Over All Total Point 38 0 45 0 5 0 0 0 713 27 0 0 2 67

Sub Base Compaction Test Details


Total Point Reference # Test Date ACP Zone B GBEC Al Maha Irrigation Initial Sirar Madas Satco Taqeqi Al Otaibi Louis Berer AFLAK AL JABAL
25 1128 1/1/2022 13 12
52 1129 1/2/2022 52
10 1130 1/3/2022 10
17 1131 1/4/2022 17
50 1132 1/5/2022 40 10
26 1133 1/6/2022 6 20
34 1134 1/8/2022 4 30
21 1135 1/9/2022 17 4
36 1136 1/10/2022 10 3 23
27 1137 1/11/2022 2 5 20
47 1138 1/12/2022 38 9
46 1139 1/13/2022 8 4 26 8
42 1140 1/15/2022 42
16 1141 1/16/2022 14 2
136 1142 1/17/2022 6 130
38 1143 1/18/2022 10 28
16 1145 1/20/2022 16
22 1146 1/22/2022 16 6
22 1147 1/23/2022 10 2 10
42 1148 1/24/2022 42
13 1149 1/25/2022 11 2
39 1150 1/26/2022 37 2
29 1151 1/27/2022 2 25 2
34 1152 1/29/2022 34
41 1153 1/30/2022 6 35
16 1154 1/31/2022 16
11 1155 2/1/2022 4 5 2
9 1156 2/2/2022 9
18 1157 2/3/2022 14 4
16 1158 2/5/2022 16
41 1160 2/7/2022 24 17
26 1161 2/8/2022 12 14
21 1162 2/9/2022 21
23 1163 2/10/2022 23
44 1164 2/13/2022 44
49 1166 2/14/2022 41 8
33 1167 2/15/2022 11 6 16
16 1168 2/16/2022 16
26 1169 2/17/2022 16 10
14 1170 2/19/2022 2 12
18 1170 2/20/2022 4 14
31 1174 2/24/2022 4 14 13
0
0
0
0
0
0
0
0
0
0
0
0
0
MPA LEGEND: TEST PERCENTAGE:
20 MPS DONE CRUSHING OF CYLINDER 3 DAYS 40% OF REQUIRED COMPRESSIVE STRENGTH
30 MPA NEXT SCHEDULE FOR CRUSHING OF CYLINDER 7 DAYS 75% OF REQUIRED COMPRESSIVE STRENGTH
35 MPA FOR RFI 28 DAYS100% OF REQUIRED COMPRESSIVE STRENGTH
COMPRESSIVE STRENGHT LOG SHEET
QTY of Targe t
Work DA TE OF Casting/Com Grout Grout Grout 7 DAYS Date 7 DAYS RFI # 7 D AYS Tar get 7 28 DA YS Date of
S/N RFI # C ONC RETE Sub Con Slum Temp MPA Zone Description Average 28 DAYS RFI # 28 DAYS Average 28
or der # POU RIN G
pressive of Sample Temp Comp of Testing A chieved DA YS TESTING
Cylinder DAYS

