Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Checklist SOP Thermometer Verification

Probe and Infra-red Thermometers


Month: _________________________
Deviation Deviation
Verification Remark or
S. No. Thermometer Code Area in Boiling in Melting
Date Action Taken
water Wet Ice

Accepted maximum deviation: Probe thermometer +/- 1°C; Infra-red thermometer +/- 2°C
Thermometers exceeding above deviation should be repaired or replaced.
To be performed by QA (fortnightly)
Verication done by: Quality Assur Sign: _____________________________
BLR/ID/SOP/01 Mar/21

You might also like