كورس براميفيرا
كورس براميفيرا
0 - Overview
Content:
• Computerized Project Management Overview
• How to install Primavera 5.0?
• Main Screens
• Data Gathering
• Data Entering
• Project Planning (ٍSchedule, Bar chart & PERT)
• Layouts & Reporting
• Case Study (Real Project)
• Updating
• Advanced options
Microsoft Project
http://www.microsoft.com/office/ Primavera Project Planner
project/prodinfo/default.mspx www.primavera.com
SuperProject
www.cai.com/products/
Open Plan superproject.htm
www.welcom.com
Plan View
Knowledge Plan www.planview.com
www.artemispm.com
P 5.0
•Labor Time unit
RBS M
EPS X Labor
HW E
E
Y
SW C
IT L
T
MI
H
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 8
Project Level: Systematic
Approach
Project Overview WBS:
1. Survey Baseline
2. Design
3. Procurement
Schedule
WBS (main items) 4. Construction
5. Testing
6. Handover
Main Activities Master Plan
for WBS Top
Detailed Activities
Action Plan for
each WP (design,
Resource Allocation resource, cost,..)
Middle
Planning Analysis
Detailed
Target Plans Plans Operational
Normal
Planned Performance Plan
Normal
Plan
Eq. rate 1000 LE/day Planned Performance
10*12*1000 = 120,000 LE
Target
Constraints a) 8 Eq. b) 8 day c) 100,000 LE Plan
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 12
Project Planning:
Scope of work:
Activity: Execution BOQ = 30,000 m3
Time Schedule:
Duration: 10 day
Resource Schedule:
Equipment Perf. 30 m3/hr Working condition: 10 hr/day
Number of Equipment = 10 + 20% = 12 Eq
Cost Schedule:
Equipment cost rate 1000 LE/day
Total Cost = 10*12*1000 = 120,000 LE
Constraints:
a) 8 Eq. b) 8 day c) 100,000 LE
Target Plan
Activity: Excavation BOQ= 30,000
Duration: 10 day Overtime: 3 hours
No. of Eq.: 8 Excavator
Total Cost: 100,000 LE
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 13
Project Planning:
Scope of work:
Activity: Execution BOQ = 30,000 m3
Time Schedule:
Duration: 10 day
Resource Schedule:
Equipment Perf. 30 m3/hr Working condition: 10 hr/day
Number of Equipment = 10 + 20% = 12 Eq
Cost Schedule:
Equipment cost rate 1000 LE/day
Total Cost = 10*12*1000 = 120,000 LE
Constraints:
a) 8 Eq. b) 8 day c) 100,000 LE
Target Plan
Activity: Excavation BOQ= 30,000
Duration: 8 day Overtime: 5 hours
No. of Eq.: 8 Excavator
Total Cost: 100,000 LE
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 14
Multi-Project Planning:
Scope of work: Design for 3 Projects (A, B & C)
A 500 man-hour B 600 man-hour C 800 man-hour
Time Schedule:
A 3 month Start: 1/5/2010 Finish: 30/7/2010
A 2 month Start: 1/6/2010 Finish: 30/7/2010
A 3 month Start: 1/6/2010 Finish: 30/8/2010
Resource Schedule:
Design Engineer 180 man-hour/month
Resource profile ???
Cost Schedule:
Labor cost rate = $10/man-hour for in-source & 15 for out-source
Labor Cost profile ???
Constraints:
Available No. of Engineers = 10 Outsourcing = ??