1 - 9-May-20 ACP 6 3 3 Trail Mix Trail Mix 16-May-20 CIV-RFI-188 25.1 33.7 29.40 15 Mpa 6-Jun-20 CIV-RFI-242 41 43.6 42.5 42.37 20 Mpa
2 - 9-May-20 GBEC 6 3 3 C-20 Trail Mix Trail Mix 16-May-20 CIV-RFI-188 43.9 44.6 44.25 22.5 Mpa 6-Jun-20 CIV-RFI-242 48.6 47.7 46.7 47.67 30 Mpa
3 - 21-May-20 Madas 6 3 3 C-30 Trail Mix Trail Mix 28-May-20 CIV-RFI-188 38.9 43.8 41.35 26.25 Mpa 18-Jun-20 CIV-RFI-242 47.3 49 50.7 49.00 35 Mpa
4 Civ-375 2-Jul-20 GBEC 6 1 C-35 A1-1 Chamber Base slab 9-Jul-20 CIV-RFI-424 25.3 25.4 25.35 22.5 Mpa 30-Jul-20 CIV-RFI-679 32.7 37.5 34.3 34.83 30 Mpa
5 Civ-395 6-Jul-20 ACP 6 3 3 C-30 A1 Lean concrete for Mosque Foundation 13-Jul-20 CIV-RFI-445 27.6 25.8 26.70 15 Mpa 3-Aug-20 CIV-RFI-682 30.3 30.9 31.1 30.77 20 Mpa
6 Civ-418 9-Jul-20 ACP 6 2 2 C-20 Zone A2 Block-Warehouse Foundation 16-Jul-20 CIV-RFI-498 27.6 30.7 29.15 15 Mpa 6-Aug-20 CIV-RFI-720 33.0 35.3 30.9 33.07 20 Mpa
7 CIV-476 221841 15-Jul-20 GBEC 6 1 1 C-20 Zone B1-10 & 13 Pouring Concrete for IC base slab Location B1-10,13 IC #.001 (Nos 2 22-Jul-20 CIV-RFI-573 25.8 24.8 25.30 22.5 Mpa 12-Aug-20 CIV-RFI-802 31.7 35.3 25.1 30.70 30 Mpa
8 CIV-482 246101 16-Jul-20 ACP 6 6 6 C-30 Zone A1 Lean Concrete for Dining & Kitchen Foundation .Location A3-5 Block 23-Jul-20 CIV-RFI-592 22.2 20.4 21.30 15 Mpa 13-Aug-20 CIV-RFI-806 25.2 28.9 28.4 27.50 20 Mpa
9 CIV-RFI-526 221842 19-Jul-20 Initial 6 7 7 C-20 Zone B3 Lean concrete for B3-Swimming Pool 14X25 Below Base Slab 26-Jul-20 CIV-RFI-624 24.5 21.8 23.15 15 Mpa 16-Aug-20 CIV-RFI-815 28.8 27.4 27.5 27.90 20 Mpa
10 CIV-548 221843 20-Jul-20 ACP 6 3 3 C-20 A1- Block MOSQUE Concrete for Mosque Foundation. Location A1-1 MOSQUE 27-Jul-20 CIV-RFI-631 26.9 28.2 27.55 22.5 Mpa 17-Aug-20 CIV-RFI-404 37.2 38.5 34.5 36.73 30 Mpa
11 CIV-549 246103 21-Jul-20 GBEC 3 1 1 C-30 Zone A1 Zone A1-1 Drainage Network Part 1/4 & 2/4 28-Jul-20 CIV-RFI-656 27.5 25.6 26.55 22.5 Mpa 18-Aug-20 CIV-RFI-855 34.4 31.1 32.8 32.77 30 Mpa
12 CIV-550 246103 21-Jul-20 GBEC 3 1 1 C-30 Zone B1-10 & 13 B1-Block 10 to13 Sewage Networks 2/3 & Part 3/3 28-Jul-20 CIV-RFI-657 24.2 21.2 22.70 22.5 Mpa 18-Aug-20 CIV-RFI-856 34.4 31.1 32.8 32.77 30 Mpa
13 CIV-596 246019 23-Jul-20 ACP 6 7 7 C-30 A2-Dinning hall and Kitchen Lean concrete for Foundation A2-Dinning Hall and Kitchen 30-Jul-20 CIV-RFI-679 24.4 27.4 25.90 15 Mpa 20-Aug-20 CIV-RFI-895 28.2 28.6 31.2 29.33 20 Mpa
14 CIV-615 221844 25-Jul-20 ACP 6 3 3 C-20 Zone A2 Block-Warehouse & Maintenance Building 1-Aug-20 CIV-RFI-680 28.4 26.1 27.25 22.5 Mpa 22-Aug-20 CIV-RFI-906 42.4 35.6 38.6 38.87 30 Mpa
15 CIV-620 221845 26-Jul-20 GBEC 6 1 1 C 30 Zone B1-11& 12 Sewage Drain Ne
Concrete For base slab Chambers Location B1-Block 11 & 12 Drainag 2-Aug-20 CIV-RFI-681 36 35 35.50 22.5 Mpa 23-Aug-20 CIV-RFI-921 43.5 41.4 46.2 43.70 30 Mpa
16 CIV-RFI-650 221846 27-Jul-20 Initial 12 7 7 C 30 A3-1 Swimming Pool lean concrete for Base slab Location A3-Swimming Pool Excavation Lev 3-Aug-20 CIV-RFI-683 23.9 23.5 23.70 15 Mpa 24-Aug-20 CIV-RFI-926 26.1 28 27.9 27.33 20 Mpa
17 CIV-RFI-660 246053 28-Jul-20 GBEC 3 1 1 C-20 Zone B1-1,2,3 & 4 Drainage netw
Concrete For base slab Chambers LocationZone B1-1,2,3 & 4 Drainage 4-Aug-20 CIV-RFI-699 23.7 23.5 23.60 22.5 Mpa 25-Aug-20 CIV-RFI-948 33.4 32.2 30.6 32.07 30 Mpa
18 CIV-RFI-661 246053 28-Jul-20 GBEC 3 C 30 Zone A1-1 Drainage Network parConcrete For base slab Chambers Location Zone A1-1 Drainage Networ 4-Aug-20 CIV-RFI-700 23.7 23.5 23.60 22.5 Mpa 25-Aug-20 CIV-RFI-949 33.4 31.2 30.6 31.73 30 Mpa
19 CIV-RFI-678 246055 29-Jul-20 ACP 6 1 1 C 30 Block- A2 Warehouse & MaintenConcrete For Necks Column Location A2 - Warehouse & Maintenece Fa 5-Aug-20 CIV-RFI-710 34.5 40.3 37.40 22.5 Mpa 26-Aug-20 CIV-RFI-963 40.6 40.1 46.3 42.33 30 Mpa
20 CIV-RFI-737 246063 6-Aug-20 ACP 6 3 3 C 30 A3- Block 5 Dinning Hall & Kit Concrete For lean Concrete locationA3- Block 5 Dinning Hall & Kitche 13-Aug-20 CIV-RFI-816 25.1 22.6 23.85 15 Mpa 3-Sep-20 CIV-RFI-1077 33.1 28.1 30.2 30.47 20 Mpa
21 CIV-RFI-714 246064 8-Aug-20 Initial 6 1 1 C-20 B4-Swimming Pool Lean concrete for Base slab Location B4-Swimming Pool Excavation Le 15-Aug-20 CIV-RFI-830 19.9 23.5 21.70 15 Mpa 5-Sep-20 CIV-RFI-1089 31.6 27.2 36.3 31.70 20 Mpa
22 CIV-RFI-746 246064 8-Aug-20 GBEC 6 2 2 C-20 Zone A1-1 Drainage Network PartConcrete for IC Base Slab @ Location Zone A1-1 Drainage Network 15-Aug-20 CIV-RFI-831 29.7 30 29.85 22.5 Mpa 5-Sep-20 CIV-RFI-1090 32.8 37.7 33.7 34.73 30 Mpa
23 CIV-RFI-418 246065 9-Aug-20 ACP 6 4 4 C-30 A2 Block-Warehouse Lean Concrete Pouring Inspeciton for warehouse Foundation location 16-Aug-20 CIV-RFI-843 20.7 18.9 19.80 15 Mpa 6-Sep-20 CIV-RFI-1111 28.8 30.9 30.2 29.97 20 Mpa
24 CIV-RFI-791 246070 11-Aug-20 GBEC 6 5 5 C-20 A1-Block 8 Draing Networks ParConcrete For base slab Chambers Location A1-Block 8 Draing Network 18-Aug-20 CIV-RFI-857 26.4 27.4 26.90 22.5 Mpa 8-Sep-20 CIV-RFI-1147 33.3 33.4 33 33.23 30 Mpa
25 CIV-RFI-803 246029 12-Aug-20 ACP 18 13 13 C-30 A3- Block 5 Dinning Hall & Kit Concrete For Cloumn Foundations locationA3- Block 5 Dinning Hall 19-Aug-20 CIV-RFI-878 27.5 30.9 29.20 22.5 Mpa 9-Sep-20 CIV-RFI-1152 37.0 37.8 38.53 37.77 30 Mpa
26 CIV-RFI-817 13-Aug-20 ACP 4 4 4 C-30 A2-Dinning hall and Kitchen Lean concrete for column Foundations Location A2-Dinning Hall and Ki 20-Aug-20 CIV-RFI-893 24.8 23.6 24.20 15 Mpa 10-Sep-20 CIV-RFI-1161 26.8 31.2 29.7 29.23 20 Mpa
27 CIV-RFI-818 246028 13-Aug-20 ACP 4 2 2 C-20 Zone A2-1 Warehouse building Lean concrete for Ground Beem Location Zone A2-1 Warehouse buildi 20-Aug-20 CIV-RFI-893 24.8 23.6 24.20 15 Mpa 10-Sep-20 CIV-RFI-1161 26.8 31.2 29.7 29.23 20 Mpa
28 CIV-RFI-819 13-Aug-20 GBEC 4 1 1 C-20 Zone A1-1 Drainage Network PartConcrete For Inspection Chamber base slab Chambers of Drinage Netw 20-Aug-20 CIV-RFI-894 36.6 34.2 35.40 22.5 Mpa 10-Sep-20 CIV-RFI-1162 39.3 39.6 39 39.30 30 Mpa
29 CIV-RFI-839 246080 16-Aug-20 GBEC 6 1 1 C-30 Zone A1- Block 9 Drainage Netwo
Concrete For Inspection Chamber base slab of Drainage Network @ L 23-Aug-20 CIV-RFI-920 33.9 31.1 32.50 22.5 Mpa 13-Sep-20 CIV-RFI-1186 39.3 40.3 41.4 40.33 30 Mpa
30 CIV-RFI-880 246036 19-Aug-20 ACP 6 3 3 C-30 Block-Warehouse & MaintenanceConcrete pouring for Grade Beam Location A2 - Warehouse & Maintenece26-Aug-20 CIV-RFI-962 33.1 35.4 34.25 22.5 Mpa 16-Sep-20 CIV-RFI-1229 41.3 43.7 39.7 41.57 30 Mpa
31 CIV-RFI-909 246094 23-Aug-20 ACP 6 4 4 C-30 A3- Block 5 Dinning Hall & Kit Concrete pouring for Necks Column Concrete locationA3- Block 5 Din 30-Aug-20 CIV-RFI-1013 31.9 35.3 33.60 22.5 Mpa 20-Sep-20 CIV-RFI-1281 41.4 33.8 37.1 37.43 30 Mpa
32 CIV-RFI-927 24-Aug-20 GBEC 6 6 6 C-30 Zone A1-4, 5& 6 Drainge NetworkConcrete pouring for IC Base Slab Location Zone A1-4, 5& 6 Draing 31-Aug-20 CIV-RFI-991 34.3 32.3 33.30 22.5 Mpa 21-Sep-20 CIV-RFI-1287 42.0 39.1 41.6 40.90 30 Mpa
246095
33 CIV-RFI-929 24-Aug-20 ACP 24 12 12 C-30 Block-A2 Dinning Hall Type C Concrete pouring for Column Footing Location A2 Dinning Hall Foot 31-Aug-20 CIV-RFI-991 32.8 31.5 32.15 22.5 Mpa 21-Sep-20 CIV-RFI-1287 41.2 40.7 41.3 41.07 30 Mpa
34 CIV-RFI-951 26-Aug-20 Initial 6 2 2 C-30 Zone B3-1 Swimming Pool Concrete pouring for Screed Slab for swimming pool B3-1 2-Sep-20 CIV-RFI-1059 27.6 27 27.30 26.25 Mpa 23-Sep-20 CIV-RFI-1325 29.8 28.6 30.4 29.60 35 Mpa
246154
35 CIV-RFI-964 26-Aug-20 ACP 6 1 1 C-30 A1-MOSQUE Concrete pouring for Ground beam Lean Location A1-MOSQUE 2-Sep-20 CIV-RFI-1060 30.5 31 30.75 22.5 Mpa 23-Sep-20 CIV-RFI-1326 39.0 37.9 40.4 39.10 30 Mpa
36 CIV-RFI-981 246159 27-Aug-20 Initial 6 2 2 C-30 Zone A3-1 Swimming Pool Concrete pouring for Screed Slab for swimming pool A3-1 3-Sep-20 CIV-RFI-1076 30.5 29.3 29.90 26.25 Mpa 24-Sep-20 CIV-RFI-1323 38.4 39.7 39.3 39.13 30 Mpa
37 CIV-RFI-1080 3-Sep-20 ACP C-35 Zone A3-5 Dinning & Kitchen Concrete Pouring for Neck Column (C8 - 4 Nos) Location Zone A3-5 D 10-Sep-20 CIV-RFI-1163 30.8 32 31.40 22.5 Mpa 1-Oct-20 CIV-RFI-1412 43.2 42.2 40.7 42.03 30 Mpa
38 CIV-RFI-1081 246177 3-Sep-20 ACP 12 7 7 C-30 Block-A2 Dinning Hall & Kitch Concrete Pouring for Dinning Hall & Kitchen Neck Colum Location A2 10-Sep-20 CIV-RFI-1163 30.8 32 31.40 22.5 Mpa 1-Oct-20 CIV-RFI-1412 43.2 42.2 40.7 42.03 30 Mpa
39 CIV-RFI-1082 3-Sep-20 ACP C-30 Zone A1 Mosque Concrete Pouring for Groud Beam & Minaret Foundation Location A1- 10-Sep-20 CIV-RFI-1163 30.8 32 31.40 22.5 Mpa 1-Oct-20 CIV-RFI-1412 43.2 42.2 40.7 42.03 30 Mpa
40 CIV-RFI-1100 246180 5-Sep-20 ACP 6 6 6 C-30 Block B3-5 Dining Hall & KitchLean Concrete for Dining & Kitchen Foundation .Location B3-5 Block 12-Sep-20 CIV-RFI-1176 21.9 20.5 21.20 15 Mpa 3-Oct-20 CIV-RFI-1425 23.9 23.6 28.5 25.33 20mpa
41 CIV-RFI-1177 246105 12-Sep-20 GBEC 6 1 1 C-20 B1-1,2 Concrete pouring for Chamber Base slab location B1-1 # 001,001,00 19-Sep-20 CIV-RFI-1257 22.3 22.6 22.45 22.5 Mpa 10-Oct-20 CIV-RFI-1486 34.2 34.4 34.5 34.37 30 Mpa
42 CIV-RFI-1188 13-Sep-20 Initial 6 6 6 C-30 Zone A4 Concrete pouring for Lean Concrete Location A4- Swimming Pool 10 x 20-Sep-20 CIV-RFI-1279 19.8 21.9 20.85 15 Mpa 11-Oct-20 CVI-RFI-1503 25.4 25.8 25.8 25.67 20 Mpa
246201
43 CIV-RFI-1189 13-Sep-20 ACP 18 18 18 C-20 Zone B3 Concrete For Cloumn Foundations Location B3- Block 5 Dinning Hall 20-Sep-20 CIV-RFI-1280 25.2 23.6 24.40 22.5 Mpa 11-Oct-20 CVI-RFI-1504 41.2 39.3 39.9 40.13 30 Mpa
44 CIV-RFI-1223 182116 15-Sep-20 GBEC 6 1 1 C-30 Zone B1 Concrete pouring for Incpection Chamber Base Slab Location B1-3 par 22-Sep-20 CIV-RFI-1305 26.2 28.9 27.55 22.5 Mpa 13-Oct-20 CVI-RFI-1527 38.3 31.3 35 34.87 30 Mpa
45 CIV-RFI-1292 21-Sep-20 GBEC 6 3 3 C-30 Zone B1 Concrete Pouring For IC Base Slab Drainage Network Location Zone B 28-Sep-20 CIV-RFI-1370 26.6 28.9 27.75 22.5 Mpa 19-Oct-20 CVI-RFI-1570 36.4 40.2 33.4 36.67 30 Mpa
46 CIV-RFI-1294 246193 21-Sep-20 ACP 6 2 2 C-30 Zone B2 Concrete Pouring of Lean For Foundation Location B2 Block Dining Ha 28-Sep-20 CIV-RFI-1371 18.9 23.1 21.00 15 Mpa 19-Oct-20 CVI-RFI-1571 36.1 27.6 29 30.90 20 Mpa
47 CIV-RFI-1295 21-Sep-20 ACP 6 5 5 C-20 Zone B3 Concrete Pouring For Neck Columns Location Zone B3 Block- 5 Dining 28-Sep-20 CIV-RFI-1372 26.9 26.8 26.85 22.5 Mpa 19-Oct-20 CVI-RFI-1572 35.9 34.9 32.8 34.53 30 Mpa
48 CIV-RFI-1320 24-Sep-20 GBEC 6 3 3 C-30 Zone A1 Concrete Pouring For Inspection Chamber Base Slab Location Zone A 1-Oct-20 CIV-RFI-1413 28.3 30.5 29.40 22.5 Mpa 22-Oct-20 CVI-RFI-1599 38.6 37.3 37.4 37.77 30 Mpa
246197
49 CIV-RFI-1329 24-Sep-20 ACP 6 4 4 C-30 Zone A3-5 Dinning & Kitchen Concrete Pouring of Lean For Ground Beam Location A3- Block 5 Dinin 1-Oct-20 CIV-RFI-1414 25.8 23.5 24.65 15 Mpa 22-Oct-20 CVI-RFI-1600 29.4 28.3 27.5 28.40 20 Mpa
50 CIV-RFI-1321 246199 26-Sep-20 GBEC 6 1 1 C-20 Zone B4 Concrete Pouring For Inspection Chamber Base Slab Location Zone B4 3-Oct-20 CIV-RFI-1426 26 29.5 27.75 22.5 Mpa 24-Oct-20 CVI-RFI-1598 36.5 36.1 33.5 35.37 30 Mpa
51 CIV-RFI-1395 246117 29-Sep-20 GBEC 6 2 2 C-30 Zone A1 & B1 Concrete Pouring For Inspection Chamber Base Slab Location B1 Block 126-Oct-20 CIV-RFI-1451 34.2 35.3 34.75 22.5 Mpa 27-Oct-20 CVI-RFI-1632 39.4 40.6 41.1 40.37 30 Mpa
52 CIV-RFI-1405 246119 1-Oct-20 Initial 12 9 9 C-35 B3 Block 1 Swimming pool Concrete Pouring For Swimming pool Base Slab Location B3 Block 1 8-Oct-20 CIV-RFI-1477 30.1 31.2 30.65 26.25 Mpa 29-Oct-20 CVI-RFI-1650 35.8 36.6 37.4 36.60 35 Mpa
53 CIV-RFI-1430 246120 3-Oct-20 GBEC 6 2 2 C-35 Zone A1 & B1 Concrete Pouring For Inspection Chamber Base Slab Location A1-2 P 10-Oct-20 CIV-RFI-1487 25 28.6 26.80 22.5 Mpa 31-Oct-20 CVI-RFI-1658 33.7 34.8 33.7 34.07 30 Mpa
54 CIV-RFI-1485 246124 10-Oct-20 ACP 6 5 5 C-30 Solar power Area Concrete Pouring of Lean For Foundation Location STP Tank Solar powe 17-Oct-20 CIV-RFI-1551 15.2 14.3 14.75 15 Mpa 7-Nov-20 CVI-RFI-1725 26.1 25.3 26.8 26.07 20Mpa
55 CIV-RFI-1493 246125 11-Oct-20 Initial 6 10 10 C-20 Zone A4 Concrete pouring for Screed Slab for swimming pool Location A4 18-Oct-20 8-Nov-20
CIV-RFI-1559 30.2 29 29.60 26.25 Mpa CVI-RFI-1735 38.3 39.5 41.7 39.83 35 Mpa
56 CIV-RFI-1494 246125 11-Oct-20 Initial 12 5 5 C-35 Zone B4 Concrete pouring for Screed Slab for swimming pool Location B4 18-Oct-20 8-Nov-20
57 CIV-RFI-1502 246125 11-Oct-20 ACP 6 4 4 C-35 Zone B2 Concrete pouring For Cloumn Foundations Location B2-Dinning Hall & 18-Oct-20 CIV-RFI-1560 30.4 30.7 30.55 15 Mpa 8-Nov-20 CVI-RFI-1736 36.8 36 35.1 35.97 20 Mpa
58 CIV-RFI-1519 246126 12-Oct-20 ACP 6 5 5 C-20 Zone A2 Concrete Pouring of Lean For Ground Beam Location A2 Block Dining 19-Oct-20 CVI-RFI-1573 27.6 25.8 26.70 15 Mpa 9-Nov-20 CVI-RFI-1746 29.5 30.6 30 30.03 20 Mpa
59 CIV-RFI-1532 246127 14-Oct-20 Initial 12 7 7 C-20 Zone A3 Concrete Pouring For Swimming pool R C Base Slab Location A3 Bloc 21-Oct-20 CIV-RFI-1592 30.1 30.7 30.40 26.25 Mpa 11-Nov-20 CVI-RFI-1772 34.2 34.6 36 34.93 35 Mpa
60 CIV-RFI-1539 246127 14-Oct-20 ACP 6 7 7 C-35 WWTP AREA Concrete Pouring For Lean Location Pruduct Tank Area 1 21-Oct-20 CIV-RFI-1593 23.6 23.8 23.70 15Mpa 11-Nov-20 CVI-RFI-1773 29.6 32.1 30 30.57 20 Mpa
61 CIV-RFI-1540 246128 15-Oct-20 ACP 12 12 12 C-20 Zone A3-5 Dinning & Kitchen Concrete Pouring For Ground Beam Location A3- Block 5 Dining Hall 22-Oct-20 CVI-RFI-1601 32.8 32.3 32.55 22.5Mpa 12-Nov-20 CVI-RFI-1776 32.3 36.1 33 33.80 30 Mpa
62 CIV-RFI-1567 19-Oct-20 ACP 6 6 6 C-30 WWTP AREA Concrete Pouring For Lean Location Pruduct Tank Area 3 26-Oct-20 CVI-RFI-1616 22.2 22.6 22.40 15Mpa 16-Nov-20 CVI-RFI-1808 28.0 29.9 27.8 28.57 20 Mpa
63 CIV-RFI-1569 246129 19-Oct-20 GBEC 6 6 6 C-20 Zone B1 , B2 & B4 Concrete Pouring For Inspection Chamber Base Slab Location B2- Blo 26-Oct-20 CIV-RFI-1618 26 29.1 27.55 22.5Mpa 16-Nov-20 CVI-RFI-1810 35.2 32.3 35.8 34.43 30 Mpa
64 CIV-RFI-1585 19-Oct-20 ACP 6 6 6 C-30 Zone A1 Mosque Minarete Concrete Pouring For Mosque Minarete Column Location Zone A1 Mos 26-Oct-20 CVI-RFI-1617 23.7 26.1 24.90 22.5Mpa 16-Nov-20 CVI-RFI-1809 33.4 29.9 35.4 32.90 30 Mpa
65 CIV-RFI-1591 21-Oct-20 ACP 6 3 3 C-30 B2 Dining Hall & Kitchen Type Concrete Pouring For Neck Columns Location B2 -Dinning hall and Ki 28-Oct-20 CVI-RFI-1639 26.3 26.5 26.40 22.5Mpa 18-Nov-20 CVI-RFI-1823 35.7 36.8 38.1 36.87 30 Mpa
246130
66 CIV-RFI-1596 21-Oct-20 ACP 6 3 3 C-20 A1 Utility Area 2 Concrete Pouring of Lean Concrete For Foundation R O Tank Location A 28-Oct-20 CVI-RFI-1640 20.4 18.8 19.60 15Mpa 18-Nov-20 CVI-RFI-1824 24.9 27.5 26.3 26.23 20 Mpa
67 CIV-RFI-1634 182205 27-Oct-20 GBEC 6 1 1 C-20 B2-Block 4 Concrete Pouring For Inspection Chamber Base Slab Location B2- Bloc 3-Nov-20 CIV-RFI-1690 26.4 26.8 26.60 22.5Mpa 24-Nov-20 CVI-RFI-1871 33.1 31.9 33.2 32.73 30 Mpa
68 CIV-RFI-1635 182207 28-Oct-20 Initial 6 7 7 C-30 B4 Swimming pool Concrete Pouring For Swimming pool R C Base Slab Location B4 4-Nov-20 CVI-RFI-1695 23.8 22 22.90 26.25 Mpa 25-Nov-20 CVI-RFI-1879 37.0 38.1 38.6 37.90 35 Mpa
69 CIV-RFI-1651 246146 29-Oct-20 GBEC 6 1 1 C-35 A4- Block 4 Part 2/5 Concrete Pouring For Inspection Chamber Base Slab Location A4- Block 5-Nov-20 CVI-RFI-1713 21.3 18.3 19.80 22.5Mpa 26-Nov-20 CVI-Rfi-1885 31.6 30.5 33.1 31.73 30 Mpa
70 CIV-RFI-1661 246145 31-Oct-20 ACP 6 3 3 C-30 B3-Block 5 Dining Hall and KitcConcrete Pouring For Grade Beam Lean Location B3-Block 5 Dining h 7-Nov-20 CVI-RFI-1724 19.2 23.8 21.50 15Mpa 28-Nov-20 CVI-RFI-1892 30.4 31.3 30.4 30.70 20 Mpa
71 CIV-RFI-1662 246147 1-Nov-20 GBEC 6 1 1 C-20 B2-Block 3 & A4-4 Concrete Pouring For Inspection Chamber Base Slab Location B2- Bloc 8-Nov-20 CVI-RFI-1734 27.6 26.2 26.90 22.5Mpa 29-Nov-20 CVI-RFI-1898 32.7 30 30.1 30.93 30 Mpa
72 CIV-RFI-1672 246148 2-Nov-20 Initial 6 7 7 C-30 A4 Swimming pool Concrete Pouring For Swimming Pool R C Base Slab Location A4 Swim 9-Nov-20 CVI-RFI-1747 31.3 28.2 29.75 26.25 Mpa 30-Nov-20 CVI-RFI-1908 37.7 38.6 40.8 39.03 35 Mpa
73 CIV-RFI-1689 246150 3-Nov-20 ACP 12 6 6 C-30 A2- Dining Hall & Kitchen Concrete Pouring For Grade Beam Location A2-Dining Hall & Kitchen 35.7 34.7 34.4 34.93 30 Mpa
CIV-RFI-1692
10-Nov-20 CVI-RFI-1763 26.2 26.8 26.50 22.5Mpa 1-Dec-20 CVI-RFI-1920
74 246150 3-Nov-20 GBEC 6 6 6 C-30 Zone A1 Concrete Pouring For Manholes Drainage Network @ Location A1 E02,E 34.6 36.5 35.8 35.63 30 Mpa
75 CIV-RFI-1712 246253 5-Nov-20 GBEC 6 1 1 C-30 Zone A4 Concrete Pouring For Inspection Chamber Base Slab Location A4- Block 12-Nov-20 CVI-RFI-1777 30.6 28.9 29.75 22.5 Mpa 3-Dec-20 CVI-RFI-1940 36.5 35.5 37.3 36.43 30 Mpa
76 CIV-RFI-1774 246258 11-Nov-20 ACP Trail 18 9 C-20/30/35
Trail Mix Trail Mix of 20/30/35 MPA Concrete @ Abdullah Abdin Batch plant 18-Nov-20 CVI-RFI-1825 32.9 45.85 39.38 Review Rfi 9-Dec-20 CVI-RFI-1844 Review Rfi Pass C-20/30/35
77 CIV-RFI-1775 246247 12-Nov-20 GBEC 6 2 2 C-30 B3 Drainage Network Part B06,BConcrete Pouring For Inspection Chamber Base Slabl Inspection Cha 19-Nov-20 CVI-RFI-1832 32.7 30 31.35 22.5 Mpa 10-Dec-20 CVI-RFI-1997 43.8 38.8 48.5 43.70 30 Mpa
78 CIV-RFI-1783 246250 14-Nov-20 GBEC 6 1 1 C-30 Zone B4 Drainage Network Part 1Concrete Pouring For Inspection Chamber Base Slabl Inspection Ch 21-Nov-20 CVI-RFI-1836 27.7 29.7 28.70 22.5 Mpa 12-Dec-20 CVI-RFI-2004 40.2 36.5 33.3 36.67 30 Mpa
79 CIV-RFI-1796 246250 15-Nov-20 Initial 6 5 5 C-35 B3-Swimming Pool 14X10 Concrete Pouring For Swimming Pool R C Wall Location B3-Swimmin 22-Nov-20 CVI-RFI-1849 35.6 34.6 35.10 26.25 Mpa 13-Dec-20 CVI-RFI-2016 44.5 49.4 42.4 45.43 35 Mpa
80 CIV-RFI-1806 246263 15-Nov-20 GBEC 6 1 1 C-30 Zone A1 Srorm Drain network PaConcrete Pouring For Manholes Storm Drain Network @ Location Zone A 22-Nov-20 CVI-RFI-1851 34 38.9 36.45 22.5 Mpa 13-Dec-20 CVI-RFI-2017 38.8 39 39.5 39.10 30 Mpa
81 CIV-RFI-1817 246265 17-Nov-20 ACP 6 2 2 C-20 B1-MOSQUE Concrete Pouring of Lean P C For Column Foundation Location B1- 24-Nov-20 CVI-RFI-1872 26.7 20.6 23.65 15Mpa 15-Dec-20 CVI-RFI-2037 31.6 36 33.33 33.64 20 Mpa
82 CIV-RFI-1852 246269 24-Nov-20 ACP 12 16 16 C-30 B3- Block 05 Concrete Pouring For Grade Beam Dining Hall & Kitchen Type A,B& D Loc 1-Dec-20 CVI-RFI-1921 35.7 42.6 39.15 22.5 Mpa 22-Dec-20 CVI-RFI-2118 47.1 44.5 51.5 47.70 30 Mpa
83 CIV-RFI-1878 246270 25-Nov-20 ACP 6 4 4 C-20 B2-Diing Hall & Kitchen Concrete Pouring of Lean P C For Grade Beam Location B2- Dinning & 2-Dec-20 CVI-RFI-1927 27.8 25.6 26.70 15Mpa 23-Dec-20 CVI-RFI-2127 32.3 30 32.9 31.73 20 Mpa
84 CIV-RFI-1881 246270 25-Nov-20 GBEC 6 1 1 C-30 A4- Block 04 Drainage Network Concrete
P Pouring For Inspection Chamber Base Slabl Drainage Networ 2-Dec-20 CVI-RFI-1928 33.9 33.2 33.55 22.5 Mpa 23-Dec-20 CVI-RFI-2128 41.3 39.3 38.5 39.70 30 Mpa
85 CIV-RFI-1903 246273 29-Nov-20 ACP A1- Block 01 Mosque Concrete Pouring For Grade Beam & Column as per highlighted Drawin 6-Dec-20 27-Dec-20
6 5 5 C-30 CVI-RFI-1967 37.3 34.5 35.90 22.5 Mpa CVI-RFI-2168 44.2 41.6 44.9 43.57 30 Mpa
86 CIV-RFI-1904 246273 29-Nov-20 ACP B1- Block Mosque Concrete Pouring For Column Footing & Minaret Column Location B1- 6-Dec-20 27-Dec-20
87 CIV-RFI-1933 246276 30-Nov-20 GBEC 6 1 1 C-30 Zone A4 Concrete Pouring For Manholes Drainage and Storm Drian Netwo 7-Dec-20 CVI-RFI-1972 40.5 39.2 39.85 22.5 Mpa 28-Dec-20 CVI-RFI-2184 47.2 46.9 47.6 47.23 30 Mpa
88 CIV-RFI-1919 246277 1-Dec-20 ACP 12 17 17 C-35 Solar power Area Concrete Pouring For Foundation & Column Lacation Equalization Tank 8-Dec-20 CVI-RFI-1979 30.2 32.8 31.50 26.25 Mpa 29-Dec-20 CVI-RFI-2197 39.4 41.1 38.5 39.67 35 Mpa
89 CIV-RFI-1925 246278 2-Dec-20 ACP 6 8 8 C-20 Utilities Area-2 Concrete Pouring For Lean P C Location Utilities Area -2 Main Water T 9-Dec-20 CVI-RFI-1853 27.5 23.7 25.60 15Mpa 30-Dec-20 CVI-RFI-2214 31.9 30.6 28.9 30.47 20 Mpa
90 CIV-RFI-1957 246280 5-Dec-20 ACP 12 10 10 C-35 Solar power Area Concrete Pouring of Foundation For MBBR-2 Location Solar power Are 12-Dec-20 CVI-RFI-2005 43.3 37.6 40.45 26.25 Mpa 2-Jan-21 CVI-RFI-2250 35.7 31.1 34.2 33.67 35 Mpa
91 CIV-RFI-1960 246280 5-Dec-20 GBEC 6 1 1 C-30 B1- Block 7,8,9,14,17, B3 Part 3Concrete Pouring For Valve Boxes For Water Supply Network @ Location12-Dec-20 CVI-RFI-2006 31.2 33.1 32.15 22.5 Mpa 2-Jan-21 CVI-RFI-2251 42.8 43.4 44.6 43.60 30 Mpa
92 CIV-RFI-1970 246281 6-Dec-20 GBEC 6 1 1 C-30 A1-Main Road Storam Drain Netw
Concrete Pouring For Manhole Storm Drain Network Point# SMH-A01, A 13-Dec-20 CVI-RFI-2018 33.8 32.2 33.00 22.5 Mpa 3-Jan-21 CVI-RFI-2265 40.6 44.2 39 41.27 30 Mpa
93 CVI-RFI-1961 246282 7-Dec-20 ACP 12 13 13 C-30 Solar power Area Concrete Pouring of Foundation For Product Tank Location Solar power 14-Dec-20 CVI-RFI-2029 32 34 33.00 22.5 Mpa 4-Jan-21 CVI-RFI-2277 40.8 39.6 39.9 40.10 30 Mpa
94 CIV-RFI-1973 8-Dec-20 Initial C-35 A3 & A4 Swimming Pool Concrete Pouring of Screed Slab For Balancing Tank & Pump Room Loca
95 CIV-RFI-1974 246283 8-Dec-20 Initial 6 6 6 B3 & B4 Swimming Pool Concrete Pouring of Screed Slab For Balancing Tank & Pump Room Loca 15-Dec-20 CVI-RFI-2038 35.7 37.55 36.63 26.25 Mpa 5-Jan-21 CVI-RFI-2291 41.3 43.7 41 42.00 35 Mpa
96 CIV-RFI-1976 8-Dec-20 Initial A3-Swimming Pool Concrete Pouring For Swimming Pool R C Wall Location A3-Swimming
97 CIV-RFI-1985 246289 9-Dec-20 Initial 6 5 5 C-35 B4-Swimming Pool Concrete Pouring For R C Walls Location B4-Swimming Pool 16-Dec-20 CVI-RFI-2050 37.9 40.95 39.43 26.25 Mpa 6-Jan-21 CVI-RFI-2308 41.1 41.7 41.2 41.33 35 Mpa
98 CIV-RFI-1987 10-Dec-20 Satco 6 5 6 A2- Ware house Grout pouring Under The Base Plate Location A2-Ware house CVI-RFI-2056 12.6 34.6 23.60 CVI-RFI-2319 46.2 48.1 42 45.43
99 CIV-RFI-1991 246290 10-Dec-20 ACP 6 5 C-30 Utilities Area-2 Concrete Pouring For R C Base Foundation Location Utilities Area -2 17-Dec-20 CVI-RFI-2057 33.6 32.8 33.20 22.5 Mpa 7-Jan-21 CVI-RFI-2320 39.0 39.9 39.4 39.43 30 Mpa
100 CIV-RFI-1992 10-Dec-20 ACP 6 5 C-20 Utilities Area-2 Concrete Pouring For Lean P C Location Utilities Area-2 Fire Tanks (2 N CVI-RFI-2058 27.7 25.8 26.75 15Mpa CVI-RFI-2321 33.3 33.4 33.9 33.53 20 Mpa
101 CIV-RFI-2027 14-Dec-20 GBEC 6 5 5 C-30 Zone A1-2,3 & B2 Concrete Pouring For Inspecton Chambers Drainage Netwok & Manhole CIV-RFI-2098 30.6 27.3 28.95 22.5Mpa CVI-RFI-2362 34.4 35.6 37 35.67 30 Mpa
246295 21-Dec-20 11-Jan-21
102 CIV-RFI-2028 14-Dec-20 ACP 6 4 4 C-20 Utilities Area-2 Concrete Pouring of Lean P C For Foundation Location Utilities Area - CIV-RFI-2099 24.4 23.2 23.80 15 Mpa CVI-RFI-2363 29.5 33.2 30.4 31.03 20 Mpa
103 CIV-RFI-2045 182240 16-Dec-20 Initial 6 3 3 C-35 A3 & B3 Swimming Pool Concrete Pouring For R C Base For Balancing Tank & Pump Room Loc 23-Dec-20 CVI-RFI-2129 35.7 35.1 35.40 26.25 Mpa 13-Jan-21 CVI-RFI-2407 43.6 43.8 39.5 42.30 35 Mpa
104 CIV-RFI-2055 246300 17-Dec-20 ACP 12 13 13 C-30 A3- Block 05 Dining Hall & KitcConcrete Pouring of Grade Beam For Dining Hall & Kitchen Type C & D 24-Dec-20 CVI-RFI-2141 32.4 30.9 31.65 22.5Mpa 14-Jan-21 CVI-RFI-2411 38.1 36.5 38.1 37.57 30 Mpa
105 CIV-RFI-2087 246352 19-Dec-20 Satco 6 8 6 A2- Dining Hall & Kitchen Ty Grout Pouring Under The Base Plate as per highlighted Drawing Locat 26-Dec-20 CVI-RFI-2155 39.9 35.1 37.50 16-Jan-21 CVI-RFI-2424 48.2 54.2 46.1 49.50
106 CIV-RFI-2085 246353 20-Dec-20 ACP R O Tank Concrete Pouring of Foundation For R O Tank Location Utilities Area
6 4 4 C-30 27-Dec-20 CVI-RFI-2169 33.5 33.4 33.45 22.5Mpa 17-Jan-21 CVI-RFI-2437 38.8 39.2 40.3 39.43 30 Mpa
107 CIV-RFI-2086 246353 20-Dec-20 ACP B1- Mosque Concrete Pouring of Neck Columns For Mosque Location B1- Mosque
108 CIV-RFI-2096 246355 21-Dec-20 ACP Main Water Tank-1 Concrete Pouring of Foundation For Water Tank Location Utilities Area 30 Mpa
CIV-RFI-2105
18 20 20 C-30 CVI-RFI-2185 34.1 34 34.05 22.5Mpa CVI-RFI-2447 37.8 39.2 40.2 39.07
109 246355 21-Dec-20 ACP Equipment Room Concrete Pouring of P C Lean For Equipment Room Column Foundation28-Dec-20 18-Jan-21
110 CIV-RFI-2097 246355 21-Dec-20 Initial 6 6 6 C-35 A4 Swimming Pool Concrete Pouring of R C Walls For Swimming Pool Location A4-Swimm CVI-RFI-2186 36 38 37.00 26.25Mpa CVI-RFI-2452 44.4 41.9 42.9 43.07 35 Mpa
111 CVI-RFI-2113 22-Dec-20 ACP 6 4 4 C-30 Utilities Area-2 Fire Tanks Concrete Pouring of Foundation For Fire Tank (02 Nos) Location Utiliti 29-Dec-20 CVI-RFI-2198 29 30.7 29.85 22.5Mpa 19-Jan-21 CVI-RFI-2467 39.0 39.3 40.5 39.60 30 Mpa
246357
112 CVI-RFI-2121 22-Dec-20 ACP 6 3 3 C-20 A3- Block 03 Concrete Pouring of P C Lean For Column Foundation Shaded Shelter 29-Dec-20 CVI-RFI-2199 20.5 21.8 21.15 15 Mpa 19-Jan-21 CVI-RFI-2467 31.8 29.6 30.6 30.67 20 Mpa
113 CIV-RFI-2135 246363 23-Dec-20 ACP 18 20 20 C-30 Main Water Tank-2 Utilities Area-C oncrete Pouring of Foundation For Main Water Tank -2 Location Utiliti 30-Dec-20 CVI-RFI-2215 28.1 29.9 29.00 22.5Mpa 20-Jan-21 CVI-RFI-2481 39.0 37 39.6 38.53 30 Mpa
114 CIV-RFI-2173 246365 26-Dec-20 SATCO 6 10 6 C-65 A2- Dining Hall & Kitchen Ty Grout pouring Under The Base Plate as per highlighted Drawing Locat 2-Jan-21 CVI-RFI-2252 39.9 37.2 38.55 23-Jan-21 CVI-RFI-2510 46.1 48.3 52.2 48.87
115 CIV-RFI-2174 246366 27-Dec-20 ACP A3- Block 03 Concrete Pouring of Foundation For Shaded Shelter Location A3- Bloc CVI-RFI-2266
6 4 4 C-30 3-Jan-21 29.5 30.6 30.05 22.5Mpa 24-Jan-21 CVI-RFI-2527 34.6 36 36.9 35.83 30 Mpa
116 CIV-RFI-2175 246366 27-Dec-20 ACP Equipment Room Concrete Pouring of Foundation For Equipment Room Location Solar p
117 CIV-RFI-2176 246368 28-Dec-20 Initial Swimming Pool 14 X 25 Concrete Pouring of R C Wall For Swimming Pool Pump & Balancing
6 7 7 C-35 4-Jan-21 CVI-RFI-2278 29.7 25.2 27.45 26.25 Mpa 25-Jan-21 CVI-RFI-2549 36.2 38.5 38.4 37.70 35 Mpa
118 CIV-RFI-2177 246368 28-Dec-20 Initial Swimming Pool 10 X 25 Concrete Pouring of R C Base Slabe Swimming Pool Pump & Balancing
119 CIV-RFI-2221 31-Dec-20 ACP 6 2 2 C-20 B3- Block 03 & 04 Concrete Pouring of P C Lean For Foundation Shaded Shelter Location CVI-RFI-2322 28.9 24.6 26.75 15 Mpa CVI-RFI-2602 34.7 36.2 35.1 35.33 20 Mpa
120 CIV-RFI-2222 31-Dec-20 ACP 6 1 1 Equipment Room Concrete Pouring of Neck Column For Equipment Room Location Solar 7-Jan-21 28-Jan-21
246373 C-30 CVI-RFI-2323 33.1 32.3 32.70 22.5Mpa CVI-RFI-2603 41 38.8 40.2 40.00 30 Mpa
121 CIV-RFI-2223 31-Dec-20 ACP A3- Block 03 Concrete Pouring of Neck Column For Shaded Shelter Location A3- Bl
122 CIV-RFI-2233 31-Dec-20 SATCO 6 12 6 A3- Block 05 Dining Hall & Ki Visual Inspection of Grout pouring Under The Base Plate as per high 7-Jan-21 CVI-RFI-2331 39.8 38 38.90 28-Jan-21 CVI-RFI-2604 56.6 51.6 44.2 50.80
123 CIV-RFI-2233 246376 2-Jan-21 SATCO 6 12 6 A3- Block 05 Dining Hall & Ki Visual Inspection of Grout pouring Under The Base Plate as per high 9-Jan-21 CVI-RFI-2330 35.8 38.3 37.05 30-Jan-21 CVI-RFI-2619 52.2 50.2 52.7 51.70
124 CIV-RFI-2261 246378 3-Jan-21 ACP 6 3 3 C-30 B3- Block 03 & 04 Concrete Pouring of Foundation For Neck Column Shaded Shelter Loca CVI-RFI-2352 34.1 34.3 34.20 22.5Mpa CVI-RFI-2631 33.8 35.3 39.8 36.30 30 Mpa
10-Jan-21 31-Jan-21
125 CIV-RFI-2262 246378 3-Jan-21 ACP 6 C-20 A3- Block 04 Concrete Pouring of P C Lean For Foundation Shaded Shelter Location CVI-RFI-2353 35.7 34 34.85 15 Mpa CVI-RFI-2632 29.0 29.3 35.6 31.30 20 Mpa
126 CIV-RFI-2270 246379 4-Jan-21 SATCO A3- Block 05 Dining Hall & Ki Grout pouring Under The Base Plate as per highlighted Drawing Locat CVI-RFI-2364 33.7 32.1 32.90 CVI-RFI-2648 46.1 44 50.4 46.83
11-Jan-21 1-Feb-21
127 CIV-RFI-2279 246379 4-Jan-21 Initial 6 5 5 6 5 6 C-35 A4 & B4 -Swimming Pool 10X2Concrete Pouring of R C Wall For Pump & Balancing Tank Location CVI-RFI-2365 34 35.7 34.85 26.25 Mpa CVI-RFI-2649 41.4 40.2 39.3 40.30 35 Mpa
128 CIV-RFI-2310 246385 6-Jan-21 ACP C-30 B1 Mosque Minarete Concrete Pouring of Minarete Column Location Zone B1 Mosque
129 CIV-RFI-2311 246385 6-Jan-21 ACP B3- Block 03 & 04 Concrete Pouring of Neck Column For Shaded Shelter Location B3- Bl CVI-RFI-2405 34.4 34.8 34.60 22.5Mpa CVI-RFI-2680 36.6 40.0 41.5 39.37 30 Mpa
12 4 4 13-Jan-21 3-Feb-21
130 CIV-RFI-2312 246385 6-Jan-21 ACP A3- Block 04 Concrete Pouring of Foundation For Neck Column Shaded Shelter Loca
131 CIV-RFI-2313 246385 6-Jan-21 ACP C-20 B1- Mosque Concrete Pouring of Lean P C For Grade Beam Location B1- Mosque CVI-RFI-2406 29.2 28.2 28.70 15 Mpa CVI-RFI-2681 29.0 32.7 31.8 31.17 20 Mpa
132 CVI-RFI-2338 246387 9-Jan-21 Initial 6 2 2 C-35 A3 & B3 Swimming Pool Concrete Pouring of Top R C Slab For Balancing Tank & Pump Room 16-Jan-21 CVI-RFI-2448 38.6 40.2 39.40 26.25 Mpa 6-Feb-21 CVI-RFI-2702 48.2 44.6 43.8 45.53 35 Mpa
133 CIV-RFI-2371 246393 12-Jan-21 ACP 6 1 1 C-30 Equalization Tank Concrete Pouring of Foundation For Cloumn Location Equalization Tan 19-Jan-21 CVI-RFI-2469 28.8 27.4 28.10 22.5Mpa 9-Feb-21 CVI-RFI-2754 34.4 32.6 34.2 33.73 30 Mpa
134 CIV-RFI-2412 246399 14-Jan-21 GBEC 6 1 1 C-30 A4 Drinage and Storm Drain Net Concrete Pouring For Inspecton Chambers Drainage Netwok & Manhol 21-Jan-21 CVI-RFI-2498 20.2 18.5 19.35 22.5 Mpa 11-Feb-21 CVI-RFI-2777 32.9 31.8 32.9 32.53 30 Mpa
135 CIV-RFI-2439 182302 16-Jan-21 SATCO 6 10 6 B2- Dining Hall & Kitchen Typ Grout Pouring Under The Base Plate as per highlighted Drawing Locat 23-Jan-21 CVI-RFI-2511 34 37.3 35.65 13-Feb-21 CVI-RFI-2789 48.2 41.4 46.1 45.23
136 CIV-RFI-2432 246454 17-Jan-21 Initial 6 3 3 C-35 A4 & B4- Swimming Pool Concrete Pouring of Top R C Slab For Balancing Tank & Pump Room 24-Jan-21 CVI-RFI-2528 30.6 31.5 31.05 26.25 Mpa 14-Feb-21 CVI-RFI-2799 36.1 37.6 36.7 36.80 35 Mpa
137 CIV-RFI-2455 246461 1/19/2021 ACP B1 Mosque Concrete Pouring of Ground Beam For Mosque Location B1-MOSQUE 34.30 30 Mpa
C-30 CVI-RFI-2563 30.5 32.8 31.65 22.5Mpa CVI-RFI-2833 37.5 31.8 33.6
138 CIV-RFI-2472 246461 1/19/2021 ACP A3- Block 04 Concrete Pouring of Neck Column For Shaded Shelter Location A3- Bl 0.00 30 Mpa
139 CIV-RFI-2473 246461 1/19/2021 ACP A3- Block 03 Concrete Pouring of Lean Concrete For Grade Beam Location A3- Block
12 7 7 26-Jan-21 16-Feb-21
140 CIV-RFI-2474 246461 1/19/2021 ACP Equipment Room Concrete Pouring of Lean Concrete For Grade Beam Location Equipmen
CIV-RFI-2475
C-20 CVI-RFI-2564 25.7 27.1 26.40 15 Mpa CVI-RFI-2834 35.6 32.1 33.9 33.87 20 Mpa
141 246461 1/19/2021 ACP A3- Block 03 & 04 Concrete Pouring of Lean Concrete For Lighting Foundation Location
142 CIV-RFI-2500 246461 1/19/2021 ACP A2- Ware house Concrete Pouring of Lean P C For Fixing Firewall Panal Location A2- W
143 CIV-RFI-2512 246457 23-Jan-21 ACP Fire& RO+Water Pump Room Concrete Pouring of Lean Concrete For Column Foundation Location
144 CIV-RFI-2513 246457 23-Jan-21 ACP C-20 B3- Block 03 Concrete Pouring of Lean Concrete For Grade Beam Location B3- Block 30-Jan-21 CVI-RFI-2620 23.8 24.6 24.20 15 MPa 20-Feb-21 CVI-RFI-2886 33.2 31.0 31.9 32.03 20 Mpa
12 4 4
145 CIV-RFI-2514 246457 23-Jan-21 ACP A2- Dining Hall & Kitchen C&DConcrete Pouring of Lean Concrete For Fixing Firewall Panal Location
146 CIV-RFI-2515 246457 23-Jan-21 ACP C-30 Equalization Tank Concrete Pouring of Lean Concrete For Cloumn (2 Nos) Location Equali 30-Jan-21 CVI-RFI-2621 31.9 32.9 32.40 22.5 Mpa 20-Feb-21 CVI-RFI-2887 40.4 38.5 39.4 39.43 30 Mpa
147 CIV-RFI-2571 246471 26-Jan-21 GBEC 6 1 1 C-30 A1-9,10,11,12 Drainage NetworkConcrete Pourinf of Inspection Chambers Location A1-9,10,11,12 D 2-Feb-21 CVI-RFI-2668 32.2 27.9 30.05 22.5 Mpa 23-Feb-21 CVI-RFI-2946 38.6 39.5 37.9 38.67 30 Mpa
148 CIV-RFI-2615 30-Jan-21 Satco 6 10 6 A1- Mosque Visual Inspection of Grout pouring Under The Base Plate Minaret colu 6-Feb-21 CVI-RFI-2703 31.4 34.3 32.85 CVI-RFI-3011 40.4 43 48.5 43.97 30 Mpa
Concrete Pouring O F inspecton Chambers For Drainage Netwok Base Slabe Location A2-Block 01-IC-#001,001,001,001,019,019,020,021,022,023,024,025,026,027,
149 CIV-RFI-2622 30-Jan-21 GBEC 6 3 3 C-30 A2-Block 01, A4- Block 03 & B4-B4- Block 01-IC# 001,008,009,010, 34.65 22.5 Mpa
CIV-RFI-2623 A4-Block 03-IC# 001,001,002,003,,004
150 30-Jan-21 ACP Fire& RO+Water Pump Room Concrete pouring of Foundation Location Fire& RO+Water Pump Room CVI-RFI-2700 31.7 37.6 CVI-RFI-3009 35.2 36.6 34.9 35.57 30 Mpa
246470 C-30 0.00 22.5 Mpa 27-Feb-21
151 CIV-RFI-2624 30-Jan-21 ACP A3- Block 03 Concrete pouring of Grade Beam Shaded Shelter Location A3- Block 03
12 4 4
152 CIV-RFI-2625 30-Jan-21 ACP A3- Block 01& B3- Block 01 B Concrete pouring of PC Lean For Foundation Location A3- Block 01 & B3- Block 0
C-20 CVI-RFI-2701 24.4 23.1 23.75 15 MPa CVI-RFI-3010 27.3 27 30.1 28.13 20 Mpa
153 CIV-RFI-2626 30-Jan-21 ACP B3- Block 04 Concrete pouring of Lean P C For Grade Beam Shaded Shelter Location B3- Block 04
154 CIV-RFI-2636 246480 31-Jan-21 GBEC 6 1 1 C-30 B3 - B06,B07,C07,C08,D08 DrainaConcrete pouring of Inspection Chamber Base Slabe For Drainage M 7-Feb-21 CVI-RFI-2723 26.3 27.5 26.90 22.5 Mpa 28-Feb-21 CVI-RFI-3027 34.2 36 32.8 34.33 30 Mpa
155 CIV-RFI-2629 246480 31-Jan-21 SATCO 6 12 6 C-30 B3- Block 05 Dining Hall & Ki Visual Inspection of Grout pouring Under The Base Plate as per high 7-Feb-21 CVI-RFI-2726 39.9 37.7 38.80 28-Feb-21 CVI-RFI-3028 44.5 46.1 42.3 44.30 30 Mpa
156 CIV-RFI-2671 246482 2-Feb-21 ACP 6 1 1 C-20 R O Plant Pad Concrete Pouring of Filter Feed Pumps & Pressure Filter Foundation For 9-Feb-21 CVI-RFI-2755 32 32.4 32.20 15 Mpa 2-Mar-21 CVI-RFI-3064 40.5 39.2 51.6 43.77 15 Mpa
157 CIV-RFI-2686 246484 3-Feb-21 SATCO 6 10 6 B3- Block 05 Dining Hall & Kitc Visual Inspection of Grout pouring Under The Base Plate as per high 10-Feb-21 CVI-RFI-2767 35.2 35.6 35.40 3-Mar-21 CVI-RFI-3076 50.2 46.9 45 47.37
Concrete Pouring of Foundation Forb DP Foundation
158 CIV-RFI-2687 246486 ACP 12 13 13 C-30 A2- Ware house 24.50 22.5 Mpa 44.60
4-Feb-21 Concrete
1. Nos of Grade Slabe For Ware house Location A2- Ware ho 11-Feb-21
Pouring
400 KG-5 CVI-RFI-2778 23.8 25.2 4-Mar-21 CVI-RFI-3096 40 49.5 44.3 30 Mpa
159 CIV-RFI-2710 246487 6-Feb-21 ACP A3- Block 01 & B3- Block 01BB 2. 700 KG-5
Concrete Nos of Foundation For Column Location A3- Block 01 &
Pouring
6 1 1 C-30 3. 800KG -6 N os 13-Feb-21 CVI-RFI-2790 27.2 28.9 28.05 22.5 Mpa 6-Mar-21 CVI-RFI-3109 40.4 39.7 31.7 37.27 30 Mpa
160 CIV-RFI-2718 246487 6-Feb-21 ACP DP Foundation 4. 1200 KG-2 Nos
161 CIV-RFI-2731 261503 8-Feb-21 SATCO 6 10 6 A1- Mosque Visual Inspection of Grout pouring Under The Base Plate Location A1- 15-Feb-21 CVI-RFI-2818 24.5 25.7 25.10 8-Mar-21 CVI-RFI-3153 45.9 41.3 39.2 42.13
162 CIV-RFI-2736 261503 8-Feb-21 ACP B3- Block 03 Concrete Pouring of Grade Beam For Shaded Shalter Location B3- Bloc
CIV-RFI-2737
6 3 3 C-30 15-Feb-21 CVI-RFI-2819 28 33 30.50 22.5 Mpa 8-Mar-21 CVI-RFI-3154 36.7 31.9 30.0 32.87 30 Mpa
163 261503 8-Feb-21 ACP Equipment room Concrete Pouring of Equipment room Grade Beam Location Solar Area
164 CIV-RFI-2765 261504 10-Feb-21 ACP 6 5 5 C-30 A1- Mosque Concrete Pouring of Grade Slabe For Mosque as per highlighted Drawi 17-Feb-21 CVI-RFI-2854 24.3 33 28.65 22.5 Mpa 10-Mar-21 CVI-RFI-3200 37.2 38.1 36.5 37.27 30 Mpa
165 CIV-RFI-2766 261504 10-Feb-21 Initial 6 4 4 C-20 A3- Swimming Pool Concrete Poruing
Pouring FoforScree SlabPole
L ighting priorRC Cementitious Application Loca 17-Feb-21
to Foundation CVI-RFI-2855 19.3 22.9 21.10 15 Mpa 10-Mar-21 CVI-RFI-3201 22.2 29.1 29.5 26.93 20 Mpa
166 CIV-RFI-2794 261510 1 C-30 Solar power Area 1- Q1- 10Nos
13-Feb-21 ACP 6 1 Concrete Pouring For Distribution Panel R C Footings (08 Nos) Locatio 20-Feb-21 CVI-RFI-2888 33.1 33.9 33.50 22.5 Mpa 13-Mar-21 CVI-RFI-3230 44.1 33 47 41.37 30 Mpa
2- FL 3- 05 Nos
167 CIV-RFI-2811 15-Feb-21 ACP 6 1 1 C-30 A1-1,2,3,4 & B1-1,2,3,4 3- Fl 6 10Pouring
Concrete Nos F or L ighting Pole RC Foundation 22-Feb-21 CVI-RFI-2928 20.6 19.3 19.95 22.5 Mpa 15-Mar-21 CVI-RFI-3281 32.6 34.8 35.3 34.23 30 Mpa
261514
168 CIV-RFI-2813 15-Feb-21 ACP 6 1 1 C-20 B2- Dining Hall & Kitchen C&D 1- Q1- 10Nos
Concrete Pouring of Lean Concrete For Fixing Firewall Panal Location 22-Feb-21 CVI-RFI-2929 24.3 28.6 26.45 22.5 Mpa 15-Mar-21 CVI-RFI-3282 33.7 23.9 29.3 28.97 20 Mpa
2- FL 3- 05 Nos
169 CIV-RFI-2841 16-Feb-21 ACP 6 1 1 C-30 A1-1,2,3,4 & B1-1,2,3,4 3- Fl 6 10Pouring
Concrete Nos F or L ighting Pole RC Foundation 23-Feb-21 CVI-RFI-2947 31.9 32.9 32.40 22.5 Mpa 16-Mar-21 CVI-RFI-3295 41.4 42.7 46.2 43.43 30 Mpa
261516
170 CIV-RFI-2843 ACP 6 1 1 1- Q1- 10Nos
C-20 B3- Block 05Dining Hall & Kitch Concrete 23-Feb-21 CVI-RFI-2948 26.5 28 27.25 22.5 Mpa 16-Mar-21 CVI-RFI-3296 38.3 31.8 40.5 36.87 20 Mpa
16-Feb-21 Pouring of Lean Concrete For Fixing Firewall Panal Locatio
2- FL 3- 05 Nos
171 CIV-RFI-2867 18-Feb-21 ACP A1-1,2,3,4 & B1-1,2,3,4 3- Fl 6 10 Nos 22.5 Mpa
172 CIV-RFI-2869 261519 18-Feb-21 ACP 6 2 2 C-30 A3- Block 01 & B3- Block 01 Concrete Pouring of Neck column For BBQ Area Location A3- Block 0 25-Feb-21 CVI-RFI-2983 30.1 27.7 28.90 22.5 Mpa 18-Mar-21 CVI-RFI-3320 44.9 38.3 31.8 38.33 30 Mpa
173 CIV-RFI-2870 18-Feb-21 ACP Fire& RO+Water Pump Room Concrete Pouring of Neck column For Pump Room Cloumn Location Utili 22.5 Mpa
174 CIV-RFI-2892 20-Feb-21 ACP c-30 R O Plant Pad Concrete pouring CVI-RFI-3012 28.8 27.2 28.00 22.5 Mpa CVI-RFI-3334 36.5 30.2 38.2 34.97
Concretre Pouring of
of Neck Column
Lighting ForFoundation
Pole RC Installation of Steel Structure Loc
Concrete Pouring of L ighting Pole RC Foundation
175 CIV-RFI-2894 261522 20-Feb-21 ACP 12 4 4 A3- Block 04 1- FL4-N
1- Q1- 10 os Nos 27-Feb-21 22.5 Mpa 20-Mar-21
CIV-RFI-2896
C-30 2- FL 3- 05 Nos CIV-RFI-3013 28.2 26.9 27.55 CVI-RFI-3338 34.8 45.5 34.8 38.37 30 Mpa
176 20-Feb-21 ACP A1-1,2,3,4 & B1-1,2,3,4 3- Fl 6 - 09 N os 22.5 Mpa
177 CIV-RFI-2915 21-Feb-21 ACP 6 1 1 C-20 A3- Block 05 Concrete Pouring
Concretre Pouring of
of Lean
Lighting
P C Pole
For Fixing
RC Foundation
Firewall Panal Location A3- CVI-RFI-3029 26.4 30 28.20 22.5 Mpa CVI-RFI-3349 36.8 27.3 35.9 33.33 20 Mpa
261523 1- Q1- 10 Nos 28-Feb-21 21-Mar-21
178 CIV-RFI-2917 21-Feb-21 ACP 6 1 1 C-30 A1-1,2,3,4 & B1-1,2,3,4 CVI-RFI-3030 41.5 47.6 44.55 22.5 Mpa CVI-RFI-3350 39.8 38.9 46.9 41.87 30 Mpa
2- FL 3- 05 Nos
179 CIV-RFI-2919 22-Feb-21 ACP B3- Block 04 Concrtete
3-
Concrete
PT - 10Pouring
Pouring
N os ofofLighting
Grade Beam
PoleFor
RC Shaded
Foundation
Shelter Location B3-Bloc
CIV-RFI-2936 1- Q1- 10 Nos
180 22-Feb-21 ACP 4 2 2 C-30 A1-1,2,3,4 & B1-1,2,3,4 CVI-RFI-3050 43.6 39.3 41.45 22.5 Mpa CVI-RFI-3371 34.5 43.2 37.2 38.30 30 Mpa
2- FL 3- 05 Nos
181 CIV-RFI-2937 261525 22-Feb-21 GBEC 4 2 2 A4,A1 & B1 Storm and Drainage 3-
Concrete
PT - 10Pouring
N os of Base Slab For Inspection Chambers # IC-A4-1# 1-Mar-21 22-Mar-21
182 CIV-RFI-2921 22-Feb-21 Initial 4 2 2 C-20 B4- Swimming Pool Concrete Poruing of Scree Slab prior to Cementitious Application Loca CVI-RFI-3051 29.8 34.7 32.25 15 Mpa CVI-RFI-3372 37.6 37.8 35.4 36.93 20 Mpa
183 CIV-RFI-2920 22-Feb-21 SATCO 6 12 6 B1- Mosque Visual Inspection of Grout pouring Under The Base Plate Location B1- CVI-RFI-3285 35.3 38.9 37.10 CVI-RFI-3373 43.5 43.9 41.4 42.93
184 CIV-RFI-2944 23-Feb-21 Initial 4 2 2 C-20 A4- Swimming Pool Concrete Poruing ofLScree
Pouring of Slab
ighting prior
Pole RCtoFoundation
Cementitious Application Loca CVI-RFI-3065 18.2 23.2 20.70 15 Mpa 23-Mar-21 CVI-RFI-3376 28.8 20.2 21.3 23.43 20 Mpa
185 CIV-RFI-2956 261528 23-Feb-21 1 1 A1-1,2,3,4 & B1-1,2,3,4 1- Q1- 10 Nos 2-Mar-21
ACP 4
C-30 2- FL3- 05 Nos CVI-RFI-3066 36.6 37.6 37.10 22.5 Mpa 23-Mar-21 CVI-RFI-3377 51.7 42.9 46.8 47.13 30 Mpa
186 CIV-RFI-2957 23-Feb-21 Al Maha 4 1 1 A1- Block 02 Concrete
3- PT - 10Pouring
N os of Electrical Sub Station Base Slabe (USS-D1) & (USS
187 CIV-RFI-2976 25-Feb-21 GBEC 6 2 2 B1 & B2 Storm Drain Network ParConcrete Pouring ofLBase
Pouring of Slabe
ighting PoleFor
RCStorm Manhole SMH-A46,47,18,1
Foundation
188 CIV-RFI-2986 25-Feb-21 1- Q1- 10 Nos
ACP 6 2 2 C-30 A1-1,2,3,4 & B1-1,2,3,4 CVI-RFI-3097 25 22.9 23.95 22.5 Mpa CVI-RFI-3406 30 30.2 30.1 30.10 30 Mpa
2- FL3- 02 Nos
189 CIV-RFI-2987 261531 25-Feb-21 ACP DP Foundation Concrete
3- PT - 10Pouring
N os of DP Foundation -08 Nos 4-Mar-21 3/25/2021
190 CVI-RFI-2991 25-Feb-21 ACP C-20 B3- Block 05Dining Hall & Kit Concrete Pouring of Lean Concrete For Fixing Firewall Panal Locatio CVI-RFI-3098 23 18 20.50 15 Mpa CVI-RFI-3407 25.9 25.1 28.1 26.37 20 Mpa
191 CIV-RFI-2988 25-Feb-21 SATCO 6 5 6 B1- Mosque Visual Inspection of Grout pouring Under The Base Plate Minaret colu CVI-RFI-3286 45 47.2 46.10 CVI-RFI-3408 45.7 50.7 41.8 46.07
192 CIV-RFI-3005 27-Feb-21 Al Maha 3 2 2 A1- Block 02 Substation Concrete Pouring of Electrical 1500KV Substation For Foundation (US
261533 C-30 6-Mar-21 CVI-RFI-3110 23.6 23.8 23.70 22.5 Mpa 27-Mar-21 CVI-RFI-3421 34.1 31.9 51.2 39.07 30 Mpa
193 CIV-RFI-3006 27-Feb-21 GBEC 3 1 1 A2 & B2 Drainage Network Lift SConcrete Pouring of Lean Concrete For Liftstation 1 & 2 Location Zone
194 CIV-RFI-3023 261536 28-Feb-21 ACP 6 6 6 C-30 A3- Block 05 Concrete Pouring
Pouring of
ofLSlab
ighting
on Pole
GradeRCasFoundation
per highlighted Drawing For D 7-Mar-21 CVI-RFI-3130 34.1 28.1 31.10 22.5 Mpa 28-Mar-21 CVI-RFI-3439 35.9 39 51.2 42.03 30 Mpa
CIV-RFI-3037 Pre Cast Yard 1- Q1 & Q3- 10 Nos
195 1-Mar-21 ACP
261537 12 10 10 C-30 2- PT - 10 N os 8-Mar-21 CVI-RFI-3155 23.8 32.9 28.35 22.5 Mpa 29-Mar-21 CVI-RFI-3456 34.6 31 37.9 34.50 30 Mpa
196 CIV-RFI-3039 1-Mar-21 ACP A3- Block 05 Concrete
3- FL4 - 4Pouring
N os of Slab on Grade as per highlighted Drawing For D
197 CIV-RFI-3052 2-Mar-21 ACP 6 4 4 C-30 A3- Block 05 Concrete Pouring of Slab on Grade as per highlighted Drawing For D CVI-RFI-3177 29.4 28.5 28.95 22.5 Mpa CVI-RFI-3473 39.9 34.8 34.6 36.43 30 Mpa
261538 9-Mar-21 30-Mar-21
198 CIV-RFI-3063 2-Mar-21 ACP 6 4 4 C-20 B3- Block 05Dining Hall & Kit Concrete Pouring For Lean P C For Fixing Firewall Panal Location B3 CVI-RfI-3178 31.2 31.7 31.45 15 Mpa CVI-RFI-3474 32.5 29.7 31.7 31.30 20 Mpa
199 CIV-RFI-3070 3-Mar-21 ACP A3- Block 05 Concrete Pouring of Slab on Grade as per highlighted Drawing For D
261540 12 8 8 C-30 10-Mar-21 CVI-RFI-3202 37.3 39.8 38.55 22.5 Mpa 31-Mar-21 CVI-RFI-3496 41.3 37 36 38.10 30 Mpa
Concrete Pouring F or L ighting Pole RC Foundation
261540 12 8 8 C-30 1- Q1 & Q3- 10 Nos 10-Mar-21 CVI-RFI-3202 37.3 39.8 38.55 22.5 Mpa 31-Mar-21 CVI-RFI-3496 41.3 37 36 38.10 30 Mpa
200 CIV-RFI-3079 3-Mar-21 ACP Pre Cast Yard 2- PT - 10 N os
201 CIV-RFI-3086 4-Mar-21 ACP A2- Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
202 CIV-RFI-3099 261543 4-Mar-21 ACP 12 7 7 C-30 A3- Block 04 Concrete Pouring For Lighting Pole RC Foundation 11-Mar-21 CVI-RFI-3222 35.1 33.4 34.25 22.5 Mpa 1-Apr-21 CVI-RFI-3506 41.9 40.9 39.2 40.67 30 Mpa
Concrete Pouring of Lean For Grade Beam Shaded shelter Location A3-
1- Q1 & Q3- 10 Nos
203 CIV-RFI-3100 4-Mar-21 ACP Pre Cast Yard 2- PT - 10 N os
204 CIV-RFI-3103 4-Mar-21 ACP A2- Dining Hall & Kitchen Concrete Pouring For Lighting Pole RC Foundation
Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
1- Q1 & Q3- 10 Nos
205 CIV-RFI-3114 261544 4-Mar-21 ACP 12 9 9 C-30 Pre Cast Yard 2- PT - 10 N os 11-Mar-21 CVI-RFI-3231 33.5 32.8 33.15 22.5 Mpa 1-Apr-21 CVI-RFI-3517 45.2 41 44.1 43.43 30 Mpa
206 CIV-RFI-3115 4-Mar-21 ACP DP Foundation Concrete Pouring For DP Foundation -08 Nos
207 CIV-RFI-3117 7-Mar-21 ACP A2- Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
208 CIV-RFI-3125 261546 7-Mar-21 ACP 6 7 7 C-30 A2- Ware house Concrete Pouring For Lighting Pole RC Foundation 14-Mar-21 CVI-RFI-3258 29.7 33.2 31.45 22.5 Mpa 4-Apr-21 CVI-RFI-3539 35.6 31.7 36.4 34.57 30 Mpa
Concrete Pouring of Slab on Grade as per highlighted Drawing Locatio
1- Q1 & Q3- 10 Nos
209 CIV-RFI-3134 7-Mar-21 ACP Pre Cast Yard 2- PT - 10 N os
201 CIV-RFI-3132 8-Mar-21 Al Maha 3 4 4 A1- Block 02 Concrete Pouring For RMU Foundation Location A1- Block 02
