REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE IV-B
PALAWAN 3rd DISTRICT ENGINEERING OFFICE
PUERTO PRINCESA CITY

C.Y. 2021 PROJECT


DETAILED ENGINEERING PLAN FOR
WIDENING OF BRIDGE - MALINAO BR. (B00178PW)
ALONG PUERTO PRINCESA SOUTH RD
SECTION ID : S00032PW
LOCATION : PUERTO PRINCESA CITY
STATION LIMIT : K0027+162.00
BRIDGE LENGTH : 30.00 METERS
BRIDGE ID : B00178PW

SUBMITTED : RECOMMENDED : APPROVED :

IMELDA M. VALDESTAMON ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE


CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: D A TE : D A TE :
SUMMARY OF QUANTITIES INDEX OF DRAWINGS
ITEM NO. DESCRIPTION OUAKT1TT UNIT REMARKS □ RAW ING NO.
T IT L E
PROJECT PROFILE
S H E E T NO.
PART B CTHEfl GENERAL REQUIREMENTS
TITLE SHEET
PROJECT = WIDENING OF BRIDG E-
B5 PiojetlBlbfisnU Sign Beard 2,00 Each
B.7 (2) Occupafcnal Saletyand Healti Program 1.00 Lump sum 1
SUMMARY OF QUANTITIES AND INDEX OF DRAWINGS, PROJECT PROFILE, LOCATION PLAN AND VICINITY MALINAO BR. (B00178PW)
MAP
B a (2J Trafc Menegement 1.00 Lump sum 2 GENERAL NOTES
ALONG PUERTO PRINCESA SOUTH RD
B.9 ycbteaton/Demcbfaafcn 1.00 Lump sum 3 TOPOGRAPHIC PLAN
LOCATION PUERTO PRINCESA CITY
B 12 Removal and Relocator oTUililes 1.00 Lump sum A BRIDGE LAY OUT SHOWING GENERAL PLAN APPROPRIATION PhP 27,700,000.00
PART C EARTHWORK
5 GENERAL ELEVATION A M I BORING LOG TOTAL ESTIMATED COST PhP 27,700,000.00
100P)a2 kidividual Removal orTrees 301 -500 mmdia Small Each
15.00 6 SECTION SHOWING EXISTING BRIDGE A M3 WIDENING SOURCE OF FUND CY-2021 GAA - REGULAR
101(6) RemovalolStuckres and Obshiclon.Concrete 57.fi D Cubic Metei 7 FOUNDATION PLAN
INFRASTRUCTURE PROGRAM
103(2)3 Bridge Eicsvafan. Common Sol 827.00 Cube Metei fi A B U T ** NT AND FOOTING DETAILS
CLASSIFICATION BRIDGE
104(1) a EmfcanVmenltom road wayexcavator, Common Soil 1,168.00 Cube Meter
5 AB UT**NT AND WINGWALL DETAILS
I04{2]a EmfcanVmenltom Borrow, Common Sol Cubic Meter
LIMITS K0027+162.00
1,020.00 10 ABUTMENT. FOUNDATION, AND WINGWALL BAR BENDING DIAGRAM
PART D SUBBASE AfiC EASE COURSE BRIDGE LENGTH 30.00 M.
SECTION. ANCHOR BAR DETAILS. ANCHOR BAR SLOT DETAIL,
200 (1) Aggregate Subha se Course 334.00 Cubic Meter
11
ELASTDMERlC BEAR NG PAD PLAN NO. OF SPAN ONE (1)
FART E SURFACE COURSES SHEAR KEY DETAIL. SHEAR KEY SECTION, END BLOCK DETAIL, END BLOCK SECTION. RISER DETAIL PROJECT DURATION 225CD
12 RISER SECTION
Porta nd Cemenl Concrete Pavement (llii reinfarced) ELASTOMERIC BEARNG PAD
311 (1) e1 730.00 Square Meter
028m tick 14 days
13 TYPICAL REINFORCED CONCRETE PILE DETAIL
Pcrbrd Cemerl Conaete Pave men I (Renfaieed). 0 35
311 (2)h1 138.4A Square Meter GIRDER PI AN SHOWl NG DOWELS GIRDER ELEVATION SHOWING DIAPHRAGM DOWELS A STIRRUPS
m tlick 14 days 14a
GRDER SECTION. CABLE ELEVATION
FART F BRIDGE CONSTRUCTION GIRDER DIAPHRAGM, DECKSLAE
14b
SECTION AMD DETAILS
400(4)a1 Precasl Ccncrete Piles. tertiEhed(400mmx400 mm) 352.00 Mater
15a DECK SLAB REINFORCEMENT PLAN