Target Plan
Time Schedule:
Resource Schedule:
Cost Schedule:
Constraints:
Target Plan
E
D
Activity Time
2) Bar Chart A
B
Time Chart
C
GANTT Chart D
(Basic plan) E
1 2 3 4 5 6 7 Time
Bar Chart
Time Resource
Control Control
III
-- -- -- -- -- Week
1 20 24
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 23
For example
Actual Performance
Work Duration Actual Totals
Phase Package (week) ($1000)
I- Design A110000 3 25 Time = 11 W
A210000 4 25 Cost = $ 62,000
A310000 4 12
II- Procurement A120000 3 220 Time = 8 W
A220000 3 260 Cost = 640,000
A320000 2 160
III- Construction A130000 11 25 Time = 35 W
A230000 13 30 Cost = $ 77,000
A330000 11 22
Phase
I
II
III
-- -- -- -- -- Week
1 20 24
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 24
For example
KPI Report
Planned Actual Total time Total cost
Phase Performance Performance variance Variance
(week) ($1000)
Time Cost Time Cost
I- Design 12 60 11 62 -1 Good +2 Bad
Conclusion :
Strength points 1-
2-
Weakness points 1-
2-
Recommendations 1-
2-
A100-01
A100-02
A100-03
Primavera Package ≈ 70 MB
3) Directory bar
5) Status bar
Oracle Database
Data Gathering
Admin User
Enterprise Project
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 43
Primavera P5.0, P6.0, P6.1, P6.2
Enterprise Management = Multi-Project Standard Information
- IT Manager
- MIS Manager
- Network Manager Middle
Alex Manager:
- IT Manager
Operational
- MIS Manager
Add Holidays
10 Jan 2009
Resource: --
Supplier, Vendor, Consultant, third party
Project: ---
Customer calendar
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 48
4) Activity Codes:
Global:
Code Value Description
HW Hard Ware Activities
SW Soft Ware Activities
SR Server Activities
GA General Activates
EPS:
-----
Project:
-----
ID Name
IT IT Cost Account
ITD IT Design
ITH IT H/w
ITS IT S/w
Description:
هى الدور الوظيفى للمورد والمهارات
• Engineer
المطلوبة لهذا الدور وتستخدم عند عمل
• Technician
التخطيط المبدئى للمشروع
• Helper
• Tool Box
Rate type: Price / unit
• Price / unit $ 100 /hour
• Price / unit 2 $ 120 /hour
• Price / unit 3
•Price / unit 4
•Price / unit 5
Global:
Resource Resource Resource Unit/day Maximum Role
ID name type units/day
HWE H/w Eng. Labor 8 Hour 8 ITC
Project:
----
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 52
Enterprise Information Systematic
Approach
Project
Master Plan for WBS
(Target plan)
WBS (main items)
(Monthly to Annual)
Milestones Top
Main Activities
Action Plan for each WP
(design, resource, cost,..)
(Weekly to Monthly) Main Steps Middle
Detailed Plans
(Daily to Weekly)
Details Operational
ID Name
- SR Server room
- L1 Lab #1
- L2 Lab #2
- L3 Lab #3
- GA General Activities
- L2 Lab #2
- L2HW Lab #2 H/w activities 3 -
- L2SW Lab #2 S/w activities - 4
- L3 Lab #3
- L3HW Lab #3 H/w activities 3 -
- L3SW Lab #3 S/w activities - 4
- GA General Activities
- GASR Survey activities 1 1
- GADS Design activities 2 2
- GAMB Mob.& Preparation 1 1
- GAST Setup & testing activities 1 1
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 59
6) Resource Availability
Resource Resource Resource Unit/day Maximum Required
ID name type units/day units/day
HWE H/w Eng. Labor 8 Hour 8*4=32 ?
Duration (day) ? ?
Lab #1
L1SW 6 26-Jan-09 5
General Activities:
Server Room:
- IT Manager
- MIS Manager
- Network Manager Middle
Alex Manager:
- IT Manager
Operational
- MIS Manager
MIS Manager
-
-
Network Manager
Resource: --
Supplier, Vendor, Consultant, third party
Project: ---
Customer calendar
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 97
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 98
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 99
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 100
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 101
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 102
• Cost Accounts (Cost Centers)
1 2 3 4
WBS Main Activities
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 109
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 110
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 111
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 112
Resources (Labor, Non-labor, Materials)
IT IT Cost Account
ITD IT Design
ITH IT H/w
ITS IT S/w
Description:
هى الدور الوظيفى للمورد والمهارات
• Engineer
المطلوبة لهذا الدور وتستخدم عند عمل
• Technician
التخطيط المبدئى للمشروع
• Helper
• Tool Box
Rate type: Price / unit
• Price / unit $ 100 /hour
• Price / unit 2 $ 120 /hour
• Price / unit 3
•Price / unit 4
•Price / unit 5
Global:
Resource Resource Resource Unit/day Maximum Role
ID name type units/day
HWE H/w Eng. Labor 8 Hour 8 ITC
Project:
----
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 117
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 118
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 119
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 120
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 121
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 122
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 123
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 124
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 125
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 126
Enterprise Information Systematic
Approach
Project
Master Plan for WBS
(Target plan)
WBS (main items)
(Monthly to Annual)
Milestones Top
Main Steps
Action Plan for each WP
(design, resource, cost,..)