211 CIV-RFI-3141 261549 8-Mar-21 ACP 3 C-30 A2- Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall 15-Mar-21 CVI-RFI-3283 25.6 24 24.80 22.5 Mpa 5-Apr-21 CVI-RFI-3552 30.1 32.4 33.3 31.93 30 Mpa
3 3
212 CIV-RFI-3152 8-Mar-21 ACP A2- Ware house Concrete Pouring of Slab on Grade as per highlighted Drawing Locatio
213 CIV-RFI-3168 9-Mar-21 ACP C-30 B3- Block 05 Dining Hall & KitcheConcrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall CVI-RFI-3297 33 30.8 31.90 22.5 Mpa CVI-RFI-3571 35.2 36.4 39.3 36.97 30 Mpa
261601 12 8 8 16-Mar-21 6-Apr-21
214 CIV-RFI-3172 9-Mar-21 ACP C-20 B3- Block 03 & 04 Concrete Pouring of Lean Concrete For Lighting Pole Foundation FL- CVI-RFI-3298 25.1 27 26.05 15 Mpa CVI-RFI-3572 29.2 30.3 26.8 28.77 20 Mpa
215 CIV-RFI-3184 10-Mar-21 ACP B3- Block 05 Dining Hall & KitcheConcrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
216 CIV-RFI-3195 10-Mar-21 ACP 6 5 5 C-30 A2- Dining Hall & Kitchen Concrete Pouring
Concrete Pouring FoforSlab
L ighting Pole RC
on Grade Foundation
Smooth Concrete For Multi purpose CVI-RFI-3310 24.8 25.3 25.05 22.5 Mpa CVI-RFI-3589 30.6 31.2 33.7 31.83 30 Mpa
261603 1- Q1 & Q3- 20 Nos 17-Mar-21 7-Apr-21
217 CIV-RFI-3197 10-Mar-21 ACP Pre Cast Yard 2- PT - 20 N os
218 CIV-RFI-3183 10-Mar-21 GBEC 6 4 4 C-20 A2 & B2- Drainage Network Lift StConcrete Pouring of Screed For Lift Station Under Foundation Location CVI-RFI-3322 21.2 23.9 22.55 15 Mpa CVI-RFI-3590 30.6 31.2 33.7 31.83 20 Mpa
219 CIV-RFI-3206 11-Mar-21 ACP B3- Block 05 Dining Hall & KitcheConcrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
261606 12 14 14 C-30 18-Mar-21 CVI-RFI-3321 28.1 34.2 31.15 22.5 Mpa 8-Apr-21 CVI-RFI-3603 31.5 37.9 33.6 34.33 30 Mpa
220 CIV-RFI-3225 11-Mar-21 ACP B1- Mosque Concrete Pouring of Slab on Grade Smooth Concrete For Mosque as per
221 CIV-RFI-3228 13-Mar-21 ACP B2- Dining Hall & Kitchen Concrete Pouring F or L ighting Pole RC Foundation 10-Apr-21
Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
261607 6 7 7 C-30 1- Q1 & Q3- 20 Nos 20-Mar-21 CVI-RFI-3339 30 29.3 29.65 22.5 Mpa CVI-RFI-3612 33.7 38.5 40.3 37.50 300 Mpa
222 CIV-RFI-3224 13-Mar-21 ACP Pre Cast Yard 2- PT - 20 N os
223 CIV-RFI-3257 14-Mar-21 ACP Pre Cast Yard Concrete Pouring For Distribution Pane Foundation -07 Nos
6 5 5 C-30 21-Mar-21 CVI-RFI-3351 26.3 28.9 27.60 22.5 Mpa 11-Apr-21 CVI-RFI-3620 35.2 34.7 32.6 34.17 30 Mpa
224 CIV-RFI-3237 14-Mar-21 ACP B3- 2 Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
261611
225 CIV-RFI-3239 14-Mar-21 ACP B3- Block 05 Concrete Pouring of Lean P C For Fixing Firewall Panal as per highli
CIV-RFI-3242
6 4 4 C-20 21-Mar-21 CVI-RFI-3352 21.3 21.9 21.60 15 Mpa 11-Apr-21 CVI-RFI-3621 24.1 27.2 33.2 28.17 20 Mpa
226 14-Mar-21 ACP A1- Mosque Concrete Pouring of Lean P C For Fixing Firewall Panal as per highli
227 CIV-RFI-3264 3/15/2021 ACP B3- Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall CVI-RFI-3374
6 6 6
228 CIV-RFI-3094 3/15/2021 ACP Fire& RO+Water Pump Room Concrete Pouring of Lean Concrete For Grade Beam Fire& RO+Water
261612 C-30 22-Mar-21 27.1 29.3 28.20 22.5 Mpa 12-Apr-21 CVI-RFI-3646 28.2 39.6 37 34.93 30 Mpa
229 CIV-RFI-3273 3/15/2021 GBEC A1, A4 & B1 Drainage and Stor Concrete Pouring of Base Slabe For Storm Manhole SMH-B09,B10,B11
6 5 5
230 CIV-RFI-3277 3/15/2021 GBEC A2 & B2- Drainage Network Lift Concrete Pouring of Lift Station RC Foundation Location A2 & B2- Dra
231 CIV-RFI-3287 16-Mar-21 ACP B2- Dining Hall & Kitchen Concrete Pouring of Slab on Grade With Stamp Pattern For Dining Hall
6 5 5
232 CIV-RFI-3290 261614 16-Mar-21 ACP C-30 A3- Bllck 05 Dining Hall & KitcheConcrete Pouring of Slab on Grade as per highlighted Drawing For Din 23-Mar-21 CVI-RFI-3378 43.3 45.5 44.40 22.5 Mpa 13-Apr-21 CVI-RFI-3667 40.7 36.6 39.6 38.97 30 Mpa
233 CIV-RFI-3291 16-Mar-21 GBEC 6 4 4 A1 Drainage & Storm Drain NetworConcrete Pouring with Installatin of Storm and Drainage Manholes#
234 CIV-RFI-3301 17-Mar-21 ACP . B3- Bllck 05 Dining Hall & KitcheConcrete Pouring of Smooth Concrete For Ceramic Floor Tiles Multipur
261616 6 7 7 C-30 24-Mar-21 CVI-RFI-3393 27 31.5 29.25 22.5 Mpa 14-Apr-21 CVI-RFI-3670 31.7 35.1 37 34.60 30 Mpa
235 CIV-RFI-3308 17-Mar-21 ACP B2- Dining Hall & Kitchen Concrete Pouring of Smooth Concrete For Ceramic Floor Tiles Multipur
236 CIV-RFI-3314 261618 18-Mar-21 Initial 6 3 3 C-20 B3- Swimming Pool Concrete Pouring of Screed Prior to Cementitious coating Location B3 25-Mar-21 CVI-RFI-3409 24.8 27 25.90 15 Mpa 15-Apr-21 CVI-RFI-3688 34.1 33.2 35.5 34.27 20 Mpa
237 CIV-RFI-3323 20-Mar-21 ACP A3- Bllck 05 Dining Hall & KitcheConcrete Pouring of Slab on Grade For Kitchen Area as per highlight
238 CIV-RFI-3324 ACP 6 5 5 A3- Block 04 Concrete Pouring of L ighting RC Foundation
20-Mar-21 Concrete Pouring of Grade Beam For Shaded shelter Location A3- Block
261621 C-30 1- Q1 & Q3- 20 Nos 27-Mar-21 CVI-RFI-3422 30.6 24.9 27.75 22.5 Mpa 4/17/2021 CVI-RFI-3689 34.2 36.2 34.5 34.97 30 Mpa
239 CIV-RFI-3326 20-Mar-21 ACP Pre Cast Yeard 2- PT- 20 Nos
240 CIV-RFI-3330 20-Mar-21 GBEC 6 5 5 A1 Water Supply Network Part 1 Concrete Pouring for Base Slab With Manholes Installation Points
241 CIV-RFI-3357 22-Mar-21 ACP 6 6 6 A3- Block 05 Concrete Pouring of Slab on Grade For Kitchen Area as per highlight
242 CIV-RFI-3360 261624 22-Mar-21 Al Maha C-30 Pre Cast Yard Concrete Pouring of RMU Foundation Location A2- Pre Cast Yard (10 P 29-Mar-21 CVI-RFI-3457 27.6 28.7 28.15 22.5 Mpa 19-Apr-21 CVI-RFI-3704 34.2 31.1 30.1 31.80 30 Mpa
6 6 6
243 CIV-RFI-3361 22-Mar-21 Al Maha A1- Block 01 Concrete Pouring of Electrical Duct Bank ED-B-02, 03 & ED-B-D2 Loc
244 CIV-RFI-3388 24-Mar-21 ACP Equipment room Concrete Pouring of Slab on Grade as per highlighted Drawing Locati
245 CIV-RFI-3390 24-Mar-21 ACP 6 6 6 A3- Block 05 Dining Hall & KitcheConcrete Pouring of
Concrete Pouring ForSlab
Lighting RC Founda
on Grade tionFor Food Storage Area as
Concrete
CIV-RFI-3392
261628 C-30 1- Q1 & Q3- 10 Nos 31-Mar-21 CVI-RFI-3497 23.3 26.4 24.85 22.5 Mpa 21-Apr-21 CIV-RFI-3720 34 37.2 36.7 35.97 30 Mpa
246 24-Mar-21 ACP Pre Cast Yeard 2- PT- 10 Nos
247 CIV-RFI-3394 24-Mar-21 GBEC 6 5 5 A2 Lifting station 2 - Utility Area Concrete pouring of R C Wall For Lifting Station Location A2 Utility A
248 CIV-RFI-3413 27-Mar-21 GBEC B2 Lifting station 01 - Drainage NConcrete pouring of R C Wall For Lifting Station-01 Location B2- Drai
CIV-RFI-3423
261632 6 4 4 C-30 3-Apr-21 CVI-RFI-3518 29.3 29.1 29.20 22.5 Mpa 24-Apr-21 CIV-RFI-3726 36.8 38.1 34.3 36.40 30 Mpa
249 27-Mar-21 GBEC A1 & B1 Storm,Drainage and WateConcrete Pouring of
Concrete Pouring ForManholes
Lighting RC
BaseFounda
Slabe tion
For Storm Drain Networ
1- Q1 & Q3- 10 Nos
250 CIV-RFI-3436 281635 28-Mar-21 GBEC 6 1 1 C-30 Pre Cast Yeard 2- PT- 10 Nos 4-Apr-21 CVI-RFI-3540 27.8 33.3 30.55 15 Mpa 25-Apr-21 CIV-RFI-3744 36.9 41.7 38.4 39.00 30 Mpa
251 CIV-RFI-3442 281638 29-Mar-21 ACP 12 9 9 C-30 A2- Dining Hall & Kitchen Typ Concrete pouring of Slab on Grade For Kitchen Area as per highlighte 5-Apr-21 CVI-RFI-3553 28.5 25.1 26.80 15 Mpa 26-Apr-21 CIV-RFI-3757 33.6 31.6 34.4 33.20 30 Mpa
252 CIV-RFI-3467 30-Mar-21 ACP Concrete pouring
A2- Dining Hall & Kitchen Typ Concrete Pouring of
ofLSlab
ighting Pole RC
on Grade ForFoundation
Service Area-01 & 02 as per hi
6 5 5 1- Q1 & Q3- 10 Nos
253 CIV-RFI-3479 261640 30-Mar-21 ACP C-30 Pre Cast Yard 2- PT - 10 N os 6-Apr-21 CVI-RFI-3573 25.8 33 29.40 22.5 Mpa 27-Apr-21 CIV-RFI-3759 34.3 30 31.9 32.07 30 Mpa
254 CIV-RFI-3483 30-Mar-21 GBEC 6 4 4 A3 Storm Drain & Drainage NetwoConerete Pouring of Base Slabe for Manhole with Installation for S
255 CIV-RFI-3484 31-Mar-21 ACP A2- Dining Hall & Kitchen Typ Concrete Pouring of Lean Concrete Chiller Room as per highlighted D
256 CIV-RFI-3485 261641 31-Mar-21 ACP 12 7 7 C-30 A2- Dining Hall & Kitchen Typ Concrete Pouring of Slab on Grade For Food Storage Area as per high 7-Apr-21 CVI-RFI-3591 28.8 30 29.40 22.5 Mpa 28-Apr-21 CIV-RFI-3767 32.5 33.4 30.4 32.10 30 Mpa
257 CIV-RFI-3493 31-Mar-21 ACP Fire& RO+Water Pump Room Concrete Pouring of L ighting Pole RC Foundation
Concrete Pouring of Grade Beam For Fire& RO+Water Pump Room Locatio
1- Q1 & Q3- 10 Nos
258 CIV-RFI-3501 261645 1-Apr-21 ACP 6 1 1 C-30 Pre Cast Yard 2- PT - 10 N os 8-Apr-21 CVI-RFI-3604 28.9 26.8 27.85 22.5 Mpa 29-Apr-21 CIV-RFI-3776 32.5 33.4 30.2 32.03 30 Mpa
259 CIV-RFI-3513 3-Apr-21 ACP A3- Block 05 Dining Hall & Kitc Concrete Pouring of Lean Concrete For Chiller Room Area as per high
CIV-RFI-3514
6 3 3 C-20 CVI-RFI-3613 27.5 24.4 25.95 15 Mpa CIV-RFI-3780 18.5 19.5 20.4 19.47 20 Mpa
260 261647 3-Apr-21 ACP A2- Dining Hall & Kitchen Type Concrete Pouring of Lean Concrete Chiller Room as per highlighted D 10-Apr-21 1-May-21
CIV-RFI-3515 A3- Block 03 Concrete Pouring of Foundation For Sub Station
261 3-Apr-21 SATCO 6 12 6 C-35 B3- Block 03 Visual Inspection of Grout CVI-RFI-3614 39.3 39 39.15 22.5 Mpa CIV-RFI-3781 44.2 50.4 48.5 47.70 35 Mpa
B1- M osque 1-AB-2 Location B4- Block pouring
08 Under The Base Plate For Shaded S
262 CIV-RFI-3525 4-Apr-21 Al Maha 4 3 3 B3- Block 05 2- USS-S4 Location B3- Bloc k 05
CIV-RFI-3529 B4- Block 08 3- USS- D 8 Location B1- Mosque
263 4-Apr-21 ACP Equipment room Concrete Pouring of Column For Equipment Room Location Solar Power
264 CIV-RFI-3531 261650 4-Apr-21 ACP 4 4 4 C-30 HPP ControlRoom Concrete Pouring of Foundation & Grade Beam For HPP ControlRoom Lo11-Apr-21 Cvi-RFI-3622 29 22.5 25.75 22.5 Mpa 2-May-21 CIV-RFI-3788 34.7 31.8 36.9 34.46666666667 30 Mpa
Concrete Pouring of L ighting Pole RC Foundation
265 CIV-RFI-3537 4-Apr-21 ACP Pre Cast Yard 1- Q1 & Q3- 10 Nos
CIV-RFI-3547 2- PT - 10 N os
266 4-Apr-21 GBEC 4 2 2 Pre Cast Yeard Concrete Pouring of GRP Valve Boxes With Installation For Water Supp
267 CIV-RFI-3551 5-Apr-21 Madas 6 2 2 C-20 B4- Block 01 To 04 Road Concrete Pouring of Lean PC For Foundation Parking Shaded Location CVI-RFI-3647 21.2 20.6 20.90 15 Mpa CIV-RFI-3791 23.7 24 21.9 23.20 20 Mpa
261701 12-Apr-21 3-May-21
268 CIV-RFI-3547 5-Apr-21 GBEC 6 2 2 C-30 Pre Cast Yeard Concrete Pouring of GRP Valve Boxes With Installation For Water Supp CVI-RFI-3654 29.4 29.1 29.25 22.5 Mpa CIV-RFI-3792 33.0 33.3 33.7 33.33 30 Mpa
269 CIV-RFI-3570 6-Apr-21 ACP 6 C-20 HPP ControlRoom Concrete Pouring of
Concrete Pouring ofLLean
ighting Pole RCFor
Concretre Foundation
HPP Control Room Trench Locat CVI-RFI-3668 21.8 22.7 22.25 15 Mpa CIV-RFI-3818 23.5 29.4 22.7 25.20 20 Mpa
261703 2 2 1- Q1 & Q3- 10 Nos 13-Apr-21 4-May-21
270 CIV-RFI-3578 6-Apr-21 ACP 6 C-30 Pre Cast Yard 2- PT - 10 N os CVI-RFI-3669 28.9 27.4 28.15 22.5 Mpa CIV-RFI-3819 35.4 31 34.8 33.73 30 Mpa
271 CVI-RFI-3631 12-Apr-21 ACP B3- Block 05 Dining Hall & Kitc Concrete Pouring of Slab on Grade For Kitchen Area & Food Storage a
272 CVI-RFI-3644 12-Apr-21 Al Maha 4 5 5 A1- Block 01 & 09 Between RoadConcrete Pouring For LV Duct Bank (2 Nos) & MV Duct Bank (01 Nos
261717 C-30 Concrete Pouring F or L ighting Pole RC Foundation 19-Apr-21 CIV-RFI-3705 27.6 29.4 28.50 22.5 Mpa 10-May-21 CIV-RFI-3861 30.7 31.1 32.1 31.30 30 Mpa
273 CVI-RFI-3649 12-Apr-21 ACP 4 5 5 Pre Cast Yard 1- Q1 & Q3- 10 Nos
CVI-RFI-3656 12-Apr-21 4 4 2- PT - 10Pouring
A1,A3,A4,B1,B3 Mai Road & OreConcrete N os of Manholes Base Slabe With Installation For Stor
274 GBEC 4
Concrete Pouring of Slab on Gra de Smooth Conc rete For Cera mic Floor Se rvice Line- 02 as per highlighted D rawing L oc ation B3- Block 05 D ining Hall & Kitchen T ype AB&D
275 CVI-RFI-3658 26723 13-Apr-21 ACP 6 5 5 C-30 B3- Block 05 Dining Hall & Kitc 20-Apr-21 CIV-RFI-3713 34.1 35.6 34.85 22.5 Mpa 11-May-21 CIV-RFI-3866 34.8 35.9 35.5 35.40 30 Mpa
276 CVI-RFI-3640 14-Apr-21 Madas C-20 A4- Ring Road Concrete Pouring of Lean Concrete For Parking Shelter (33 Nos) Locat CIV-RFI-3721 21.8 22.8 22.30 15 Mpa CIV-RFI-3880 29.4 25.1 25.9 26.80 20 Mpa
6 3 3
277 CVI-RFI-3643 14-Apr-21 Madas B4- Ring Road Concrete Pouring of For Foundation For Parking Shelter (20 Nos) Loca
261724 21-Apr-21 12-May-21
278 CVI-RFI-3664 14-Apr-21 ACP C-30 Solar Power Area Concrete Pouring of Columns For HPP Control Room Location Solar Po CIV-RFI-3722 25.9 26.7 26.30 22.5 Mpa CIV-RFI-3881 30.7 31.3 34.8 32.27 30 Mpa
6 4 4
279 CVI-RFI-3665 14-Apr-21 ACP A2- Ware house Concrete Pouring of Slab on Grade For Toilet Area as per highlighted
280 CVI-RFI-3693 18-Apr-21 ACP C-20 Zone A3-2 Cricket Area Concrete pouring
Concrete Pouring for
Forlean
Lighting Polelocation
concrete RC Foundation
A3-2 Cricket Area CIV-RFI-3742 20 20.3 20.15 15 Mpa 16-May-21 CIV-RFI-3882 23.5 25.9 22.7 24.03 20 Mpa
261733 12 3 3 1- Q1 & Q3- 10 Nos 25-Apr-21
281 CVI-RFI-3694 18-Apr-21 ACP C-30 Pre Cast Yard CIV-RFI-3743 30.5 31.4 30.95 22.5 Mpa 16-May-21 CIV-RFI-3883 35.6 33.1 34.1 34.27 30 Mpa
2- PT - 10 N os
282 CVI-RFI-3702 19-Apr-21 ACP C-20 B3-5 Kitchen & Dinning Lean concrete pouring for Chiller Dinning & Kichen location B3-5 26-Apr-21 CIV-RFI-3758 19.8 19.2 19.50 15 Mpa 17-May-21 CIV-RFI-3884 22.8 27.4 25.9 25.37 20 Mpa
261732 12 4 4
283 CVI-RFI-3703 19-Apr-21 ACP C-30 Utility Area Concrete pouring for Foundation & 6 Columns Location A1- Control 26-Apr-21 CIV-RFI-3758 0.00 22.5 Mpa 17-May-21 CIV-RFI-3884 0.00 30 Mpa
284 CIV-RFI-3711 261851 20-Apr-21 ACP 6 5 6 C-5 A1- Ro Pump Room installation of CMU Wall Masonry @ A1-Ro Pump Room 27-Apr-21 CIV-RFI-3760 28.7 27.8 28.25 3 MPA 18-May-21 CIV-RFI-3916 38.8 35.6 36.8 37.07 5 Mpa
285 CIV-RFI-3739 261741 25-Apr-21 GBEC 6 2 2 C-30 A2 Drainage & Storm Drain NetworConcrete Pouring of Manholes for Drainage and Storm Network with 2-May-21 CIV-RFI-3789 0.00 22.5 Mpa 23-May-21 CIV-RFI-3972 0.00 30 Mpa
286 CIV-RFI-3783 1-May-21 ACP 6 2 2 C-20 Cricket Area & Baskit Ball Lan concrete pouring for cricket and basketball A3-2,3 8-May-21 CIV-RFI-3834 0.00 15 Mpa 29-May-21 CIV-RFI-4079 0.00 20 Mpa
261748
287 CIV-RFI-3778 1-May-21 GBEC 6 2 2 C-35 Zone A2 A2 Utility Area Lifting Station 2 8-May-21 CIV-RFI-3837 0.00 26.25 Mpa 29-May-21 CIV-RFI-4080 0.00 35Mpa
288 CIV-RFI-3786 2-May-21 ACP 6 1 1 C-20 A3-4 Lean concrete pouring for Around football Location A3-4 9-May-21 CIV-RFI-3838 0.00 15 Mpa 30-May-21
261855 CIV-RFI-4132 22.9 22.5 22.5 22.63 30 Mpa
289 CIV-RFI-3787 2-May-21 Madas 6 2 2 C-30 Zone A4 Concrete Pouring for carparking shades in zone A4 - for the Point# 9-May-21 CIV-RFI-3839 27.2 28.2 27.70 22.5 Mpa 30-May-21
290 CIV-RFI-3464 4-May-21 ACP 6 4 4 C-30 Utility Area Concrete Pouring for generator 1,2 Foundation Location A utilitly area 11-May-21 22.5 Mpa 30 Mpa
261858 CIV-RFI-3867 0.00 1-Jun-21 CIV-RFI-4152 29.7 30.9 30.2 30.27
291 CIV-RFI-3805 4-May-21 Madas 6 4 4 C-30 Zone A1 Road side Concrete pouring for the Low Current Duct Back Network Location A1- 11-May-21 22.5 Mpa 30 Mpa
292 CIV-RFI-3813 261860 5-May-21 ACP 6 7 7 C-30 Utility Area Concrete Pouring for generator 3,4 Foundation Location A utilitly area 12-May-21 CIV-RFI-3876 0.00 22.5 Mpa 2-Jun-21 CIV-RFI-4153 36.6 33.3 30.2 33.37 30 Mpa
293 CIV-RFI-3823 261861 6-May-21 ACP 6 7 7 C-30 Utility Area Concrete pouring for generator 5,6 Foundation Location A utilitly area 13-May-21 CIV-RFI-3877 0.00 22.5 Mpa 3-Jun-21 CIV-RFI-4163 0.00 30 Mpa
294 CIV-RFI-3832 8-May-21 ACP 3 3 3 C-30 Utility Area Concrete pouring for generator 7 Foundation Location A utilitly area 30 Mpa
261863 15-May-21 CIV-RFI-3878 0.00 22.5 Mpa 5-Jun-21 CIV-RFI-4195 0.00
295 CIV-RFI-3840 8-May-21 Madas 3 3 3 C-30 Zone A1 Road side Concrete pouring for the duct bank for the Low Current Network Locat 30 Mpa
296 9-May-21 ACP 3 3 3 C-30 Utility Area Concrete pouring for Main Diesel Tank Foundation Location A utilitly 16-May-21 0.00 30 Mpa
CIV-RFI-3853 261865 CIV-RFI-3879 0.00 22.5 Mpa 6/6/2021 CIV-RFI-4210
297 9-May-21 Madas 3 3 3 C-30 Utility Area Concrete pouring for Duck Bank A1 16-May-21 0.00 30 Mpa
298 CIV-RFI-3864 261875 10-May-21 GBEC 6 2 2 C-35 B2- Lifting station 01 -Drainage NConcrete pouring For Lifting Station-01 2nd phase Location B2- Drain 17-May-21 CIV-RFI-3924 0.00 26.5 Mpa 6/7/2021 CIV-RFI-4244 0.00 35 Mpa
299 CIV-RFI-3903 18-May-21 Madas 3 2 2 C-30 Zone A1 Road side Concrete Pouring for the Duct Bank. for the Duct Bank for the Low C 0.00 30 Mpa
261883 25-May-21 CIV-RFI-4018 0.00 22.5 Mpa 1/20/1900 CIV-RFI-4362
300 CIV-RFI-3915 18-May-21 ACP 3 3 3 C-30 Utilities Area-2 & A3-05 Concrete Pouring for the parapet Main Diesel Tank Utility Area And Toi 0.00 30 Mpa
301 CIV-RFI-3917 261890 19-May-21 ACP 12 9 9 C-30 Utility Area 02 & B3-05 Dining KiConcrete Pouring for the Slab On Grade R O Tank & Fire pump Room Loc
26-May-21 CIV-RFI-4057 0.00 22.5 Mpa 6/16/2021 CIV-RFI-4372 0.00 30 Mpa
302 CIV-RFI-3932 20-May-21 GBEC 3 2 2 C-30 A1,A2 Drainage & Storm Network Concrete Pouring with Installation of Manhole and Inspection Cham
261894 27-May-21 CIV-RFI-4058 0.00 22.5 Mpa 6/17/2021 CIV-RFI-4401 0.00 30 Mpa
303 CIV-RFI-3936 20-May-21 Louis Berger 3 3 3 C-30 Utility Area Concrete pouring for RC wall Trench Location A1- Control Room-01
304 CIV-RFI-3975 23-May-21 ACP C-35 Pre Cast Yard Concrete Pouring For Lighting Pole RC Foundation Q1 & Q3- 10 N 30-May-21 CIV-RFI-4133 26.5 25.9 26.20 26.5 Mpa 6/20/2021 CIV-RFI-4439 0.00 35 Mpa
305 CIV-RFI-3976 261900 23-May-21 ACP 18 4 4 C-20 Utility Area 1&2 Lean Concrete Pouring Transformer Stations 1&2 Utility Area
5/30/2021 CIV-RFI-4134 20.6 19.9 20.25 15 Mpa 6/20/2021 CIV-RFI-4440 0.00 20 Mpa
306 CIV-RFI-3977 23-May-21 ACP C-20 A3 Cricket Area Lean Concrete Pouring Around Cricket Area Kerbstones work A3
307 CIV-RFI-3992 261954 24-May-21 Madas 6 5 5 C-30 A1 Mosque Area Concrete pouring for Duct Bank 5/31/2021 CIV-RFI-4135 29.8 29.2 29.50 22.5 Mpa 6/21/2021 CIV-RFI-4461 34.8 34.5 33.2 34.17 30 Mpa
308 CIV-RFI-4010 25-May-21 ACP 6 3 3 C-30 B3-3 Shaded Shelter Concrete Pouring For Slab On Grade Of Shaded Shelter B3-3 With Stam CIV-RFI-4136 29.3 28.7 29.00 22.5 Mpa CIV-RFI-4491 36.3 35.6 33.5 35.13 30 Mpa
309 CIV-RFI-4011 25-May-21 Louis Berger C-20 Dining Building A2 & A3-5 Lean Concrete Pouring For Electrical Room trenches Location A2&A3-5
261960 6 2 2 6/1/2021 CIV-RFI-4137 20.2 19.7 19.95 15 Mpa 6/22/2021 CIV-RFI-4493 25.8 29.2 23.2 26.07 20 Mpa
310 CIV-RFI-4012 25-May-21 Louis Berger C-20 Utility Area Control room- 02 Lean Concrete Pouring Of The Electrical Trench Of Control Room - 02
311 CIV-RFI-4016 25-May-21 ACP C-30 A1 - RO-Plant Concrete Pouring For the columns First Floor for the RO and Fire Pump CIV-RFI-4136 29.3 28.7 29.00 22.5 Mpa CIV-RFI-4491 36.3 35.6 33.5 35.13 30 Mpa
312 CIV-RFI-4034 26-May-21 ACP 6 5 5 B1 Mosque Concrete Pouring for the Mezzanine Floor Slab Mosque B1
261965 C-30 6/2/2021 CIV-RFI-4154 24.9 27.6 26.25 22.5 Mpa 6/23/2021 CIV-RFI-4514 0.00 30 Mpa
313 CIV-RFI-4037 26-May-21 GBEC 6 5 5 Zone A2, A3 & A1 Concrete Pouring for Valve Chamber and DMH, SMH Inspection Chambe
314 CIV-RFI-4081 29-May-21 ACP 6 12 12 A1 Mosque Concrete Pouring for the Mezzanine Floor Slab Mosque A1
315 CIV-RFI-4082 29-May-21 Louis Berger 6 5 5 Solar Power Area Concrete Pouring for the Base of transformer Foundations numbers 1&2
316 CIV-RFI-4087 261973 29-May-21 ACP 6 C-30 A3-5 Dining Concrete Pouring for the Electrical room Dining A3-5 6/5/2021 CIV-RFI-4196 0.00 22.5 Mpa 6/26/2021 CIV-RFI-4567 0.00 30 Mpa
317 CIV-RFI-4088 29-May-21 ACP Laundry Facility Concrete Pouring for the Washing Base At laundry Building
318 CIV-RFI-4089 29-May-21 Louis Berger A1-Control Room 02 Concrete Pouring for the Electrical Trench of control room 02 base
319 CIV-RFI-4095 30-May-21 Al Maha 4 1 1 C-30 A1 Mosque Area Concrete pouring for USS-D5& USS-D4 CIV-RFI-4211 0.00 22.5 Mpa CIV-RFI-4569 0.00 C-30
320 CIV-RFI-4100 30-May-21 ACP 4 3 3 C-20 Waste management Lean Concrete pouring for Foundatios Waste management Building CIV-RFI-4212 0.00 15 Mpa CIV-RFI-4570 0.00 C-20
261975 6/6/2021 6/27/2021
321 CIV-RFI-4101 30-May-21 ACP C-30 A2 Dining Kitchen & Food store concrete pouring for Chiller Dinning Kitchen& Food Store location A2 CIV-RFI-4213 0.00 22.5 Mpa CIV-RFI-4569 0.00 C-30
322 CIV-RFI-4114 30-May-21 Madas 4 1 1 C-20 BTW A1 & A4 concrete Pouring for the Blinding for the points #01,02,03,04,05,06, CIV-RFI-4214 0.00 15 Mpa CIV-RFI-4570 0.00 C-20
323 CIV-RFI-4119 31-May-21 Concrete Pouring of Inspection Cha mbers, Manhole & Valve Chambers w ith Installation CIV-RFI-4245
Points#
261981 GBEC 12 5 5 C-30 A1,A2,A3 Drainage , Water SuppIC-Comm1# 1,2,3,4 & IC-Admin# 01,02 & IC-M osque#02, IC-G ame Room#01, 6/7/2021 0.00 6/28/2021 CIV-RFI-4587 0.00 C-30
IC-GYM -Part A#01,02& IC-A3#01,02,03,04 & IC-GY M-Pa rt A#03 & IC-A1-4#007, IC-A1-5#007, IC-A 1-003#007, IC-A1-002#007 & Valve Boxes : 6 Nos & V alve Chambers: 4 Nos
324 CIV-RFI-4150 2-Jun-21 ACP 4 6 6 C-30 A3-5 Dining Kitchen & Food stoConcrete pouring of Slab on Grade Chiller Room & Electrical Room Wal
325 CIV-RFI-4151 2-Jun-21 Louis Berger 4 5 5 C-30 Solar Power Area Concrete pouring for RC Walls of transformer Foundation number 1 CIV-RFI-4267 0.00 22.5 Mpa CIV-RFI-4641 0.00 C-30
326 CIV-RFI-4152 261984 2-Jun-21 Louis Berger C-30 A1 Control Room 02 Concrete pouring for RC walls Trench Control Room 2 Location A1 6/9/2021 6/30/2021
327 CIV-RFI-4232 2-Jun-21 ACP 4 C-20 A1 BasketBall Court & Tensie Co
Lean concrete pouring Under Curbstone BasketBall Court & Tensie Cou
CIV-RFI-4254 15 Mpa CIV-RFI-4642 0.00 C-20
328 CIV-RFI-4233 2-Jun-21 ACP C-20 A4 Tensie Court Lean concrete pouring Under Curbstone Tensie Court Location A4 As Pe
329 CIV-RFI-4173 261985 3-Jun-21 GBEC 6 1 1 C-30 A2 & A3 Concrete pouring with Installation of Incpection Chambers# IC 6/10/2021 CIV-RFI-4292 29.1 27.7 28.40 22.5 Mpa 7/1/2021 CIV-RFI-4642 0.00 C-30
330 CIV-RFI-4194 261986 5-Jun-21 ACP 12 5 5 C-30 A3-3 Shaded Shelter Concrete Pouring For Slab On Grade Of Shaded Shelter A3-3 With Stam 6/12/2021 CIV-RFI-4296 0.00 22.5 Mpa 7/3/2021 CIV-RFI-4653 0.00 C-30
331 CIV-RFI-4215 261991 6-Jun-21 ACP 6 4 4 C-20 A2 main Road Lean concrete pouring Under Carbstone A2 main Road Location A1 As 6/13/2021 CIV-RFI-4325 0.00 15 Mpa 7/4/2021 CIV-RFI-4691 0.00 C-20
332 CIV-RFI-4236 7-Jun-21 ACP 3 4 4 C-30 A3-4 Shaded Shelter Concrete Pouring For Slab On Grade Of Shaded Shelter A3-4 With Stam
333 CIV-RFI-4237 261998 7-Jun-21 Louis Berger 3 3 3 C-30 Solar Power Area Concrete pouring for RC Walls of transformer Foundation number 2 6/14/2021 CIV-RFI-4354 0.00 22.5 Mpa 7/5/2021 CIV-RFI-4697 0.00 C-30
334 CIV-RFI-4238 7-Jun-21 ACP C-30 A1 Utility Area Concrete pouring for RC Roof Slab Of Control Room - 01 Utility Area
335 CIV-RFI-4250 261997 8-Jun-21 AL MAHA 6 3 3 C-30 Zone A1-1 & A4-3& A1-4 Concrete pouring for EDB-008 & LVDB-007 & Street light duct bank 6/15/2021 CIV-RFI-4363 0.00 22.5 Mpa 7/6/2021 CIV-RFI-4721 0.00 C-30
337 CIV-RFI-4276 9-Jun-21 GBEC 6 2 2 C-30 A1,A2 & Utility - Water Supply,Concrete Pouring for Inspection chambers, Valve Chambers, DM CIV-RFI-4363 0.00 22.5 Mpa CIV-RFI-4733 0.00 C-30
6/16/2021 7/7/2021
CIV-RFI-4253 261993 9-Jun-21 ACP 6 2 2 C-20 A1-1 Main road (tamimi Road) Lean concrete pouring Under Curb stone Location Main road (tamimi R CIV-RFI-4364 0.00 15 Mpa CIV-RFI-4734 0.00 C-20
338 CIV-RFI-4279 10-Jun-21 Louis Berger 4 4 4 A1-SWGR Room #2 Concrete Pouring for Foundation Location A1-SWGR Room #2
339 CIV-RFI-4294 10-Jun-21 ACP 4 2 2 Waste management Concrete Pouring for RC isolated footing of waste management Building
262000 C-30 6/17/2021 CIV-RFI-4402 0.00 22.5 Mpa 7/8/2021 CIV-RFI-4762 0.00 C-30
340 CIV-RFI-4295 10-Jun-21 Louis Berger Utility Area control room-01 Concrete Pouring for parapet Beam of control room 01
341 CIV-RFI-4270 10-Jun-21 BTW A1 & A4 Concre te pouring for Foundation for the car park sha de points #
Madas 4 2 2
RC
Concrete
-1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27
pouring for duc t bank for the Low current netw ork for the ma nhole s#
342 CIV-RFI-4309 262253 12-Jun-21 Madas 6 2 2 C-30 A3 Main Road btw A3 main roa d 6/19/2021 CIV-RFI-4437 0.00 22.5 Mpa 7/10/2021 CIV-RFI-4785 0.00 C-30
343 CIV-RFI-4443 13-Jun-21 Madas 6 2 2 C-30 A3 ROAD Concrete pouring for the LC duct bank in zone A3 road CIV-RFI-4444 0.00 22.5 Mpa CIV-RFI-4809
262256 6/20/2021 7/11/2021
344 CIV-RFI-4318 13-Jun-21 SATCO 6 16 6 C-68 A1 Mosque Grout Mixing and pouring for zamil pre-fabricated stairs steps at mosqu CIV-RFI-4438 0.00 CIV-RFI-4810 0.00
345 CIV-RFI-4355 262258 14-Jun-21 acp 6 10 10 C-20 A1-1 Main Road (Tamimi Road )Lean concrete pouring Under Curb stone Location Main road (tamimi R 6/21/2021 CIV-RFI-4452 0.00 15 Mpa 7/12/2021 CIV-RFI-4826 0.00 C-20
346 CIV-RFI-4358 15-Jun-21 ACP 18 10 10 Health clinic Building concrete pouring for Slab on Grade Of Health Clinic Building
262263 C-30 6/22/2021 CIV-RFI-4492 25.8 12.90 22.5 Mpa 7/13/2021 CIV-RFI-4841 0.00 C-30
347 CIV-RFI-4370 15-Jun-21 Madas 6 6 6 A3 Main Road Concrete Pouring for the Duct Bank for the Low Current Network Loc
348 CIV-RFI-4380 16-Jun-21 Louis Berger 3 2 2 A1 control room -02 concrete pouring of RC column for HPP Control room Location A1 Co CIV-RFI-4515 0.00
262264 C-30
concrete pouring of 7 RC Foundations For Daily Diesel Tank Location
6/23/2021 22.5 Mpa 7/14/2021 CIV-RFI-4845 31.5 30.1 30.7 30.77 C-30
349 CIV-RFI-4381 16-Jun-21 ACP 3 3 3 Solar Power Area 1 CIV-RFI-4516 0.00
350 CIV-RFI-4400 17-Jun-21 Madas 6 2 2 C-30 BTW A1 & A4 Concrete Pouring for the Duct Bank for the Low Current Network Loc CIV-RFI-4536 0.00 22.5 Mpa CIV-RFI-4883 C-20
262266 6/24/2021 7/15/2021
351 CIV-RFI-4395 17-Jun-21 ACP 6 2 2 C-20 A3 Main Road Lean concrete pouring Under Curb stone Location Main road A3 CIV-RFI-4537 0.00 15 Mpa CIV-RFI-4884 0.00 C-20
352 CIV-RFI-4423 262268 19-Jun-21 ACP 6 1 1 C-30 A2 Dining Building concrete pouring for Electrical trench Location Dining Building A2 6/26/2021 CIV-RFI-4568 0.00 22.5 Mpa 7/17/2021 CIV-RFI-4901 0.00 C-30
353 CIV-RFI-4430 20-Jun-21 AL MAHA A1 Concrete pouring for USS-S2
3 2 2 Concrete pouring for 3 street duct bank
354 CIV-RFI-4431 262269 20-Jun-21 AL MAHA C-30 A1 6/27/2021 CIV-RFI-4571 0.00 22.5 Mpa 7/18/2021 CIV-RFI-4905 0.00 C-30
355 CIV-RFI-4450 20-Jun-21 Madas 3 2 2 A3 & A1 ROAD & BTW A1 & A4 Concrete pouring for the LC trench for the D uct Bank & Concrete pouring for the Column Neck for the points #
01,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40
356 CIV-RFI-4457 21-Jun-21 ACP 3 1 1 A3-5 Dining Building Concrete Pouring for Electrical mechanical room Slab on Grade Locatio
C-30 CIV-RFI-4600 0.00 22.5 Mpa CIV-RFI-4911 0.00 C-30
357 CIV-RFI-4460 21-Jun-21 Madas 3 1 1 A3 & A1 ROAD & BTW A1 & A4 Concrete pouring for the LC trench for the D uct Bank & Concrete pouring for the Column Neck for the points #
262275 01,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40
6/28/2021 7/19/2021
358 CIV-RFI-4471 21-Jun-21 ACP 3 1 1 A3-1 BBQ Area Lean concrete pouring For grade beam Location A3-1 BBQ Area
C-20 CIV-RFI-4601 0.00 15 Mpa CIV-RFI-4912 0.00 C-20
359 CIV-RFI-4472 21-Jun-21 ACP 3 1 1 Main road A3 Lean concrete pouring under curb stone as per highlighted Location Ma
360 CIV-RFI-4480 262276 22-Jun-21 Madas 6 2 2 C-30 A4 ROAD Concrete pouring for the RC footing for the c ar park shade for the points : 6/29/2021 CIV-RFI-4620 0.00 22.5 Mpa 7/20/2021 CIV-RFI-4914 0.00 C-30
133 to 172 ( 10 Footings )
361 CIV-RFI-4500 23-Jun-21 SATCO 6 16 6 C-68 A1 GLS RO tank Grout Mixing and pouring around the GLS RO Tank Location A1 CIV-RFI-4643 0.00 CIV-RFI-4917 0.00 C-68
362 CIV-RFI-4513 262280 23-Jun-21 Madas 6 3 3 C-30 A4 ROAD (TAMIMI) Concrete pouring for the RC footing for the c ar park shade for the points : 6/30/2021 CIV-RFI-4659 0.00 22.5 Mpa 7/21/2021 CIV-RFI-4918 0.00 C-30
221 to 260 ( 10 Footings )
363 CIV-RFI-4517 23-Jun-21 ACP 6 2 2 C-20 A1-1,2,8,9 Lean concrete under curb stone in between ( A1-1&A1-2) and ( A1-1& A CIV-RFI-4660 0.00 15 Mpa CIV-RFI-4919 0.00 C-20
364 CIV-RFI-4531 24-Jun-21 ACP 6 3 3 C-20 A1 Tamimi Road Lean Concrete Pouring For backing of curbstone Location A1 Tamimi R CIV-RFI-4642 0.00 15 Mpa CIV-RFI-4921 0.00 C-20
262281 7/1/2021 7/22/2021
365 CIV-RFI-4538 24-Jun-21 SATCO 6 16 6 C-68 A1 GLS tank Grout Mixing and pouring around the GLS Tank # 01 Location A1 CIV-RFI-4643 0.00 CIV-RFI-4922 0.00 C-68
366 CIV-RFI-4539 262282 25-Jun-21 SATCO 6 16 6 C-68 A1 GLS tank Grout Mixing and pouring around the GLS Tank # 01 Location A1 7/2/2021 CIV-RFI-4646 0.00 7/23/2021 CIV-RFI-4925 0.00 C-68
367 CIV-RFI-4545 26-Jun-21 Madas 4 2 2 A4 ROAD (TAMIMI) Concrete pouring for the RC footing for the c ar park shade for the points :
173 to 220pouring
Concrete ( 12 Footings )
for parapet Beam For Daily Diesel Tank 7 PCs Locati
368 CIV-RFI-4550 26-Jun-21 Louis Berger 4 2 2 C-30 Solar Power Area 1 CIV-RFI-4654 0.00 22.5 Mpa CIV-RFI-4933 0.00 C-30
262283 Pouring of Inspectionn Chambers & Valve Box Points# I 7/3/2021 7/24/2021
369 CIV-RFI-4555 26-Jun-21 GBEC 4 1 1 A2,A3 Drainage & Water Supply NConcrete
CIV-RFI-4554 26-Jun-21 SATCO 6 16 6 C-68 A1 GLS tank Grout Mixing and pouring around the GLS Tank # 01 Location A1 P CIV-RFI-4934 C-68
370 CIV-RFI-4563 27-Jun-21 ACP 6 2 2 C-30 A1-1 Concrete pouring for 1st quadrant walkways Location A1-1 Walkways CIV-RFI-4692 0.00 22.5 Mpa CIV-RFI-4948 0.00 C-30
262285 7/4/2021 7/25/2021
371 CIV-RFI-4572 27-Jun-21 ACP 6 2 2 C-20 A1 Tamimi Road Lean concrete pouring under curbstone The remaining as per highlighte CIV-RFI-4693 0.00 15 mpa CIV-RFI-4949 0.00 C-20
372 CIV-RFI-4598 28-Jun-21 SATCO 6 16 6 C-68 Equalization tank Grout pouring of GLS equalization tank Location STP area CIV-RFI-4698 0.00 51 Mpa CIV-RFI-4965 0.00 C-68
262289 7/5/2021 7/26/2021
373 CIV-RFI-4607 28-Jun-21 ACP 6 2 2 C-30 A3-5 Dining Kitchen & Food stor
Concrete pouring For LPG Underground slab location A3-5 CIV-RFI-4699 0.00 22.5 Mpa CIV-RFI-4966 0.00 C-30
374 CIV-RFI-4616 29-Jun-21 Louis Berger 4 3 3 C-30 Control room 02 Concrete pouring For roof slab control room 02 Location A1 CIV-RFI-4723 0.00 22.5 Mpa CIV-RFI-4980 0.00 C-30
375 CIV-RFI-4624 29-Jun-21 ACP 4 3 3 BTW A1-1,9,8 Lean concrete pouring Fo support back of curbstone Location A1
376 262302 29-Jun-21 ACP C-20 7/6/2021 CIV-RFI-4722 0.00 15 Mpa 7/27/2021 CIV-RFI-4981 0.00 C-20
377 CIV-RFI-4626 29-Jun-21 ACP Solar Area 2 Concrete poring for external fence columns as per Highlighted
Concrete Pouring for the Column points
378 CIV-RFI-4630 29-Jun-21 madas 4 3 3 C-30 BTW A1 & A4 # A NB - 1 to 60 ( 15 Columns ) CIV-RFI-4723 0.00 22.5 Mpa CIV-RFI-4980 0.00 C-30
Concrete pouring for the car park foundation for the points #
379 CIV-RFI-4665 30-Jun-21 madas 6 2 2 C-30 Mosque CIV-RFI-4739 0.00 22.5 Mpa CIV-RFI-4999 34.8 36.3 33.8 34.97 C-30
262304 1 to 51 7/7/2021 7/28/2021
CIV-RFI-4625 30-Jun-21 platinum 6 2 2 C-20 A3-4 Lean concrete pouring Under Curbstone football Location A3-4 CIV-RFI-4747 CIV-RFI-5000
380 CIV-RFI-4649 1-Jul-21 ACP 12 7 7 C-30 B2 Dining Kitchen & Food stor Concrete pouring of the dining B2 Kitchen area only slab on grade Loc CIV-RFI-4763 0.00 22.5 Mpa CIV-RFI-5002 0.00 C-30
262309 7/8/2021 7/29/2021
381 CIV-RFI-4655 1-Jul-21 ACP 6 7 7 C-20 BTW Solar ares 1 & Utility area 1Concrete pouring for columns post internal Fence ( 40 Nos ) as per high CIV-RFI-4764 0.00 15 Mpa CIV-RFI-5003 0.00 C-20
382 CIV-RFI-4680 3-Jul-21 GBEC 6 3 3 C-35 Lifting station 1&2 Concrete Pouring of Lift Stations 01&02 RC Wall last phase only Locati CIV-RFI-4786 0.00 26.5 Mpa CIV-RFI-5022 0.00 C-35
7/10/2021 7/31/2021
383 CIV-RFI-4681 262314 3-Jul-21 ACP 12 8 8 C-30 A1-1 Walkways concrete pouring for Walkway No. 2&4 Location A1-1 CIV-RFI-4787 0.00 22.5 Mpa CIV-RFI-5023 0.00 C-30
384 CIV-RFI-4682 262315 4-Jul-21 ACP 12 12 12 C-30 A1-1 Walkways concrete pouring for Walkway No. 1&3 Location A1-1 7/11/2021 CIV-RFI-4811 0.00 22.5 Mpa 8/1/2021 CIV-RFI-5041 0.00 C-30
386 CIV-RFI-4707 5-Jul-21 ACP 6 4 4 C-20 BTW Utility area 1 & Solar poweconcrete pouring For Internal fence AS per highlighted Location BTW Ut CIV-RFI-4827 0.00 15 Mpa CIV-RFI-5055 0.00 C-20
262317 7/12/2021 8/2/2021
387 CIV-RFI-4708 5-Jul-21 SATCO 6 16 6 C-68 Utility Area01 Grout pouring of GLS potable tank Location Utility area 01 CIV-RFI-4828 32.1 31.2 31.65 51 Mpa 0.00 C-68
388 CIV-RFI-4712 6-Jul-21 ACP 6 5 5 A1-1 walkways Concrete pouring for 5,6,7,8 quadrant Location A1-1 Walkways
389 CIV-RFI-4715 6-Jul-21 BTW A1 & A4 Concrete pouring for the column neck for the Points #
Madas
C-30 1,2,3,4,5,6,7,8,9,10,11,12,13,14 CIV-RFI-4842 0.00 22.5 Mpa CIV-RFI-5060 0.00 C-30
390 CIV-RFI-4716 6-Jul-21 Mosque Concrete pouring for the founda tion for the c arpark shade (16- Foundations)
Madas 6 5 5
262319 Concrete pouring for the founda tion for the L C network for the duct Ba nk 7/13/2021 8/3/2021
391 CIV-RFI-4717 6-Jul-21 Madas Mosque
392 CIV-RFI-4726 6-Jul-21 acp 6 4 4 C-20 Solar Power Area01 Lean concrete pouring For External fence AS per highlighted Location S CIV-RFI-4843 0.00 15 Mpa CIV-RFI-5061 0.00 C-20
393 CIV-RFI-4727 6-Jul-21 SATCO 6 16 6 C-68 Utility Area01 Grout pouring of GLS potable tank Location Utility area 01 CIV-RFI-4844 0.00 51 Mpa CIV-RFI-5072 0.00 C-68
394 CIV-RFI-4736 7-Jul-21 Madas 3 4 4 A3 Road Concrete pouring for the LC network for the duct Bank
395 CIV-RFI-4749 7-Jul-21 acp 3 3 3 C-30 A3-1 BBQ Area concrete pouring of Grade beam BBQ area location A3-1 CIV-RFI-4846 27.3 25.6 26.45 22.5 Mpa CIV-RFI-5098 0.00 C-30
262322 7/14/2021 8/4/2021
396 CIV-RFI-4750 7-Jul-21 acp B2 Dining Kitchen & Food store Concrete Pouring of Slab on Grade For Food Storage Area Location A2- D
397 CIV-RFI-4748 7-Jul-21 SATCO 6 16 6 C-68 Utility Area01 Grout pouring of GLS potable tank Location Utility area 01 CIV-RFI-4847 33 35 34.00 51 Mpa CIV-RFI-5099 0.00 C-68
398 CIV-RFI-4772 262323 8-Jul-21 ACP 6 2 2 C-20 BTW Solar ares 02 & Utility areaLean concrete pouring For internal fence AS per highlighted Location S 7/15/2021 CIV-RFI-4885 0.00 15 Mpa 8/5/2021 CIV-RFI-5100 0.00 C-20
399 CIV-RFI-4793 11-Jul-21 Madas 6 2 2 C-30 Zone A1 Concrete pouring for the LC NETWORK for the Duck Bank In ZoneA1 CIV-RFI-4906 0.00 22.5 Mpa CIV-RFI-5134 0.00 C-30
262331 7/18/2021 8/8/2021
400 CIV-RFI-4808 11-Jul-21 ACP 6 2 2 C-20 Main Road Utility Area & A3 Lean concrete pouring under the curb stone Main Road as per highlighte CIV-RFI-4907 0.00 15 Mpa CIV-RFI-5135 0.00 C-20
401 CIV-RFI-4820 12-Jul-21 Louis Berger 6 4 4 Control room 02 Concrete pouring for parapet Beam & Additional Beam Control room 02
402 CIV-RFI-4823 12-Jul-21 ACP 6 5 5 Health clinic Building Concrete pouring For additional Part Surrounding The Health clinic Bu
262334 C-30 7/19/2021 CIV-RFI-4913 0.00 22.5 Mpa 8/9/2021 CIV-RFI-5128 0.00 C-30
403 CIV-RFI-4824 12-Jul-21 ACP A2 Dining Kitchen & Food stor concrete pouring for LPG underground slab Location A2 Dining kitchen
404 CIV-RFI-4825 12-Jul-21 ACP A1-5 Walkway inside Block Concrete pouring for walkway A1-5 Location A1
405 CIV-RFI-4834 13-Jul-21 ACP 6 4 4 A1-4,3,2 Walkways Concrete pouring for Walkways Slab A1-4,3,2 Location A1,4,3,2
406 CIV-RFI-4836 13-Jul-21 C-30 Mosque Concrete Pouring for the Nec k Column for the points #
Madas 6 5 5 CIV-RFI-4915 0.00 22.5 Mpa CIV-RFI-5173 0.00 C-30
262335 AN -01 to A N 68 ( 16 Neck Columns ) 7/20/2021 8/10/2021
C-30 CIV-RFI-4915 0.00 22.5 Mpa CIV-RFI-5173 0.00 C-30
262335 7/20/2021 8/10/2021
407 CIV-RFI-4837 13-Jul-21 Madas Zone A1 Concrete pouring for the LC NETWORK for the Duck Bank In ZoneA1
408 CIV-RFI-4838 13-Jul-21 Madas 6 4 4 C-20 BTW A1 & A4 Lean Concrete pouring for the Blinding for the Car park shades found CIV-RFI-4916 0.00 15 Mpa CIV-RFI-5174 0.00 C-20
409 CIV-RFI-4862 262336 14-Jul-21 ACP 6 2 2 C-20 Utility Area 01 Lean concrete under curb stoneMain Road as per highlighted Location Ut 7/21/2021 CIV-RFI-4920 0.00 15 Mpa 8/11/2021 CIV-RFI-5175 0.00 C-20
410 CIV-RFI-4898 15-Jul-21 C-20 GYMNASIUM Lean Concre te p ouring for car park foundation blinding for the point # CIV-RFI-4923
Madas 6 2 2 0.00 15 Mpa CIV-RFI-5191 0.00 C-20
262339 101 to 139 ( 13 Foundation ) 7/22/2021 8/12/2021
411 CIV-RFI-4899 15-Jul-21 C-30 BTW A1 & A4 Concrete pouring for car park foundation for the point # CIV-RFI-4924
Madas 6 2 2 0.00 22.5 Mpa CIV-RFI-5192 0.00 C-30
101 to 124 ( 8 Foundation ) & Duct Bank
412 CIV-RFI-4895 17-Jul-21 ACP 6 5 5 C-30 A1-6,7,8 Walkways Concrete Pouring for walkway Location A1-6,7,8 CIV-RFI-4895
262344 7/24/2021 CIV-RFI-4935 27.6 30.2 28.90 22.5 Mpa 8/14/2021 32.2 35.3 30.7 32.73 C-30
413 CIV-RFI-4897 17-Jul-21 ACP 6 4 4 C-30 A Foot ball Concrete pouring For lighting pole 2 NoS Location A-Foot Ball CIV-RFI-4897
414 CIV-RFI-4902 7/18/2021 Platinum 6 2 2 C-20 BTW A7 & BASKETBALL COULean Concrete for the under curbstone location BTW A7 & BASKET CIV-RFI-4950 15.1 15.8 15.45 15 Mpa CIV-RFI-4902 23.9 26.5 22.6 24.33 C-20
262345 7/25/2021 8/15/2021
415 CIV-RFI-4910 18-Jul-21 Madas 6 2 2 C-30 A4 Swimming Pool Concrete Pouring for 13 Nos Foundation Car Parking Location A4- Swimming pool CIV-RFI-4951 26.1 25.3 25.70 22.5 Mpa CIV-RFI-4901 33.7 35.3 37.7 35.57 C-30
416 CIV-RFI-4968 283458 26-Jul-21 Madas 6 2 2 C-30 A4 & A1 Concrete Pouring for Column Neck for the car park shade 21 Nos @ A4 & A18/2/2021 CIV-RFI-5056 25.5 26.5 26.00 22.5 Mpa 8/23/2021 CIV-RFI-4968 29.9 30.7 31.8 30.80 C-30
417 CIV-RFI-4979 27-Jul-21 acp BTW A1 & A4 lean concrete for curbstone @ BTW A1 & A4 Carparking as per Highl CIV-RFI-4979
283460 6 4 4 C-20 8/3/2021 CIV-RFI-5062 0.00 15 Mpa 8/24/2021 0.00 C-20
418 CIV-RFI-4991 27-Jul-21 acp Waste management Area Lean Concrete pouring for waste Management Grade beam CIV-RFI-4991
419 CIV-RFI-5012 1001 29-Jul-21 gbec 3 1 C-30 A2 Utility Area Lifting Station 2 Concrete pouring for Lifting Station 2 Chamber Base Slab 8/5/2021 CIV-RFI-5042 13.2 - 13.20 22.5 Mpa 8/26/2021 CIV-RFI-5012 26.5 26.5 C-30
420 CIV-RFI-5030 1-Aug-21 Louis Berger 6 6 C-5 Control room 02 CMU installation for control room 02 Location A1 CIV-RFI-5136 7.52 9.3 8.41 C-5 CIV-RFI-5030 23.4 21.6 22.50 C-5
421 1002 1-Aug-21 Madas 2 1 rfis so far not raised 8/8/2021 8/29/2021
422 1-Aug-21 GBEC 1
423 CIV-RFI-5085 4-Aug-21 maha 4 2 2 Generators area Concrete Pouring for duct bank for MV cables in generators area
424 CIV-RFI-5073 4-Aug-21 Louis Berger 4 2 3 Solar Power Area Concrete pouring for exhaust Stacks Foundations 2 Pcs Location Sola 5095 5097 5073
1003 C-30 8/11/2021 CIV-RFI-5176 28.7 17.2 22.95 22.5 Mpa 9/1/2021 44.7 39.3 34.2 39.40 C-30
425 CIV-RFI-5095 4-Aug-21 Louis Berger Control Room #2 Concrete pouring for Control room #2 floor slab 5085
426 CIV-RFI-5097 4-Aug-21 ACP 4 2 2 A4- BBQ Concrete Pouring for BBQ foundation
427 CIV-RFI-5105 5-Aug-21 GBEC A2- Lifting Station 2 Pouring of Top Slab of Lifting Station 02 CIV-RFI-5105
1004 6 2 2 C-35 8/12/2021 CIV-RFI-5188 26.5 23.9 25.20 26 Mpa 9/2/2021 40.3 37.6 28.8 35.57 C-35
428 CIV-RFI-5106 5-Aug-21 GBEC B2- Lifting station 01 Pouring of Top Slab of Lifting Station 01 CIV-RFI-5106
1005 Concrete Pou ring for car park shade foundation
429 CIV-RFI-5127 7-Aug-21 madas 6 1 1 C-30 A4 8/14/2021 31.6 30 30.80 22.5 Mpa 9/4/2021 CIV-RFI-5127 0.00 C-30
( 9 Fou ndatio n ) as per Highlihted Area
430 CIV-RFI-5133 8-Aug-21 Louis Berger 2 1 A1-1 Concrete pouring of Lintel beam for Control room #2 CIV-RFI-5133 CIV-RFI-5133
431 CIV-RFI-5141 8-Aug-21 madas 2 1 A4 Concrete Pouring of Column Neck for the car park shade ( 14 Fou CIV-RFI-5141 CIV-RFI-5141
1006 C-30 8/15/2021 27.2 28.3 27.75 22.5 Mpa 9/5/2021 49.7 49.2 44.6 47.83 C-30
432 CIV-RFI-5142 8-Aug-21 aflak 2 2 Conrete Pouring of Turnstile(6-Units) CIV-RFI-5142 CIV-RFI-5142
433 CIV-RFI-5143 8-Aug-21 Madas Conrete Pouring of Low Current Ductbank as Highlighted Area CIV-RFI-5143 CIV-RFI-5143 22.025
434 CIV-RFI-5147 9-Aug-21 SATCO 6 27 6 C-68 lifting station 2 Grouting Top of wall for Lifting Sation #2 CIV-RFI-5147 39.14 32.55 35.85 51 Mpa CIV-RFI-5147 68.68 36.4 62.97 56.02 C-68
1007 8/16/2021 9/6/2021
435 CIV-RFI-5152 9-Aug-21 ACP 6 3 3 C-30 Solar Power Area Concrete for exhaust Stacks Foundations 2 Pcs CIV-RFI-5152 30.7 29 29.85 22.5 Mpa CIV-RFI-5152 52.7 42.1 39.5 44.77 C-30
436 CIV-RFI-5164 10-Aug-21 ACP 4 2 2 Solar area Concrete Pouring of Pipe Routing Foundation-Walls CIV-RFI-5164 CIV-RFI-5164
437 CIV-RFI-5168 1008 10-Aug-21 MADAS 2 2 2 C-30 A4 Tamimi side Concrete pouring for the car park shade ( 14 Foundations) 8/17/2021 CIV-RFI-5168 23.9 22.7 23.30 22.5 Mpa 9/7/2021 CIV-RFI-5168 45.7 44.2 36.2 42.03 C-30
438 CIV-RFI-5169 10-Aug-21 ACP A3-5 Dining Kitchen Concrete pouring for handicap Toilet and Garbage Area- Slab o CIV-RFI-5169 CIV-RFI-5169
439 CIV-RFI-5187 11-Aug-21 RFI rejected duCar Shade Concrete Pouring of Neck column CONCRETE POURED WITH OUT INFORMATION
440 CIV-RFI-5204 1010 12-Aug-21 acp 6 4 4 C-30 Waste management Area Concrete Pouring for waste Management Grade beam 8/19/2021 CIV-RFI-5204 34 37.2 35.60 22.5 Mpa 9/9/2021 CIV-RFI-5204 42.9 41 26.5 36.80 C-30
441 1011 C-30 Zone A1-1 Walkway Concrete Pou ring o f walkway pavement- Z one A1-1 as per
CIV-RFI-5216 14-Aug-21 acp 6 6 6 8/21/2021 CIV-RFI-5216 38.3 34.5 36.40 22.5 Mpa 9/11/2021 CIV-RFI-5216 44.2 41 40 41.73 C-30
Highlighted Area
442 CIV-RFI-5239 15-Aug-21 Madas Zone A4- Car Shade Concrete Pouring for Car park shade- Zone A4 - 5 Units CIV-RFI-5239 CIV-RFI-5239
1012 6 1 1 C-30 Concrete Pou ring for du ct bank for the Low current netwo rk - 8/22/2021 31.7 30 30.85 22.5 Mpa 9/12/2021 34.8 32.8 33.8 33.80 C-30
443 CIV-RFI-5240 15-Aug-21 Madas ZONE A4 CIV-RFI-5240 CIV-RFI-5240
3 Cross ing As High ligh ted
444 CIV-RFI-5244 16-Aug-21 ACP 3 3 3 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted CIV-RFI-5244 CIV-RFI-5244
C-30 39.7 41.2 40.45 26 Mpa 35.7 34.9 34.8 35.13 C-30
445 CIV-RFI-5250 1013 16-Aug-21 madas 3 2 2 Zone A4- Car Shade Concrete pouring for 5 Neck column and Car park shade -1 Founadtion 8/23/2021 CIV-RFI-5250 9/13/2021 CIV-RFI-5250
446 CIV-RFI-5247 16-Aug-21 Louis Berger 6 6 C-5 Control room -1 Sample of Mortar plastering work- Control room -1 CIV-RFI-5247 3.73 3.14 3.44 5 Mpa CIV-RFI-5247 0.00 C-5
447 CIV-RFI-5264 17-Aug-21 SATCO 6 42 6 C-68 Fire water Tank Pouring of Grout at Fire water GLS tank CIV-RFI-5264 36 30.61 33.31 51 Mpa CIV-RFI-5264 39.1 41.72 43.37 41.40 C-68
448 CIV-RFI-5265 1014 17-Aug-21 ACP 6 1 1 C-30 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted 8/24/2021 CIV-RFI-5265 43.8 40.9 42.35 22.5 Mpa 9/14/2021 CIV-RFI-5265 38.2 33.4 37 36.20 C-30
449 CIV-RFI-5270 17-Aug-21 ACP 6 2 2 C-20 B/W A4 & Tammimi road Lean concrete pouring Under Curbstone Location A4 As Per Highlighte CIV-RFI-5270 21.9 16.8 19.35 15 MPA CIV-RFI-5270 24.3 24.1 21.5 23.30 C-20
450 CIV-RFI-5273 18-Aug-21 acp 6 4 4 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted CIV-RFI-5273 CIV-RFI-5273
451 CIV-RFI-5281 18-Aug-21 acp C-30 Solar area Concrete Pouring for Pipe Routing Foundation - Base only CIV-RFI-5281 29.6 27.1 28.35 22.5 Mpa CIV-RFI-5281 39.8 37.1 34.4 37.10 C-30
452 CIV-RFI-5283 1015 18-Aug-21 acp A3 FootBall Field Concrete Pouring For Fence Post- Football Area 8/25/2021 CIV-RFI-5283 9/15/2021 CIV-RFI-5283
453 CIV-RFI-5277 18-Aug-21 SATCO 42 C-68 Fire water Tank Pouring of Grout at Fire water GLS Tank-2 CIV-RFI-5277 16.28 17.83 17.06 51 Mpa CIV-RFI-5277 40.7 41.76 37.25 39.90 C-68
454 CIV-RFI-5282 18-Aug-21 Louis Berger 6 6 C-5 Control room -1 Sample of Mortar plastering work- Control room -2 CIV-RFI-5282 20.67 18.74 19.71 5 Mpa CIV-RFI-5282 0.00 C-5
455 CIV-RFI-5304 1016 19-Aug-21 acp 6 3 3 C-30 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted 8/26/2021 CIV-RFI-5304 44.9 24.3 34.60 22.5 Mpa 9/16/2021 CIV-RFI-5304 49.5 46.9 39.4 45.27 C-30