400(14) Precasl Concrete Piles, driwn 352.00 Meter 15b DECK SLAB SECTION AND DETAILS, BAR BENDING DIAGRAM
400(16)s Tesi Piles, lirntshed and dritfin,4Q0x4O0mm 32.00 Meter 16 APPROACH SLAB SECTION AND DETAILS
400(20] Pie Shoes 24,00 Each 17 APPROACH SLAB EAR BENDING DIAGRAM
I 01|2)h Conaete Ralrig Batster 60.00 Wetei 1fl DIAPHRAGM SECT ON AMD DETAILS
404(1)a Re rbiting Steel Bai. Glade <3C 18,141,70 Kfcgram 18 DIAPHRAGM BAR SENDI NG SCHEDULE
404(1)b Relnfcrcmg Steel Bar. Grade 60 20,764 BO Kilogram RAIL POST AND BALL US TER DETAILS. SIDEWALK DETAILS, DRAIN DETAILS, SIDEWALK BAR BENDING
20
DIAGRAM
<S05(1)b3 StucfcjrsI Concrete, Class *A‘ , 27.56 Mpa, 2B Days 250,00 Cubie Meter
^Q5(1)d3 StucBjralConcrete, Class ’A\36.0 Mpa, 28 Days Cubic Meter 21 TYPICAL CONCRETE SLOPE PROTECTION. GABION DETAILS
3.60
Presressea StueUral Concrete Members, 30.00m.. PCCP GENERAL NOTES
406(1)18 4.00 Each 22
T<rt3e W-B, IGrders TYPICAL DETALS OF PCCP AND DETAILS OF PAVEMENT MARKINGS
<11(2) Painl 300.00 Square Meter APPROACH PARAPET MARKINGS, ROAD SIGN DETAILS AND
23
GUARDRAIL DETAILS
412(1) Etasbrmerie Bearing Pads 8.00 Each
24 DPWH STANDARD PROJECT BILLBOARD AhC TRAFFIC MANAGEMENT PLAN
413(3)a PiemnHed Expansion JonlFiferiMti Sealant, 12mm 0.08 Cubic Meter &
25 TRAFFIC MANAGEMENT PLAN'
413(4)8 Expansion Joml 60.00 Linear Met l
26 MATERIAL SOURCE
PART G: CRANAGE AND SLOPE PROTECTION STRUCTURES
27 ROAD TYPICAL DETAILS
S0S(2]a Grouted Rprap,Class A 327.80 Cubic Meter
28 BRIDGE APPROACH PLAN AND PROFILE
510(2) Concrete Stape Pioteclon 488,30 Cubic Meter
29 ROAD CROSS-SECTIONS
511(1 )a3 Gabions, 1m X 1m x 2m MefeficCoated 320.00 Cubic Meter