(Weekly to Monthly) Main Activities Middle
Detailed Plans
(Daily to Weekly)
Detailed Activities Operational
- L1 Lab #1
- L2 Lab #2
- L3 Lab #3
- GA General Activities
Activity Codes:
1 2 3 4
WBS Work type
- L2 Lab #2
- L2HW Lab #2 H/w activities 3 -
- L2SW Lab #2 S/w activities - 4
- L3 Lab #3
- L3HW Lab #3 H/w activities 3 -
- L3SW Lab #3 S/w activities - 4
- GA General Activities
- GASR Survey activities 1 1
- GADS Design activities 2 2
- GAMB Mob.& Preparation 1 1
- GAST Setup & testing activities 1 1
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 163
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 164
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 165
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 166
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 167
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 168
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 169
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 170
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 171
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 172
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 173
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 174
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 175
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 176
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 177
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 178
Resource Analysis
Resource Resource Resource Unit/day Maximum Required
ID name type units/day units/day
HWE H/w Eng. Labor 8 Hour 8*4=32 72 = 8*9
Duration (day) 45 25
Unit:
نختار هذا النوع من النسب المئوية عندما يكون
تقدم أعمال النشاط يمكن حسابه عن طريق الموارد المخصصة لهذا النشاط
Unit % = (Actual Units / At Completion Units) x 100
Physical:
نختار هذا النوع من النسب عندما يكون
تقدم األعمال النشاط أسهل عن طريق التقدير الشخصى.
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 209
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 210
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 211
Status
Lab #1
L1SW 6 26-Jan-09 5
General Activities:
Server Room:
من خالل هذه الشاشة نحدد إذا كنا نرغب فى استخدام برنامج
Methodology Manager
Resource Dependent
يقوم البرنامج بحساب تواريخ النشاط طبقا للتقويم المخصص للموارد نختار هذا
النوع عند وجود موارد حاكمة أى تتحكم فى مدة وتواريخ النشاط.
Level Of Effort
هذا النوع من األنشطة يتم تحديد مدة تنفيذه طبقا لألنشطة المرتبطة به ويستخدم
لمعرفة تاريخ بداية ونهاية ونسبة تنفيذ مجموعة من األنشطة والمثال التالى يوضح
هذا النوع من النشاط حيث تم ربط بدايته ببداية أول نشاط فى المجموعة وربط
.نهايته بنهاية آخر نشاط فى المجموعة
Level Of Effort
PM 5.0 Computerized Project Management - Primavera 5.0 - 2010 241
Milestone
وال Milestoneهو حدث ليس له مدة تنفيذ ونسبة إنجاز إما صفر أو % 100
Fixed Unit/Time
معدل الموارد لكل وحدة زمنية ثاب ًتا ويتم تغيير مدة النشاط
وكمية المورد طبقا لتوا فر هذا المعدل لكل وحدة زمنية ونستخدم هذا النوع فى حالة
وجود مورد له معدل إنتاجية محدد.
ونفرض أن لدينا نشاط خرسانة مسلحة ونريد تقسيم هذا النشاط إلى نجارة وحدادة وصب:
الصب %20 النجارة %40الحدادة %40
Shared
المستخدم الحالى يمكنه الدخول والتعديل فى المشروع وبقية
المستخدمين أيضا يمكنهم الدخول والتعديل فى المشروع
Read Only
يمكنك فتح المشروع ولكن للقراءة فقط وال يمكنك التعديل فيه