456 CIV-RFI-5319 1017 21-Aug-21 madas 6 1 1 C-35 Precast Yard 8/28/2021 CIV-RFI-5319 37 28.8 32.90 26 Mpa 9/18/2021 CIV-RFI-5319 35.3 33.8 29.4 32.83 C-35
Cocrete Structure of Docking Structure at Precast yard
457 CIV-RFI-5325 22-Aug-21 ACP 3 2 2 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted CIV-RFI-5325 CIV-RFI-5325
1018 C-30 8/29/2021 37.1 25.1 31.10 22.5 Mpa 9/19/2021 43.1 39.9 34.9 39.30 C-30
458 CIV-RFI-5326 22-Aug-21 taqeqe 3 1 1 A2 & utility area Concrete pouring for Substation & RMU Foundations at zone A2 & Utilit CIV-RFI-5326 CIV-RFI-5326
459 CIV-RFI-5328 1019 23-Aug-21 ACP 5 4 4 C-30 Zone A1-1 Walkway Concrete Pouring of walkway pavement- Zone A1-1 as per Highlighted 8/30/2021 CIV-RFI-5328 34.5 26.6 30.55 22.5 Mpa 9/20/2021 CIV-RFI-5328 35.4 34.1 34.4 34.63 C-30
460 CIV-RFI-5356 1020 24-Aug-21 ACP 5 2 2 C-30 btw A3A4 &A5A6 Concrete Pouring of walkway pavement- Zone A1-1 btw A3A4 &A5A6 8/31/2021 CIV-RFI-5356 28 21.2 24.60 22.5 Mpa 9/21/2021 CIV-RFI-5356 32.2 31.6 30.8 31.53 C-30
461 CIV-RFI-5360 25-Aug-21 acp 5 2 2 C-30 Quad B1 and B/W B1 and B2 Concrete Pouring of walkway Pavement inside Quad B1 and B/W B1 an CIV-RFI-5360 32.6 31.4 32.00 22.5 Mpa CIV-RFI-5360 37.2 32.1 30.2 33.17 C-30
1021 9/1/2021 9/22/2021
462 CIV-RFI-5376 25-Aug-21 madas 5 1 1 C-35 Precast Yard Concrete Structure of Docking Structure at Precast yard CIV-RFI-5376 30.9 28.9 29.90 26 Mpa CIV-RFI-5376 38.5 33.3 32 34.60 C-35
463 CIV-RFI-5386 1022 26-Aug-21 acp 5 4 4 C-30 BTW Quadrant B1 and B2 & InsidConcrete Pouring walkway Pavement inside Quad B1, B2 and B/W B1 9/2/2021 CIV-RFI-5386 18.8 17.7 18.25 22.5 Mpa 9/23/2021 CIV-RFI-5386 37.2 32.1 30.2 33.17 C-30
464 CIV-RFI-5416 29-Aug-21 ACP 5 4 4 C-30 Quad B2 Concrete pouring for walkway Pavement inside Quad B2 CIV-RFI-5416 19.2 16.7 17.95 22.5 Mpa CIV-RFI-5416 44.8 40.2 40.5 41.83 C-30
1024 9/5/2021 9/26/2021
465 CIV-RFI-5419 29-Aug-21 Madas 5 3 3 C-35 Precast Yard Concrete pouring for Docking station & CCTV CIV-RFI-5419 29.9 22.5 26.20 26 Mpa CIV-RFI-5419 39.1 41 44.6 41.57 C-35
466 CIV-RFI-5438 30-Aug-21 taqeqe 2 2 2 A2 sub station concrete pouring for substation foundations at zone A2 as per attached CIV-RFI-5438 20.8 21.3 21.05 CIV-RFI-5438 38.8 36.9 35.2 36.97
1025 C-30 9/6/2021 22.5 Mpa 9/27/2021 C-30
467 CIV-RFI-5451 30-Aug-21 acp 3 2 2 quardent B,4,5 Concrete pourinig For walkway inner side quardent B 4,5 CIV-RFI-5451 20.5 19.6 20.05 CIV-RFI-5451 39.2 37.8 34.4 37.13
469 CIV-RFI-5453 1026 31-Aug-21 ACP 5 6 6 C-30 A1-Mosque Concrete pouring For Toilet Slab on Grade location A1-Mosque 9/7/2021 CIV-RFI-5453 34.8 27.1 30.95 22.5 Mpa 9/28/2021 CIV-RFI-5453 38 36.3 33.9 36.07 C-30
470 CIV-RFI-5465 1-Sep-21 ACP quardent B,5 Concrete pourinig For walkway inner side quardent B 5 CIV-RFI-5465 CIV-RFI-5465
471 CIV-RFI-5469 1027 1-Sep-21 ACP 5 5 5 C-30 A1-1 Concrete pouring for walkway Pavement A1-1 9/8/2021 CIV-RFI-5469 23.8 20.7 22.25 22.5 Mpa 9/29/2021 CIV-RFI-5469 33.4 35.9 34.5 34.60 C-30
472 CIV-RFI-5482 1-Sep-21 ACP B3- Block 03 Concrete Pouring for Shaded Shelter Location B3- Block 3 CIV-RFI-5482 CIV-RFI-5482
473 CIV-RFI-5469 1028 2-Sep-21 ACP 5 4 4 C-30 A1-1 Concrete pouring for walkway Pavement A1-1 9/9/2021 CIV-RFI-5469 20.3 19 19.65 22.5 Mpa 9/30/2021 CIV-RFI-5469 36.7 34.5 32.6 34.60 C-30
474 CIV-RFI-5485 4-Sep-21 ACP Out Side Quad Concrete pouring for walkway Pavement out side Quad B1,B2& B3 CIV-RFI-5485 CIV-RFI-5485
475 CIV-RFI-5492 1029 4-Sep-21 ACP 5 3 3 C-30 A1-1 walkways Concrete pouring for walkway Pavement A1-1 9/11/2021 CIV-RFI-5492 26.5 22.3 24.40 22.5 Mpa 10/2/2021 CIV-RFI-5492 32.3 33.8 34.6 33.57 C-30
476 CIV-RFI-5496 4-Sep-21 ACP A4 outer walkways Concrete pouring for walkway Pavement A4 CIV-RFI-5496 CIV-RFI-5496
477 CIV-RFI-5507 1031 6-Sep-21 ACP 5 4 4 C-30 A4 outer walkways Concrete pouring for walkway Pavement A4 9/13/2021 CIV-RFI-5507 28.1 27.3 27.70 22.5 Mpa 10/4/2021 CIV-RFI-5507 31.9 29.7 29.3 30.30 C-30
478 CIV-RFI-5518 1032 7-Sep-21 ACP 5 1 1 C-30 A1-2,A1-3&A1-4 Concrete pouring for walkway Pavement for for A1-2,A1-3&A1-4 9/14/2021 CIV-RFI-5518 28.3 28.9 28.60 22.5 Mpa 10/5/2021 CIV-RFI-5518 32 31.3 30 31.10 C-30
479 CIV-RFI-5531 1033 8-Sep-21 ACP 5 3 3 C-30 Kitchen A2 Concrete pouring for walkway Pavement for Slab on Grade 9/15/2021 CIV-RFI-5531 30.3 28.9 29.60 22.5 Mpa 10/6/2021 CIV-RFI-5531 33.2 30.8 29.7 31.23 C-30
480 CIV-RFI-5538 1034 9-Sep-21 ACP 5 5 5 C-30 A1-1 Concrete pouring For Walk Way Concrete out Side All A1-1 Quad 9/16/2021 CIV-RFI-5538 42.1 30.5 36.30 22.5 Mpa 10/7/2021 CIV-RFI-5538 31.5 29.9 29.5 30.30 C-30
481 CIV-RFI-5545 11-Sep-21 ACP 3 2 2 Out Side Quad Concrete pouring for walkway Pavement Out Side Quad B5 CIV-RFI-5545 CIV-RFI-5545
482 CIV-RFI-5552 1035 11-Sep-21 GBEC 2 2 2 C-30 B4-1,2,3,4 Concrete pouring for SMH sewage manhole SMH-BO5, SMH-BO6, SM 9/18/2021 CIV-RFI-5552 29.4 23.7 26.55 22.5 Mpa 10/9/2021 CIV-RFI-5552 31.5 29.9 29.4 30.27 C-30
483 CIV-RFI-5553 11-Sep-21 ACP Outer quad with tamimi road Concrete pouring for walkway Pavement A1 out quad with tamimi side as CIV-RFI-5553 CIV-RFI-5553
484 CIV-RFI-5573 1037 13-Sep-21 ACP 5 3 3 C-30 A1-1 Concrete pouring For Walk Way B/W quad A7&A8 9/20/2021 CIV-RFI-5573 31.8 26.2 29.00 22.5 Mpa 10/11/2021 CIV-RFI-5573 34.7 30.7 29.8 31.73 C-30
485 CIV-RFI-5602 1039 15-Sep-21 ACP 5 6 6 C-30 Swimming Pool Concrete pouring for walkway Pavement of A4 Swimming pool 9/22/2021 CIV-RFI-5602 27.1 26.3 26.70 22.5 Mpa 10/13/2021 CIV-RFI-5602 34.8 34.7 32.6 34.03 C-30
486 CIV-RFI-5607 1040 16-Sep-21 ACP 5 3 3 C-30 Swimming Pool Concrete pouring for walkway Pavement of A4 Swimming pool Part 2 9/23/2021 CIV-RFI-5607 23.2 24 23.60 22.5 Mpa 10/14/2021 CIV-RFI-5607 31.6 34.2 31 32.27 C-30
487 CIV-RFI-5633 18-Sep-21 ACP 3 2 2 Tennis Court Concrete pouring for walkway Pavement of A4 Tennis court CIV-RFI-5633 CIV-RFI-5633
1041 C-30 9/25/2021 26 22 24.00 22.5 Mpa 10/16/2021 30.3 30.9 32.5 31.23 C-30
488 CIV-RFI-5643 18-Sep-21 Taqeqe 2 2 2 CIV-RFI-5643 CIV-RFI-5643
A2 & Solar area Concrete pouring for duct bank location A2 Admin area & solar Area
489 CIV-RFI-5660 20-Sep-21 ACP Quad A3 Concrete pouring for walkway Pavement of A4 Quad A3 CIV-RFI-5660 CIV-RFI-5660
1043 5 3 3 C-30 9/27/2021 0.00 22.5 Mpa 10/18/2021 35.2 30.6 29.7 31.83 C-30
490 CIV-RFI-5661 20-Sep-21 ACP A1-1 outer road Tamimi side roadconcrete pouring for fence foundation poles CIV-RFI-5661 CIV-RFI-5661
491 CIV-RFI-5668 1045 22-Sep-21 ACP 5 6 6 C-30 Swimming Pool Concrete pouring for walkway Pavement of A4 Swimming pool part 3 9/29/2021 CIV-RFI-5668 25.4 21.6 23.50 22.5 Mpa 10/20/2021 CIV-RFI-5668 29.7 38.1 40 35.93 C-30
492 CIV-RFI-5693 25-Sep-21 ACP 5 3 3 C-20 A4 Parking Area Concrete pouring for fence poles location A4 parking Area Tamimi Side CIV-RFI-5693 21.3 20.6 20.95 15 Mpa CIV-RFI-5693 25.3 23.8 25.9 25.00 C-20
1046 10/2/2021 10/23/2021
493 CIV-RFI-5697 25-Sep-21 ACP 5 3 3 C-30 Quad A1 & A3 Concrete pouring for walkway Pavement of A4 Quad A1 & A3 CIV-RFI-5697 21.3 21 21.15 22.5 Mpa CIV-RFI-5697 32.9 31.5 30.6 31.67 C-30
494 CIV-RFI-5706 26-Sep-21 ACP 5 1 1 C-30 A1-1 Concrete pouring for walkway Pavement of location A1-1 CIV-RFI-5706 21.5 20.7 21.10 22.5 Mpa CIV-RFI-5706 32.3 35.1 39.3 35.57 C-30
495 CIV-RFI-5710 26-Sep-21 madas 5 2 2 C-20 B4 road Concrete pouring for the car park shade blinding ( 14 foundation ) CIV-RFI-5710 16.9 16 16.45 15 Mpa CIV-RFI-5710 25.2 22.6 23.8 23.87 C-20
1047 10/3/2021 10/24/2021
496 CIV-RFI-5711 26-Sep-21 aflak 5 1 1 C-30 A4 road Tamimi side Concrete pouring for the turnstile foundation CIV-RFI-5711 27.7 25 26.35 22.5 Mpa CIV-RFI-5711 33.2 32.5 31.7 32.47 C-30
497 CIV-RFI-5712 26-Sep-21 madas C-35 B4 precast yard Concrete puroing for the foundation for docking station & Camera pool CIV-RFI-5712 23.8 27.1 25.45 26 Mpa CIV-RFI-5712 31.9 35.7 37.7 35.10 C-35
498 CIV-RFI-5732 1048 27-Sep-21 madas 5 1 1 C-30 NEAR ADMIN BUILDING concrete pouring for the low current duct bank 10/4/2021 CIV-RFI-5732 27.7 25 26.35 22.5 Mpa 10/25/2021 CIV-RFI-5732 31.9 35.7 37.7 35.10 C-30
499 CIV-RFI-5740 29-Sep-21 madas 5 3 3 C-35 Pre cast yard Concrete pouring for the foundation for docking station & Camera poo CIV-RFI-5740 31.5 32.1 31.80 26 Mpa CIV-RFI-5740 41.1 39.8 34.7 38.53 C-35
500 CIV-RFI-5741 1050 29-Sep-21 acp 5 3 3 C-30 A4-2 Concrete pouring for walkway Pavement of A4 Quad A4-2 10/6/2021 CIV-RFI-5741 27.2 29.2 28.20 22.5 Mpa 10/27/2021 CIV-RFI-5741 36.3 35.3 35.1 35.57 C-30
501 CIV-RFI-5744 29-Sep-21 satco 3 1 1 C-20 Control room 2 hand mix lean concrete pouring for the capacitor bank foundation & out CIV-RFI-5744 15.1 0 15.10 15 Mpa CIV-RFI-5744 33 29.4 0 31.20 C-20
502 CIV-RFI-5779 4-Oct-21 madas FIRE STATION concrete pouring for the low current duct bank near fire station area as CIV-RFI-5779 CIV-RFI-5779
1054 5 1 1 C-30 10/11/2021 28.5 24 26.25 22.5 Mpa 11/1/2021 36.2 28 33.8 32.67 C-30
503 CIV-RFI-5781 4-Oct-21 madas Pre cast yard concrete pouring for electrical Feeder @ precast yard CIV-RFI-5781 CIV-RFI-5781
504 CIV-RFI-5802 1055 5-Oct-21 Taqeqe 3 0 0 C-30 B/w warehouse and dining buildiconcrete pouring for the street lighting under ground duct bank as per 10/12/2021 CIV-RFI-5802 21.6 0 21.60 22.5 Mpa 11/2/2021 CIV-RFI-5802 33.4 29.9 0 31.65 C-30
505 CIV-RFI-5824 1057 7-Oct-21 GBEC 5 1 1 C-30 A4 concrete pouring for valve champer and sewage manhole as per highligh 10/14/2021 CIV-RFI-5824 22.4 21.5 21.95 22.5 Mpa 11/4/2021 CIV-RFI-5824 38.1 39.4 38.8 38.77 C-30
506 CIV-RFI-5832 9-Oct-21 Taqeqe 5 1 1 C-30 A2 utility area concrete pouring for 4 Duct banks @ A2 utility area as per highlighted dr CIV-RFI-5832 20.7 20.1 20.40 22.5 Mpa CIV-RFI-5832 35 31 40.1 35.37 C-30
1058 10/16/2021 11/6/2021
507 CIV-RFI-5844 9-Oct-21 madas 5 1 1 C-35 Pre cast yard concrete pouring for pre-cast manhole base slab & pre-cast CCTV pole CIV-RFI-5844 19.6 23.6 21.60 26 Mpa CIV-RFI-5844 36 38.9 34 36.30 C-35
508 CIV-RFI-5856 1060 11-Oct-21 satco 6 1 6 C-68 Waste Management Area grout applying for the column neck of concrete foundation on the top lev10/18/2021 CIV-RFI-5856 22.93 24 23.47 51 Mpa 11/8/2021 CIV-RFI-5856 33.1 36.23 32.34 33.89 C-68
509 CIV-RFI-5854 1061 12-Oct-21 acp 5 3 3 C-20 Solar area Concrete pouring for Fence location near solar system utilities Area as per 10/19/2021 CIV-RFI-5854 15.4 15.9 15.65 15 Mpa 11/9/2021 CIV-RFI-5854 22 22.8 24.9 23.23 C-20
510 CIV-RFI-5838 13-Oct-21 madas 5 1 1 C-35 Car parking concrete pouring for car parking shades foundation neck column ( 15 pc CIV-RFI-5838 24.1 24.6 24.35 26.5 CIV-RFI-5838 40.6 40.2 40 40.27 C-35
511 CIV-RFI-5873 13-Oct-21 acp 5 1 1 C-20 Gate NO 2 Concrete pouring for curbstone at A4 Gate NO 2 as per highlighted dra CIV-RFI-5873 16.8 16.8 16.80 15 Mpa CIV-RFI-5873 C-20
Concrete pouring of curb stone at location A3 Commercial Building as 10/20/2021 CIV-RFI-5874
24.8 26.3 34.4 28.50
512 CIV-RFI-5874 1062 13-Oct-21 acp C-20 Near swimming pool 16.8 16.8 16.80 15 Mpa 11/10/2021 CIV-RFI-5874 C-20
513 CIV-RFI-5887 13-Oct-21 madas C-35 Precast yard concreate pouring for Camera Pole foundation (8 pcs) & CMH foundation CIV-RFI-5887 24.1 24.6 24.35 26.5 CIV-RFI-5887 40.6 40.2 40 40.27 C-35
514 CIV-RFI-5872 13-Oct-21 satco 6 4 6 C-68 Waste Management Area grout applying for the column neck of concrete foundation on the top le CIV-RFI-5872 23.64 22.08 22.86 51 Mpa CIV-RFI-5872 37.61 39.23 41.96 39.60 C-68
515 CIV-RFI-5898 16-Oct-21 ACP 4 3 3 C-30 A3-5 Kitchen Concrete pouring for walkway Pavement of Slab on grade For Tent Loc CIV-RFI-5898 CIV-RFI-5898
1064 10/23/2021 22.9 25 23.95 22.5 Mpa 11/13/2021 34.3 34.5 29.7 32.83 C-30
516 CIV-RFI-5912 16-Oct-21 aflak 1 1 1 C-30 A1&A4 Guard House Blinding concrete pouring for sliding gate between A1&A4 guard house CIV-RFI-5912 CIV-RFI-5912
517 CIV-RFI-5923 1065 17-Oct-21 madas 5 1 1 C-30 Between Zone A4 & B4 Guard hoConcrete Pouring for Low Current duct bank L oc ation Be tween Zone A4 10/24/2021 CIV-RFI-5923 26 23 24.50 22.5 Mpa 11/14/2021 CIV-RFI-5923 41.1 40.3 40.6 40.67 C-30
& B4 Guard house
518 CIV-RFI-5926 18-Oct-21 ACP 2 1 1 A4 Gymnasium Concrete pouring for walkway Pavement location A4 Gymnasium CIV-RFI-5926 CIV-RFI-5926
519 CIV-RFI-5928 1066 18-Oct-21 ACP 2 1 1 C-30 B/W A4-2 & Swimming pool andConcrete pouring for walkway Pavement location B/W A4-2 & Swimm 10/25/2021 CIV-RFI-5928 22.3 20.1 21.20 22.5 Mpa 11/15/2021 CIV-RFI-5928 40.7 31.6 30.8 34.37 C-30
521 CIV-RFI-5949 18-Oct-21 aflak 1 1 1 A1&A4 Guard House Concrete Pourin For Sliding gate Foundation Location between A1&A4 CIV-RFI-5949 CIV-RFI-5949
522 CIV-RFI-5930 19-Oct-21 ACP 5 2 2 C-30 Near A4-2 Concrete pouring for walkway Pavement location Near A4-2 CIV-RFI-5930 27 26 26.50 22.5 Mpa CIV-RFI-5930 35.8 34.8 38.7 36.43 C-30
523 CIV-RFI-5957 1067 19-Oct-21 madas 3 1 1 C-20 B4 main road Blinding Concrete pouring for the Car Park foundation ( 10 pcs) 10/26/2021 CIV-RFI-5957 11/16/2021 CIV-RFI-5957
18.8 21.4 20.10 15 Mpa 30.4 28.8 32.1 30.43 C-20
CIV-RFI-5946 19-Oct-21 ACP 2 1 1 C-20 Solar area concrete poring for Fance Instalation Solor System Side CIV-RFI-5946 CIV-RFI-5946
524 CIV-RFI-5963 1068 20-Oct-21 SATCO 5 1 C-30 Landing area A3-5 K & D Concrete Pouring of Slab on Grade For Landing area in front of the elect 10/27/2021 CIV-RFI-5963 20.3 23.8 22.05 22.5 Mpa 11/17/2021 CIV-RFI-5963 23.1 28.1 24.8 25.33 C-30
525 CIV-RFI-5981 10/21/2021 ACP 5 2 2 C-30 A4 prayer Shellter Concrete pouring for walkway Pavement location A4 prayer Shellter CIV-RFI-5981 29.1 28.3 28.70 22.5 Mpa CIV-RFI-5981 28.6 26.9 27.5 27.67 C-30
1068 10/28/2021 11/18/2021
526 CIV-RFI-5997 10/21/2021 SATCO 5 1 1 C-30 A3-5 K & D hnd mix concrete pouring of LPG Tank outer side Steel Bollards Found CIV-RFI-5997 23.3 23.4 23.35 22.5 Mpa CIV-RFI-5997 25.9 26.7 26.6 26.40 C-30
527 CIV-RFI-6000 1070 10/23/2021 ACP 5 2 2 C-30 A4 prayer Shellter Concrete pouring for walkway Pavement location A4 prayer Shellter pt. 10/30/2021 CIV-RFI-6000 28.9 24.6 26.75 22.5 Mpa 11/20/2021 CIV-RFI-6000 38.6 32.7 35.7 35.67 C-30
528 CIV-RFI-6013 10/24/2021 ACP 5 2 2 C-30 A4-1 & A4-3 out side Concrete pouring for walkway Pavement location A4-1 & A4-3 out sid CIV-RFI-6013 31.7 27.6 29.65 22.5 Mpa CIV-RFI-6013 36.3 32.9 38.3 35.83 C-30
1071 10/31/2021 11/21/2021
529 CIV-RFI-6024 10/24/2021 SATCO 5 1 1 C-30 K & D LPG tank hand mix concrete for the LPG tank outer fence first portion as per high CIV-RFI-6024 21.9 20.3 21.10 22.5 Mpa CIV-RFI-6024 28 25.8 25.9 26.57 C-30
530 CIV-RFI-6041 1072 10/25/2021 ACP 5 1 1 C-30 A4-1 & A4-3 out side Concrete pouring for walkway Pavement location A4-1 & A4-3 out sid 11/1/2021 CIV-RFI-6041 28.5 29.6 29.05 22.5 Mpa 11/22/2021 CIV-RFI-6041 36.7 32.4 35.7 34.93 C-30
531 CIV-RFI-6036 10/26/2021 ACP 3 2 2 C-30 A3-5 foot ball ground Concrete pouring for walkway Pavement location A3-5 foot ball groun CIV-RFI-6036 CIV-RFI-6036
1073 Inspe ction for Concre te Pouring For Car Parking Foundation (10 Nos) 11/2/2021 24.9 25.8 25.35 22.5 Mpa 11/23/2021 37.7 34.9 36.4 36.33 C-30
532 CIV-RFI-6034 10/26/2021 Madas 2 2 2 C-30 Car parking CIV-RFI-6034 CIV-RFI-6034
L oca tion B4-Parking A rea as per highlighted drawing.
533 CIV-RFI-6044 10/27/2021 ACP 3 2 2 C-30 A3-5 foot ball ground Concrete pouring for walkway Pavement location A3-5 foot ball groun CIV-RFI-6044 CIV-RFI-6044 34.93
534 CIV-RFI-6057 10/27/2021 SATCO 1 1 2 C-30 Loundary room Concrete Pouring For Feeder pilar behind loundary room as per highlig CIV-RFI-6057 28 27 27.50 22.5 Mpa CIV-RFI-6057 35 34 35.8 C-30
535 CIV-RFI-6059 1074 10/27/2021 SATCO 1 C-30 A3- Block 05 K & D Concrete Porring For Neck Column LPG tank outer fence Location A3 B 11/3/2021 CIV-RFI-6059 11/24/2021 CIV-RFI-6059
Inspe ction for concrete pouring for pre-cast manhole base slab (13 pcs),
536 CIV-RFI-6035 10/27/2021 Madas 5 2 2 C-35 Pre cast yard pre-cast Camera pole foundation ( 8 pcs )
CIV-RFI-6035 28 30 29.00 26 Mpa CIV-RFI-6035 39.7 42.7 40.4 40.93 C-35

