ESTIMATING AND COSTING

ESTIMATE OF SEPTIC TANK FOR 25 USERSs


n
Example 1.-Prepare a detailed estimate ot a Septic tank with Soak-pit
the given drawings, Fig. 10-1.
Soak-pit for 25 users
Septic tank shall be of first class brickwork in l:4 cement mortar the found. Trom
shall be of 1:3:6cement concrete. Inside of septic tank shall befinished with 12 mmon nd n
and
floor shall be finished with 20 mm cement plaster witnl mortar mixed with sentpla floor
Proofing compound. Upper and lower portion ot soak-pitshal be of second class bricard wa
Cement mortar and middle portion shall be of dry brickwork. Roof covering slabs o r k in
shal be of precast R.C.C. The length of the connecting pipe from latrine seat mavbafne w
metres Assume suitable rates.
latrine seat may De
taken as

SEPTIC TANK FOR 25 USERS

C. I.Cowl
SOAKKPIT
50mm Dia. C. I. Ventilating pipe 2mm High
Bolt 75cm R. C. C. Slab Precast 7.5cm R.C.C. U-Bolt
G. L Slab 30x30cm Reno
Inlet Sn15 Outlet Brick work
with20
100mm 1 6cement mortar 2
S. W. Pipe 00 mmDia
300 cm Long cm R. C. C. J W. Pipe 300
Battle 100cm
iron Foot Steps Dia

0. Slope 1 in
20
Dry Brick
Work
15cm
:3:6 C.C. Coarse Sand

20
Brick Work with Brick Aggrega
1:6 Cement mortar

15cm Coarse Sand AE


9

Iron Foot
4cm R.C.c.
Baffle
90 100cm Dia
-40
200

20 402

15cm Brick Aggregate

PLAN
All
Dimensions in Cenfimetre unless otherwise Speciie

Fig..6-1
SEPTIC TANK FOR 25 USERS 287
Details of Measurement and Calculation of
Quantities (Ex. 1)
Item| Particulars of
No. items and details No. |Length Breadthor
Height Quantity| Explanatory notes
ol workS
Depth
m m

I. Earthwork in exca
vation Septic tank 2.80 1.70 L.95 9.28 Ht. = 140 + 30+205
Soak-pit up to
195 m 'S
3.00 m depth
TK2.00 ca I+ O.
2 +C.2+ O,
.009.42

Soak-pit lower 0.20 0.30 Below dry brickw


portion
Total 19.00 cu m H: 20mm
2. Cement concrete
1:3:6-Floor and
foundationn
Sloping 1loor
2.0
2.00
.
0.90
0.20 0.95
0.05 0.09Average thickness

Total 1.04
1OT
2
5 Cm
3. First class cu m
brickwork in 1:4
cement mortar in
Septic tank
Long walls
Tst step 2.60 0.30 0.60 0.94
2ndsstep 2.40 0.20 1.15 1.10
Short wals-
Ist step 0.90 0.30 0.60
2ndstep 0.90 0.20 1.15 0.3
0.42
4. 2nd class brick- Total 2.78
work in I:6 cement
Ccu m
mortar in
$0ak-pil
Upper portion X1.20 x 0.200.50 O.15 L= mean circum.
Lower portion| (TX1.20 x 0.20
5. | 2nd class dry Total 0.53 cu m
brickwork in Soak
6.
pit
Precast
TX 1.20 x0.20 2.50 1.88 cu m
R.C. work
finished smooth in-
cluding steel rein
lorcement complete
laid in position
Rool cover slab of
Septic tankk 2.40 1.30 0.075 0.234 7.5 cm thickness
I TXI.404
Roof cover slab of x 0.075 0.115
soak-pit
Baffle wall in
4
septic
tank
I1.00|0.04 0.45 0.018
Total 0.367 cu m
288
ESTIMATING AND cOSTING

ltem Particulars of Height


No. items and details No.
works Length Breadthor Quantity Explanatory notes
Depth
m
7. 12 mm cement
T:3
plaster
withstandardwater
proofing compound in
ptic tank
Long walls
Short walls 2.00 .70 6.80
0.90 1.70 3.06
Inner face
Total 9.86
. 20 mm cement plaster Sq m
1:3 with standard water
proofing compound in
floor of septic tank
2.00 0.90 1.80
9. 50 mm size brick sq m
2ggregate
Outer side of
soak-pit I (T*1.55) X .15 2.50
At 1.84 L =mean circum.
bottom of
soak-pit TX1.013
4 0.20 0.16

10. Total 2.00


Coarse sand outer side of
Cu

k-pit
I1.
TX1.85 x.15 2.50 2.18
| Iron foot steps of 16 mm
cu m
L mean circum.
dia. bar **

12. 100 dia. S.W. pipe


mm
4 nos.

laying and jointing with


I:3 cement mortar
complete
Inlet end from latrine to
Septic tank
Outer end from 3.00
tank to soak-pit
septic 3.00
3.30
3.30
13. Total
S.W. Tee
100 mm dia. 0.30
with oneleg of 40 cm m

14. S.W. Bend 100 mm dia no.

15. 50 mm dia. C.I. no.


ventilating pipe
2.00
**

16. |50 mm dia. C.I. cowl at 2.00 m


top of
ventilating pipe
I no.