Primavera 5.

0 - Overview
Content:
• Computerized Project Management Overview
• How to install Primavera 5.0?
• Main Screens
• Data Gathering
• Data Entering
• Project Planning (ٍSchedule, Bar chart & PERT)
• Layouts & Reporting
• Case Study (Real Project)
• Updating
• Advanced options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 2


Computerized Project Management
Primavera P5.0, P6.0, P6.1, P6.2

Enterprise Management = Multi-Project  Standard Information

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 3


Project Management Software

Microsoft Project
http://www.microsoft.com/office/ Primavera Project Planner
project/prodinfo/default.mspx www.primavera.com

SuperProject
www.cai.com/products/
Open Plan superproject.htm
www.welcom.com

Plan View
Knowledge Plan www.planview.com
www.artemispm.com

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 4


Project Management Software

Project Planning Packages: 15 %


Single project
• Primavera Project Planner - P3- 1996

• Primavera P5.0 – 2005  XP windows


Multi-Project 10 %
• Primavera P6.0 – 2006  Vista window
Enterprise Management
• Primavera P6.1 - 2007
Undo • Primavera P6.2 - 2008 Integration Management
Standard Information
• Primavera P7.0 - 2010

Project Information Systems:


• Microsoft Project – MSP 50 %
Single project
• Time Line6 - TL6 6%
• Microsoft Excel 10 %

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 5


Primavera P5.0, P6.0, P6.1, P6.2

ALL TOOLS HAVE DIFFERENCES

• Network • Standard Information

• GANTT Chart • Integration Management

• Resource Allocation • Multi-project resources

• Resource Profiles • Performance analysis

• Budgeting • Interface with other software

• Reports • Flexibility & Ease of Use

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 6


Resources:
• Labor Critical Resources Parameters:
• Limited (Available < Required)
• Equipment & Tools
• Safety effect
• Material • Cost effect
• Subcontractors

P 5.0
•Labor Time unit

•Non-Labor Time unit

•Material Physical unit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 7


Breakdown Structure
D OBS: Organization Breakdown Structure
B EPS: Project Breakdown Structure
E
A RBS: Resource Breakdown Structure
G WBS: Work Breakdown Structure
C F
H

RBS M
EPS X Labor
HW E
E
Y
SW C
IT L
T
MI
H
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 8
Project Level: Systematic
Approach
Project Overview WBS:
1. Survey Baseline
2. Design
3. Procurement
Schedule
WBS (main items) 4. Construction
5. Testing
6. Handover
Main Activities Master Plan
for WBS Top

Detailed Activities
Action Plan for
each WP (design,
Resource Allocation resource, cost,..)
Middle
Planning  Analysis
Detailed
Target Plans Plans Operational

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 9


I- Project Planning
WBS: Work breakdown Structure
Activity List
Calendar
 Network
Gantt Chart
RBS: Resource Breakdown Structure
Resource List
Resource Allocation
 Resource Profiles (Histogram)
Critical Resources (Limited)
Resource Analysis (Smoothing & Leveling)
Crushing
Cost Curves
 Baseline (Target) Plan
(Planned performance)
II- Project Control
Update (actual performance)
 Performance Analysis  Variance
Performance Evaluation  KPI Report
Forecasting
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 10
Project Planning Module:
Scope of work & BOQ

Normal
Planned Performance Plan

Constraints  a) Limited Res. b) Limited Time c) Limited Budget


Target
Plan
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 11
Project Planning Module:
Scope of work = 30,000 m3 Execution

Eq. Perf. 30 m3/hr


10 day 10 hr/day
10 + 20% = 12 Eq.

Normal
Plan
Eq. rate 1000 LE/day Planned Performance
10*12*1000 = 120,000 LE
Target
Constraints  a) 8 Eq. b) 8 day c) 100,000 LE Plan
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 12
Project Planning:
Scope of work:
Activity: Execution BOQ = 30,000 m3

Time Schedule:
Duration: 10 day
Resource Schedule:
Equipment Perf. 30 m3/hr Working condition: 10 hr/day
Number of Equipment = 10 + 20% = 12 Eq

Cost Schedule:
Equipment cost rate 1000 LE/day
Total Cost = 10*12*1000 = 120,000 LE
Constraints:
a) 8 Eq. b) 8 day c) 100,000 LE

Target Plan
Activity: Excavation BOQ= 30,000
Duration: 10 day Overtime: 3 hours
No. of Eq.: 8 Excavator
Total Cost: 100,000 LE
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 13
Project Planning:
Scope of work:
Activity: Execution BOQ = 30,000 m3

Time Schedule:
Duration: 10 day
Resource Schedule:
Equipment Perf. 30 m3/hr Working condition: 10 hr/day
Number of Equipment = 10 + 20% = 12 Eq

Cost Schedule:
Equipment cost rate 1000 LE/day
Total Cost = 10*12*1000 = 120,000 LE
Constraints:
a) 8 Eq. b) 8 day c) 100,000 LE

Target Plan
Activity: Excavation BOQ= 30,000
Duration: 8 day Overtime: 5 hours
No. of Eq.: 8 Excavator
Total Cost: 100,000 LE
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 14
Multi-Project Planning:
Scope of work: Design for 3 Projects (A, B & C)
A  500 man-hour B 600 man-hour C 800 man-hour
Time Schedule:
A  3 month Start: 1/5/2010 Finish: 30/7/2010
A  2 month Start: 1/6/2010 Finish: 30/7/2010
A  3 month Start: 1/6/2010 Finish: 30/8/2010

Resource Schedule:
Design Engineer  180 man-hour/month
Resource profile ???