/
30 ROAD CROSS-SECTIONS
517(1)a Drain Ppe. Galvanized 38.00 Linear Meter
31 ROAD CROSS-SECTIONS
PAPTH MISCELLANEOUS STRUCTURES
32 ROAD CROSS-SECTIONS
Mehl Guaidrail (Mefal Beam] hckiding Post Single, W-
603(3)a1 213.36 Linear Meter 33 ROAD CROSS-SECTIONS
Beam
34 RIVER PLAN AND PROFILE
603f4)b Wefel Beam Era Piece. But Nose 4.00 Each
35 RIVER CROSS-SECTIONS
Waning Skjns, SOfmm, W1-3A. Horizontal Aignmenl
605(1 )C1 2.00 Each 38 RIVER CROSS-SECTIONS
Curw L of R
Regulatery Signs , GDOmm. R4-1B. Speed Signs Speed 37 RiVER CROSS SECTIONS
G05(2)r2 2.00 Each
ResHefon (Maxrwm)
38 RIVER CROSS-SECTIONS
Rpgubtery Signs. 600mm, R64,(MBcelaneous Signs
60S(2)ag3 2.00 Each 39 RIVER CROSS-SECTIONS
Load and Dme/iskm Resfriclon Sgn)
605(6]e1 Haiard Matters. 450mm x 600mm, Chewon Sgns 40 RIVER CROSS-SECTIONS

607(3)a
kiems (y Iluminateri jSclar] Pavement Level ted Marker/
8.00

108.00
Each

Each
41 RIVER CROSS SECTIONS Sulu Sea
Sted Flush Type. Mono-Dreckral
<2 RIVER CROSS-SECTONS
612(1) Relecfcrced Hiemiopfesfc PavsmenlMarkiigs White 37.10 Squaie Meter
43 LONGITUDINAL EXPANSION JOINT DETAIL
612(2) Releetorteed Themiopksfc PavemenlMarkrgs Yelow 40.80 Square Meter 46 SOLAR STUDS PLAN AND DETAIL
NOTES:
T H E Q U A N T IT IE S OF A LL ITEM S OF W O R K A R E S T IL L S U B JE C T T O C H A N G E PER A C T U A L FIELD R E Q U IR E M E N T S .

THE SITE

THIS SITE
9°41'28.75,IN,
118o41'52.10"E
O C A T IO N P -.N
NOT TO S C ALE

PROJECT NAME AND LOCATION SHEET CONTENTS : DRAFTED/PREPARED RECOMMENDED:


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B L IC W O R K S A N D H IG H W A Y S DETAILED ENGINEERING PLAN FOR
S U M M A R Y O F Q U A N T IT IE S ,
R E G IO N A L O FFIC E IV-B W ID E N IN G O F 8 R ID G E -
P A L A W A N 3R D M A LIN A O BR {B 00178P W ) IN D E X OF D R A W IN G S
A LO N G P U E R T O P IN C E S A S O U T H RD P R O J E C T P R O F ILE , L O C A T IO N PLAN REYNARD G. LAGASCA ALBERT > t JONSON JR IMELDA M. VALDESTAMON ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E
PUERTO PRINCESA CITY. PALAWAN > • CHIEF. PLANNING AN D D E SIG N SEC TIO N OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PUERTO PRINCESA CITY
A N D V IC IN IT Y M AP V l‘> '
DATE / ' DATE: DATE:
GENERAL NOTES
CONSTRUCTION
SYMBOLS
1. IN THE INTERPRETATION OF DRAWINGS, INDICATED DIMENSIONS SHALL 1. SETTING OUT DIMENSIONS FOR STIRRUPS AND TIE HOOKS
GOVERN ALL DIMENSIONS, DISTANCES AND SIZES SHALL NOT BE SCALED
FOR CONSTRUCTION PURPOSES. THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENTS LINE OF SYMMETRY IDENTIFICATION
OR SIMILARITY "Sy m b o l
OF THE STRUCTURE SHALL BE APPROVED BY THE ENGINEER PRIOR TO
2. UNLESS OTHERWISE INDICATED, ALL DIMENSIONS AND MEMBER SIZES ARE THE START OF ANY CONSTRUCTION WORK. f 2 '\
A
TITLE TARGET
IN MILLIMETERS.