537 CIV-RFI-6107 1077 10/31/2021 SATCO 1 C-30 Precast Yard Core Test for RMU Foundation (2Nos) Location A2- Precast Yard 11/7/2021 CIV-RFI-6041 0.00 22.5 Mpa 11/28/2021 CIV-RFI-6107 0.00 C-30

CIV-RFI-6070 1078 C-20 A4 Concrete pouring for Fence Pole Location A4 Swimming Pool & A 4- CIV-RFI-6070
538 11/1/2021 ACP 5 1 1 11/8/2021 22 19.8 20.90 15 Mpa 11/29/2021 CIV-RFI-6070 31 27.5 26.5 28.33 C-20
T ennis Court
540 CIV-RFI-6095 11/1/2021 ACP 5 1 1 C-30 A4- Tennis court Concrete pouring for Under Walk way Location A4- Tennis Court 11/8/2021 CIV-RFI-6095 27.2 28.7 27.95 22.5 Mpa 11/29/2021 CIV-RFI-6095 35.1 37.7 35.6 36.13 C-30
541 CIV-RFI-6111 1079 11/2/2021 SATCO 5 1 1 C-30 FIre Station Concrete Pouring For Fire Shelter Foundation 11/9/2021 CIV-RFI-6111 29.1 30.2 29.65 22.5 Mpa 11/30/2021 CIV-RFI-6111 36.9 37 31 34.97 C-30
Concrete pouring for Under Walk w ay at location A3- Baske t Ball
542 CIV-RFI-6113 11/3/2021 ACP 3 1 1 C-30 A3 BASKET Ball CIV-RFI-6113 CIV-RFI-6113
1080 Ground 11/10/2021 28.2 25.7 26.95 22.5 Mpa 12/1/2021 37.3 36.8 34.1 36.07 C-30
543 CIV-RFI-6134 11/3/2021 ACP 2 1 1 C-30 A2- Dining Hall & Kitchen Concrete Pouring For Slab on Grade Toilet Area Location A2- Dining & Kitc CIV-RFI-6134 CIV-RFI-6134
Concrete pouring for Fence Pole as per highlighted drawing L oc ation
544 CIV-RFI-6071 11/4/2021 ACP 5 2 2 C-20 Solar Area CIV-RFI-6071 18.1 20.1 19.10 15 Mpa CIV-RFI-6071 25.2 23.8 25.8 24.93 C-20
Solar Area
1081 11/11/2021 12/2/2021
Concrete pouring for Slab and Grade A t location A 3 Dinnning kitc hen
545 CIV-RFI-6154 11/4/2021 ACP 5 2 2 C-30 A3 Dinning kitchen CIV-RFI-6154 33.1 27.1 30.10 22.5 Mpa CIV-RFI-6154 35.5 28.8 38.8 34.37 C-30
tent Pt 2
CIV-RFI-6158 C-30 A1&A4 Guard House concrete pouring for the sliding gate foundation betwee n A1&A 4 guard CIV-RFI-6158 C-30
546 11/6/2021 aflak 2 1 1 30.8 25.5 28.15 22.5 Mpa CIV-RFI-6158 38.8 37.9 35.6 37.43
house as per highlighte d drawing

547 CIV-RFI-6161 11/6/2021 ACP 5 2 2 C-20 B/w A4 & B4 Center Median Concrete pourinf for Fence Pole Location B/w A4 & B4 Center Median CIV-RFI-6161 24.2 26.3 25.25 15 Mpa CIV-RFI-6161 28.8 25 28.2 27.33 C-20
1082 11/13/2021 12/4/2021
CIV-RFI-6169 C-30 Car parking concrete pouring for Ca r pa rk shade Foundation neck column ( 10 pcs) as CIV-RFI-6169 C-30
548 11/6/2021 madas 5 1 1 30.8 25.5 28.15 22.5 Mpa CIV-RFI-6169 38.8 37.9 35.6 37.43
per highlighted drawing

549 CIV-RFI-6170 11/6/2021 ACP 3 1 1 C-30 A3 Dinning kitchen tent & Basket Concrete pouring for Slab and Grade A t location A 3 Dinning kitchen tent CIV-RFI-6170 32.8 27.1 29.95 22.5 Mpa CIV-RFI-6170 34.2 35.3 33.9 34.47 C-30
& Ba sket Ball Ground Pt 2
concrete pouring for Ca marepoll Founda tion 8 (Pcs) And Manhole wall
550 CIV-RFI-6168 11/7/2021 madas 5 2 2 C-35 Laydown Area CIV-RFI-6168 29.1 28 28.55 26 Mpa CIV-RFI-6168 35 33.7 35.4 34.70 C-35
(13 Pcs) , M anhole Ba se (13 Pcs)
1083 11/14/2021 12/5/2021
Concrete pouring for Walk way location A 3 dinning kitchen foot ball
551 CIV-RFI-6177 11/7/2021 ACP 5 2 2 C-30 A3 Dinning kitchen CIV-RFI-6177 29.3 28.1 28.70 22.5 Mpa CIV-RFI-6177 33 36.4 32.3 33.90 C-30
ground side
Concrete pouring for Under Walk w ay at location A3-5 Kitchen A4 Road
552 CIV-RFI-6195 11/8/2021 acp 2 1 1 C-30 A3-5 Kitchen A4 Road Side CIV-RFI-6195 CIV-RFI-6195
Side
553 CIV-RFI-6200 1084 11/8/2021 acp 2 1 1 C-30 B/w A4 & B4 Concrete pouring for Fence at location B/w A4 & B4 11/15/2021 CIV-RFI-6200 28.1 29.5 28.80 22.5 Mpa 12/6/2021 CIV-RFI-6200 0.00 C-30
concrete pouring For Ramp located and in front of dining and kitche n
554 CIV-RFI-6210 11/8/2021 acp 1 1 1 C-30 A3- Block 05 K & D CIV-RFI-6210 CIV-RFI-6210
main door A 3-5 LPG T ank side
1085 concrete pouring For Ramp and wa lkwa y located a nd in front of dining
555 CIV-RFI-6236 11/9/2021 acp 5 2 2 C-30 A3- Block 05 K & D 11/16/2021 CIV-RFI-6236 25.9 29.7 27.80 22.5 Mpa 12/7/2021 CIV-RFI-6236 36.9 35.3 34.2 35.47 C-30
and kitchen main door A 3-5 LPG T ank side
Concrete pourinf for walkway Pave ment of location A4 prayer Shellter
556 CIV-RFI-6228 11/10/2021 acp 5 1 1 C-30 A4 prayer Shellter RAM P
CIV-RFI-6228 22.1 20.3 21.20 22.5 Mpa CIV-RFI-6228 32.5 31 33.9 32.47 C-30
1086 11/17/2021 CIV-RFI-6239 12/8/2021
557 CIV-RFI-6239 11/10/2021 madas 5 1 1 C-30 FIre Station Concrete Pouring of Duct Bank For Low Current cable Passing 21.8 20.4 21.10 22.5 Mpa CIV-RFI-6239 22.6 21.9 22.2 22.23 C-30
558 CIV-RFI-6249 11/10/2021 acp 5 C-20 B/w A4 & B4 Concrete pouring for Fence at location B/w A4 & B4 CIV-RFI-6249 19.7 21.4 20.55 15 Mpa CIV-RFI-6249 23.8 22.9 21.5 22.73 C-20
CIV-RFI-6256 Aflak C-30 A1&A4 Guard House concrete pouring for the sliding gate Beam & foundation betwee n CIV-RFI-6256 CIV-RFI-6256
559 11/13/2021 1 1 1
A1&A4 gua rd house as pe r highlighted draw ing
concrete pouring for the fire station beam on grade & foundations neck
560 CIV-RFI-6257 1088 11/13/2021 SATCO 2 1 1 C-30 FIre Station 11/20/2021 CIV-RFI-6257 24.6 26.2 25.40 22.5 Mpa 12/11/2021 CIV-RFI-6257 37.7 35.5 38.7 37.30 C-30
column as per highlighted drawing
concrete pouring for the slab on grade for garba ge room dry part &
561 CIV-RFI-6258 11/13/2021 SATCO 2 1 1 C-30 K & D Garbage room & Electro-MeE lectro-M echanic al room sla b on grade a s per higlhighted drawing CIV-RFI-6258 CIV-RFI-6258

Concrete pouring for Under Walk w ay at location A3 DIN NING K itche n


562 CIV-RFI-6266 ACP 5 1 1 C-30 A3 DINNING Kitchen B3 Side B3 Side CIV-RFI-6266 24.7 26.5 25.60 22.5 Mpa CIV-RFI-6266 36.9 32.7 35.2 34.93 C-30
1089 11/15/2021 11/22/2021 12/13/2021
Betw een Commerical Building & Concrete pouring for Fence Pole Location Betwee n Commerica l Building
563 CIV-RFI-6269 ACP 5 2 2 C-20 A3- Road CIV-RFI-6269 23.9 26.5 25.20 15 Mpa CIV-RFI-6269 27.2 24.7 29.4 27.10 C-20
& A3-Road As per highlighted drawings
concrete pouring for the ( 3 PCs ) stairs beneeth the doors in T ent area K
CIV-RFI-6295 11/17/2021 SATCO / ACP 2 C-30 K & D Tent area & D as per highlighted drawing
CIV-RFI-6295 CIV-RFI-6295
concrete pouring for slab on grade in between garba ge room and
CIV-RFI-6296 11/17/2021 SATCO / ACP 1 1 1 C-30 B/w garbage room & mechanical mechanic al room as per highlighted drawing CIV-RFI-6296 CIV-RFI-6296
25.8 21.4 23.60 22.5 Mpa 12/15/2021 33.7 34.4 35.2 34.43 C-30
1091
564 CIV-RFI-6298 11/17/2021 ACP 2 1 1 C-30 A3-5 DINNING Kitchen A4 Side concrete pouring for ramp Walkway A3 DINNING Kitchen A4 Side a s 11/24/2021 CIV-RFI-6298 CIV-RFI-6298
per highlgihted drawing
CIV-RFI-6299 11/17/2021 ACP 5 1 1 C-20 A4 Near Type B section Concrete pouring for Fence at location A4 Near Type B section CIV-RFI-6299 20.4 21.9 21.15 15 Mpa 12/15/2021 CIV-RFI-6299 26.1 26.9 24.6 25.87 C-20
CIV-RFI-6289 18-Nov-21 ACP 3 2 2 Control Room 1&2 Concrete pouring for Roof Slab Above the Water Proofing Layer 11/25/2021 CIV-RFI-6289 12/16/2021 CIV-RFI-6289
565 1092 C-30 26.5 24.1 25.30 22.5Mpa 32 35 37 34.67 C-30
CIV-RFI-6305 18-Nov-21 SATCO 2 1 1 A3-5 Dinning & Kitchen Concrete Pouring of Slab on Grade For Access Road Infrond of Garbag 11/25/2021 CIV-RFI-6305 12/16/2021 CIV-RFI-6305
Concrete pouring for Under Walk w ay at location A3 DIN NING K itche n
CIV-RFI-6324 11/22/2021 ACP 3 1 1 C-30 A3 DINNING Kitchen B3 Side & 11/29/2021 CIV-RFI-6324 12/20/2021 CIV-RFI-6324
B3 Side & 2 Ra mp
566 1095 27.2 26.5 26.85 22.5Mpa 37.5 37 35.2 36.57 C-30
concrete pouringfor the slab on grade location food store kitchen and
CIV-RFI-6344 11/22/2021 SATCO 2 1 1 C-30 Dining and kitchen food store bac 11/29/2021 CIV-RFI-6344 12/20/2021 CIV-RFI-6344
dining a s per highlighted drawing
concrete pouring for the fenc e location A 4 tennis court as per highlighted
CIV-RFI-6343 11/23/2021 ACP 2 1 1 C-20 tennis court 11/30/2021 CIV-RFI-6343 23.3 20.5 21.90 15 Mpa 12/21/2021 CIV-RFI-6343 38.5 36.2 33.9 36.20 C-20
draw ing
CIV-RFI-6338 11/23/2021 ACP 2 1 1 A3 Dinning & Kitchen B3 Side Concrete pouring for Under Walk w ay L oca tion A3 Dinning & Kitchen CIV-RFI-6338 22.5Mpa CIV-RFI-6338
B3 Side
A3-5 Dining Hall & Kitchen Concrete Pouring F or Slab on Grade L PG Tank Area Location A 3-5
CIV-RFI-6346 11/23/2021 SATCO 2 1 1 CIV-RFI-6346 22.5Mpa CIV-RFI-6346
567 1096 Dining Hall & K itche n
C-30 11/30/2021 26 28.3 27.15 12/21/2021 38.5 35.7 33.4 35.87 C-30
CIV-RFI-6347 SATCO B3-5 Dining Hall& Kitchen Concrete Pouring F or E lectric al Trench Location B3-5 Dining Hall & CIV-RFI-6347 CIV-RFI-6347
11/23/2021 2 22.5Mpa
Kitc hen
CIV-RFI-6348 Gbec Pre cast yard Concrete Pouring Inspection Chamber (8 Nos) Valve Cha mber(2 Nos) CIV-RFI-6348 CIV-RFI-6348
11/23/2021 2 1 1 22.5Mpa
L oca tion Pre Cast Y
568 CIV-RFI-6363 1097 11/24/2021 Sky High 5 1 1 C-20 Between A1 & A4 Entry Area Concrete Pouring For Main Gate Pool (4 Nos) as per highlighted drawing 12/1/2021 CIV-RFI-6363 21.1 21.8 21.45 15 Mpa 12/22/2021 CIV-RFI-6363 25.5 27.2 23.4 25.37 C-20
569 CVI-RFI-6354 1098 11/25/2021 SATCO 5 2 2 C-30 K & D tent side concrete pouring for the landing slab and stairs 3 PCs location tent side 12/2/2021 CVI-RFI-6354 25.4 28.5 26.95 22.5 Mpa 12/23/2021 CVI-RFI-6354 33 31.2 32.3 32.17 C-30
CIV-RFI-6298-1 11/28/2021 ACP 5 1 1 C-30 A3-5 DINNING Kitchen A4 Side concrete pouring for ramp Walkway A3 DINNING Kitchen A4 Side as per h 12/5/2021 CIV-RFI-6298-1 0.00 22.5 Mpa 12/26/2021 CIV-RFI-6298-1 0.00 C-30
570 1100
CIV-RFI-6388 11/28/2021 satco 5 1 1 C-30 K & D football playground side concrete pouring for the 3 PCs landing stair located A3-5 kitchen and din 12/5/2021 CIV-RFI-6388 28.4 25.4 26.90 22.5 Mpa 12/26/2021 CIV-RFI-6388 37 36.7 37.9 37.20 C-30
571 CIV-RFI-6390 1101 11/29/2021 satco 5 1 1 C-30 K & D football playground and rococrete pouring for the walkway location A3-5 kitchen and dining corner 12/6/2021 CIV-RFI-6390 26.9 25.5 26.20 22.5 Mpa 12/27/2021 CIV-RFI-6390 35.6 38.3 35.8 36.57 C-30
572 CIV-RFI-6413 1103 12/1/2021 MADAS 5 1 1 C-35 Pre cast Concrete
yard Pourig of Pre cast Manhole base slab (13 pcs), CCTV Pole Foundation ( 6 pcs) CHH Manhole CIV-RFI-6413
12/8/2021 (13pcs0 27.1 25.6 26.35 26.25 Mpa 12/29/2021 CIV-RFI-6413 34.8 35.6 37.2 35.87 C-35
CIV-RFI-6431 SATCO next to transformer station concrete pouring for the ele ctrical M V unde r ground duct bank surfac e CIV-RFI-6431 CIV-RFI-6431
5 2 2 22.5 Mpa
base as per highlighte d drawing
573 1106 12/6/2021 C-30 concrete pouring for the 2 duct ba nks located at start of B4 road betw een 12/13/2021 CIV-RFI-6433 28.3 26.2 27.25 1/3/2022 33.7 31.2 32.9 32.60 C-30
CIV-RFI-6433 SATCO 2 1 1 B4 road 22.5 Mpa CIV-RFI-6433
B4-5 & B4-1 as pe r highlighted draw ing
CIV-RFI-6450 12/7/2021 ACP 3 1 1 C-20 Solar Area Concrete pouring for Fence Location Solar Area 12/14/2021 CIV-RFI-6450 0.00 15 Mpa 1/4/2022 CIV-RFI-6450
574 1107 L ean concrete for Curbstone Installation A4 Road & A3 Road as per 35.9 34.2 36.5 35.53 C-20
CIV-RFI-6453 12/7/2021 SATCO 2 1 1 C-20 A3 & A4 12/14/2021 CIV-RFI-6453 0.00 15 Mpa 1/4/2022 CIV-RFI-6453
highlighted
Concrete drawing
pouring for Under Walk w ay at location A3 Around the
CIV-RFI-6451 12/8/2021 ACP 3 1 1 C-30 A3-5 Concrete pouring manholes 12/15/2021 CIV-RFI-6451 0.00 22.5 Mpa 1/5/2022 CIV-RFI-6451
575 1108 Commerica l Building pt1 Base With Instalation for Storm, Sewage & 37.1 38 36 37.03 C-30
CIV-RFI-6468 12/8/2021 GBEC 2 1 1 C-30 B1 Water Suuply Sewage and Sto Concrete
Water S upply Networks,
pouring manholesPoints#SMH
Base With-B26,27,31,30,30a& Sewage & 12/15/2021 CIV-RFI-6468
Instalation for Storm,Sewage 0.00 22.5 Mpa 1/5/2022 CIV-RFI-6468
CIV-RFI-6469 12/9/2021 GBEC 2 1 1 C-30 B1 Water Suuply Sewage and Stor Water
DM H-06,07,08,09,10
S upply Networks,& VC-,45,46,47
Points#SMH - 28,28a,29 & V C-43 &44 CIV-RFI-6469 CIV-RFI-6469
576 1109 Concrete pouring for Under Walk w ay at location A3 Around the 12/16/2021 28.2 25.6 26.90 22.5 Mpa 1/6/2022 36 37.5 36.8 36.77 C-30
CIV-RFI-6478 12/9/2021 ACP 3 1 1 C-30 Around the Commerical BuildingInspection Chamber Base, Vavle Box Base CIV-RFI-6478 CIV-RFI-6478
Commerica
Concrete l Building
pouring pt2 Pole Location Betwee n Commerica l Building
for Fence
CIV-RFI-6269-1 12/11/2021 ACP 0 1 1 C-20 Between Commerical Building & 12/18/2021 CIV-RFI-6269-1 0.00 15 Mpa 1/8/2022 CIV-RFI-6269-1 0.00 C-20
& A3-Road
Concrete As per
pouring forhighlighted
Under Walk drawings
w ay at location A3 Around the
577 CIV-RFI-6485 1110 12/11/2021 ACP 5 0 0 C-30 Around the Commerical Building 12/18/2021 CIV-RFI-6485 27.5 28.4 27.95 22.5 Mpa 1/8/2022 CIV-RFI-6485 35.3 36.3 33.9 35.17 C-30
Commerica
Concret l Building
Pouring of pre-cast manhole base slab (13 pcs ), pre-ca st CCTV
CIV-RFI-6488 12/11/2021 MADAS 5 1 1 C-35 Pre cast yard 12/18/2021 CIV-RFI-6488 30.6 32.3 31.45 26.25 Mpa 1/8/2022 CIV-RFI-6488 37.9 36.9 38.7 37.83 C-35
pole foundation ( 8 pc s ) & pre-c ast manhole wall ( 13 pcs ) .
578 CIV-RFI-6507 1111 12/12/2021 SATCO 5 1 1 C-30 Fire Truck Shelter Concrete pouring of Grade Beam Location Fire Truck Shelter 12/19/2021 CIV-RFI-6507 27.4 26.2 26.80 22.5 Mpa 1/9/2022 CIV-RFI-6507 35.1 37.2 37.8 36.70 C-30
CIV-RFI-6511 12/13/2021 SATCO 2 1 1 C-30 B3-5 Concrete Pouring of Foundation For LPG Tank Location B3-5 D & K 12/20/2021 CIV-RFI-6511 1/10/2022 CIV-RFI-6511
579 1112 26.1 23 24.55 22.5 Mpa 34.1 36.5 35.6 35.40 C-30
CIV-RFI-6515 12/13/2021 ACP 3 1 1 C-30 A3-5 Commerical Building Concrete pouring for Under Walk way at location REMP Near the Commeric12/20/2021 CIV-RFI-6515 1/10/2022 CIV-RFI-6515
CIV-RFI-6535 12/15/2021 TAQIQI 5 1 1 C-30 between A2&B2 Concrete pouring for duct bank location A2 (2X110 ) length 7.80 m 12/22/2021 CIV-RFI-6535 24.6 28.1 26.35 22.5 Mpa 1/12/2022 CIV-RFI-6535 31.2 36.8 35.5 34.50 C-30
580 1114
CIV-RFI-6536 12/15/2021 MADAS 5 1 1 C-35 Pre cast yard Inspection for concrete pouring for pre-cast manhole base slab (15 pcs ), 12/22/2021 CIV-RFI-6536 30.7 31.8 31.25 26.25 Mpa 1/12/2022 CIV-RFI-6536 36.3 37.4 38 37.23 C-35
581 CIV-RFI-6574 1116 12/18/2021 SATCO 5 1 1 C-30 Pre cast Yard & A1- Game Room Concrete Pouring For AC Outdoor Unit Foundation (25 No's) Pre cast 12/25/2021 CIV-RFI-6574 27.7 26 26.85 22.5 Mpa 1/15/2022 CIV-RFI-6574 36.7 35.2 36.8 36.23 C-30
CIV-RFI-6577 12/19/2021 SATCO 2 1 1 B4- Main Road & Guard house Concret Pouring Column neck For Car Parking (10 Neck Columns) Loc 12/26/2021 CIV-RFI-6577 1/16/2022 CIV-RFI-6577
582 1117 C-30 25.5 27 26.25 22.5 Mpa 36.1 35.4 36.5 36.00 C-30
CIV-RFI-6579 12/19/2021 SATCO 3 1 1 A1- Game Room Concrete Pouring For Walkway Around Game Room as per highlighted 12/26/2021 CIV-RFI-6579 1/16/2022 CIV-RFI-6579
583 CIV-RFI-6597 1118 12/20/2021 SATCO 5 1 1 C-30 Swimming pool in front of A-2 Kconcrete pouring for the walkway around the swimming pool located in A12/27/2021 CIV-RFI-6597 28.4 27.5 27.95 22.5 Mpa 1/17/2022 CIV-RFI-6597 33.8 34.5 36 34.77 C-30
584 CIV-RFI-6619 1120 12/22/2021 MADAS 5 1 1 C-35 Pre cast yard Inspection for concrete pouring for pre-cast manhole base slab (15 pcs ) 12/29/2021 CIV-RFI-6619 28.7 27.6 28.15 26.25 Mpa 1/19/2022 CIV-RFI-6619 35 37.6 35.2 35.93 C-35
585 CIV-RFI-6631 1121 12/23/2021 Nortnsky 5 1 1 C-20 A1-Game room to A1-8, A1-2 Visual inspection of Fance pole & Gate Pole Instalation Location A1-Ga 12/30/2021 CIV-RFI-6631 22 20.8 21.40 15 Mpa 1/20/2022 CIV-RFI-6631 32.4 32.2 32.3 32.30 C-20
586 CIV-RFI-6645 1123 12/26/2021 GBEC 5 1 1 C-35 B3 Dining Kitchen & Road B1 Concrete Pouring with Installation of Inspection Chambers & Manh 1/2/2022 CIV-RFI-6645 25.2 27.2 26.20 26.25 Mpa 1/23/2022 CIV-RFI-6645 33.7 32.6 31.1 32.47 C-35
CIV-RFI-6676 Nortnsky Concrete Pouring F or U nder RW & curbstone Locatio B4- Block 01 To
12/27/2021 1 1 1 C-20 B4- Block 01 To 03 1/3/2022 CIV-RFI-6676 1/24/2022 CIV-RFI-6676 C-20
04 as per highlighted dra wing
CIV-RFI-6659 12/27/2021 Taqiqi 1 1 1 C-30 B2 Concrete pouring for 3 duct bank location in roads 17,009 1/3/2022 CIV-RFI-6659 33.9 34.1 33.3 15 Mpa 1/24/2022 CIV-RFI-6659 33.9 34.1 33.3 33.77 C-30
Concrete Pouring of Walkway Location A1- Bloc k 07 & 08 as per
CIV-RFI-6679 12/27/2021 Nortnsky 1 1 1 C-30 A1- Block 08 & 07 1/3/2022 CIV-RFI-6679 1/24/2022 CIV-RFI-6679 C-30
highlighted drawing
587 1124 Concrete Pouring of Walkway L oc ation B4- Block 03 & 04 as per
CIV-RFI-6680 12/27/2021 Al Jabal 1 1 1 C-30 B4- Block 03&04 1/3/2022 CIV-RFI-6680 1/24/2022 CIV-RFI-6680 34.7 34 33.1 33.93 C-30
highlighted drawing
27 24.1 25.55 22.5 Mpa
CIV-RFI-6684 SATCO concrete pouring for the duc t bank in B4 car parking as pe r highlighted
12/27/2021 1 1 1 C-30 car parking 1/3/2022 CIV-RFI-6684 1/24/2022 CIV-RFI-6684 34.7 34 33.1 33.93 C-30
draw ing
CIV-RFI-6685 SATCO grouting on top of the nec k column under the steel plate loc ated at utility
12/27/2021 6 1 1 C-68 Fire Truck Shelter 1/3/2022 CIV-RFI-6685 16.28 17.83 17.06 51 Mpa 1/24/2022 CIV-RFI-6685 52.49 54.04 58.95 55.16 C-68
area under the fire truc k she lter as per highlighted draw ing
CIV-RFI-6695 12/28/2021 SATCO concret pouring for the slab on grade located in B3 K & D toilets as per CIV-RFI-6695 CIV-RFI-6695
C-30 K & D toilets 1/4/2022 1/25/2022 C-30
highlighted drawing
lea n concrete for beneeth the ba rbeque foundation located in B3
CIV-RFI-6699 12/28/2021 SATCO 3 5 5 C-30 Swimming pool 1/4/2022 CIV-RFI-6699 25.1 26.3 25.70 22.5 Mpa 1/25/2022 CIV-RFI-6699 34.9 33.9 32.6 33.80 C-30
swimming pool as per highlighted draw ing
588 1125 12/28/2021 concrete pouring of slab on gra de for Survice area loc ated a t B2 K & D
CIV-RFI-6701 SATCO C-30 K & D survice area 1/4/2022 CIV-RFI-6701 1/25/2022 CIV-RFI-6701 C-30
as per highlighted dra wing pt.1
12/28/2021 concrete pouring for the wa lkwa y located a t A 1-3, A1-4 & A1-5 inner
CIV-RFI-6703 NOM 2 2 2 C-30 walkway inner road side
road side as per highlighted dra wing
1/4/2022 CIV-RFI-6703 0.00 22.5 Mpa 1/25/2022 CIV-RFI-6703 0.00 C-30