Cost Schedule:
Labor cost rate = $10/man-hour for in-source & 15 for out-source
Labor Cost profile ???
Constraints:
Available No. of Engineers = 10 Outsourcing = ??

Target Plan

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 15


Project Planning:
Scope of work:

Time Schedule:

Resource Schedule:

Cost Schedule:

Constraints:

Target Plan

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 16


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 17
Project Planning  Main Outputs: D
1) Network & Time Clacultion 
– Logic diagram – Flow chart – Sequence chart - PERT ES, EF
LS, LF
A B C TF

E
D

Activity Time
2) Bar Chart A

B
Time Chart
C
GANTT Chart D
(Basic plan) E

1 2 3 4 5 6 7 Time

3) Resource Profiles - Histogram (Material, Equipment, Labor, Subcontractors)

4) Resource Analysis  Limited Res. (Smoothing, Leveling, Crushing)


5) Cost Analysis (Budget, Cash In/out, S-Curve, Payments, ...)

6) Reports Baseline Planned Performance  Updating  Control


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 18
Network & Time Clacultion

Bar Chart

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 19


Resource / Budget Profiles

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 20


Project Control Module:

(Actual / Planned) Analysis

Scope of work Control

Time Resource
Control Control

Cost KPI Report for


Control each level

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 21


WBS (Main Item) List

Work Description Responsibility


Phase Package (Key person)
I- Design A110000
A210000 Refer to,
A310000
II- Procurement A120000 Project
A220000 Organization
Structure
A320000
III- Construction A130000
A230000
A330000

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 22


For example
Master Plan  Master Planned Performance
Work Duration Budget Totals
Phase Package (week) ($1000)
I- Design A110000 4 20 Time = 12 W
A210000 5 25 Cost = $ 60,000
A310000 3 15
II- Procurement A120000 2 200 Time = 7 W
A220000 3 300 Cost = 650,000
A320000 2 150
III- Construction A130000 12 24 Time = 38 W
A230000 15 32 Cost = $ 78,000
A330000 11 22

Total Project A00000 24 20 Time = 24 W


Cost = 800,000
Bonus rate = $1500 /week
Phase
I
II

III

-- -- -- -- -- Week
1 20 24
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 23
For example
Actual Performance
Work Duration Actual Totals
Phase Package (week) ($1000)
I- Design A110000 3 25 Time = 11 W
A210000 4 25 Cost = $ 62,000
A310000 4 12
II- Procurement A120000 3 220 Time = 8 W
A220000 3 260 Cost = 640,000
A320000 2 160
III- Construction A130000 11 25 Time = 35 W
A230000 13 30 Cost = $ 77,000
A330000 11 22

Total Project A00000 22 779 Bonus = 1500*2= $ 3000


+3 = 781

Phase
I
II

III

-- -- -- -- -- Week
1 20 24
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 24
For example
KPI Report
Planned Actual Total time Total cost
Phase Performance Performance variance Variance
(week) ($1000)
Time Cost Time Cost
I- Design 12 60 11 62 -1 Good +2 Bad

II- Procurement 7 650 8 640 +1 Bad -10 Good

III- Construction 38 78 35 77 -3 Good -1 Good

Total Project 24 788 22 779 -2 Good -9 Good


+3=781

Conclusion :
Strength points 1-
2-
Weakness points 1-
2-
Recommendations 1-
2-

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 25


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 26
Cost Analysis

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 27


Updating A100

A100-01

A100-02

A100-03

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 28


How to install Primavera 5.0 to 6.2?

Primavera Package ≈ 70 MB

Microsoft SQL Server (Primavera) ≈ 70 MB


Free Space > 0.5 GB

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 29


How to install Primavera 5.0?

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 30


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 31
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 32
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 33
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 34
Desktop Short Cut

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 35


Log in
1. Start Primavera by clicking the Primavera icon on the desktop or
clicking Start, Programs, Primavera, Project Management.

2. Type a Login Name <admin> and a Password <admin>, and then


click OK.

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 36


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 37
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 38
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 39
Main Screen Overview
1) Title bar
2) Menu bar 4) Navigation bar

3) Directory bar
5) Status bar

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 40


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 41
Primavera 5.0 Overview

Oracle Database

Relationship between Primavera components.