DESIGN CRITERIA 2. REINFORCED CONCRETE /


d NORTH ARROW
d
1. DESIGN SPECIFICATION
« * M O O ft
a. CONCRETE MIX AND PLACING
1. DPWH Design Guidelines, Criteria and Standards, Volume 5 - Bridge Design, 2015 PIN DIAMETER D = fid FOR 0 1 0 THRU 0 25
D = fid FOR Q2B 0 3 2 AND 036 SUB TITLE TARGET
2. DPWH LRFD BRIDGE SEISMIC DESIGN SPECIFICATION (BSDS) 2013)
(1) DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE INDICATION OF ELEVATION
<? V s ilJ ,
2 LOADING
LIMITS OF DIMENSION
a. DEAD LOAD WEIGHT OF THE STRUCTURE AND 1.05 kN/m * (2) CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN
ALLOWANCE FOR FUTURE WEARING COURSE. c. CONCRETE COVER TO REINFORCEMENT SECTION IN WATER
ACCORDANCE WITH THE SPECIFICATIONS.
b. LIVELOAD : SECTION TARGET
(1) AASHTO HL-93 TRUCK AND EQUIVALENT LANE LOADING. CONCRETE COVER TO REINFORCEMENT SHALL BE 50mm UNLESS SECTION IN EARTH
(3) FOR CONCRETE DEPOSITED AGAINST THE GROUND, LEAN CONCRETE
(2) SIDEWALK LL : 4.07 kPa SHOWN OTHERWISE ON DRAWINGS.
WITH A MINIMUM THICKNESS OF 50mm SHALL LAID FIRST BEFORE
{3) ALTERNATE MILITARY LOADING: SECTION IN STRUCTURAL
INSTALLING THE REINFORCEMENT. THIS LEAN CONCRETE SHALL NOT i'. > -
STEEL
107 kN i 07kN BE CONSIDERED IN MEASURING THE STRUCTURAL DEPTH OF d. CONSTRUCTION JOINT DETAIL REFERENCE
CONCRETE SECTION.
(I)_ (1) THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE
i SECTION IN CONCRETE

AS SHOWN ON DRAWINGS OR AS AGREED WITH THE ENGINEER.


1.22 m. {4] THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL
PLACING SEQUENCES FOR ALL CONCRETING WORK. CONCRETE STRUCTURE BUNDLED BARS
|4] P E R M IT DESIGN LIVE LOAD (SPECIAL PERMIT REQUIRED BEFORE (2) THE INTERFACE BETWEEN THE FIRST AND SECOND POUR
PASSING THE B R ID G E ):
CONCRETES SHALL BE ROUGHENED WITH AN AMPLITUDE OF 6mm ELASTOMERIC BEARING PAD
116 kN 107kN 107kN 107kN 107kN 1C7kN 1()7kN MINIMUM.
b EAR FENDING, SPLICING AND PLACING
0 ROUND