CIV-RFI-6689 12/28/2021 MADAS 5 1 1 C-35 Pre cast yard Inspection for Concrete Pouring For pre-cast manhole base slab (15 pcs ), 1/4/2022 CIV-RFI-6689 32 30.9 31.45 26.25 Mpa 1/25/2022 CIV-RFI-6689 36.1 38.2 38.7 37.67 C-35
12/29/2021 concrete pouring for the service a rea located inside K & D B2 as per
CIV-RFI-6705 SATCO 2 C-30 K&D service area 1/5/2022 CIV-RFI-6705 27.8 26.6 27.20 22.5 Mpa 1/26/2022 CIV-RFI-6705 34.7 33.2 31.2 33.03 C-30
highlighted drawing
589 1126
12/29/2021 concrete pouring for the slab on grade for the toilets locate d inside K & D
CIV-RFI-6713 SATCO 3 1 1 C-30 K & D toilets 1/5/2022 CIV-RFI-6713 1/26/2022 CIV-RFI-6713 C-30
B3 a s per highlighted drawing
concrete pouring for the wa lkwa y in B4-1 & B4-2 1st a nd 2nd qua rdants
CIV-RFI-6720 12/30/2021 Al Jabal 2 1 1 C-30 quardant 1st & 2nd quardants 1/6/2022 CIV-RFI-6720 26.9 26 26.45 22.5 Mpa 1/27/2022 CIV-RFI-6720 33.8 31.8 34.2 33.27 C-30
as per highlighted dra wings
1127 concrete pouring for the toilets locate d inside K & D B2 as per
590 CIV-RFI-6726 12/30/2021 SATCO 1 1 1 C-30 K & D toilets 1/6/2022 CIV-RFI-6726 1/27/2022 CIV-RFI-6726 C-30
highlighted drawing
concrete pouring inspe ction for the walkway located at A1-2 & A1-3
CIV-RFI-6730 12/30/2021 NOM 2 1 1 C-30 utility area outer side 1/6/2022 CIV-RFI-6730 1/27/2022 CIV-RFI-6730 C-30
utility area side oute r walkway as per highlighted drawing
27 27.9 27.45 22.5 Mpa 34.6 33.3 34.1 34.00
CIV-RFI-6732 Al Jabal concrete pouring for the wa lkwa y located a t A 1-2 inner road side as per
1/1/2022 5 2 2 C-30 walkway inner road side 1/8/2022 CIV-RFI-6732 1/29/2022 CIV-RFI-6732 C-30
highlighted drawing
591 1128 concrete poring for security fence located a t utility area near to fire tanks
CIV-RFI-6738 1/1/2022 North sky 5 1 1 C-20 near to fire tanks & product tank & se curity fe nce a nd gate located at STP area ne ar to product tank as per 1/8/2022 CIV-RFI-6738 24.6 24.7 24.65 15 Mpa 1/29/2022 CIV-RFI-6738 23.9 24.5 24.7 24.37 C-20
highlighted drawing

1129 concrete pouring for the service a rea located inside K & D B2 as per
592 CIV-RFI-6739 1/2/2022 SATCO 5 3 3 C-30 K & D service area 1/9/2022 CIV-RFI-6739 1/30/2022 CIV-RFI-6739 C-30
highlighted drawing 28.4 25.4 26.90 22.5 Mpa 35.3 32.2 34.6 34.03
concrete pouring for the slab on grade for the toilets locate d inside K & D
CIV-RFI-6751 1/3/2022 SATCO 1 1 1 C-30 K & D toilets 1/10/2022 CIV-RFI-6751 1/31/2022 CIV-RFI-6751 C-30
B3 a s per highlighted drawing
Concrete pouring of Walkw ay L oca tion B4- Bloc k 01 & 02 a s per
CIV-RFI-6753 1/3/2022 Al jabal 1 1 1 C-30 B4- Block 01 & 02 1/10/2022 CIV-RFI-6753 1/31/2022 CIV-RFI-6753
highlighted drawing
593 1130 concrete pouring for the service a rea located inside K & D B2 as per
CIV-RFI-6756 1/3/2022 SATCO 1 C-30 K & D service area 1/10/2022 CIV-RFI-6756 26.9 27.6 27.25 22.5 Mpa 1/31/2022 CIV-RFI-6756 35.7 33.8 33 34.17 C-30
highlighted drawing
CIV-RFI-6757 NOM concrete pouring for the wa lkwa y located in A1-6 a nd A1-7 inne r road a s
1/3/2022 2 1 1 C-30 inner road 1/10/2022 CIV-RFI-6757 1/31/2022 CIV-RFI-6757
per highlighted drawing
concrete pouring for the wa lkwa y located in B4 around type A porta
594 CIV-RFI-6776 1131 1/4/2022 Al Jabal 3 1 1 C-30 Type A inside 1/11/2022 CIV-RFI-6776 25.5 26.5 26.00 22.5 Mpa 2/1/2022 CIV-RFI-6776 36.3 32.8 32.4 33.83 C-30
ca bins a s per highlighted drawings
CIV-RFI-6784 SATCO concrete pouring for the mosque toilets and ima m house loca ted in B1
1/5/2022 3 1 1 C-30 mosque toilets and imam house 1/12/2022 CIV-RFI-6784 27.4 26.7 27.05 22.5 Mpa 2/2/2022 CIV-RFI-6784 36.2 33.7 32.7 34.20 C-30
mosque a s per highlighted drawing
CIV-RFI-6768 1/5/2022 MADAS Inspection for Concre te Pouring For pre-cast manhole base sla b (15
3 1 1 C-35 Pre cast yard pcs ), & pre-cast manhole wall ( 15 pc s ) 1/12/2022 CIV-RFI-6768 29 28.5 28.75 26.25 Mpa 2/2/2022 CIV-RFI-6768 38.8 36.3 38 37.70 C-35

1132 1/5/2022 concrete poring for car parking shades foundations located at B4 car
595 CIV-RFI-6792 SATCO 3 1 1 C-30 car parking 1/12/2022 CIV-RFI-6792 27.4 26.7 27.05 26.25 Mpa 2/2/2022 CIV-RFI-6792 36.2 33.7 32.7 34.20 C-30
parking area as per highlighte d drawing
1/5/2022 concrete pouring for the wa lkwa y located in B4 around type A porta
CIV-RFI-6777 Al Jabal 3 2 2 C-30 Type A inside 1/12/2022 CIV-RFI-6777 27.4 26.7 27.05 22.5 Mpa 2/2/2022 CIV-RFI-6777 36.2 33.7 32.7 34.20 C-30
ca bins a s per highlighted drawings
1/5/2022 lea n concrete pouring for the curbstone foundation loca ted around B4
CIV-RFI-6787 NOM 3 2 2 C-20 tennis court 1/12/2022 CIV-RFI-6787 21.9 22.1 22.00 15 Mpa 2/2/2022 CIV-RFI-6787 23.8 24.7 22.9 23.80 C-20
tennis court as per highlighte d drawing
concrete pouring for the 2 PCs duct bank located a t B4 parking a rea near
CIV-RFI-6803 1/6/2022 SATCO 1 1 1 C-30 Parking area near to guard house 1/13/2022 CIV-RFI-6803 27.8 26 26.90 22.5 Mpa 2/3/2022 CIV-RFI-6803
to guard house a s per highlighted drawing
concrete pouring for the under staircases inside A1-3 quardant & outer
CIV-RFI-6806 1/6/2022 NOM 1 1 1 C-30 inside quardant A1-3 & outer si 1/13/2022 CIV-RFI-6806 2/3/2022 CIV-RFI-6806
qua rdant wa lkways loca ted in A1-8 & A1-9 as per highlighted
27.8 26 26.90 22.5 Mpa
CIV-RFI-6807 1133 SATCO concrete pouring for the ele ctric room foundation located in B2 K & D a s
596 1/6/2022 1 1 1 C-30 K & D electric room 1/13/2022 CIV-RFI-6807 2/3/2022 CIV-RFI-6807 32.1 33 33.9 33.00 C-30
per highlighted drawing
CIV-RFI-6809 NOM concrete pouring for the wa lkaw ay located at utility around area admin
1/6/2022 1 1 1 C-30 around admin building 1/13/2022 CIV-RFI-6809 22.5 Mpa 2/3/2022 CIV-RFI-6809
building as per highlighted draw ing
27.8 26 26.90
CIV-RFI-6822 SATCO concrete pouring for the duc t bank located at utility area behind the
1/6/2022 1 1 1 C-30 behind loundary building 1/13/2022 CIV-RFI-6822 22.5 Mpa 2/3/2022 CIV-RFI-6822
loundary building as per highlighted drawing
1134 concrete pouring for the wa lkaw ay located at utility around area admin
597 CIV-RFI-6828 1/8/2022 NOM 5 4 4 C-30 around admin building 1/15/2022 CIV-RFI-6828 27.3 26.2 26.75 22.5 Mpa 2/5/2022 CIV-RFI-6828 35.3 32.4 32.2 33.30 C-30
building as per highlighted draw ing
concrete pouring for the curbstone located in utility are a bus parking area
CIV-RFI-6844 1/10/2022 ACP 5 3 3 C-20 Utilities Area 1/17/2022 CIV-RFI-6844 23.5 25.5 24.50 15 Mpa 2/7/2022 CIV-RFI-6844 24.4 23.6 26.4 24.80 C-20
as per highlighted dra wing
CIV-RFI-6848 NOM concrete pouring for the wa lkwa y located a t A 1-9 inside the quardant and
1/10/2022 2 2 2 C-30 A1-9 outside as per highlighte d drawing 1/17/2022 CIV-RFI-6848 2/7/2022 CIV-RFI-6848
598 1136
concrete pouring for the ca r pa rking shades neck columns 9 PCs loc ated
CIV-RFI-6859 1/10/2022 SATCO 3 2 2 C-30 car parking 1/17/2022 CIV-RFI-6859 27.5 27.9 27.70 22.5 Mpa 2/7/2022 CIV-RFI-6859 36.2 35.2 33.9 35.10 C-30
at B4 c ar pa rking area a s per highlighted drawing
CIV-RFI-6867 SATCO concrete pouring for the L PG tank foudnation loca ted at B2 K & D LPG
1/10/2022 2 0 0 C-30 K & D LPG tank 1/17/2022 CIV-RFI-6867 2/7/2022 CIV-RFI-6867
tank a s per highlighted drawing
Inspection for Concre te Pouring For pre-cast manhole base sla b (15
CIV-RFI-6891 1/12/2022 MADAS 5 1 1 C-35 Pre cast yard 1/19/2022 CIV-RFI-6891 28.5 28.2 28.35 26.25 Mpa 2/9/2022 CIV-RFI-6891 38.5 39.7 39.4 39.20 C-35
pcs ), & pre-cast manhole wall ( 15 pc s )
599 1138
concrete pouring for the ele ctrical room foundation located at B2 K & D
CIV-RFI-6905 1/12/2022 SATCO 5 1 1 C-30 K & D electrical room 1/19/2022 CIV-RFI-6905 27.4 27.9 27.65 22.5 Mpa 2/9/2022 CIV-RFI-6905 37 35.7 34.4 35.70 C-30
ele ctrical room as per highlighted dra wing
L ean concrete under RW 41 Location A2- Block 01 & B2 D & K around
CIV-RFI-6919 1/13/2022 NOM 3 1 1 C-20 A2- Block 01 & B2- D&K 1/20/2022 CIV-RFI-6919 0.00 15 Mpa 2/10/2022 CIV-RFI-6919 0.00 C-20
L PG Tank as pe r highlighted draw ing

CIV-RFI-6924 NOM L ean Concrete pouring for B3- Football Pitch Curbstone & B4- Block 01,
1/13/2022 2 1 1 C-20 B3- Football Pitch & B4- Block 0 1/20/2022 CIV-RFI-6924 22.9 22.6 22.75 15 Mpa 2/10/2022 CIV-RFI-6924 27.9 27.6 26.2 27.23 C-20
03, 04, 06& 07 under RW & Curbstone as per highlighted drawing
600 1139
Concrete pouring for wa lkwa y Location A 1- Block 05, 06, 11& 12 as
CIV-RFI-6913 1/13/2022 NOM 3 2 2 C-30 A1- Block 05, 06, 11& 12 1/20/2022 CIV-RFI-6913 28 28.5 28.25 22.5 Mpa 2/10/2022 CIV-RFI-6913 32 32.3 35 33.10 C-30
per highlighted drawing
Concrete pouring For Car Parking Column neck (11 No's) as per
CIV-RFI-6928 1/13/2022 SATCO 2 1 1 C-30 B4- Main Road Car parking 1/20/2022 CIV-RFI-6928 28 28.5 28.25 22.5 Mpa 2/10/2022 CIV-RFI-6928 32 32.3 35 33.10 C-30
highlighted drawing
CIV-RFI-6955 1/15/2022 NOM 3 1 C-30 NOM didn’t rice rfi NOM not rising rfi concrete 1/22/2022 CIV-RFI-6955 0.00 22.5 Mpa 2/12/2022 CIV-RFI-6955 31.9 33.6 33.1 32.87 C-30
602 1140 concrete pouring for the BBQ foundation loc ated at B2 swimming pool
CIV-RFI-6957 1/15/2022 SATCO 2 1 2 C-30 swimming pool 1/22/2022 CIV-RFI-6957 27.7 26.2 26.95 22.5 Mpa 2/12/2022 CIV-RFI-6957 31.9 33.6 33.1 32.87 C-30
as per highligted drawing
lea n concrete poruing for the curbstone loca ted at utiltiy area loundry
CIV-RFI-6948 1/16/2022 SATCO 5 1 1 C-30 loundry building 1/23/2022 CIV-RFI-6948 23.9 24.7 24.30 22.5 Mpa 2/13/2022 CIV-RFI-6948 26.6 25.9 28 26.83 C-30
building as per highlighted draw ing
603 1141 A2
CIV-RFI-6951 1/16/2022 NOM 5 2 2 C-30 rfi not rised for nom concrete pouring in A2 ,, 1/23/2022 CIV-RFI-6951 28.4 25.6 27.00 22.5 Mpa 2/13/2022 CIV-RFI-6951 34.6 33.4 31.2 33.07 C-30
CIV-RFI-6955 1/16/2022 MADAS 3 2 3 C-65 B4 Manhole cover 1/23/2022 CIV-RFI-6955 27.7 26.2 26.95 2/13/2022 CIV-RFI-6955 0.00
CIV-RFI-6958 SATCO concrete pouring for the curbstone sub ba se located at utility area near to
1/17/2022 3 1 1 C-20 near to gate 4 guard house 1/24/2022 CIV-RFI-6958 23.1 24.4 23.75 15 MPA 2/14/2022 CIV-RFI-6958 27.2 26.2 25.4 26.27 C-20
gate 4 guard house as pe r highlighted dra wing
604 CIV-RFI-6954 1142 1/17/2022 NOM C-30 NOM didn’t rice rfi NOM not rising rfi concrete 1/24/2022 CIV-RFI-6954 27.35 22.5 Mpa 2/14/2022 CIV-RFI-6954 34.5 33.1 33.3 33.63 C-30
28.5 26.2
CIV-RFI-6959 1/17/2022 NOM 4 2 2 C-30 NOM didn’t rice rfi NOM not rising rfi concrete 1/24/2022 CIV-RFI-6959 0.00 22.5 Mpa 2/14/2022 CIV-RFI-6959 34.5 33.1 33.3 33.63 C-30
CIV-RFI-6981 1/17/2022 ACP 3 1 1 C-20 Utilities Area Lean Concrete pouring for kerb stone at location A1 Utilities Area 1/24/2022 CIV-RFI-6981 23.1 24.4 23.75 15 MPA 2/14/2022 CIV-RFI-6981 27.2 26.2 25.4 26.27 C-20
concrete pouring for the 5 duct ba nks located at utility area a round the
CIV-RFI-7001 1/19/2022 SATCO 0 0 0 C-30 health clinic 1/24/2022 CIV-RFI-7001 28.9 27 27.95 22.5 Mpa 2/14/2022 CIV-RFI-7001
health c linic as per highlighted dra wing
CIV-RFI-6983 1/19/2022 Taqiqi 2 2 2 C-30 B1 road 17 Concrete pouring for street light duct banks (2x110) length 12.20 m as 1/26/2022 CIV-RFI-6983 28.9 27 27.95 22.5 Mpa 2/16/2022 CIV-RFI-6983 0.00 C-30
concrete pouring for the wa lkwa y as per highlighte d drawing located
CIV-RFI-6987 1/19/2022 NOM 2 2 2 C-30 A1- Block 6 & 7 & 8 & 10 1/26/2022 CIV-RFI-6987 28.9 27 27.95 22.5 Mpa 2/16/2022 CIV-RFI-6987 0.00 C-30
A1- Block 6 & 7 & 8 & 10
1144 concrete pouring for 3 side s around the mosque be nee th the a luminum
CIV-RFI-7000 1/19/2022 SATCO 2 1 1 C-30 mosque 1/26/2022 CIV-RFI-7000 28.9 27 27.95 22.5 Mpa 2/16/2022 CIV-RFI-7000 0.00 C-30
cla dding for ga p filling located at B1 mosuqe as per highlighted drawing
lea n concrete pouring for the BBQ founda tion locate d at B4 swimming
605 CIV-RFI-7004 1/19/2022 SATCO 2 1 1 C-30 swimming pool 1/26/2022 CIV-RFI-7004 0.00 22.5 Mpa 2/16/2022 CIV-RFI-7004 0.00 C-30
pool as per highlighte d drawing
lea n concrete pouring for the 4 big light pools locate d at B3 around
CIV-RFI-7005 1/19/2022 SATCO 1 1 1 C-20 Cricket play ground 1/26/2022 CIV-RFI-7005 15 MPA 2/16/2022 CIV-RFI-7005 0.00 C-20
circket play ground as per highlighted draw ing 22.6 25.6 24.10
CIV-RFI-6982 1/19/2022 ACP C-20 A1 Lean Concrete pouring for kerb stone at location A1 Utilities Area 1/26/2022 CIV-RFI-6982 15 MPA 2/16/2022 CIV-RFI-6982 0.00 C-20
concrete pouring for the transformer founda tion locate d at B4 & B1 road
CIV-RFI-7006 1/19/2022 SATCO 1 1 1 C-30 road 1/26/2022 CIV-RFI-7006 0.00 22.5 Mpa 2/16/2022 CIV-RFI-7006 0.00 C-30
closer to B1 side as pe r highlighted dra wing
L ean Concrete Pouring for under the RW Location Betwe en A2 D & K
CIV-RFI-7012 1/20/2022 NOM 5 1 1 C-20 Between A2 D & K & A2- Block 0 1/27/2022 CIV-RFI-7012 22.1 24.2 23.15 15 MPA 2/17/2022 CIV-RFI-7012 0.00 C-20
& A2- Block 01as per highlighte d drwaing
606 1145
concrete pouring for the duc t bank located B/w B4 & B1 road as per
CIV-RFI-7033 1/20/2022 SATCO 5 1 1 C-30 road 1/27/2022 CIV-RFI-7033 26.2 27.5 26.85 22.5 Mpa 2/17/2022 CIV-RFI-7033 0.00 C-30
highlighted drawing
1146 1/22/2022 Inspection for Concre te Pouring For pre-cast manhole base sla b (12
607 CIV-RFI-7036 MADAS 5 1 1 C-30 Pre cast yard 1/29/2022 CIV-RFI-7036 31.5 32.1 31.80 22.5 Mpa 2/19/2022 CIV-RFI-7036 0.00 C-30
pcs ), & pre-cast manhole wall ( 15 pc s )
CIV-RFI-7046 1/23/2022 NOM 5 2 2 C-30 A1-4 Concrete Pouring of Walkway Location A1 per highlighted drawing 1/30/2022 CIV-RFI-7046 27 25.6 26.30 22.5 Mpa 2/20/2022 CIV-RFI-7046 0.00 C-30
608
CIV-RFI-7047 1147 1/23/2022 NOM 3 1 1 C-20 B4-block3 lean concrete Pouring for under the curbestone Location B4-block3 as pe 1/30/2022 CIV-RFI-7047 15 Mpa 2/20/2022 CIV-RFI-7047 0.00 C-20
L ean Concrete pouring for Curb stone at location A 1 Utilities Area Sola r 23.3 24.8 24.05
CIV-RFI-7040 1/23/2022 ACP 2 1 1 C-20 A1 1/30/2022 CIV-RFI-7040 15 Mpa 2/20/2022 CIV-RFI-7040 0.00 C-20
Side
L ean Concrete pouring for Curb stone at location A 1 Utilities Area Sola r
CIV-RFI-7060 1/24/2022 ACP 3 1 1 C-20 Utilities Area 1/31/2022 CIV-RFI-7060 23.9 24.7 24.30 15 Mpa 2/21/2022 CIV-RFI-7060 0.00 C-20
Side
1148 B3\B4 main road lea n concrete Pouring for under the curbe stone L oc ation & BET B3\B4
609 CIV-RFI-7062 1/24/2022 NOM 3 1 1 C-20
main road as per highlighted drwing
1/31/2022 CIV-RFI-7062 23.9 24.7 24.30 15 Mpa 2/21/2022 CIV-RFI-7062 0.00 C-20

concrete pouring for the columns for main doors gate located at B1
CIV-RFI-7065 1/24/2022 SATCO 4 1 1 C-30 mosque 1/31/2022 CIV-RFI-7065 27.7 24.6 26.15 22.5 Mpa 2/21/2022 CIV-RFI-7065 0.00 C-30
mosque main gate said as per highlighted drawing
concrete poure d without survey approval + not rising RFI + without
610 CIV-RFI-7076 1149 1/25/2022 NOM C-30 inside A1-9 T echnician checking + poured with expired concrete mixe r + without CIV-RFI-7076 0.00 22.5 Mpa CIV-RFI-7076 0.00 C-30
steel RFI 2/1/2022 2/22/2022
L ean Concrete pouring for Curb stone at location A 1 Utilities Area Sola r
CIV-RFI-7078 1/25/2022 ACP 5 2 2 C-20 A2 CIV-RFI-7078 23.3 25.3 24.30 15 Mpa CIV-RFI-7078 0.00 C-20
Side
611
concrete pouring for fence pole located at utiliti are a A1 side as per
CIV-RFI-7077 1/29/2022 North sky 3 C-20 A1 side CIV-RFI-7077 23.3 25.3 24.30 15 Mpa CIV-RFI-7077 0.00 C-20
highlighted drawing
lea n concrete Pouring for under the Ca rbustone Location A 2 Bloc k as pe r
CIV-RFI-7102 1/29/2022 NOM 2 1 1 C-20 Food STO & COMMERCIAL BLDG CIV-RFI-7102 24.6 33.2 28.90 15 Mpa CIV-RFI-7102 0.00 C-20
highlighted drwing
612 1152 2/5/2022 2/26/2022
CIV-RFI-7105 1/29/2022 MADAS 3 C-35 Pre cast yard Inspection for Concrete Pouring For pre-cast manhole wall ( 12 pcs ) CIV-RFI-7105 33.4 31.6 32.50 26 Mpa CIV-RFI-7105 0.00 C-35
CIV-RFI-7106 1/29/2022 Aflak 2 1 1 C-35 Zone B-4 Road Concrete Pouring for the turnstile foundation in Zone B4 CIV-RFI-7106 26.5 25.5 26.00 26 Mpa CIV-RFI-7106 0.00 C-35
concrete pouring for the small out door AC units, stairca se s & bea m
613 CIV-RFI-7132 1/29/2022 SATCO 5 1 1 C-30 mosque CIV-RFI-7132 0.00 26 Mpa CIV-RFI-7132 0.00 C-35
above entrance gate located a t B1 mosque as per highlighted drawa ing
1153 concrete pouring for duct bank le ngth ( 6.63 m ) as per attac hed
CIV-RFI-7122 1/30/2022 TAQIQI 3 1 1 C-30 BTW solar area & A1 CIV-RFI-7122 26 26.2 26.10 22.5 Mpa CIV-RFI-7122 0.00 C-30
draw ings
614 2/6/2022 2/27/2022
lea n concrete pouring for the curbstone loca ted at B4 parking area as per
CIV-RFI-7149 1/30/2022 NOM 2 1 1 C-20 Parking area CIV-RFI-7149 24 24.7 24.35 15 Mpa CIV-RFI-7149 0.00 C-20
highlighted drawing
CIV-RFI-7141 1/31/2022 North sky 3 1 1 C-20 B4 -Road side Concete pouring for fence @ b4 road side CIV-RFI-7141 24.8 26.1 25.45 15 Mpa CIV-RFI-7141 0.00 C-20
concrete pouring for the fenc e and ga te locate d at A2 Utility area as per
CIV-RFI-7156 1154 1/31/2022 North sky C-20 A2 CIV-RFI-7156 0.00 15 Mpa CIV-RFI-7156 0.00 C-20
615 highlighted drawing 2/7/2022 2/28/2022
concrete pouring for the retaining wall base located at B2 lifting station
CIV-RFI-7166 1/31/2022 SATCO 2 1 1 C-20 lifting station 1 side CIV-RFI-7166 24.8 26.1 25.45 15 Mpa CIV-RFI-7166 0.00 C-20
side as per highlighted drawing
1155 B3 Concrete pouring for the big lighting pole foundation 2 PCs loc ated a t B3
616 CIV-RFI-7178 2/1/2022 SATCO 5 1 1
cricket play ground & footba ll ground as per highlighted drawing
2/8/2022 CIV-RFI-7178 28.2 26.2 27.20 22.5 Mpa 3/1/2022 CIV-RFI-7178 0.00 C-30