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 42
Defaults

Data Gathering

Admin User

Enterprise Project
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 43
Primavera P5.0, P6.0, P6.1, P6.2
Enterprise Management = Multi-Project  Standard Information

Information  Enterprise Level:


1) Organizational Breakdown Structure (OBS)  Managers
‫الهيكل التنظيمى للمؤسسة‬
2) Enterprise Project Structure (EPS)  Project Classification
)‫هيكل مشروعات المؤسسة (النوعية‬
3) Coding System  Standard IDs
4) Calendars  Working / Non-working days/hours
5) Resource List  Material, Labor, Non-labor
6) Cost Accounts  Cost centers

Information  Project Level:


1) Reference Data  EPS, Manager, Coding, Calendars, … etc.
2) Project name & Project ID
3) Work Breakdown Structure (WBS) – “Main Items”
4( Activity List )main activities … to … Details activities(
5) Resource Allocation
6) Planning  Analysis  Smoothing, leveling, crushing
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 44
Main Information:
I- Enterprise Data: “Long term”
• Organizational Breakdown Structure (OBS)
• Enterprise Breakdown Structure (EBS)
• Calendar List (Working & Non-working days)
• Activity Codes
• Cost Accounts (Cost Centers)
• Resource roles
• Resource List (Labor, Non-labor, Materials)

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 45


1) Organizational Breakdown Structure (OBS)

XYZ Manager (Top Manager)


Cairo Manager: Top

- IT Manager
- MIS Manager
- Network Manager Middle

Alex Manager:
- IT Manager
Operational
- MIS Manager

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 46


2) Enterprise Project Structure (EPS)
ID Name Responsible Manager
ITP IT Projects IT Manager
- Hard Ware Projects
- Soft Ware Projects
- Installation Projects
- Maintenance Projects

MIS MIS Projects IT Manager

NWP Network Projects IT Manager

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 47


3) Calendars (Working & Nonworking)
Global: Company wide
Standard 5 days

Add Holidays
10 Jan 2009

Resource: --
Supplier, Vendor, Consultant, third party

Project: ---
Customer calendar
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 48
4) Activity Codes:
Global:
Code Value Description
HW Hard Ware Activities
SW Soft Ware Activities
SR Server Activities
GA General Activates
EPS:
-----
Project:
-----

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 49


5) Cost Accounts (Cost Centers)
“Budget work break structure”

ID Name
IT IT Cost Account
ITD IT Design
ITH IT H/w
ITS IT S/w

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 50


6( Resource Role: “Policy”

Role ID: ITC Role Name: IT Crew

Description:
‫هى الدور الوظيفى للمورد والمهارات‬
• Engineer
‫المطلوبة لهذا الدور وتستخدم عند عمل‬
• Technician
‫التخطيط المبدئى للمشروع‬
• Helper
• Tool Box
Rate type: Price / unit
• Price / unit $ 100 /hour
• Price / unit 2 $ 120 /hour
• Price / unit 3
•Price / unit 4
•Price / unit 5

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 51


7) Resource List
Resource type: Labor Non-Labor Material

Global:
Resource Resource Resource Unit/day Maximum Role
ID name type units/day
HWE H/w Eng. Labor 8 Hour 8 ITC

SWE S/w Eng. Labor 8 Hour 8 ITC

MAT Total Material $1000 - -


Materials

Project:
----
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 52
Enterprise Information Systematic
Approach
Project
Master Plan for WBS
(Target plan)
WBS (main items)
(Monthly to Annual)
Milestones Top

Main Activities
Action Plan for each WP
(design, resource, cost,..)
(Weekly to Monthly) Main Steps Middle

Detailed Plans
(Daily to Weekly)
Details Operational

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 53


Main Information:

II- Project Data:


1. Project name & description
2. Work Breakdown Structure (WBS)
3. Activity list (ID, description, duration)
4. Activity relations (Predecessor, SS, SF, FS, FF)
5. Resource Assignments (allocation)
6. Resource Availability (Maximum limits)
7. Work Products & Documents
8. Notebook

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 54


1) Project name & description
- EPS: IT Projects
- Project ID: AUCIT
- Project Name: AUC IT Center
- Planned Start: 01 / 01 / 09
- Must finish by: ---- (Max. 2 Month)
- Responsible Manager (OBS): IT Manager
- Rate type: Price / unit
- Project Architect: No

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 55


2) Work Breakdown Structure (WBS)

ID Name
- SR Server room

- L1 Lab #1

- L2 Lab #2

- L3 Lab #3

- GA General Activities

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 56


3) Activity List Original duration
- SR Server room (Day)
- SRHW Server H/w activities 2
- SRSW Server S/w activities 2
- L1 Lab #1
- L1HW Lab #1 H/w activities 10
- L1SW Lab #1 S/w activities 6
- L2 Lab #2
- L2HW Lab #2 H/w activities 10
- L2SW Lab #2 S/w activities 6
- L3 Lab #3
- L3HW Lab #3 H/w activities 10
- L3SW Lab #3 S/w activities 6
- GA General Activities
- GASR Survey activities 2
- GADS Design activities 5
- GAMB Mob.& Preparation 1
- GAST Setup & testing activities 2

