 M/S KUNDU SHIPPING STEEL TUG MIN DISARI SIMARIA SITE

2 M/S KUNDU SHIPPING STEEL TUG MIN DUHATI SIMARIA SITE

N BOAT

2 Steel Boat Ranjeet Kumar - In River AUNTA SITE

3 Steel Boat Tyagi Baba Enterprises - In River AUNTA SITE

O TRACTOR

1 TRACTOR WITH TROLLY M/S NANDKISHOR SINGH B.R -01GD-1724 SIMARIA SITE

2 TRACTOR WITH TROLLY M/S RAJLAXMI CONSTRUCTION B.R -45G-3533 SIMARIA SITE

3 TRACTOR WITH TROLLY M/S K.P AND SONS WB-39A-0727 SIMARIA SITE

P GEN/SET

1 KIRLOSKAR GEN SET SPS GEN/SNT/250KVA/2 Kirloskar   BESIDE M1 PLANT SIMARIA SITE

2 KIRLOSKAR GEN SET SPS GEN/SNT/200KVA/2 Kirloskar   casting yard

3 KIRLOSKAR GEN SET SPS GEN/SNT/125KVA/28 Kirloskar   breakdown

4 CASTING YARD GANTRY 200 MT SIMARIA


KIRLOSKAR GEN SET SPS GEN/SNT/125KVA/78 Kirloskar  
SITE

5 TATA GEN SET SPS GEN/OPN/62.5KVA/81 TATA

6 KIRLOSKAR GEN SET SPS GEN/SNT/62.5KVA/67 Kirloskar   WORKSHOP

7 KIRLOSKAR GEN SET SPS GEN/SNT/82.5KVA/19 Kirloskar   P-16 SIMARIA SITE

8 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/33 Kirloskar   P-11

9 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/35 Kirloskar  

10 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/34 Kirloskar   Breakdown(Accident)

11 CASTING YARD GANTRY 30 MT SIMARIA


KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/31 Kirloskar   SITE

12 KIRLOSKAR GEN SET SPS GEN/SNT/40 KVA/10 Kirloskar   Aunta Store

13 KIRLOSKAR GEN SET SPS GEN/SNT/62.5 KVA/143 Kirloskar   p-16

14 35 KVA DG SPS GEN/SNT/35KVA/1 Kirloskar   Near Workshop

15 45 KVA DG SPS GEN/SNT/45KVA/2 Ashok Leyland   On Boat

16 62.5 KVA DG SPS GEN/SNT/62.5KVA/55 Kirloskar   P-4 Barge

17 62.5 KVA DG SPS GEN/SNT/62.5KVA/129 Kirloskar   40MT Gantry

18 62.5 KVA DG SPS GEN/SNT/125KVA/79 Kirloskar   P-1

19 62.5 KVA DG SPS GEN/SNT/62.5KVA/142 Kirloskar   Febrication

20 62.5 KVA DG SPS GEN/SNT/62.5KVA/144 Kirloskar   Casting yard AUNTA SITE

21 125 KVA DG SPS GEN/SNT/125KVA/3 Tata Cummins India Limited  Near Workshop

22 125 KVA DG SPS GEN/SNT/125KVA/30 Kirloskar   P2

23 125 KVA DG SPS GEN/SNT/125KVA/67 Kirloskar   Gantry 200 ton

24 125 KVA DG SPS GEN/SNT/125KVA/79 Kirloskar   P1

25 125 KVA DG SPS GEN/SNT/125KVA/35 Kirloskar   Gantry 200 ton

26 200 KVA DG SPS GEN/SNT/200KVA/3 Kirloskar   Batching Plant

Q AIR COMPRESSOR MACHINE

1 AIR COMPRESSOR ACR/XA/310/19 Atlas Copco India Ltd.  aunta

2 AIR COMPRESSOR ACR/PG185/35 ELGi aunta

3 Air Compressors ACR/XA176/8 Atlas Copco India Ltd.  CASTING YARD SIMARIA SITE

R BOLERO/SCORPIO

1 BOLERO Manish kumar BR 21P 0323

2 MAHINDRA PICK UP(CAMPER) M/S SANJEET KUMAR BR09GA6593

3 MAHINDRA PICK UP(CAMPER) M/S Maa construction BR 09GB 3501


SIMARIA SITE
4 SCORPIO(SPM SIR) M/S SUDHA KUMARI BR01PS-3467

5 MAHINDRA SCORPIO M/S SYAMSUNDER PRASAD SINGH BR50P1131

6 MAHINDRA SCORPIO M/S SURAJ TRADERS BR09PA7676

7 Scorpio Sarita Kumari BR 01PF 7912

8 Scorpio Rakesh Singh BR 02PA 3721

9 Scorpio M/s Manish Kumar BR 09M 2038

10 Scarpio Ram Lalan A/F

11 Scarpio Rajkishor BR 01AZ 0520

12 Campher Rahul Kumar Pandey BR 01GF 1942

13 BOLERO Pankaj Kumar Singh BR 03P 1980

14 Campher M/s DIWAKAR KUMAR JH 01EF 6718 AUNTA SITE

15 Campher Rahul Kumar Pandey BR 01GG 0612

S MULTI AXLE

1 Trailers/Platforms HMT/TII/130MT/13-A

2 Trailers/Platforms HMT/TII/130MT/13-B

T HORSE

1 VOLVO HOR/VOL/150MT/12

2 TATA TRAILOR HOR/TAT/35MT/7


S.P. SINGLA CONSTRUCTIONS PVT. LYD.
AUNTA-SIMARIA
TARGET VS ACHIEVEMENT FOR MONTH OF MAY 2021
PLANNED IN THE PLANNED ACHIEVED
SR NO ACTIVITY UNITS MONTH ACHIEVED DATE DATE REMARKS
2 P1
segment launching PAIR