concrete pouring for pre cast AC units 16 PCs loca ted at A2 K & D out
CIV-RFI-7180 2/2/2022 SATCO 5 1 1 C-35 K & D outside 2/9/2022 CIV-RFI-7180 0.00 26.25 Mpa 3/2/2022 CIV-RFI-7180 0.00 C-35
side as per highlighted drwaing
617
1156 concrete pouring for fence & gates ( 2 PCs ) located in A1 & A3 game
CIV-RFI-7186 2/2/2022 Northen Sky 3 1 1 C-20 game room, K & D & tennis court 2/9/2022 CIV-RFI-7186 29.2 25.8 27.50 15 Mpa 3/2/2022 CIV-RFI-7186 0.00 C-20
room, K & D & tennis court as per highlighted drwaing
CIV-RFI-7187 2/2/2022 NOM 2 C-20 B4 Lean concrete for the curbstone carparking area B4 2/9/2022 CIV-RFI-7187 24 22.4 23.20 15 Mpa 3/2/2022 CIV-RFI-7187 0.00 C-20
concrete pouring for the wa lkwa y located a t A 3 around the swimming
CIV-RFI-7194 2/3/2022 NOM 4 1 1 C-30 A3 CIV-RFI-7194 27.4 26.7 27.05 22.5 Mpa CIV-RFI-7194 0.00 C-30
pool as per highlighte d drawing
618
concrete pouring for the big lighting pole s foundation PCs locate d at B3
CIV-RFI-7197 2/3/2022 SATCO 1 1 1 C-30 B3 CIV-RFI-7197 27.4 26.7 27.05 22.5 Mpa CIV-RFI-7197 0.00 C-30
11557 Cric ket & football play ground 2/10/2022 3/3/2022
CIV-RFI-7222 AFLAK concrete pouring for the sliding gate foundation located at A2 utility area
2/3/2022 2 1 1 C-30 A2 CIV-RFI-7222 0.00 22.5 Mpa CIV-RFI-7222 0.00 C-30
as per highlighted dra wing
619 CIV-RFI-7229 MADAS
2/3/2022 3 C-35 Pre cast yard Concrete Pouring For pre-cast CCTV pole foundation ( 15 pcs ) CIV-RFI-7229 32.3 31.6 31.95 26 Mpa CIV-RFI-7229 0.00 C-35
CIV-RFI-7202 2/5/2022 NOM 2 1 1 C-30 B3 concrete for NOM, not rising rfi, concrete on site without rfi CIV-RFI-7202 0.00 22.5 Mpa CIV-RFI-7202 0.00 C-30
concrete pouring for unde r stairca se s wa lkwa y located in B4 inside
CIV-RFI-7211 2/5/2022 Al Jabal 2 1 1 C-30 B4 CIV-RFI-7211 29.2 27.4 28.30 22.5 Mpa CIV-RFI-7211 0.00 C-30
qurda nts as per highlighte d drawings
620
1158 NO M concrete pouring no rfi rised ( concrete pouring for the walkway 2/12/2022 3/5/2022
CIV-RFI-7220 2/5/2022 NOM C-30 B3 CIV-RFI-7220 28.4 27 27.70 22.5 Mpa CIV-RFI-7220 0.00 C-30
located at B3 swimming pool as per highlighted drawing )
concrete pouring for the big lighting pole foundation 1 PC locate d at B3
CIV-RFI-7221 2/5/2022 SATCO 1 1 1 C-30 B3 CIV-RFI-7221 28.4 27 27.70 22.5 Mpa CIV-RFI-7221 0.00 C-30
cricket play ground as per highlighted draw ing
621
CIV-RFI-7223 NOM NO M concrete pouring no rfi rised ( concrete pouring for the walkway
2/6/2022 3 1 1 C-30 B3 CIV-RFI-7223 29.2 27.4 28.30 22.5 Mpa CIV-RFI-7223 0.00 C-30
located at B3 swimming pool as per highlighted drawing )
CIV-RFI-7224 2/6/2022 MADAS 1 1 1 C-30 A2 Inspection for Concrete Pouring For sliding gate foundation CIV-RFI-7224 0.00 22.5 Mpa CIV-RFI-7224 0.00 C-30
622 1159 concrete pouring for the big lighting pole s foundations located at b3 2/13/2022 3/6/2022
CIV-RFI-7239 2/6/2022 SATCO 1 1 1 C-30 B3 CIV-RFI-7239 29.2 27.4 28.30 22.5 Mpa CIV-RFI-7239 0.00 C-30
Cric ket & football play ground as pe r highlighted draw ing
concrete pouring for the fenc e and ga te locate d atB/W A 2&B2 as pe r
CIV-RFI-7228 2/6/2022 North sky 5 1 1 C-20 B/W A2&B2 CIV-RFI-7228 24 21 22.50 15 Mpa CIV-RFI-7228 0.00 C-20
highlighted drawing
623
CIV-RFI-7250 1160 SATCO concrete pouring for the big lighting pole locate d at B3 football play
2/7/2022 5 2 2 C-30 football play ground 2/14/2022 CIV-RFI-7250 0.00 22.5 Mpa 3/7/2022 CIV-RFI-7250 0.00 C-30
ground a s per highlighte drawing
CIV-RFI-7255 1161 2/8/2022 NOM 5 2 2 C-30 A3-swimming pool no rfi rised for concrete pouring 2/15/2022 CIV-RFI-7255 0.00 22.5 Mpa 3/8/2022 CIV-RFI-7255 0.00 C-30
624 concrete pouring for the slab on grade located at B2 K & D M echanical
CIV-RFI-7267 1162 2/9/2022 SATCO 5 1 1 C-30 B2-K & D Mechanical & Electrical 2/16/2022 CIV-RFI-7267 0.00 22.5 Mpa 3/9/2022 CIV-RFI-7267 0.00 C-30
and e lectrica l room a s per highlighted drawing
CIV-RFI-7211 concrete pouring for unde r stairca se s wa lkwa y located in B4 inside
2/10/2022 Al Jabal 2 2 1 C-30 inside quardants CIV-RFI-7211 0.00 22.5 Mpa CIV-RFI-7211 0.00 C-30
qurda nts as per highlighte d drawings
625
CIV-RFI-7251 lea n concrete pouring under c urb stone located a t A 2 parking as per
2/10/2022 NOM 3 1 1 C-20 parking CIV-RFI-7251 0.00 15 Mpa CIV-RFI-7251 0.00 C-20
highlighted drawing
CIV-RFI-7270 NOM concrete pouring for the wa lkwa y located a t A 3 around the swimming
2/10/2022 2 1 C-30 around swimming pool CIV-RFI-7270 0.00 22.5 Mpa CIV-RFI-7270 0.00 C-30
pool as per highlighte d drawing
626
CIV-RFI-7288 SATCO concrete pouring for the mechnic al room w ater heater founda tion pad
2/10/2022 1 1 1 C-30 K & D Mechanical room CIV-RFI-7288 0.00 22.5 Mpa CIV-RFI-7288 0.00 C-30
located in B2 K & D mec hanical room
1163 2/17/2022 3/10/2022
concrete pouring for the foundation for the curb stone locate d in A 2 Roa d
CIV-RFI-7291 2/10/2022 SATCO 1 1 C-20 Road 09 K & D side CIV-RFI-7291 0.00 15 Mpa CIV-RFI-7291 0.00 C-20
09 K & D side
627
lea n concrete pouring for c urbstone located in B.w A2 & B2 Road 16 as
CIV-RFI-7292 2/10/2022 SATCO 1 1 C-20 Road 16 CIV-RFI-7292 0.00 15 Mpa CIV-RFI-7292 0.00 C-20
per highlighted drawing
Inspection for Concre te Pouring For barrier gate pre cast founda tion
CIV-RFI-7278 2/10/2022 AFLAK C-35 Pre cast yard & Utility Area CIV-RFI-7278 0.00 26 Mpa CIV-RFI-7278 0.00 C-35
2 2 1 (Nos - 6) & sliding gate foundation
628
Inspection for Concre te Pouring For pre-cast manhole base sla b (15
CIV-RFI-7281 2/10/2022 MADAS C-35 Pre cast yard CIV-RFI-7281 0.00 26 Mpa CIV-RFI-7281 0.00 C-35
3 2 1 pcs ), & pre -cast CCT V pole foundation ( 6 pcs )
concrete pouring for the sub station foundation loc ated a t B2 in front of K
CIV-RFI-7298 2/12/2022 SATCO 3 3 3 C-30 In front of K & D CIV-RFI-7298 22.5 Mpa CIV-RFI-7298 C-30
& D as per highlighted drawing
629 1164 2/19/2022 0.00 3/12/2022 0.00
concrete pouring for the ca r pa rking shades founda tions located in B4
CIV-RFI-7300 2/12/2022 SATCO 2 C-30 B/w Tennis & Swimming pool CIV-RFI-7300 22.5 Mpa CIV-RFI-7300 C-30
B/w Te nnis & Swimming pool as per highlighte d drawing
CIV-RFI-7305 1165 2/13/2022 Al jabal concrete pouring for the wa lkwa ys loc ated at B4 inner road as per
5 1 1 C-30 inner road 2/20/2022 CIV-RFI-7305 0.00 22.5 Mpa 3/13/2022 CIV-RFI-7305 0.00 C-30
highlighted drawing
630
CIV-RFI-7317 1166 MADAS B4 - 1,2,3,4 Inspe ction for Grout pouring Manhole Cover fixing a s per highlighted CIV-RFI-7317
6 C-65 2/21/2022 0.00 29.5 Mpa 3/14/2022 CIV-RFI-7317 0.00 C-65
2/14/2022 6 3 draw ing.
CIV-RFI-7329 SATCO lea n concrete pouring for c urb stone foundation loc ated in B/w A2 & A3
2/15/2022 3 1 1 C-20 middle road CIV-RFI-7329 0.00 15 Mpa CIV-RFI-7329 0.00 C-20
middle of the road as per highlighted draw ing
631 lea n concrete pouring for the car parking shade foundation located in B4,
CIV-RFI-7338 1167 2/15/2022 SATCO 2 1 1 C-20 car parking B1 side, basket ball &B1 & B2 car parking B1 side, basket ba ll & K & D health c linic side as 2/22/2022 CIV-RFI-7338 0.00 15 Mpa 3/15/2022 CIV-RFI-7338 0.00 C-20
per highlighted drawings

CIV-RFI-7359 SATCO concrete pouring for the ca r pa rking founda tion locate d at B4 car parking
2/15/2022 5 2 2 C-30 car parking in front of swimming CIV-RFI-7359 0.00 22.5 Mpa CIV-RFI-7359 0.00 C-30
in front of swimming pool as per highlighted draw ing
632
CIV-RFI-7321 Al Jabal 2 concrete pouring for the wa lkwa ys loc ated at B4 inner road as per
2/16/2022 2 C-30 inner road CIV-RFI-7321 0.00 22.5 Mpa CIV-RFI-7321 0.00 C-30
highlighted drawing
CIV-RFI-7324 Northen Sky 3 concrete pouring for the fenc e and ga te locate d at B/W B4&B4 a s per
2/16/2022 2 C-20 B/W B4&B4 CIV-RFI-7324 0.00 15 Mpa CIV-RFI-7324 0.00 C-20
highlighted drawing
633
1168 concrete pouring for the ca r shades foundations locate d in B4 Ca r pa rking 2/23/2022 3/16/2022
CIV-RFI-7345 2/16/2022 SATCO 3 1 C-30 Car parking B1 side CIV-RFI-7345 0.00 22.5 Mpa CIV-RFI-7345 0.00 C-30
B1 side as per highlighte d drawing
lea n concrete pouring forcurb stone foundation located at A2 loundry
CIV-RFI-7357 2/16/2022 SATCO 2 C-20 loundry building bus parking sidebuilding bus pa rking side as per highlighted draw ing CIV-RFI-7357 0.00 15 Mpa CIV-RFI-7357 0.00 C-20
634
2/16/2022 MADAS 5 1 C-35 0.00 26 Mpa 0.00 C-35
CIV-RFI-7371 SATCO lea n concrete pouring for the tent dounda tion loca ted in B2, and B3 K &
2/17/2022 3 1 C-20 K & D tent area CIV-RFI-7371 22.5 Mpa CIV-RFI-7371 C-20
D tent area a s per highlighted drawing
635 1169 2/24/2022 0.00 3/17/2022 0.00
lea n concrete pouring for the curb stone foundation locate d at B1 basket
CIV-RFI-7372 2/17/2022 SATCO 2 1 C-20 basket ball CIV-RFI-7372 22.5 Mpa CIV-RFI-7372 C-20
ball area a s per highlighted drawing
1171 2/20/2022 concrete pouring for the wa lkwa y located in B4 around prayer she lter as
CIV-RFI-7378 Al jabal 3 2 2 C-30 around prayer shelter CIV-RFI-7378 0.00 22.5 Mpa CIV-RFI-7378 0.00 C-30
per highlighted drawing
636
1171 2/20/2022 lea n concrete pouring for the curb stone foundation locate d in B1 road as
CIV-RFI-7393 SATCO 3 1 1 C-20 road CIV-RFI-7393 0.00 15 Mpa CIV-RFI-7393 0.00 C-20
per highlighted drawing
2/27/2022 3/20/2022
1171 2/20/2022 lea n concrete pouring for the re taining wa ll sub base foundation loc ated
CIV-RFI-7397 SATCO 1 C-20 football play ground CIV-RFI-7397 0.00 15 Mpa CIV-RFI-7397 0.00 C-20
in B3 football pla y ground as per highlighted drawing
637
1171 2/20/2022 concrete pouring for the ca r pa rking shades founda tions located in B4 c ar
CIV-RFI-7398 SATCO 2 1 1 C-30 car parking B1 side CIV-RFI-7398 0.00 22.5 Mpa CIV-RFI-7398 0.00 C-30
parking B1 side as per highlighted drawing
concrete pouring for the fenc e and ga te locate d at B4 T ensie court a s per
CIV-RFI-7328 2/23/2022 Northen Sky 2 1 C-20 B4 Tensie court CIV-RFI-7328 0.00 15 Mpa CIV-RFI-7328 0.00 C-20
highlighted drawing
CIV-RFI-7378 Al jabal concrete pouring for the wa lkwa y located in B4 around prayer she lter as
2/23/2022 2 1 C-30 around prayer shelter CIV-RFI-7378 0.00 22.5 Mpa CIV-RFI-7378 0.00 C-30
per highlighted drawing
CIV-RFI-7404 1172 SATCO concrete pouring for duct ba nk 2 PCs locate d in B1 road as pe r
638 2/23/2022 2 1 C-30 road 3/2/2022 CIV-RFI-7404 0.00 22.5 Mpa 3/23/2022 CIV-RFI-7404 0.00 C-30
highlighted drawing
CIV-RFI-7406 SATCO concrete pouring for duct ba nk loca ted in B3 & B1 B/w K & D & B1 as
2/23/2022 2 1 C-30 B/w K & D and B1 CIV-RFI-7406 0.00 22.5 Mpa CIV-RFI-7406 0.00 C-30
per highlighted drawing
CIV-RFI-7409 SATCO concrete pouring for AC units located in B3 K & D as per highlighte d
2/23/2022 2 C-30 K & D CIV-RFI-7409 0.00 22.5 Mpa CIV-RFI-7409 0.00 C-30
draw ing
CIV-RFI-7422 2/24/2022 GBEC 2 1 1 C-30 Zone B3 & B2 Road 009, Water Su
C oncrete Pouring with Installation of IC-A3-1#03, SMH-A44,45 , VC-38, CIV-RFI-7422 0.00 22.5 Mpa CIV-RFI-7422 0.00 C-30
639 1174 concrete pouring for the tent foundations locate d in B3 K & D tent area 3/3/2022 3/24/2022
CIV-RFI-7428 2/24/2022 SATCO 3 1 1 C-30 K & D tent area CIV-RFI-7428 0.00 22.5 Mpa CIV-RFI-7428 0.00 C-30
as per highlighted dra wing
OSAIMI TESTS SUMMARY upto 31 July 2021
ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Sirar louis berger Platinum
No. TEST Unit Rate ACP Amnt GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Sirar Amnt louis berger Amnt Platinum Amnt
Total

1 Field Density test 25 5262 131550 4171 104275 315 7875 0 0 0 0 252 6300 0 0 0 0 29 725 0 0 0 0 0 0 0 0 10029

2 Modified Proctor Value 130 14 1820 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

3 Washed Sieve Analysis 80 14 1120 0 0 0 0 1 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15

4 Soil Classifications 25 14 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

5 Correction oversize fraction 25 14 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

6 Liquid Limit Plastic Limit And Plastic Index 95 14 1330 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

7 Material finer than #200 Sieve 20 14 280 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

8 California Bearing Ratio 195 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 Overtime 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 Plate Load Test 2500 6 15000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 5000 0 0 0 0 0 0 8

11 Plate Load Test (Revised Price) 1000 13 13000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3000 0 0 0 0 0 0 16

12 Concrete Cylinder 34 1187 40358 352 11968 162 5508 172 5848 0 0 0 0 1 34 39 1326 2 68 0 0 0 0 45 1530 14 476 1974

13 Slum Measurement 19 801 15219 143 2717 86 1634 124 2356 0 0 0 0 1 19 28 532 1 19 0 0 0 0 34 646 5 95 1223

14 Temperature measurement 12 798 9576 141 1692 85 1020 123 1476 0 0 0 0 0 0 27 324 0 0 0 0 0 0 33 396 4 48 1211

15 Compressive strength of concrete cylinder 38 1187 45106 352 13376 162 6156 172 6536 0 0 0 0 0 0 39 1326 0 0 0 0 0 0 45 1710 14 532 1971

16 Curing & Capping of concrete cylinder 8 1187 9496 352 2816 162 1296 172 1376 0 0 0 0 0 0 39 1326 0 0 0 0 0 0 45 360 14 112 1971

17 Casting of Grout/Mortor 12 0 0 0 0 0 0 0 0 0 0 132 1584 0 0 0 0 0 0 0 0 0 0 0 0 0 0 132

18 Compressive strenght of Grout/Mortor 12 0 0 0 0 0 0 0 0 0 0 132 1584 0 0 0 0 0 0 0 0 0 0 0 0 0 0 132

19 Temperature of Grout/Mortor 12 0 0 0 0 0 0 0 0 0 0 272 3264 0 0 0 0 0 0 0 0 0 0 0 0 0 0 272

20 pH water test 40 0 0 0 0 0 0 0 0 0 0 7 280 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7

21 Total dissolved solids 40 0 0 0 0 0 0 0 0 0 0 9 360 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9

22 Sulphate Content 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 Sodium Absorption Ratio Test 350 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 plantation soil testing 0 0 0 0 0 0 1 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8

25 Asphalt Extraction & Gradation 100 4 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1100 15

26 masshal stability,flow and density of asphhalt 200 4 800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 2200 15

27 maximum theoretical specific graivity of asphal 150 4 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1650 15

28 loss of stability determination after 24 houre 100 4 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1100 15

29 Asphalt Temp Monitering 40 28 1120 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 85 3400 113

30 Asphalt Sample 100 4 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1100 15

31 MC & TC 100 3 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 600 9

32 Asphalt Coring 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 600 6

33 Density and Thickness of Asphalt Coring 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 840 12

T Amount 288575 T Amount 136844 T Amount 23489 T Amount 17672 T Amount 0 T Amount 13372 T Amount 53 T Amount 4834 T Amount 812 T Amount 8000 T Amount 0 T Amount 4642 T Amount 13853

588968 43286.25
VAT 15% VAT 15% 20526.6 VAT 15% 3523.35 VAT 15% 2650.8 VAT 15% 0 VAT 15% 2005.8 VAT 15% 7.95 VAT 15% 725.1 VAT 15% 121.8 VAT 15% 1200 VAT 15% 0 VAT 15% 696.3 VAT 15% 2077.95

G Total 331861.25 G Total 157370.6 G Total 27012.35 G Total 20322.8 G Total 0 G Total 15377.8 G Total 60.95 G Total 5559.1 G Total 933.8 G Total 9200 G Total 0 G Total 5338.3 G Total 15930.95
Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
IGMT SUMMARY Aug 2021
ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Sirar louis berger Platinum
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Sirar Amnt louis berger Amnt Platinum Amnt
Total

1 Field Density test 23 214 4922 47 1081 36 828 0 0 30 690 0 0 0 0 0 0 94 2162 0 0 0 0 0 0 0 0 421

2 Modified Proctor Value 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Washed Sieve Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Soil Classifications 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 Correction oversize fraction 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Liquid Limit Plastic Limit And Plastic Index 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 Material finer than #200 Sieve 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8 California Bearing Ratio 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 Overtime 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 Plate Load Test 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Plate Load Test (Revised Price) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

12 Concrete Cylinder 30 89 2670 10 300 37 1110 0 0 0 0 0 0 2 60 4 120 5 150 0 0 0 0 6 180 0 0 153

13 Slum Measurement 10 56 560 2 20 12 120 0 0 0 0 0 0 0 0 2 20 3 30 0 0 0 0 3 30 0 0 78

14 Temperature measurement 10 56 560 3 30 12 120 0 0 0 0 0 0 2 20 2 20 3 30 0 0 0 0 3 30 0 0 81

15 Compressive strength of concrete cylinder 35 89 3115 10 350 37 1295 0 0 0 0 0 0 2 70 4 140 5 175 0 0 0 0 6 210 0 0 153

16 Curing & Capping of concrete cylinder 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Casting of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 12 132 0 0 0 0 0 0 0 0 0 0 18 198 0 0 30

18 Compressive strenght of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 12 132 0 0 0 0 0 0 0 0 0 0 18 198 0 0 30

19 Temperature of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 111 1221 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111

20 pH water test 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21 Total dissolved solids 300 0 0 0 0 0 0 0 0 0 0 1 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1

22 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 Sodium Absorption Ratio Test 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 plantation soil testing 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Asphalt Sample & Extraction & Gradation 95 3 285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

26 masshal stability,flow and density of asphhalt 200 3 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

27 maximum theoretical specific graivity of asphal 148 3 444 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

28 loss of stability determination after 24 houre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

29 Asphalt Temp Monitering 20 16 320 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16

30 MC & TC 100 3 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

31 Asphalt Coring 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

32 Density and Thickness of Asphalt Coring 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

T Amount 13776 T Amount 1781 T Amount 3473 T Amount 0 T Amount 690 T Amount 1785 T Amount 150 T Amount 300 T Amount 2547 T Amount 0 T Amount 0 T Amount 846 T Amount 0

29150 2066.4
VAT 15% VAT 15% 267.15 VAT 15% 520.95 VAT 15% 0 VAT 15% 103.5 VAT 15% 267.75 VAT 15% 22.5 VAT 15% 45 VAT 15% 382.05 VAT 15% 0 VAT 15% 0 VAT 15% 126.9 VAT 15% 0

G Total 15842.4 G Total 2048.15 G Total 3993.95 G Total 0 G Total 793.5 G Total 2052.75 G Total 172.5 G Total 345 G Total 2929.05 G Total 0 G Total 0 G Total 972.9 G Total 0
Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
IGMT SUMMARY Sep 2021
ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Sirar louis berger Platinum
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Sirar Amnt louis berger Amnt Platinum Amnt
Total

Field Density test

1 Field Density test 23 145 3335 88 2024 21 483 0 0 3 69 11 253 0 0 8 184 0 0 67 1541 0 0 1 23 0 0 344

SOIL TESTING

2 Modified Proctor Value 128 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Washed Sieve Analysis 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Liquid Limit Plastic Limit And Plastic Index 92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 California Bearing Ratio 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Plate Load Test 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CONCRETE TEST

7 Temperature measurement of concrete 10 60 600 2 20 6 60 0 0 0 0 1 10 1 10 0 0 2 20 0 0 0 0 0 0 0 0 72

8 Slum Measurement 15 60 900 2 30 6 90 0 0 0 0 1 15 1 15 0 0 2 30 0 0 0 0 0 0 0 0 72

9 Concrete Cylinder 30 86 2580 2 60 15 450 0 0 0 0 3 90 5 150 0 0 2 60 0 0 0 0 0 0 0 0 113

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of concrete cyli 35 86 3010 2 70 15 525 0 0 0 0 3 105 5 175 0 0 2 70 0 0 0 0 0 0 0 0 113

GROUT/MORTAR TEST

12 Temperature of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

13 Casting of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

14 Compressive strenght of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WATER TESTING

15 pH water test 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ASPHALT TESTING

18 Asphalt Sample & Extraction & Gradation 95 2 190 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

19 marshal stability & resistance to plastic flow / 200 2 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

20 maximum theoretical specific graivity of asphal 148 2 296 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

22 Asphalt Temp Monitoring 20 14 280 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

23 MC & TC Sample with Test 100 2 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

24 Asphalt Coring 95 11 1045 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11

25 Density and Thickness of Asphalt Coring 65 11 715 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11

IGMT SUMMARY Sep 2021


T Amount 13551 T Amount 2204 T Amount 1608 T Amount 0 T Amount 69 T Amount 473 T Amount 350 T Amount 184 T Amount 180 T Amount 1541 T Amount 0 T Amount 23 T Amount 0

A 23210 2032.65
VAT 15% VAT 15% 330.6 VAT 15% 241.2 VAT 15% 0 VAT 15% 10.35 VAT 15% 70.95 VAT 15% 52.5 VAT 15% 27.6 VAT 15% 27 VAT 15% 231.15 VAT 15% 0 VAT 15% 3.45 VAT 15% 0

G Total 15583.65 G Total 2534.6 G Total 1849.2 G Total 0 G Total 79.35 G Total 543.95 G Total 402.5 G Total 211.6 G Total 207 G Total 1772.15 G Total 0 G Total 26.45 G Total 0

Grant Total previous 347703.65 previous 159418.75 previous 31006.3 previous 20322.8 previous 793.5 previous 17430.55 previous 233.45 previous 5904.1 previous 3862.85 previous 9200 previous 0 previous 6311.2 previous 15930.95

641329 Total Amt 363287.3 Total Amt 161953.35 Total Amt 32855.5 Total Amt 20322.8 Total Amt 872.85 Total Amt 17974.5 Total Amt 635.95 Total Amt 6115.7 Total Amt 4069.85 Total Amt 10972.15 Total Amt 0 Total Amt 6337.65 Total Amt 15930.95

Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
IGMT SUMMARY Oct 2021
ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Sirar louis berger Platinum
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Sirar Amnt louis berger Amnt Platinum Amnt
Total

Field Density test

1 Field Density test 23 82 1886 75 1725 19 437 0 0 3 69 41 943 7 161 3 69 29 667 0 0 0 0 0 0 0 0 259

SOIL TESTING

2 Modified Proctor Value 128 0 0 0 0 0 0 0 0 0 0 2 256 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

3 Washed Sieve Analysis 75 0 0 0 0 0 0 0 0 0 0 2 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

4 Liquid Limit Plastic Limit And Plastic Index 92 0 0 0 0 0 0 0 0 0 0 2 184 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

5 California Bearing Ratio 192 0 0 0 0 0 0 0 0 0 0 1 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1

6 Plate Load Test 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CONCRETE TEST

7 Temperature measurement of concrete 10 22 220 1 10 10 100 0 0 0 0 4 40 2 20 0 0 1 10 0 0 0 0 0 0 0 0 40

8 Slum Measurement 15 22 330 1 15 10 150 0 0 0 0 4 60 2 30 0 0 1 15 0 0 0 0 0 0 0 0 40

9 Concrete Cylinder 30 49 1470 5 150 32 960 0 0 0 0 17 510 2 60 0 0 8 240 0 0 0 0 0 0 0 0 113

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of concrete cyli 35 49 1715 5 175 32 1120 0 0 0 0 17 595 2 70 0 0 8 280 0 0 0 0 0 0 0 0 113

GROUT/MORTAR TEST

12 Temperature of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 5 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5

13 Casting of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 12 132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12

14 Compressive strenght of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 12 132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12

WATER TESTING

15 pH water test 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ASPHALT TESTING

18 Asphalt Sample & Extraction & Gradation 95 3 285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 95 4

19 marshal stability & resistance to plastic flow / 200 3 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 200 4

20 maximum theoretical specific graivity of asphal 148 3 444 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 148 4

22 Asphalt Temp Monitoring 20 13 260 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 40 15

23 MC & TC Sample with Test 100 4 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 100 5

24 Asphalt Coring 95 5 475 0 0 0 0 0 0 0 0 1 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6

25 Density and Thickness of Asphalt Coring 65 5 325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5

IGMT SUMMARY Oct 2021


Approved
T Amount 8410 T Amount 2075 T Amount 2767 T Amount 0 T Amount 69 T Amount 3344 T Amount 341 T Amount 69 T Amount 1212 T Amount 0 T Amount 0 T Amount 0 T Amount 583

A 21701 1261.5
VAT 15% VAT 15% 311.25 VAT 15% 415.05 VAT 15% 0 VAT 15% 10.35 VAT 15% 501.6 VAT 15% 51.15 VAT 15% 10.35 VAT 15% 181.8 VAT 15% 0 VAT 15% 0 VAT 15% 0 VAT 15% 87.45

G Total 9671.5 G Total 2386.25 G Total 3182.05 G Total 0 G Total 79.35 G Total 3845.6 G Total 392.15 G Total 79.35 G Total 1393.8 G Total 0 G Total 0 G Total 0 G Total 670.45

Grant Total previous 363287.3 previous 161953.35 previous 32855.5 previous 20322.8 previous 872.85 previous 17974.5 previous 635.95 previous 6115.7 previous 4069.85 previous 10972.15 previous 0 previous 6337.65 previous 15930.95

663029 Total Amt 372958.8 Total Amt 164339.6 Total Amt 36037.55 Total Amt 20322.8 Total Amt 952.2 Total Amt 21820.1 Total Amt 1028.1 Total Amt 6195.05 Total Amt 5463.65 Total Amt 10972.15 Total Amt 0 Total Amt 6337.65 Total Amt 16601.4

Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa

IGMT SUMMARY Nov 2021


ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Sirar louis berger Platinum Northen sky
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Sirar Amnt louis berger Amnt Platinum Amnt Platinum Amnt
Total

Field Density test

1 Field Density test 23 89 2047 34 782 1 23 0 0 0 0 63 1449 4 92 0 0 134 3082 0 0 0 0 1 23 0 0 0 0 326

SOIL TESTING

2 Modified Proctor Value 128 0 0 1 128 0 0 0 0 0 0 2 256 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3


3 Washed Sieve Analysis 75 0 0 0 0 0 0 0 0 0 0 2 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

4 Liquid Limit Plastic Limit And Plastic Index 92 0 0 0 0 0 0 0 0 0 0 2 184 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

5 California Bearing Ratio 192 0 0 0 0 0 0 0 0 0 0 2 384 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

6 Plate Load Test 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CONCRETE TEST

7 Temperature measurement of concrete 10 30 300 1 10 4 40 0 0 0 0 10 100 2 20 0 0 0 0 0 0 0 0 0 0 0 0 1 10 48

8 Slum Measurement 15 29 435 1 15 4 60 0 0 0 0 10 150 2 30 0 0 0 0 0 0 0 0 0 0 0 0 1 15 47

9 Concrete Cylinder 30 88 2640 2 60 15 450 0 0 0 0 32 960 3 90 0 0 0 0 0 0 0 0 0 0 0 0 5 150 145

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of concrete cyli 35 88 3080 2 70 15 525 0 0 0 0 32 1120 3 105 0 0 0 0 0 0 0 0 0 0 0 0 5 175 145

GROUT/MORTAR TEST

12 Temperature of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

13 Casting of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

14 Compressive strenght of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WATER TESTING

15 pH water test 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ASPHALT TESTING

18 Asphalt Sample & Extraction & Gradation 95 14 1330 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

19 marshal stability & resistance to plastic flow / 200 14 2800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

20 maximum theoretical specific graivity of asphal 148 14 2072 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14

22 Asphalt Temp Monitoring 20 61 1220 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61

23 MC & TC Sample with Test 100 13 1300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13

24 Asphalt Coring 95 5 475 0 0 0 0 0 0 0 0 1 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6

25 Density and Thickness of Asphalt Coring 65 5 325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5

IGMT SUMMARY Nov 2021


T Amount 18024 T Amount 1065 T Amount 1098 T Amount 0 T Amount 0 T Amount 4848 T Amount 337 T Amount 0 T Amount 3082 T Amount 0 T Amount 0 T Amount 23 T Amount 0 T Amount 350
Approved

33151 2703.6
VAT 15% VAT 15% 159.75 VAT 15% 164.7 VAT 15% 0 VAT 15% 0 VAT 15% 727.2 VAT 15% 50.55 VAT 15% 0 VAT 15% 462.3 VAT 15% 0 VAT 15% 0 VAT 15% 3.45 VAT 15% 0 VAT 15% 52.5

G Total 20727.6 G Total 1224.75 G Total 1262.7 G Total 0 G Total 0 G Total 5575.2 G Total 387.55 G Total 0 G Total 3544.3 G Total 0 G Total 0 G Total 26.45 G Total 0 G Total 402.5

Grant Total previous 372958.8 previous 164339.6 previous 36037.55 previous 20322.8 previous 952.2 previous 21820.1 previous 1028.1 previous 6195.05 previous 5463.65 previous 10972.15 previous 0 previous 6337.65 previous 16601.4 previous 0

696180 Total Amt 393686.4 Total Amt 165564.35 Total Amt 37300.25 Total Amt 20322.8 Total Amt 952.2 Total Amt 27395.3 Total Amt 1415.65 Total Amt 6195.05 Total Amt 9007.95 Total Amt 10972.15 Total Amt 0 Total Amt 6364.1 Total Amt 16601.4 Total Amt 402.5

Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
IGMT SUMMARY DEC 2021
ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Al Jabel louis berger Platinum Northen sky NOM Al Suliya
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Al Jabel Amnt louis berger Amnt Platinum Amnt Sky High Amnt NOM Amnt Al Suliya Amnt
Total

Field Density test

1 Field Density test 23 0 0 76 1748 0 0 0 0 0 0 248 5704 0 0 0 0 29 667 0 0 0 0 0 0 0 0 0 0 0 0 0 0 353

SOIL TESTING

2 Modified Proctor Value 128 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Washed Sieve Analysis 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Liquid Limit Plastic Limit And Plastic Index 92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 California Bearing Ratio 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Plate Load Test 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CONCRETE TEST

7 Temperature measurement of concrete 10 5 50 3 30 5 50 0 0 0 0 17 170 0 0 0 0 2 20 0 0 2 20 0 0 0 0 3 30 3 30 0 0 40

8 Slum Measurement 15 5 75 3 45 5 75 0 0 0 0 17 255 0 0 0 0 2 30 0 0 2 30 0 0 0 0 3 45 3 45 0 0 40

9 Concrete Cylinder 30 17 510 9 270 25 750 0 0 0 0 39 1170 0 0 0 0 6 180 0 0 3 90 0 0 0 0 7 210 4 120 0 0 110

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of concrete cyli 35 17 595 9 315 25 875 0 0 0 0 39 1365 0 0 0 0 6 210 0 0 3 105 0 0 0 0 7 245 4 140 0 0 110

GROUT/MORTAR TEST

12 Temperature of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 2 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

13 Casting of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 6 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6

14 Compressive strenght of Grout/Mortor 11 0 0 0 0 0 0 0 0 0 0 6 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6

WATER TESTING

15 pH water test 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ASPHALT TESTING

18 Asphalt Sample & Extraction & Gradation 95 1 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 1140 13

19 marshal stability & resistance to plastic flow / 200 1 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 2400 13

20 maximum theoretical specific graivity of asphal 148 1 148 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 1776 13

22 Asphalt Temp Monitoring 20 4 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 108 2160 112

23 MC & TC Sample with Test 100 1 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 600 7

24 Asphalt Coring 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1045 11

25 Density and Thickness of Asphalt Coring 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 715 11

IGMT SUMMARY DEC 2021


T Amount 1853 T Amount 2408 T Amount 1750 T Amount 0 T Amount 0 T Amount 8818 T Amount 0 T Amount 0 T Amount 1107 T Amount 0 T Amount 245 T Amount 0 T Amount 0 T Amount 530 T Amount 335 T Amount 9836
Approved

30914 277.95
VAT 15% VAT 15% 361.2 VAT 15% 262.5 VAT 15% 0 VAT 15% 0 VAT 15% 1322.7 VAT 15% 0 VAT 15% 0 VAT 15% 166.05 VAT 15% 0 VAT 15% 36.75 VAT 15% 0 VAT 15% 0 VAT 15% 79.5 VAT 15% 50.25 VAT 15% 1475.4

G Total 2130.95 G Total 2769.2 G Total 2012.5 G Total 0 G Total 0 G Total 10140.7 G Total 0 G Total 0 G Total 1273.05 G Total 0 G Total 281.75 G Total 0 G Total 0 G Total 609.5 G Total 385.25 G Total 11311.4

Grant Total previous 393686.4 previous 165564.35 previous 37300.25 previous 20322.8 previous 952.2 previous 27395.3 previous 1415.65 previous 6195.05 previous 9007.95 previous 10972.15 previous 0 previous 6364.1 previous 16601.4 previous 402.5 previous 0 previous 0

727094 Total Amt 395817.35 Total Amt 168333.55 Total Amt 39312.75 Total Amt 20322.8 Total Amt 952.2 Total Amt 37536 Total Amt 1415.65 Total Amt 6195.05 Total Amt 10281 Total Amt 10972.15 Total Amt 281.75 Total Amt 6364.1 Total Amt 16601.4 Total Amt 1012 Total Amt 385.25 Total Amt 11311.4

Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
IGMT SUMMARY Jan 2022

ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Al Jabel louis berger Platinum Northen sky NOM Al Suliya
Total
Unit
No. TEST Rate ACP Amount GBEC Amnt Madas Amnt Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt Taqeqe Amnt Al otaibi Amnt Al Jabel Amnt louis berger Amnt Platinum Amnt Sky High Amnt NOM Amnt Al Suliya Amnt

Field Density test

1 Field Density test 23 38 874 45 1035 0 0 0 0 5 115 713 16399 2 46 0 0 27 621 0 0 67 1541 0 0 0 0 0 0 0 0 0 0 897

SOIL TESTING

2 Modified Proctor Value 128 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Washed Sieve Analysis 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Liquid Limit Plastic Limit And Plastic 92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 California Bearing Ratio 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Plate Load Test 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CONCRETE TEST

7 Temperature measurement of concr 10 8 80 0 0 3 30 0 0 0 0 25 250 1 10 0 0 3 30 0 0 6 60 0 0 0 0 2 20 28 280 0 0 76

8 Slum Measurement 15 8 120 0 0 3 45 0 0 0 0 24 360 1 15 0 0 3 45 0 0 6 90 0 0 0 0 2 30 29 435 0 0 76

9 Concrete Cylinder 30 18 540 0 0 16 480 0 0 0 0 60 1800 2 60 0 0 5 150 0 0 12 360 0 0 0 0 11 330 56 1680 0 0 180

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of co 35 18 630 0 0 16 560 0 0 0 0 60 2100 2 70 0 0 5 175 0 0 12 420 0 0 0 0 11 385 56 1960 0 0 180

GROUT/MORTAR TEST

12 Temperature of Grout/Mortor 11 0 0 0 0 2 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

13 Casting of Grout/Mortor 11 0 0 0 0 3 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

14 Compressive strenght of Grout/Mor 11 0 0 0 0 3 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

WATER TESTING

15 pH water test 10 0 0 0 0 0 0 0 0 0 0 2 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 0 0 2 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ASPHALT TESTING

18 Asphalt Sample & Extraction & Gradation 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 190 2

19 marshal stability & resistance to pla 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 400 2

20 maximum theoretical specific graivit 148 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 296 2

22 Asphalt Temp Monitoring 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 400 20

23 MC & TC Sample with Test 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 100 1

24 Asphalt Coring 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Density and Thickness of Asphalt Co 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Approv
IGMT SUMMARY Jan 2022 ed
T Amount 2244 T Amount 1035 T Amount 1203 T Amount 0 T Amount 115 T Amount 20989 T Amount 201 T Amount 0 T Amount 1021 T Amount 0 T Amount 2471 T Amount 0 T Amount 0 T Amount 765 T Amount 4355 T Amount 1386