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 57


4) Activity Relations Original duration Predecessors
- SR Server room (Day)
- SRHW Server H/w activities 2 GAMB FS=0
- SRSW Server S/w activities 2 SRHW FS=0
- L1 Lab #1
- L1HW Lab #1 H/w activities 10 SRSW SS1-FF1
- L1SW Lab #1 S/w activities 6 L1HW SS3-FF2
- L2 Lab #2
- L2HW Lab #2 H/w activities 10 SRSW SS1-FF1
- L2SW Lab #2 S/w activities 6 L2HW SS3-FF2
- L3 Lab #3
- L3HW Lab #3 H/w activities 10 SRSW SS1-FF1
- L3SW Lab #3 S/w activities 6 L3HW SS3-FF2
- GA General Activities
- GASR Survey activities 2 - -
- GADS Design activities 5 GASR FS=0
- GAMB Mob.& Preparation 1 GADS FS=0
- GAST Setup & testing activities 2 L1SW,2SW,3SW FS=0

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 58


5) Resource allocation HWE /day SWE /day Mat
- SR Server room
- SRHW Server H/w activities 2 -
- SRSW Server S/w activities - 2
- L1 Lab #1
- L1HW Lab #1 H/w activities 3 -
- L1SW Lab #1 S/w activities - 4

- L2 Lab #2
- L2HW Lab #2 H/w activities 3 -
- L2SW Lab #2 S/w activities - 4
- L3 Lab #3
- L3HW Lab #3 H/w activities 3 -
- L3SW Lab #3 S/w activities - 4
- GA General Activities
- GASR Survey activities 1 1
- GADS Design activities 2 2
- GAMB Mob.& Preparation 1 1
- GAST Setup & testing activities 1 1
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 59
6) Resource Availability
Resource Resource Resource Unit/day Maximum Required
ID name type units/day units/day
HWE H/w Eng. Labor 8 Hour 8*4=32 ?

SWE S/w Eng. Labor 8 Hour 8*4=32 ?

Duration (day) ? ?

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 60


7) Work Products & Documents

GADS Design activities:


• Drawings Approved
• Detailed Design Specification In Progress

GAMB Mob.& Preparation


• General Documents In Progress

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 61


8) Notebook

GAMB Mob.& Preparation

• Contractor will send the equipment & tools


specification for review and approval before
it is shipped.

‫مفكرة النشاط عبارة عن المالحظات الخاصة بالنشاط أو التعليقات أو رسم‬


‫توضيحى أو صورة أو ملف فيديو حيث يمكن إضافة جميع هذه البيانات من خالل‬
.‫مفكرة النشاط‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 62


Updating ‫تحديث بيانات المشروع‬
ID Orig. Dur. Actual Start Actual Finish Remaining Dur.

Lab #1

L1HW 10 18-Jan-09 30-Jan-09 0

L1SW 6 26-Jan-09 5

General Activities:

GASR 2 03-Jan-09 04-Jan-09 0

GADS 5 05-Jan-09 10-Jan-09 0

GAMB 1 12-Jan-09 12-Jan-09 0

Server Room:

SRHW 2 15-Jan-09 17-Jan-09 0

SRSW 2 16-Jan-09 18-Jan-09 0


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 63
Main Screens & Data Entering

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 64


Gantt Chart ‫ ثم‬Show in Bottom ‫ ثم نختار‬Layout ‫لتقسيم الشاشة نضغط‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 65


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 66
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 67
Resource/Cost Usage Profile ‫ التكلفة‬/ ‫منحنى الموارد‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 68


Resource/Cost Usage Spreadsheet ‫ التكلفة‬/ ‫جدول الموارد‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 69


Activity Usage Profile ‫ التكلفة لألنشطة‬/ ‫منحنى الموارد‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 70


Activity Usage Spreadsheet ‫جدول الموارد لألنشطة‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 71


Resource leveling ‫موازنة الموارد‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 72


‫‪Preserve Scheduled Early and Late Dates‬‬
‫هذا االختيار يحفظ التواريخ المبكرة والمتأخرة المحسوبة من الشبكة قبل عمل الموازنة‬
‫ولعمل مقارنة بين تواريخ األنشطة قبل وبعد ال ‪Leveling‬من شاشة األنشطة‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪73‬‬


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 74
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 75
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 76
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 77
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 78
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 79
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 80
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 81
1) Organizational Breakdown Structure (OBS)

XYZ Manager (Top Manager)


Cairo Manager: Top

- IT Manager
- MIS Manager
- Network Manager Middle

Alex Manager:
- IT Manager
Operational
- MIS Manager

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 82


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 83
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 84
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 85
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 86
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 87
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 88
2) Enterprise Project Structure (EPS)
IT Projects
- Hard Ware Projects
- Soft Ware Projects
- Installation Projects
- Maintenance Projects

MIS Manager
-
-

Network Manager

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 89


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 90
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 91
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 92
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 93
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 94
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 95
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 96
3) Calendars (Working & Nonworking)
Global: Company wide
Standard 5 days