3 P2

segment launching PAIR

4 P3

UPPER PYLON 1ST Lift NOS

UPPER PYLON 2ND Lift NOS

UPPER PYLON 3rd Lift NOS

5 P4

PIER TABLE STAGE-2 NOS

6 P5

7 P6

LOWER PYLON 4TH LIFT LIFT

8 P7

LOWER PYLON 1ST LIFT LIFT

LOWER PYLON 2ND LIFT LIFT

9 P8
S.P. Singla Constructions Pvt. Ltd
Six Laning of Aunta-Simaria Ganga Bridge,Mokama
Daily Progress Report
Water Level
Mesurem Temp. Water Level as
Month : Feb 2020 ent ( Co )
Pre.Day
on DPR Date
Rain (mm) Weather
(Ganga)

Date: 1-Mar-20 Min. 19.1


34.520 34.450
Max. 24.1

Achieve
Total Achieve Total Balance as
Strucuture / Activity Unit Till Remarks
Scope Month Achieved on date
Previous
Foundation
Casting status including False Steining
A-1 Rmt 38.7 38.7 0 38.7 0.0 completed
P1 Rmt 56.7 56.7 0 56.7 0.0 completed
P2 Rmt 56.7 56.7 0 56.7 0.0 completed
P3 Rmt 56.7 56.7 0 56.7 0.0 completed
P4 Rmt 53.7 53.7 0 53.7 0.0 completed
P5 Rmt 53.7 56.6 0 56.6 -2.9 2 FS Balance
P6 Rmt 53.7 55.1 0 55.1 -1.4 2 FS Balance

P7 Rmt 53.7 0.0 9.425 9.4 44.3 L-3 TO L-15+2 FS BALANCE

P8 Rmt 53.7 53.7 0 53.700 0.0 L-12 TO L-15+2 FS Balance


P9 Rmt 53.7 53.7 0 53.7 0.0 L-15+2 FS Balance
P10 Rmt 53.7 53.6 0 53.6 0.1 L-15+2 FS Balance
P11 Rmt 53.7 50.8 0 50.8 2.9 L-14 ,L-15 & 2 FS Balance
P12 Rmt 53.7 58.1 3 61.1 -7.4 L-14 ,L-15 & 2 FS Balance
P13 Rmt 53.7 54.5 3 57.5 -3.8
P14 Rmt 53.7 0.0 0 0.0 53.7
P15 Rmt 56.7 56.7 0 56.7 0.0 completed
P16 Rmt 56.7 56.7 0 56.7 0.0 completed
A-2 Rmt 38.7 38.7 0 38.7 0.0 completed
Bottom Plug Nos 18 Err:509 Err:509 Err:509 Err:509
Well cap Nos 18 Err:509 Err:509 Err:509 Err:509
Sinking status including False Steining
A-1 Rmt 40.505 2.902 2.902 0.000 completed
P1 Rmt 60.227 -18.090 -18.090 0.000 completed
P2 Rmt 56.158 -17.936 -17.936 0.000 completed
P3 Rmt 57.875 -18.234 74.73 56.498 1.377
P4 Rmt 56.545 -17.983 72.55 54.563 1.982
P5 Rmt 52.795 -18.024 60.66 42.633 10.162
P6 Rmt 52.985 -17.968 62.30 44.331 8.654
P7 Rmt 53.693 0.000 6.31 6.306 47.387
P8 Rmt 52.741 -18.045 50.52 32.475 20.266
P9 Rmt 52.513 -17.965 61.64 43.673 8.840
P10 Rmt 52.795 -17.981 62.11 44.128 8.667
P11 Rmt 48.397 -9.314 39.30 29.989 18.408
P12 Rmt 47.226 -18.917 50.30 31.386 15.840
P13 Rmt 53.7 -15.619 -15.619 69.319
P14 Rmt 53.7 0.000 0.000 53.700
P15 Rmt 59.215 -18.205 -18.205 0.000 completed
P16 Rmt 60.789 -18.000 -18.000 0.000 completed
A-2 Rmt 39.23 2.914 0.00 2.914 0.000 completed
Total Sinking 540.41 264.60
Sub-Structure
- Abtment Shaft Nos 2 2.0 0 2.0 0.0 A-1 & A-2 shaft completed

- Lower Pylon Mtr 323.552 0.0 0 0.0 323.6


- Abtm Cap Nos 2 2.0 0 2.0 0.0
- Pier Table Nos 16 8.0 0 8.0 8.0
Super Structure
- Casting of Box Segment Nos 600 0.0 0 0.0 600.0
Simaria Site
M1 Nos 64 48.0 0 48.0 16.0
M2 Nos 60 45.0 2 47.0 13.0
M3 Nos 55 44.0 2 46.0 9.0
M4 Nos 55 23.0 1 24.0 31.0
M5 Nos 40 2 2.0 38.0
M6 Nos 21 21.0
Aunta Site
M1 Nos 64 64.0 0 64.0 0.0
M2 Nos 60 53.0 2 55.0 5.0
M3 Nos 55 52.0 2 54.0 1.0
M4 Nos 55 37.0 0 37.0 18.0
M5 Nos 40 0.0 0 0.0 40.0
M6 Nos 21 21.0
Total Nos 590 382.0 12 394.0 196.0
- Erection of Segment Nos 590 118.0 16 134.0 456.0
- Upeer Pylon Nos 16 Err:509 Err:5090 Err:509 Err:509

Cumulative as on date M-15 M-20 M-30 M-35 M-45 M-55


Concrete
Qty(In cum)
108732.719260875 4160.7 25.5 2054.2 51950.5 5671.2 38687.9