41153 VAT 15% 336.6 VAT 15% 155.25 VAT 15% 180.45 VAT 15% 0 VAT 15% 17.25 VAT 15% 3148.35 VAT 15% 30.15 VAT 15% 0 VAT 15% 153.15 VAT 15% 0 VAT 15% 370.65 VAT 15% 0 VAT 15% 0 VAT 15% 114.75 VAT 15% 653.25 VAT 15% 207.9

G Total 2580.6 G Total 1190.25 G Total 1383.45 G Total 0 G Total 132.25 G Total 24137.35 G Total 231.15 G Total 0 G Total 1174.15 G Total 0 G Total 2841.65 G Total 0 G Total 0 G Total 879.75 G Total 5008.25 G Total 1593.9

Grant Total previous 395817.35 previous 168333.55 previous 39312.75 previous 20322.8 previous 952.2 previous 37536 previous 1415.65 previous 6195.05 previous 10281 previous 10972.15 previous 281.75 previous 6364.1 previous 16601.4 previous 1012 previous 385.25 previous 11311.4

768247 Total Amt 398397.95 Total Amt 169523.8 Total Amt 40696.2 Total Amt 20322.8 Total Amt 1084.45 Total Amt 61673.35 Total Amt 1646.8 Total Amt 6195.05 Total Amt 11455.15 Total Amt 10972.15 Total Amt 3123.4 Total Amt 6364.1 Total Amt 16601.4 Total Amt 1891.75 Total Amt 5393.5 Total Amt 12905.3

Approved By

QA/QC Manager

For further clarification Contact

Tariq.ismail@satco.sa
Subcon Deduction Details
Grand Total 727094.45

ACP GBEC Madas Initial Irrigation satco Aflak Maha Taqeqe Al otaibi Al Jabel louis berger Platinum Sky High NOM Al Suliya
ACP Amount Remark GBEC Amnt Remark Madas Amnt Remark Initial Amnt Irrigation Amnt satco Amnt Aflak Amnt Maha Amnt remark Taqeqe Amnt remark Al otaibi Amnt Al Jabel Amnt louis berger Amnt Platinum Amnt Sky High Amnt NOM Amnt Al Suliya Amnt

T
T Amount 395817.4 T Amount 168334 T Amount 39313 T Amount 20323 T Amount 952 T Amount 37536 T Amount 1416 T Amount 6195
Amount 10281 T Amount 10972 T Amount 281.75 T Amount 6364 T Amount 16601 T Amount 1012 T Amount 385.3 T Amount 11311

50% payment #
Deduction 5140.5 05

After
Deduciton 5140.5
Remaining

Note : Amount Include With VAT


Asphalt sampling,Asphalt
DATE OF Axtraction & Gradation
Work CONCRE &marshall stability,flow,& Temp of
RFI # Sub Con
order # TE density & maximum theoretical asphlat
POURING specific gravity & loss of
S/N stability after 24 hours
1 CIV-RFI-4201 5-Jun-21 Platinium
CIV-RFI-4202 261986 5-Jun-21 Platinium 1 8
2 CIV-RFI-4202 261991 6-Jun-21 Platinium 1 10
3 CIV-RFI-4202 261993 9-Jun-21 Platinium 1 7
4 CIV-RFI-4303 262253 12-Jun-21 Platinium 2
5 CIV-RFI-4341 262256 13-Jun-21 Platinium 1 8
6 CIV-RFI-4341 262258 14-Jun-21 Platinium 1 8
CIV-RFI-4369 262263 15-Jun-21 Platinium
7 CIV-RFI-4366 262263 15-Jun-21 Platinium 1 10
CIV-RFI-4394 262264 16-Jun-21 Platinium
8 CIV-RFI-4376 262264 16-Jun-21 Platinium 1 12
9 CIV-RFI-4474 262275 21-Jun-21 Platinium 1
10 CIV-RFI-4475 262275 21-Jun-21 Platinium
11 CIV-RFI-4476 262276 22-Jun-21 Platinium
12 CIV-RFI-4486 6/22/2021 Platinium 1 10
13 CIV-RFI-4487 262276 6/22/2021 Platinium
14 CIV-RFI-4488 6/22/2021 Platinium
15 CIV-RFI-4534 262204 6/24/2021 Platinium 2 2
16 CIV-RFI-4640 262308 6/30/2021 Platinium
17 CIV-RFI-4725 262319 7/6/2021 ACP
18 CIV-RFI-4751 262322 7/7/2021 ACP 1 8
19 CIV-RFI-4783 262323 7/8/2021 ACP 1 2
20 CIV-RFI-4773 262328 7/10/2021 Platinium
21 CIV-RFI-4833 262335 7/13/2021 ACP
22 CIV-RFI-4860 262336 7/14/2021 ACP 1 10
23 CIV-RFI-4861 262336 7/14/2021 ACP
24 CIV-RFI-4936 283453 7/24/2021 ACP
25 CIV-RFI-4940 283454 7/25/2021 ACP 1 8
26 CIV-RFI-4962 283458 7/26/2021 Platinium
27 CIV-RFI-4969 283460 7/27/2021 Platinium 1 7
28 CIV-RFI-5340 1019 8/23/2021 ACP
29 CIV-RFI-5350 1020 8/24/2021 1 3
30 CIV-RFI-5358 1021 8/25/2021 ACP 1 5
31 CIV-RFI-5387 1022 8/26/2021 ACP
32 CIV-RFI-5404 1023 8/28/2021 ACP 1 5
33 CIV-RFI-5404 1024 8/29/2021 ACP 3
34 CIV-RFI-5437 1025 8/30/2021 ACP
35 CIV-RFI-5470 1027 9/1/2021 ACP
36 CIV-RFI-5480 1028 9/2/2021 ACP 1 5
37 CIV-RFI-5509 1031 9/6/2021 ACP
38 CIV-RFI-5521 A 1032 9/7/2021 ACP 1 9
39 CIV-RFI-5604 1041 9/18/2021 ACP
40 CIV-RFI-5604 1042 9/19/2021 ACP
41 CIV-RFI-5893 1063 10/14/2021 ACP
42 CIV-RFI-5902 1064 10/16/2021 ACP 1 4
43 CIV-RFI-5913 1065 10/17/2021 platinum
44 CIV-RFI-5914 1065 10/17/2021 platinum 1 2
45 CIV-RFI-5908 1066 10/18/2021 ACP
46 CIV-RFI-5954 1067 10/19/2021 ACP 1 4
47 CIV-RFI-6027 1072 10/25/2021 ACP
48 CIV-RFI-6235 1072 10/25/2021 ACP

CIV-RFI-6038 1073 ACP


49 10/26/2021 1 5
50 CIV-RFI-6101 1078 11/1/2021 ACP
51 CIV-RFI-6115 1080 11/3/2021 ACP 1 6
52 CIV-RFI-6165 1082 11/6/2021 ACP
53 CIV-RFI-6187 1083 11/7/2021 ACP 1 4
54 CIV-RFI-6222 1086 11/10/2021 ACP
55 CIV-RFI-6244 1087 11/11/2021 ACP 1 5
CIV-RFI-6287 11/17/2021 ACP
56 1091
CIV-RFI-6288 11/17/2021 ACP
CIV-RFI-6301 11/18/2021
57 CIV-RFI-6302 1092 11/18/2021 ACP 2 10
CIV-RFI-6314 11/18/2021
CIV-RFI-6311 ACP
58 1093 11/20/2021 1 3

CIV-RFI-6312 Acp
11/20/2021

CIV-RFI-6318 ACP
11/21/2021 1 6
59
CIV-RFI-6342 ACP
11/21/2021
1094
CIV-RFI-6319

CIV-RFI-6319 ACP
11/21/2021

CIV-RFI-6326 11/22/2021 ACP 1 6


60 1095

CIV-RFI-6327 11/22/2021 ACP

CIV-RFI-6336 11/23/2021 ACP


61 1096
CIV-RFI-6337 11/23/2021 ACP 1 4

CIV-RFI-6356 11/24/2021
ACP
62 1097
CIV-RFI-6357 11/24/2021
ACP 1 4

CIV-RFI-6368 11/25/2021
ACP
63 1098
CIV-RFI-6369 11/25/2021
ACP 1 3

64 CIV-RFI-6355 11/29/2021
ACP 1 4
1101
CIV-RFI-6378 11/29/2021
ACP
65 CIV-RFI-6379 11/29/2021 ACP

CIV-RFI-6399 11/30/2021
ACP 1 3

1102
CIV-RFI-6400 11/30/2021
ACP 1 3
CIV-RFI-6411 11/30/2021 ACP

CIV-RFI-6415 ACP
12/1/2021
66 1103
66 1103
CIV-RFI-6416 ACP
12/1/2021 1 4
67 CIV-RFI-6419 1104 12/4/2021 Al Suliya 2 2

CIV-RFI-6461 12/8/2021 Al Suliya


68 1108
CIV-RFI-6462 12/8/2021 Al Suliya
1 10

CIV-RFI-6476 12/9/2021 Al Suliya


69 1109

CIV-RFI-6477 12/9/2021 Al Suliya


1 12

CIV-RFI-6489 1110 Al Suliya


70 12/11/2021

CIV-RFI-6502 1111 Al Suliya


71 12/12/2021 1 14

CIV-RFI-6513 1112 Al Suliya


72 12/13/2021 1 12

CIV-RFI-6526 Al Suliya
1113 12/14/2021 1 10

CIV-RFI-6529 Al Suliya
73 12/14/2021

CIV-RFI-6434 Al Suliya
1114 12/15/2021

CIV-RFI-6537 Al Suliya
74 12/15/2021 1 9

CIV-RFI-6552 1115 Al Suliya


75 12/16/2021 1 12

CIV-RFI-6572 1116 Al Suliya


76 12/18/2021 1
CIV-RFI-6475 1117 Al Suliya
77 12/19/2021 1 13

CIV-RFI-6593 ACP
1118
12/20/2021

CIV-RFI-6594 Al Suliya
78 12/20/2021 1 10

CIV-RFI-6622 1120 Al Suliya


79 12/22/2021

CIV-RFI-6700 1125 Al Suliya


78 12/28/2021 1 3

CIV-RFI-6820 1134 Al Suliya


79 1/8/2022 1

CIV-RFI-6831 1135 Al Suliya


80 1/9/2022 1 9

CIV-RFI-6935 1138 Al Suliya


81 1/12/2022 1 10

CIV-RFI-7217 2/5/2022 AL Solaya


81

CIV-RFI-7218 2/5/2022 AL Solaya


81 1158

CIV-RFI-7219 2/5/2022 AL Solaya


81

CIV-RFI-7240 2/6/2022 AL Solaya


81 1 3
1159
CIV-RFI-7243 2/6/2022 AL Solaya
81 1 3

CIV-RFI-7268 1162 AL Solaya


81 2/9/2022 2
CIV-RFI-7293 Al solaya
81 2/10/2022 2 6

CIV-RFI-7294 Al solaya
81 1163 2/10/2022

CIV-RFI-7295 Al jabal
81 2/10/2022

CIV-RFI-7296 Al jabal
81 2/10/2022

CIV-RFI-7302 Al jabal
81 2/12/2022 1 11
1164
CIV-RFI-7303 Al jabal
81 2/12/2022

CIV-RFI-7314 1165
81 2/13/2022 Al Solaya 1 8

CIV-RFI-7327
81 2/14/2022 Al Solaya

CIV-RFI-7333 1166
81 2/14/2022 Al Solaya

CIV-RFI-7335
81 2/14/2022 1 9

CIV-RFI-7358 1167
81 2/15/2022 Al Solaya 1 9

CIV-RFI-7364 1168 Al solaya 9


81 2/16/2022 2

CIV-RFI-7390 1171 Al solaya


81 2/20/2022 1 4

CIV-RFI-7391 1171 Al solaya


81 2/20/2022 1 3

CIV-RFI-7407 1172 SATCO


82 2/21/2022

CIV-RFI-7408 1173 SATCO


83 2/23/2022 1 6

CIV-RFI-7427 SATCO
2/24/2022 1 8
84 1174
84 1174
CIV-RFI-7432 SATCO
2/24/2022
Density &
MC & Asphalt
Thickness of Zone Description
TC Coring
asphlat core

A3 FootBall Field Visual inspection For spray MC1 Location F


A3 FootBall Field Asphalt Wearing Course Location FootBall F
A3 FootBall Field Asphalt Wearing Course Location FootBall F
A3 FootBall Field Asphalt Wearing Course Location FootBall F
1 A3-2 Cricket AreaVisual inspection For spray MC1 Location
A3 Cricket Area Asphalt Wearing Course Part 1 As Per highli
A3 Cricket Area Asphalt Wearing Course Part 2 As Per highli
1 A3-2 Cricket AreVisual inspection For spray MC1 Location
A3 Cricket Area Asphalt Wearing Course Part 3 As Per highli
1 A1 Volley Ball Visual inspection For spray MC1 Location V
A3-2 Cricket Are Asphalt Wearing Course Walk Way around
1 A1 Volley Ball Visual inspection For spray MC1 Location Vo
A1 Tennis Court Visual inspection For spray MC1 Location A1
1 A3 Basket Ball & Visual inspection For spray MC1 LocationA3
A1 Volley Ball Asphalt Binder Course Part 2 Location Volley
A1 Tennis Court Asphalt Binder Course Location Tennis Court
A3 Basket Ball &Asphalt wearing Course Location Basket Bal
Asphlat Trial MixAsphalt Trail Mix @ Al Waj
3 6 A3-4 Football ArCore test for asphalt Location A3-4 Football a
1 A1-1 Tamimi RoaVisual inspection For spray MC1 Location A
A1-1 Tamimi roa Asphalt Binder Course Location Tamimi road
A1-1 Tamimi roa Asphalt Binder Course Part 2 Location Tamim
3 6 A3-2 Cricket AreCore test for asphalt Location A3-2 Cricket A
1 BTW A1-5,4,3,2 Visual inspection For spray MC1 Main road
BTW A1-5,4,3,2 Asphalt Binder Cours Main road A2 Location
A1-1 Tamimi roaAsphalt Binder Cours Main road A1 Tamimi P
1 BTW A1-1 & A1-8Visual inspection For spray MC1 Location
BTW A1-1 & A1-8Asphalt Binder Course for Location BTW A1
A4-Tennis Visual Inspection of MC coat for location
1 A4-Tennis
A4-Tennis Asphalt Binder Course for location A4-Tenni
1 BTW A1 & A4 Visual inspection For spray MC1 Prior Asph
BTW A1 & A4 Binder Course Asphalt Location BTW A1 &
A4
BTW A1 & A4 Binder Course Asphalt Location BTW A1 & A4
1 BTW Zone A1 & Application of Prime Coat (MC1) Prior to A
BTW Tamimi & ABinder Course Asphalt Location BTW Tamimi
BTW Tamimi & ABinder Course Asphalt Location BTW Tamimi
1 Between A1&A4 MC1 Laying perior Asphalt layer between A
1 B/W A4 & A1 gatMC1 Laying perior Asphalt layer between A1
B/W A4 & A1 gatAsphalt Binder coarse layer between A1 & A4
1 A4-4 MC-1 on Base course A4-4 Car Parking And
Road B/W A4&TaAsphalt binder Course layer Part 1 As Per hig
7 A1-Tamimi road Core test for binder course location A1-1 &
4 A1-Tamimi road Core test for binder course location A1-1 &
1 Between A4-2,3&MC-1 Laying perior Asphalt layer Location A
inner road B/W po
Asphalt Base Course for location Between
1 A4 Tennis Court RC-2 on 1st Asphalt Course Base Course At la
A4 Tennis Court Asphalt Waring coarse on 1st Layer Asphalt
1 A4 Parking Mc-1 on Base course A4-4 Car Parking Roa
A4 PARKING AreaBinder Course Layer Asphalt Course Base
1 B/W A3&A4 Mc-1 on Base course Road between A3 &
A4 both side
5 5 tennis court, A4 Coring Test for second layer asphlat for tennis

Road B/W A4 & AAsphalt on Base course Road between A3 & A


1
1 Road B/W A1 & AMc-1 on Base course Road between Road B
Road B/W A1 & AAsphalt Base Course on Base course Road
1 Road B/W A1 & AMc-1 on Base course Road between Road B
Road B/W A1 & AAsphalt on Base course Road between Roa
1 Between A1 & AVisual Inspection of Application MC-1 For
A1&A2 Asphalt Base Course for Road location B/W
A1&A2 MC 1 for Road location B/W A1& A2
1 A4-4 Road MC 1 for Road location B/W A4-4 Road
A1&A2 Asphalt for Road location B/W A1& A2
A4 Asphalt for Road location B/W A4-4 Road
B/w A4 & A1 Asphalt Course wearing course ACWC Road
B/w A4 & A1, A4 Asphalt Course wearing course ACWC Road
& Parking location B/w A4 & A1, A4 Road

A4-4 Road PampRC 2 for Road location B/W A4-4 Road


1 Ramp
B/W A1-1 , A4 Asphalt Cource Wearing course ACWC for
Road location B/W A1-1 , A4 Parking
B/W A1-1 , A4 RC2 laying perior asphalt laying for Road
1 location B/W A1-1 , A4 Parking
aspahlt road core test for the asphalt road in A4, A3, &
A1 road as per highlighted drawing
aspahlt road core test for the asphalt road in A4, A3, &
6 5 A1 road as per highlighted drawing

B/W A1-1 , A4 & Asphalt Cource Wearing course ACWC for


Road location B/W A1-1 , A4 Parking & A4

1 B/W A1-1 , A4 & RC-2 for Road location B/W A1-1 , A4


Parking & A4
1 B/W A1-1 , A4 RC-2 Prior To Asphalt Wearing course For
Road location B/W A1-1 , A4 Parking
B/W A1-1 , A4 Asphalt Wearing course for Road Location
B/W A1-1 , A4 Parking
RC-2 for Road location B/W A1-1 , A4
B/W A1-1 , A4
1 Parking

B/W A1-1 , A4 Asphalt Cource Wearing course ACWC for


Road location B/W A1-1 , A4 Parking

B/W A1-1 , A3 RC-2 for Road location B/W B/W A1-1 , A3


1
Asphalt Cource Wearing course ACWC for
B/W A1-1 , A3 Road location B/W B/W A1-1 , A3
Asphalt Cource Wearing course ACWC for
B/W A4, A3
Road location B/W A4, A3

B/W A4 , A3 RamMC1 for Road At location B/W A4 , A3 Ramp


1 Sta 0+125.00 to 0+145.00
1 B/W A4, A3 RC-2 for Road location B/W B/W A4, A3
B/W A4, A3 Asphalt Cource Wearing course ACWC for
Road location B/W A4, A3
Asphalt course Base course for Road At
B/W A4 , A3 Ramlocation B/W A4 , A3 Ramp Sta 0+125.00 to
0+145.00
1 b/w A3 & A4 Rc 2 for road location B/W A3 & A4
b/w A3 & A4 ramRc 2 for road location B/W A3 & A4 Ramp
1
Asphalt Cource Wearing course ACWC for
b/w A3 & A4 ramRoad location B/W A4, A3 Ramp
sample test repormix desing of asphalt
road Tamimi sideRC2 laying on the road located at A1 tamimi
2 side road as per highlighted drawing
Asphalt coarse wearing coarse laying on the
road Tamimi sideroad located at A1 tamimi side road as per
highlighted drawing

B/w A1-1 and A1-RC 2 laying b/w A1-1 & A1-2 road and A1-
1 & A1-9 road as per highlighted drawing

asphlat coarse wearing coarse laying b/w


B/w A1-1 and A1-A1-1 & A1-2 road and A1-1 & A1-9 road as
per highlighted drawing

A2- Bus Parking Visual inspection For Spraying MC1 Prior


1 Asphalt Course LocationA2- Bus Parking
Asphalt Base coarse laying on the road
Bus Parking located at A2- Bus Parking as per
highlighted drawing
Asphalt Base coarse laying on the road
Bus Parking located at A2- Bus Parking as per
highlighted drawing
Asphalt Base coarse laying on the road
Bus Parking located at A2- Bus Parking as per
highlighted drawing

A2- Bus Parking Visual inspection For Spraying MC1 Prior


1 Asphalt Course LocationA2- Bus Parking

core test for the asphalt coarse wearing


aspahlt road coarse road in entrance gate 3, & A3-6 road
as per highlighted drawing
11
Asphalt Base coarse laying on the road
Bus Parking located at A2- Bus Parking as per
highlighted drawing
Asphalt Base coarse laying on the road
Bus Parking located at A2- Bus Parking as per
highlighted drawing
Visual inspection For Spraying MC1 Prior
Between A1-2, 5 Asphalt
& Course Location Between A1-2, 5 &
1 Utility Area As per Highlighted Area
Asphalt Base coarse laying For road
A2- Bus ParkingLocation A2- Bus Parking & Between A1-2,
5 & Utility Area as per highlighted drawing

RC-2 for wearing course in A3 basket ball


A3 & A1 tennis coand A1 tennis court volley ball court as per
highlighted drawing

Asphalt Base coarse laying For road


Between A1-2, 5 Location Between A1-2, 5 & Utility Area as
per highlighted drawing
MC1 laying located at utility area b/w solar
b/w solar and firearea and fire station as per highlighted
1 drawing
Asphalt Base coarse laying For road
fire station Location utility area fire station per
highlighted drawing
MC 1 laying for the road located at utility
fire station and area fire station and tanks road as per
1 highlighted drawing
asphalt base coarse for the road located in
fire station and utility area fire station towards the tanks
solar side road as per highlighted drawing
asphalt base coarse for the road located in
fire station and utility area fire station towards the tanks
solar side road as per highlighted drawing Pt.
2

B4 MC 1 laying for the road located at B4 inner


1 road as per highlighted drawing
B4 MC 1 laying for the tennis court located at
1 B4 as per highlighted drawing
MC 1 laying for the road located at Utility
utility area area Control room A1 Side as per
1 highlighted drawing

B4 asphalt Wearing coarse for the tennis court


located in B4 as per highlighted drawing
B4 inner road Asphalt binder course course location B4
Inner road

B4-outer road parMC1 laying for road located at B4 outer road


parking area as per highlighted drawing
1
inner road asphalt binder coarse laying located at B4
inner road as per highlighted drawing
asphalt binder coarse laying located at B4 car
car parking main parking main road 01B as per highlighted
drawing

inner road concrete pouring for the walkway located at


B4 inner road as per highlighted drawing
inner road compaction test for the walkwas located at
B4 inner road as per highlighted drawing
road 01 asphalt binding coarse laying located at B4
road 01 as per highlighted drawing
road 01 MC1 laying located at B4 road 01 as per
1 highlighted drawing
asphalt coarse binding coarse laying located
parking side roadat B4 parking side road # 1 as per
highlighted drawing

near guard houseMC1 laying located in B/w B4 & A4 near


1 guard house as per highlighted drawing
road & car parkinMC1 laying located at B4 & B3 road & car
1 parking as per highlighted drawing
car parking road asphalt coarse binder coarse located at B4
car parking road as per highlighted drwaing
asphalt coarse base coarse laying located in
near guard houseB/w B4 & A4 near guard house as per
highlighted drawing
asphalt coarse base coarse laying located in
road b/w B4 & B3 road as per highlighted
drawing
asphalt coarse base coarse layer for the road
in front of commelocated in B/w B4 & B3 in front of
commercial building as per highlighted
drawing
asphalt coarse base coarse layer for the road
near to control r located in utility area utility area as per
highlighted drawing
MC1 laying for road located in B/w A2, B2
road # 16 & road & A3 road # 16 & road #9 as per highlighted
1 drawing
asphalt laying for road located in B/w A2,
road # 16 & road B2 & A3 road # 16 & road #9 as per
highlighted drawing

road #9 asphalt laying for road located in A3 road #9


as per highlighted drawing
road #15 MC1 laying for the road located in A2 road
1 #15 as per highlighted drawing
air voids
Voids in minoral
Asphalt Content Air voids filled with marshall stability flow
aggregate
asphalt

- -
- - 69.2% 1483 3.2
- -
- -
- - - - -
- -
- -
- -
- -
- -
- -
- - - - -
- - - - -
- -
- -
- -
- -
- -
- -
- - - - -
- - 67.8% 1522 2.8
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - - - -
- - 1264 2.7
4.8% 4.4% 64% 1331 2.9%
- -
- - 1517 3.2
- - 1517 3.2
- - - - -
- - - - -
4.7% 4.1% 67% 1618 2.7%
- - - -
4.8% 4.4% 62% 1474 2.6%
- -
- -
- - - - -
5.0% 4.3% 67% 1514 2.9%
- - - - -
5.3% 4.2% 64% 1384 2.8%
- - - - -
5.4% 4.4% 68% 1408 3.2%
- - - - -
- - - - - -

5.4% 4.3% 66% 3.2%


1374
- - - - -
5.5% 4.0% 69% 1389 3.0%
- - - - -
4.9% 4.5% 66% 1354 2.9%
- -
5.8% 4.3% 65% 1415 3.8%

5.40% 4.20% 67.00% 1345 2.80%


5.80% 4.70% 68% 1395 2.80%
5.10% 4.20% 68% 1382 3.20%

5.20% 4.10% 67% 1433 2.60%

5% 4.20% 64% 1358 3.10%

5.30% 4.40% 68% 1489 3.40%

5.20% 4.20% 67% 1389 3.20%

5.10% 4.30% 66% 1328 2.70%

5.20% 3.70% 64% 1487 3.20%

5% 4.40% 68% 1458 3.30%

5.60% 4.0% 64% 1384 3.20%


5.4% 4.5% 68.1% 141400.0% 3.0%
5.3% 4.10% 6.5% 153800% 2.9%

4.8% 4.2% 67.3% 148300.0% 2.8% 14.7

0.05 4.40% 69.30% 1574 2.60%

4.5% 4.7% 67% 1446 2.7% 14.30

5% 4.18% 63.0% 1457 3.3% 14.70

4.5% 3.95% 69% 1417 3.4% 15.20

6.0% 380% 6800% 1475 270% 1590%

5.4% 410% 6710% 1437 290% 1630%


5.1% 430% 6500% 1472 300% 1570%

6.1% 460.0% 6400% 1384 340.0% 1640.0%

5.6% 4.0% 66% 1462 3.2% 16.1%

5.5% 4.7% 64.6% 1457 3.2% 14.7%

5.2% 4.4% 65% 1404 3.0% 15.7%


Marshall
loss of bulk
MC & RC Compaction Thickness of
stability specific
L/M2 of Core test asphlat core
after 24 gravity
hours

1930% 2.42

- - 0.81 - -

- - 0.77 - -
- - 0.77 - -

- - 0.79 - -
18.1% 2.41
- - 0.64 - -
24.6 2.394
24.4% 2.415% - - -
0.82
24.7 2.432
24.7 2.434
- - 0.834 - -
- - 0.875 - -
24.9% 2.407% -
- - 0.8
25.1% 2.513% -
97.9,99.9,97.7,
100.4,99.6,96.7,96.3
- - 1.53 - -
23.0% 2.421% - - -
- - 1.55 - -
24.2% 2.407%
- - 1.45 - -
24.4% 2.413% Sample of MC
- - 1.05 - -
96.5,96.7,98.2,
- - - 96.7 -

23.9% 2.402%
- - 0.98 - -
23.7% 2.418%
- - 0.845 - -
24.6% 2.427%
1.43
24.80% 2.421%
0.79
0.79

23.70% 2.423%
21.70% 2.409%
25% 2.398%

0.7

24.60% 2.410

98.1,97.5,96.6,
97.8,96.8

24.80% 2.397

23.90% 2.407

24.40% 2.408

24.50% 2.396

24.10% 2.403

24.30% 2.399

23.90% 2.428
17.20% 2.93
15.6% 2.425

0.88

24.4% 2.42

0.92

16.70% 0.02

0.96

24.3% 2.43

23.6% 2.44

23.3% 2.44

0.82

96.2,96.7,96,95
.5,95.7,95.3,96.
2,96.6,95.4,96, 65,73,69,72,67
95.3 mm

2440% 244%

2450% 244%

0.99
2430% 244%

work
order MC
tempratu
re ?????

2480.0% 242.6%

0.94

24.8% 2.4%

23.8% 2.45%

22.1% 2.4%
E

221744
Electrical Resistivity earth Test
3/1/2020 ERT TEST 30
Re Test 7
WO#

261866
261799
250005
262301
1058
1069
1085
1085
1085
Soil Sample Test
Location Point Date Proctro Value
A1 Sub Grade 1 1/14/2020 2.074
B1 Sub Grade 1 1/14/2020 2.085
A4 Sub Grade 1 4/18/2020 2.12
Sub Base Stock Pile 1 1/4/2020 2.253
Sub Base Stock Pile 1 4/30/2020 2.273
Sea Sand Prior For Sand Bedding 1 6/7/2020 1.914
LandScap Area 1 10/5/2020 2.082
Soil Sample for Plantation 1 11/28/2020
Soil Sample for Plantation 1 12/17/2020
Sand Sample for Plastering (Initial) 1 1/7/2021 Pass
Soil Sample for Plantation (SATCO Irrigation) 3 3/7/2021 Pass
Soil Sample for Plantation (SATCO Irrigation) 2 3/9/2021 Pass
Base Course Sample (ACP) 1 3/31/2021 Fail
Base Course Sample (ACP) 1 4/6/2021 Fail
Base Course Sample (ACP) 1 4/12/2021 Fail
Base Course Sample (ACP) 1 5/9/2021 Fail
Base Course Sample (ACP) 1 5/10/2021 2263
Base Course Sample (ACP) 1 5/17/2021 2272
Base Course Sample (ACP) 1 6/29/2021 2.296
Base Course Sample (SATCO) Source Bada 1 10/9/2021 2.284
Base Course Sample (SATCO) B4 Stock pile 1 10/21/2021 2.197
sand sample for ligting station 1 1 11/9/2021 1.901
base course sample 01 1 11/9/2021 2.276
base course sample 02 1 11/9/2021 2.289
Moister CBR

Abolation
5.6
5.8

5.1
7.1 112
6.3
6.1 only proctor test
7.4
7.2
Plate Bearing Test
Work Final
RFI# Location Point Load kpa Less than Date Status
order # Sattlement
CIV-171 Al Otibi B1-10 1 200 <25mm 0.89 5/11/2020 Pass
CIV-266 Acp A3-1 1 200 <25mm 1.51 6/11/2020 Pass

CIV-503 acp A1 Mosque , A2 Dinning Hall & ware house 3 200 7/18/2020 Pass

CIV-RFI-619 Acp A2 Block-Kichen & dinning area 1 200 7/26/2020 Pass


CIV-RFI-651 Al Otibi B1- Block 04 1 200 7/28/2020 Pass
CIV-RFI-968 Acp A1-1 1 200 8/2/2020 Pass
CIV-RFI-1101 Al Otibi B1-3 1 200 9/6/2020 Pass
CIV-RFI-1205 Al Otibi B1 Block 01 & 02 2 200 9/14/2020 Pass
CIV-RFI-1343 Acp Zone B1 Block 5 1 200 9/27/2020 Pass
CIV-RFI-1409 Acp Zone B1 Block 7 1 200 10/1/2020 Pass
CIV-RFI-1420 Acp Zone A3- Block 5 Dining Hall & Kitchen 1 200 10/3/2020 Pass
CIV-RFI-1434 Acp Plate Bearing Test Location Zone B1 Block 11 & 12 2 200 10/4/2020 Pass
CIV-RFI-1482 Acp Plate Bearing Test Location Zone B1 Block 8 & 9 2 200 10/5/2020 Pass
CIV-RFI-1474 Acp Plate Bearing Test Location A1- Block 02 1 200 10/8/2020 Pass
CIV-RFI-1558 Acp Plate Bearing Test Location A1- Block 07 & 08 2 200 10/18/2020 Pass
CIV-RFI-1568 Acp Plate Bearing Test Location A1- Block 06 1 200 10/19/2020 Pass
CIV-RFI-1749 Acp Plate Bearing Test For Dining Hall & Kitchen Location B3- Block 05 1 200 11/9/2020 Pass Released for payment
CIV-RFI-1818 Acp Plate Load Test B2 Dining Hall & Kitchen Type C & D 1 200 11/17/2020 Pass Released for payment
<25mm
MIR # 03 MIR # 05 MIR # 06 MIR # 07 MIR # 09

HDPE PIPE HDPE Total QTY


MM QTY MM QTY MM QTY MM QTY MM QTY MM QTY
20mm 20mm 20mm 20mm 300 20mm 20mm 300
25 MM 100 25 MM 25 MM 900 25 MM 25 MM 25 MM 1000
32 MM 600 32 MM 32 MM 100 32 MM 200 32 MM 32 MM 900
40MM 200 40MM 40MM 1000 40MM 100 40MM 500 40MM 1800
50MM 600 50MM 50MM 300 50MM 200 50MM 1000 50MM 2100
63MM 500 63MM 63MM 500 63MM 200 63MM 200 63MM 1400
75MM 200 75MM 75MM 600 75MM 200 75MM 500 75MM 1500
90MM 500 90MM 90MM 200 90MM 400 90MM 1100
110MM 100 110MM 110MM 200 110MM 100 110MM 400
125MM 100 125MM 100 125MM 200

UPVC UPVC Total QTY


MM QTY MM QTY MM QTY MM QTY MM QTY MM QTY
75X3.6 50 75X3.6 75X3.6 25 75X3.6 25 75X3.6 75X3.6 100
110.5.3 150 110.5.3 110.5.3 100 110.5.3 100 110.5.3 125 110.5.3 475
160X7.7 160X7.7 125 160X7.7 100 160X7.7 100 160X7.7 100 160X7.7 425
200X9.6 49 200X9.6 200X9.6 40 200X9.6 50 200X9.6 200X9.6 139

Chamber DN 600 Chamber Total QTY


MM QTY
DN-600 69 69
Ref # Description QTY
234201 water sample 1
246038 TDS 2
246038 PH Value 2
234212 Plantation soil test 2
1001 PH Value & TDS 1+1
1136 PH Value & TDS 2+2
Date
7/5/2020
8/22/2020
8/22/2020
10/1/2020
7/29/2021
1/10/2022
IGMT SUMMARY Jan 2022
ACP GBEC Madas Irrigation satco Aflak Taqeqe Al Jabel Sky High NOM Al Suliya
Total
No. TEST Unit Rate ACP Amount GBEC Amnt Madas Amnt Irrigation Amnt satco Amnt Aflak Amnt Taqeqe Amnt Al Jabel Amnt Sky High Amnt NOM Amnt Al Suliya Amnt

1 Field Density test 23 38 874 45 1035 0 0 5 115 713 16399 2 46 27 621 67 1541 0 0 0 0 0 0 897

7 Temperature measurement of concrete 10 8 80 0 0 3 30 0 0 25 250 1 10 3 30 6 60 2 20 28 280 0 0 76

8 Slum Measurement 15 8 120 0 0 3 45 0 0 24 360 1 15 3 45 6 90 2 30 29 435 0 0 76

9 Concrete Cylinder 30 18 540 0 0 16 480 0 0 60 1800 2 60 5 150 12 360 11 330 56 1680 0 0 180

10 Capping of concrete cylinder 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Compressive Test With Curing of concrete c 35 18 630 0 0 16 560 0 0 60 2100 2 70 5 175 12 420 11 385 56 1960 0 0 180

12 Temperature of Grout/Mortor 11 0 0 0 0 2 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

13 Casting of Grout/Mortor 11 0 0 0 0 3 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

14 Compressive strenght of Grout/Mortor 11 0 0 0 0 3 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

15 pH water test 10 0 0 0 0 0 0 0 0 2 20 0 0 0 0 0 0 0 0 0 0 0 0 2

16 Total dissolved solids 30 0 0 0 0 0 0 0 0 2 60 0 0 0 0 0 0 0 0 0 0 0 0 2

17 Sulphate Content 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

18 Asphalt Sample & Extraction & Gradation 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 190 2

19 marshal stability & resistance to plastic flo 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 400 2

20 maximum theoretical specific graivity of asp 148 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 296 2

22 Asphalt Temp Monitoring 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 400 20

23 MC & TC Sample with Test 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 100 1

24 Asphalt Coring 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Density and Thickness of Asphalt Coring 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

T Amount 2244 T Amount 1035 T Amount 1203 T Amount 115 T Amount 20989 T Amount 201 T Amount 1021 T Amount 2471 T Amount 765 T Amount 4355 T Amount 1386

IGMT SUMMARY Jan 2022 VAT 15% 336.6 VAT 15% 155.25 VAT 15% 180.45 VAT 15% 17.25 VAT 15% 3148.35 VAT 15% 30.15 VAT 15% 153.15 VAT 15% 370.65 VAT 15% 114.75 VAT 15% 653.25 VAT 15% 207.9

41153 G Total 2580.6 G Total 1190.25 G Total 1383.45 G Total 132.25 G Total 24137 G Total 231.15 G Total 1174.15 G Total 2841.65 G Total 879.75 G Total 5008.25 G Total 1593.9