Resource: --
Supplier, Vendor, Consultant, third party

Project: ---
Customer calendar
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 97
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 98
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 99
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 100
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 101
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 102
• Cost Accounts (Cost Centers)

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 103


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 104
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 105
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 106
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 107
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 108
4) Activity Codes:
Global:
Code Value Description
HW Hard Ware Activities
SW Soft Ware Activities
SR Server Activities
GA General Activates
EPS:
-----
Project:
-----

1 2 3 4
WBS Main Activities
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 109
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 110
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 111
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 112
Resources (Labor, Non-labor, Materials)

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 113


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 114
5) Cost Accounts (Cost Centers)
“Budget work break structure”

IT IT Cost Account
ITD IT Design
ITH IT H/w
ITS IT S/w

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 115


6( Resource Role: “Policy”

Role ID: ITC Role Name: IT Crew

Description:
‫هى الدور الوظيفى للمورد والمهارات‬
• Engineer
‫المطلوبة لهذا الدور وتستخدم عند عمل‬
• Technician
‫التخطيط المبدئى للمشروع‬
• Helper
• Tool Box
Rate type: Price / unit
• Price / unit $ 100 /hour
• Price / unit 2 $ 120 /hour
• Price / unit 3
•Price / unit 4
•Price / unit 5

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 116


7) Resource List
Resource type: Labor Non-Labor Material

Global:
Resource Resource Resource Unit/day Maximum Role
ID name type units/day
HWE H/w Eng. Labor 8 Hour 8 ITC

SWE S/w Eng. Labor 8 Hour 8 ITC

Project:
----
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 117
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 118
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 119
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 120
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 121
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 122
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 123
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 124
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 125
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 126
Enterprise Information Systematic
Approach
Project
Master Plan for WBS
(Target plan)
WBS (main items)
(Monthly to Annual)
Milestones Top

Main Steps
Action Plan for each WP
(design, resource, cost,..)
(Weekly to Monthly) Main Activities Middle

Detailed Plans
(Daily to Weekly)
Detailed Activities Operational

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 127


Main Information:

II- Project Data:

1. Project name & description

2. Work Breakdown Structure (WBS)

3. Activity list (ID, description, duration)

4. Activity relations (Predecessor, SS, SF, FS, FF)

5. Resource Assignments (allocation)

6. Work Products & Documents

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 128


1) Project name & description
- EPS: IT Projects
- Project ID: AUCIT
- Project Name: AUC IT Center
- Planned Start: 01 / 01 / 09
- Must finish by: ---- (Max. 2 Month)
- Responsible Manager (OBS): IT Manager
- Rate type: Price / unit
- Project Architect: No

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 129


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 130
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 131
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 132
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 133
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 134
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 135
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 136
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 137
2) Work Breakdown Structure (WBS)
- SR Server room

- L1 Lab #1

- L2 Lab #2

- L3 Lab #3

- GA General Activities

Activity Codes:
1 2 3 4
WBS Work type

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 138


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 139
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 140
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 141
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 142
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 143
3) Activity List Original duration
- SR Server room (Day)
- SRHW Server H/w activities 2
- SRSW Server S/w activities 2
- L1 Lab #1
- L1HW Lab #1 H/w activities 10
- L1SW Lab #1 S/w activities 6
- L2 Lab #2
- L2HW Lab #2 H/w activities 10
- L2SW Lab #2 S/w activities 6
- L3 Lab #3
- L3HW Lab #3 H/w activities 10
- L3SW Lab #3 S/w activities 6
- GA General Activities
- GASR Survey activities 2
- GADS Design activities 5
- GAMB Mob.& Preparation 1
- GAST Setup & testing activities 2

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 144


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 145
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 146
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 147
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 148
4) Activity Relations Original duration Predecessors
- SR Server room (Day)
- SRHW Server H/w activities 2 GAMB FS=0
- SRSW Server S/w activities 2 SRHW FS=0
- L1 Lab #1
- L1HW Lab #1 H/w activities 10 SRSW SS1-FF1
- L1SW Lab #1 S/w activities 6 L1HW SS3-FF2
- L2 Lab #2
- L2HW Lab #2 H/w activities 10 SRSW SS1-FF1
- L2SW Lab #2 S/w activities 6 L2HW SS3-FF2
- L3 Lab #3
- L3HW Lab #3 H/w activities 10 SRSW SS1-FF1
- L3SW Lab #3 S/w activities 6 L3HW SS3-FF2
- GA General Activities
- GASR Survey activities 2 - -
- GADS Design activities 5 GASR FS=0
- GAMB Mob.& Preparation 1 GADS FS=0
- GAST Setup & testing activities 2 L1SW,2SW,3SW FS=0

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 149


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 150
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 151
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 152
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 153
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 154
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 155
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 156
‫عند الضغط المزدوج بالماوس على الخط الممثل للعالقة‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪157‬‬


Trace Logic

‫األنشطة السابقة والالحقة للنشاط المختار‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 158


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 159
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 160
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 161
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 162
5) Resource allocation HWE /day SWE /day
- SR Server room
- SRHW Server H/w activities 2 -
- SRSW Server S/w activities - 2
- L1 Lab #1
- L1HW Lab #1 H/w activities 3 -
- L1SW Lab #1 S/w activities - 4