(1) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL


e FALSEWORK III B TUMINOUS WEARING
SURFACE ON BRIDGES
,
SQUARE
4 Prim 1.37m 4.11m J H ol . 4,11m ,1.37m. AT
OF SHOP DRAWINGS INDICATING THE BENDING, CUTTING. SPLICING PLAN VIEW AND ELEVATION
t IM PA C T
AND INSTALLATION OF ALL REINFORCING BARS
ALL FALSEWORK SHALL BE DESIGNED BY THE CONTRACTOR
SUBJECT TO THE APPROVAL BY THE ENGINEER.
FTWFl OF CUT & FILL SLOPES
IN ACCORDANCE WITH DIVISION 1 OF AASHTO SPEC. CENTERLINE
d SEISMIC LOAD : PLAN VIEW OF SLOPE
(2) BARS SHALL BE BENT COLD. BARS PARTIALLY EMBEDDED IN f. FORMWORK PL PLATE
PROTECTION
IN ACCORDANCE WITH DIVISION 1A OF THE 1992 AASHTO IN CONCRETE SHALL NOT BE FIELD BENT UNLESS PERMITTED BY
L ANGLE SHAPE
STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES USING THE ENGINEER
ACCELERATION COEFFICIENT OF 0.4 FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT PLAN VIEW OF GROUTED C C C lo C
YIELD UNDER THE LOAD AND SHALL BE SUCH AS TO AVOID THE
r o ir o RIPRAP ON SLOPE
m. LOAD COMBINATION ■ (3) BAR SPLICING NOT INDICATED ON DRAWINGS SHALL BE SUBJECT
FORMATION OF FINE. ALL CORNERS OF CONCRETE MEMBERS
(1) GROUP = 1.3 (1.0 D + 1.67<L+I]n + 1.0 SF] TO THE APPROVAL OF THE ENGINEER. SHALL BE CHAMFERED TO 20mm UNLESS NOTED OTHERWISE ON
(2) GROUP IB = 1.3 [1.0 D + 1.0 (L+I)p + 1.0 SF] DRAWINGS. STRIPPING OF FORMS AND SHORES SHALL BE AS
(3) GROUP VII = 1,0 (1.C D + 1 0 SF + EQ]
W HERE:
D = DEAD LOAD
(4) WELDED SPLICES, IF APPROVED BY THE ENGINEER. SHALL DEVELOP
IN TENSION AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH
OF THE BARS
DESIGNATED BY THE ENGINEER. THE FOLLOWING MAYBE USED AS
A GUIDE:

