R2/3 = 1.785 m
1 x 1.785 x 1
V =
0.018 5000
= 1.402 m/sec
Tunnel
3.50
FSL
r = 3.75 0.25
θ
7.50
a = 3.742 a = 3.742
3.75
7.50
Cos θ = 0.250
3.750
Cos θ = 0.067
θ = 86.177 Degrees
a = 0.250 x Tanθ
= 3.742 m
2a = 7.483 m
Area of Triangle A1 = 0.5 x x 7.483 x 0.25
= 0.935 m2
Perimeter above FSL (P) = 2 * π * R *(ө/180) = 11.281 m
Area of sector (A2) = (π r^2/2)*(1/180)*2*ө = 21.151 m2
Area above FSL A2 - A1 = 21.151 - 0.935
= 20.216 m2
2
Area of flow in tunnel (A) 50.214 - 20.216 = 29.999 m
Perimeter ( P ) 26.781 - 11.281 = 15.500 m
Slope of the tunnel = 1 in 2085
Rugosity coefficient = 0.018
Velocity of in the tunnel = 1.890 m/sec
Discharge through the tunnel = 56.682 cumecs
1 TEL CALCULATIONS
A B C D
7.5 m Dia.
8.25 8.25
U/S D-Shape Tunnel D/S
Canal Canal
A B C D
25.000 3875.00 25.000
Plan
A
B
+279.071 Tunnel top
+279.053 C
+278.971 TEL D
+278.871
+277.194
+ 277.185
FSL +277.085
+277.012
+274.971 D-shape Tunnel
+274.871 1 in 2085
+273.085
+273.012
A B C D
3875.000 m
L- Section
FSL +278.971
4.000 0.50 : 1
+274.971
8.250
3.500
+279.053
4.000
+274.871
7.50
2
Area of flow in tunnel (A) = 29.999 m
2
Velocity head (V2 /2g) = 3.570 / 19.620
= 0.182 m
= 0.20 x 0.082
= 0.016 m
TEL @ section B-B = TEL @ section A-A - Loss due to contraction - Frictional loss
= 279.071 - 0.016 - 0.002
= +279.053 m
FSL @ section B-B = TEL @ section B-B - Velocity head
= 279.053 - 0.182
= +278.871 m
Depth of flow in tunnel = 4.000 m
Tunnel invert level = +274.871 m
3.500
+277.012
4.000
+273.012
7.50
2
Area of Flow (A) = 29.999 m
Perimeter (P) = 15.500 m
Hydraulic mean depth ( R) = 1.935 m
Maning roughness co-efficient ( R) = 0.018
= 1.890 m / sec
Tunnel slope = 1 in 2085
2
Velocity head (V3 /2g) = 3.570 / 19.620
= 0.182 m
= 1.859 m
FSL +277.085
4.000 0.50 : 1
-+273.085
8.250
= 0.10 x 0.082
= 0.008 m
OVER BURDEN
GROUND LEVEL
TUNNEL TOP LEVEL
+270
+275
+280
+285
+290
+295
+300
+305
+310
+315
+320
+325
+330
+335
+340
+345
+350
+355
+360
+365
+370
+375
+380
+385
+390
+395
+400
+405
+410
+415
+420
+425
+430
+435
+440
+445
+450
+455
+460
+465
+470
+475
+480
+485
+490
+495
+500
+505
+510
+515
+520
+525
+530
+535
+540
+545
+550
+555
+560
+565
+570
+575
+580
+585
+590
+595
+600
+605
+610
+615
+620
+625
+630
+635
+640
+645
+650
+655
+660
+665
+670
+675
+680
+685
+690
+692
TUNNEL
225 363.702 274.763 282.263 81.439
SLOPE 1 in 2085
450 353.612 274.655 282.155 71.457
TUNNEL
1975 640.803 273.924 281.424 359.379
TUNNEL
2100 669.102 273.864 281.364 387.738
SLOPE 1 in 2085
2325 669.964 273.756 281.256 388.708
Title
Client
Scale
CLIENT
LEGEND:
NOTES:
GL
Vertical
TUNNEL TOP
TUNNEL BOTTOM
1 : 200
Horizontal 1 : 2500
1. ALL LEVELS ARE IN METRES, UNLESS OTHERWISE SPECIFIED.
+273.085
+274.971
+273.012
+274.871
Flow Flow
8250
8250
7500
7.5m Dia. D-Shaped Tunnel CL
CL
Flow
FSL
FSL
7500
0.5
4000
3750
Client
CBL GOVERNMENT OF ANDHRA PRADESH
WATER RESOURCES DEPARTMENT
7500 8250
PROJECT
GNSS LIFT SCHEME
Title
TUNNEL SCHEMATIC DRAWING
R=3750
indicate deformations exceeding the permissible limits.
3750
9. The steel for steel ribs shall conform to IS:808.
10. Steel ribs should be placed to the rock face.
7500 Dia
3750
Minimum
Excavation line
500
500
(Q >10)
75 Thk. Shotcrete
600 ISMB 300 @ 500 c/c 500 ISMB 300 @ 500 c/c 500
750
750
50
3750
3750
3750
7
R=3
R=3
R=3
3750
3750
Minimum Minimum
Excavation line Excavation line Excavation line
7500 7500
7500
300
500
500
300
300
500
500
300
600
600
Client
GOVERNMENT OF ANDHRA PRADESH
WATER RESOURCES DEPARTMENT
PROJECT
(Q = 1 - 4) GNSS LIFT SCHEME
(Q = 4 - 10)
Title