- L2 Lab #2
- L2HW Lab #2 H/w activities 3 -
- L2SW Lab #2 S/w activities - 4
- L3 Lab #3
- L3HW Lab #3 H/w activities 3 -
- L3SW Lab #3 S/w activities - 4
- GA General Activities
- GASR Survey activities 1 1
- GADS Design activities 2 2
- GAMB Mob.& Preparation 1 1
- GAST Setup & testing activities 1 1
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 163
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 164
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 165
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 166
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 167
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 168
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 169
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 170
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 171
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 172
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 173
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 174
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 175
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 176
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 177
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 178
Resource Analysis
Resource Resource Resource Unit/day Maximum Required
ID name type units/day units/day
HWE H/w Eng. Labor 8 Hour 8*4=32 72 = 8*9

SWE S/w Eng. Labor 8 Hour 8*4=32 96 = 8*12

Duration (day) 45 25

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 179


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 180
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 181
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 182
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 183
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 184
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 185
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 186
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 187
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 188
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 189
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 190
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 191
7) Work Products & Documents

GADS Design activities:


• Drawings Approved
• Detailed Design Specification In Progress

GAMB Mob.& Preparation


• General Documents In Progress

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 192


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 193
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 194
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 195
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 196
8) Notebook

GAMB Mob.& Preparation

• Contractor will send the equipment & tools


specification for review and approval before
it is shipped.

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 197


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 198
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 199
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 200
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 201
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 202
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 203
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 204
‫تحديث بيانات المشروع ‪Updating‬‬
‫المشروعات المستهدفة ‪Baselines‬‬
‫قبل تحديث بيانات المشروع البد من حفظ نسخة من المشروع األصلى تسمى ‪Baselines‬‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪205‬‬


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 206
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 207
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 208
‫تحديث بيانات األنشطة من شاشة التفاصيل‬
‫بعد بدء المشروع نقوم بتسجيل تقدم األعمال بصفة دورية حتى تاريخ تحديث‬
‫البيانات ‪ Data Date‬وقبل تحديث البيانات يجب أوال تحديد نوع النسبة المئوية‬
‫التى يتم حساب تقدم النشاط على أساسها‪.‬‬
‫‪Duration:‬‬
‫نختار هذا النوع من النسب المئوية عندما يكون‬
‫تقدم أعمال النشاط يمكن حسابه عن طريق مدة التنفيذ المتبقية ‪Remaining Duration‬‬
‫‪Duration % = {(Original Duration – Remaining Duration)/Original Duration} x100‬‬

‫‪Unit:‬‬
‫نختار هذا النوع من النسب المئوية عندما يكون‬
‫تقدم أعمال النشاط يمكن حسابه عن طريق الموارد المخصصة لهذا النشاط‬
‫‪Unit % = (Actual Units / At Completion Units) x 100‬‬
‫‪Physical:‬‬
‫نختار هذا النوع من النسب عندما يكون‬
‫تقدم األعمال النشاط أسهل عن طريق التقدير الشخصى‪.‬‬
‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪209‬‬
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 210
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 211
Status

Remaining Actual started


duration date
Duration % = {(Original Duration – Remaining Duration)/Original Duration} x100
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 212
Updating ‫تحديث بيانات المشروع‬
ID Orig. Dur. Actual Start Actual Finish Remaining Dur.

Lab #1

L1HW 10 18-Jan-09 30-Jan-09 0

L1SW 6 26-Jan-09 5

General Activities:

GASR 2 03-Jan-09 04-Jan-09 0

GADS 5 05-Jan-09 10-Jan-09 0

GAMB 1 12-Jan-09 12-Jan-09 0

Server Room:

SRHW 2 15-Jan-09 17-Jan-09 0

SRSW 2 16-Jan-09 18-Jan-09 0


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 213
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 214
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 215
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 216
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 217
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 218
Advanced options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 219


Create a New File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 220


‫‪Create a New File‬‬

‫من خالل هذه الشاشة نحدد إذا كنا نرغب فى استخدام برنامج‬
‫‪Methodology Manager‬‬

‫نقوم من خالله بتصميم نماذج مختلفة ألنواع المشروعات نستفيد‬


‫بها بعد ذلك عند إنشاء مشروع جديد‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪221‬‬


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 222
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 223
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 224
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 225
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 226
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 227
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 228
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 229
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 230
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 231
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 232
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 233
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 234
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 235
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 236
Advanced
Activity Options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 237


Group

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 238


Filters

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 239


Activity Types

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 240


‫‪Activity Types‬‬
‫‪Task Dependent‬‬
‫يقوم البرنامج بحساب تواريخ النشاط طبقا للتقويم المخصص للنشاط نختار هذا‬
‫النوع إذا لم نكن نخطط لتحديد مورد لهذا النشاط أو أن الموارد المخصصة لهذا‬
‫النشاط البد أن تتم حساباتها طبقا للتقويم المخصص لألنشطة‪.‬‬

