HEAD LOSS CALCULATIONS

For Pumped Flow HazzeHf = (6.185*(V/C)^1.852)*(L/D^1.167)

No. From - To Flow Pipe dia C Actual Pipe Head Loss


m3/sec m Velocity Length m in pipe m
m/sec (Each)
A B C D E F

1 Sludge Pump Del. - SDB 0.01 0.20 100 0.44 80.00 0.14
2 Filtrate Feed Pump Del. - 0.01 0.15 100 0.39 40.00 0.08

12 MLD 1.17 0.59


For Gravity Flow DarcyHf = 4*F*L*V^2/(2*G*D)

No. From - To Flow Pipe dia f Actual Pipe Head Loss


m3/hr m Velocity Length m in each
m/sec (Each) pipe m
A B C D E F

1 Outlet chamber - Divisio 0.24 0.50 0.01 1.24 27.60 0.17


2 Division Box -- Distribut 0.24 0.50 0.01 1.24 42.00 0.26
3 Distribution box - Feed 0.41 0.65 0.01 1.22 31.00 0.15
4 UASB Feed box Distribut 0.41 0.65 0.01 1.22 45.00 0.21
5 UASB Reactors -- Final p 0.71 0.60 0.01 2.51 42.00 0.90
6 SDB - Filtarte pit 0.71 0.65 0.01 2.14 150.00 2.15
7 U.A.S.B. - Sludge main f 0.01 0.10 0.01 0.88 40.00 0.64
8 Final Poilshing Unit - Fi 0.71 1.00 0.01 0.90 4 0.01

For Channel Flow MannHf = ( V*N*L^(1/2)/((A/P)^(2/3))^2

No. From - To Flow Area of n Perimeter Actual Channel


m3/sec Channel of channel Velocity Length m
m2 m m/sec
A B C D E F

1 Screen channel 0.24 0.42 0.013 1.90 0.58 2


2 Detritor 0.24 3.24 0.013 5.40 0.08 3.6
3 Sequence Batch Reactor 0.24 69.00 0.013 26.90 0.00 27.6
4 Outlet channel of reactor 0.12 0.95 0.013 2.95 0.13 27.6
5 0.24 3.24 0.013 5.40 0.08
6 0.24 3.24 0.013 5.40 0.08
7 Final Poilshing Unit - Fi 0.71 0.72 0.013 2.40 0.98 150
8 Grit Channel - Outlet Ch 0.71 3.60 0.013 5.40 0.20 24

20 MLD

For Gravity Flow DarcyHf = 4*F*L*V^2/(2*G*D)

No. From - To Flow Pipe dia f Actual Pipe Head Loss


m3/hr m Velocity Length m in each
m/sec (Each) pipe m
A B C D E F

1 Outlet chamber - Divisio 0.42 0.80 0.01 0.83 8.00 0.01


2 Division Box -- Distribut 0.10 0.40 0.01 0.83 80.00 0.28
3 Distribution box - Feed 0.02 0.15 0.01 0.98 15.00 0.20
4 UASB Feed box Distribut 0.00 0.08 0.01 0.33 8.00 0.02
5 UASB Reactors -- Final p 0.42 0.90 0.01 0.66 20.00 0.02
6 SDB - Filtarte pit 0.00 0.15 0.01 0.00 145.00 0.00
7 U.A.S.B. - Sludge main f 0.00 0.10 0.01 0.00 40.00 0.00
8 Final Poilshing Unit - Fi 0.42 1.00 0.01 0.53 4 0.00

70 MLD
For Gravity Flow DarcyHf = 4*F*L*V^2/(2*G*D)

No. From - To Flow Pipe dia f Actual Pipe Head Loss


m3/hr m Velocity Length m in each
m/sec (Each) pipe m
A B C D E F

1 Outlet chamber - Divisio 0.42 0.80 0.01 0.83 8.00 0.01


2 Division Box -- Distribut 0.10 0.40 0.01 0.83 80.00 0.28
3 Distribution box - Feed 0.02 0.15 0.01 0.98 15.00 0.20
4 UASB Feed box Distribut 0.00 0.08 0.01 0.33 8.00 0.02
5 UASB Reactors -- Final p 0.42 0.90 0.01 0.66 20.00 0.02
6 SDB - Filtarte pit 0.00 0.15 0.01 0.00 145.00 0.00
7 U.A.S.B. - Sludge main f 0.00 0.10 0.01 0.00 40.00 0.00
8 Final Poilshing Unit - Fi 0.42 1.00 0.01 0.53 4 0.00
Nos. of Minor Total Head Hyd Discharge Discharge
obstructions Losses Loss Head m Req m head
Assumed m Provided m
G H I = (H+F) J K = (I+J)

3.00 0.01 0.16 6.00 6.16 15


3.00 0.01 0.09 7.80 7.89 15

Nos. of Minor Total Head Level diff Remark


Bends Losses Loss available
Assumed m m
G H I = (H+F) J

3 0.12 0.29 0.15 Safe


3 0.12 0.38 0.15
3 0.11 0.26 0.30
3 0.11 0.32 0.15
3 0.48 1.38 0.90
3 0.35 2.50 0.15
5 0.10 0.74 1.00 For normal oper. condition
0 0.00 0.01 0.20

Head Loss Level diff


in each available
Channel m m
G H

0.0008469 0.10
6.766E-06
1.648E-08 0.00
0.0003519 0.00
0
0
0.1223684 0.30
0.0002701 0.75

Nos. of Minor Total Head Level diff Remark


Bends Losses Loss available
Assumed m m
G H I = (H+F) J

3 0.05 0.07 0.15 Safe


3 0.05 0.33 0.50
3 0.07 0.27 0.30
10 0.03 0.05 0.20
3 0.03 0.05 0.90
3 0.00 0.00 2.00
5 0.00 0.00 1.00 For normal oper. condition
0 0.00 0.00 0.20

Nos. of Minor Total Head Level diff Remark


Bends Losses Loss available
Assumed m m
G H I = (H+F) J

3 0.05 0.07 0.15 Safe


3 0.05 0.33 0.50
3 0.07 0.27 0.30
10 0.03 0.05 0.20
3 0.03 0.05 0.90
3 0.00 0.00 2.00
5 0.00 0.00 1.00 For normal oper. condition
0 0.00 0.00 0.20