‫‪Resource Dependent‬‬
‫يقوم البرنامج بحساب تواريخ النشاط طبقا للتقويم المخصص للموارد نختار هذا‬
‫النوع عند وجود موارد حاكمة أى تتحكم فى مدة وتواريخ النشاط‪.‬‬

‫‪Level Of Effort‬‬
‫هذا النوع من األنشطة يتم تحديد مدة تنفيذه طبقا لألنشطة المرتبطة به ويستخدم‬
‫لمعرفة تاريخ بداية ونهاية ونسبة تنفيذ مجموعة من األنشطة والمثال التالى يوضح‬
‫هذا النوع من النشاط حيث تم ربط بدايته ببداية أول نشاط فى المجموعة وربط‬
‫‪.‬نهايته بنهاية آخر نشاط فى المجموعة‬

‫‪Level Of Effort‬‬
‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪241‬‬
‫‪Milestone‬‬

‫تعنى كلمة ‪ Milestone‬أهداف مرحلية وأصل الكلمة مكون من مقطعين ‪Mile‬‬


‫وتعنى ميل وكلمة ‪ Stone‬تعنى حجر حيث كان عمال الطرق فى أمريكا يقومون‬
‫بوضع حجر كل ميل لقياس اإلنجاز‪.‬‬

‫للتعبير عن بداية أو نهاية األحداث المهمة بالمشروع ‪ Milestone‬ويستخدم ال‬


‫مثل نهاية أعمال األساسات أو بداية أعمال الشبكات‪.‬‬

‫وال ‪ Milestone‬هو حدث ليس له مدة تنفيذ ونسبة إنجاز إما صفر أو ‪% 100‬‬

‫ويوجد نوعان من ال ‪ Milestone‬هما ‪ Start Milestone‬و ‪Finish Milestone‬‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪242‬‬


Duration Types

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 243


‫‪Duration Types‬‬
‫‪Fixed Duration and Units‬‬
‫مدة النشاط وكمية الموارد ثابتة ويتغير طبقا لهذه معدل الموارد لكل وحدة زمنية‪.‬‬

‫‪Fixed Unit/Time‬‬
‫معدل الموارد لكل وحدة زمنية ثاب ًتا ويتم تغيير مدة النشاط‬
‫وكمية المورد طبقا لتوا فر هذا المعدل لكل وحدة زمنية ونستخدم هذا النوع فى حالة‬
‫وجود مورد له معدل إنتاجية محدد‪.‬‬

‫‪Fixed Duration and unit / time‬‬


‫مدة النشاط ثابتة ويتغير طبقا لهذه المدة كمية الموارد ونستخدم‬
‫هذا النوع فى حالة أن النشاط البد اال نتهاء منه خالل فترة محددة بغض النظر عن‬
‫معدل إنتاجية الموارد أو كميتها حيث البد من توفير هذه المعدالت طبقا لمدة النشاط‪.‬‬
‫‪Fixed Unit‬‬
‫كمية المورد ثابتة وتتغير مدة النشاط أو معدل المورد لكل‬
‫وحدة زمنية ونستخدم هذا النوع فى حالة عقد من النو ع ‪ Lump sum‬حيث إن‬
‫الكميات والتكلفة تكون ثابتة وال تتغير‪.‬‬
‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪244‬‬
Customize
activity details

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 245


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 246
‫نضيف المالحظات أو التعليقات الخاصة بالنشاط فى هذا الجزء من الشاشة‬

‫إلدراج صورة أو رسم تفصيلى بالمفكرة‬

‫لربط المفكرة بملف أو بموقع إنترنت نضغط‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪247‬‬


‫‪Steps‬‬

‫ونفرض أن لدينا نشاط خرسانة مسلحة ونريد تقسيم هذا النشاط إلى نجارة وحدادة وصب‪:‬‬
‫الصب ‪%20‬‬ ‫النجارة ‪ %40‬الحدادة ‪%40‬‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪248‬‬


‫ عند بداية‬Complete ‫نضغط‬
‫النشاط وعمل متابعة له أمام‬
‫الخطوة المنتهية‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 249


Work Products and Documents ‫قاموس المستندات‬

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 250


Constraints

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 251


‫‪Start on or after‬‬
‫يستخدم هذا القيد لجعل النشاط ال يبدأ قبل تاريخ محدد‬
‫‪Start on or before‬‬
‫يستخدم هذا القيد لجعل النشاط ال يبدأ بعد تاريخ محدد‬
‫‪Start On‬‬
‫هذا القيد يجعل تاريخ البداية المبكرة مساويا لتاريخ البداية المتأخرة مساويا لتاريخ القيد‪.‬‬
‫‪Finish on or after‬‬
‫يستخدم هذا القيد لجعل النشاط ال ينتهى قبل تاريخ معين هو تاريخ القيد‪.‬‬
‫‪Finish on or before‬‬
‫هذا القيد يحدد آخر تاريخ يمكن للنشاط أن ينتهى فيه‬
‫‪Finish on‬‬
‫هذا القيد يجعل تاريخ النهاية المبكرة مساويا لتاريخ النهاية المتأخرة مساويا لتاريخ القيد‪.‬‬
‫‪Mandatory start‬‬
‫هذا القيد يجعل تاريخ البداية المبكرة مساويا لتاريخ البداية المتأخرة مساويا لتاريخ‬
‫القيد وفى حالة تعارض تاريخ القيد مع منطق الشبكة يتم إهمال منطق الشبكة‬
‫واحترام تاريخ القيد‪.‬‬
‫‪Mandatory finish‬‬
‫هذا القيد يجعل تاريخ النهاية المبكرة مساويا لتاريخ النهاية المتأخرة مساويا لتاريخ‬
‫القيد وفى حالة تعارض تاريخ القيد مع منطق الشبكة يتم إهمال منطق الشبكة‬
‫‪As late as possible‬‬ ‫‪.‬واحترام تاريخ القيد‬
‫يستخدم هذا القيد لجعل النشاط يبدأ متأخرً ا بقدر اإلمكان وذلك دون التأثير على‬
‫األنشطة الالحقة له أى أنه يجعل فترة السماح الحرة ‪ Free Float‬مساوية للصفر‬
‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪252‬‬
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 253
‫مصروفات المشروع ‪Expenses‬‬
‫المصروفات الخاصة بالمشروع وغير مرتبطة بالموارد مثل‬
‫المصروفات اإلدارية وتكاليف التدريب واال نتقاالت ‪...‬إلخ‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪254‬‬


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 255
‫نحدد طريقة توزيع ال ‪ Expense‬على مدة النشاط‬
‫من خانة ‪Accrual Type‬‬
‫وهى إما أن تكون كل التكاليف محملة على بداية النشاط أو‬
‫موزعة بالتساوى على مدة تنفيذ النشاط أو محملة على‬
‫نهاية النشاط‪.‬‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪256‬‬


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 257
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 258
Customize
project details

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 259


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 260
File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 261


File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 262


File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 263


File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 264


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 265
File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 266


Import & Export
Options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 267


File

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 268


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 269


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 270


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 271


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 272
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 273
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 274
Advance Project
Options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 275


PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 276
Access Mode
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 277
‫‪Exclusive‬‬
‫المستخدم الحالى فقط هو الذى يستطيع التعديل فى البرنامج وبقية‬
‫المستخدمين يمكنهم الدخول للقراءة فقط ولكن ال يمكنهم التعديل‬

‫‪Shared‬‬
‫المستخدم الحالى يمكنه الدخول والتعديل فى المشروع وبقية‬
‫المستخدمين أيضا يمكنهم الدخول والتعديل فى المشروع‬

‫‪Read Only‬‬
‫يمكنك فتح المشروع ولكن للقراءة فقط وال يمكنك التعديل فيه‬

‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪278‬‬


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 279


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 280


Edit

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 281


Tools

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 282


Admin Options

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 283


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 284


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 285


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 286


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 287


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 288


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 289


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 290


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 291


Admin

PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 292


‫‪Key Terms‬‬
‫)‪• Organizational Breakdown Structure (OBS‬‬ ‫قاموس الهيكل التنظيمى‬
‫)‪• Enterprise Project Structure (EPS‬‬ ‫هيكل مشروعات المؤسسة‬
‫)‪• Work Breakdown Structure (WBS‬‬ ‫قاموس هيكل المشروع‬
‫‪• Activity Codes‬‬ ‫قاموس أكواد األنشطة‬
‫‪• Work Products and Documents‬‬ ‫قاموس المستندات(المستندات المرجعية)‬
‫‪• Project Codes‬‬ ‫قاموس أكواد المشروعات‬
‫‪• Project Tracking‬‬ ‫متابعة المشروعات‬
‫‪• Cost Account‬‬ ‫قاموس حسابات التكلفة‬
‫‪• Cost Breakdown Structure‬‬ ‫هيكل التكلفة‬
‫‪• Constraints‬‬ ‫القيود‬
‫‪• Resource allocation‬‬ ‫تحديد الموارد الخاصة بكل نشاط‬
‫‪• Notebook Items‬‬ ‫المفكرة الخاصة بالنشاط‬
‫‪• Updating‬‬ ‫تحديث بيانات المشروع‬
‫‪• Baselines‬‬ ‫المشروعات المستهدفة‬
‫‪• Layout‬‬ ‫النموذج‬
‫‪• Expenses‬‬ ‫مصروفات المشروع‬
‫‪• Earned Value‬‬ ‫قياس القيمة المستحقة‬
‫‪• Global Changes‬‬ ‫التغييرات الشاملة‬
‫‪• Risk Management‬‬ ‫إدارة المخاطر‬
‫‪• Export‬‬ ‫تصدير بيانات المشروعات‬
‫‪• Import‬‬ ‫استيراد بيانات المشروعات‬
‫‪PM 5.0‬‬ ‫‪Computerized Project Management - Primavera 5.0 - 2010‬‬ ‫‪293‬‬