MIN. TIME
ABBREVIATIONS
<L + l)n = AASHTO TRUC M -AN E/ALT MILITARY LOADING PLUS IMPACT SHORING UNDER GIRDERS. BEAMS. FRAMES ................................. 14 DAYS
INCLUDING SIDEWALK LL W/O IMPACT (5) NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL ABT ABOUT kPa KILOPASCAL
DECK SLABS ................................................................. 14 DAYS
BE SPLICED. ABUT ABUTMENT m METER
(L + l)p = PERMIT LIVE LOAD PLUS IMPACT INCLUDING SIDEWALK LL W A L L S ....................................................................
W /O IMPACT 7 DAYS BEG BEGINNING mm MILLIMETER
|6) UNLESS OTHERWISE SHOWN ON DRAWINGS, THE CLEAR DISTANCE COLUMNS...................................................................... 7 DAYS BET BETWEEN MAX MAXIMUM
SF = STREAMFLOW PRESSURE
BETWEEN PARALLEL BARS IN A LAYER SHALL NOT BE LESS THAN SIDES OF BEAMS AND ALL OTHER BOTT BOTTOM MFWL MAX. FLOOD WATER LEVEL
EQ = EARTHQUAKE OR SEISMIC LOAD
1.5 TIMES THE NOMINAL DIAMETER OF THE BAR NOR LESS THAN VERTICAL SURFACES ............ .................. ....................... BR BRIDGE MIN MINIMUM
MATERIALS BRG BEARING MO MIDDLE ORDINATE
1.5 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE. THE CLEAR
CLR CLEAR MPa MEGAPASCAL
1. CONCRETE DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm NOR g PROTECTION AND CURING OF CONCRETE
cm CENTIMETER N NEWTON
ONE BAR DIAMETER. THE BARS IN THE UPPER LAYER SHALL BE COL COLUMN NF NEAR FACE
UNLESS INDICATED OTHERWISE ON PLANS. THE CONCRETE CLASS AND PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER. CONCRETE SURFACES SHALL BE PROTECTED FROM HARMFULS Nn. NUMBER
CONC CONCRETE
STRENGTH SHALL BE AS FOLLOWS: EFFECTS OF SUN.WIND AND RUNNING WATERS AND SHALL BE CONST CONSTRUCTION O.C. ON CENTERS
KEPT DAMP FOR AT LEAST 7 DAYS. CONT CONTINUOUS O.W.L ORDINARY WATER LEVEL
28-DAY CYLINDER MAX. SIZE OF (7) CRANKED SPLICES
CTR CENTER PEJ PREMOULDED EXPANSION JOINT
STRENGTH COARSE
STRUCTURAL MEMBER CLASS DET DETAIL PVC POLYVINYL CHLORIDE
AGGREGATE 3 STRUCTURAL STEEL
MPa PSI CIAM DIAMETER PVI POINT OF VERTICAL INTERSECTION
mm | in . )
VERTICAL OFFSET DIAPH DIAPHRAGM OTY QUANTITY
MAX: d + 3 mm THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS
DWG DRAWING R RADIUS
CAST-IN-PLACE GIRDERS.
A — - FOR ALL STRUCTURAL STEEL WORK. THESE SHOP DRAWINGS SHALL EA EACH RC REINFORCED CONCRETE
SLABS, DIAPHRAGMS. 21 3045 20
WINGWALLS, BACKWALLS. (MOD) BE APPROVED BY THE ENGINEER BEFORE ANY FABRICATION EF EACH FACE RDWY ROADWAY
COPINGS, COLUMNS '2 d COMMENCES. ELEV ELEVATION REINF REINFORCEMENT
ENGR ENGINEER SDWK SIDEWALK
FOOTINGS A 21 3045 38
EQ EQUAL SL SLOPE
PRECAST R.C. PILE AA 28 4060 20 EW EACHWAY SP SPIRAL
THIN REINFORCED SECTIONS EXP EXPANSION SPCD SPACED
C 21 3045 12
RAILINGS AND RAILPOST EXT EXTERIOR SPCS SPACES
(fi) HOOKS AND BENDS
PRESTRESSED CONCRETE EXIST EXISTING STD STANDARD
P 35 5075 20
MEMBERS FF FAR FACE STIR STIRRUP
LEAN CONCRETE 50 DIMENSIONS OF 90 - DEGREE AND 180 - DEGREE HOOKS (a) CAMBER FOR REINFORCED CONCRETE SUPERSTRUCTURES WERE FTG FOOTING STA STATION
10 1450
DETERMINED BASED THE USE OF SHORINGS DURING CONSTRUCTION. GEN GENERAL STRUCT STRUCTURE
2 . REINFORCING STEEL HOR HORIZONTAL SYMM SYMMETRY
(b) CAMBER FOR COMPOSITE SUPERSTRUCTURES WITH PRECAST HW h ig h w a t e r THK THICK

(a) REINFORCING STEEL SHALL CONFORM TO AASHTO M31 (ASTM A615). PRESTRESSED GIRDERS WERE DETERMINED BASED ON UNSHORED INT INTERIOR TYP TYPICAL
GRADE 40. DEFORMED, WITH MINIMUM YIELD STRENGTH, CONDITIONS. INTERM INTERMEDIATE VAR VARIABLE
fy = 276 MPa (40,000 PSI). JT JOINT VERT VERTICAL
5 EMBANKMENT CONSTRUCTION SEQUENCE L LENGTH VOL VOLUME
(b) REINFORCING STEEL SHALL BE FREE OF MILL SCALES. OIL OR ANY PIN DIAMETER- D = 6d FOR 0 1 0 THRU 0 2 5 LG LONG W WIDTH
SUBSTANCES WHICH WILL WEAKEN THE BOND WITH CONCRETE. D = 8d FOR 02B. 032 AND 036 APPROACH EMBANKMENT SHALL BE CONSTRUCTED PRIOR TO DRIVING kg KILOGRAM w/ WITH
OF ABUTMENT PILES. kN KILONEWTON & AND

PROJECT NAME AND LOCATION SHEET CONTENTS : DRAFTEDl PREPARED: SUBMITTED : RECOMMENCED
REPUBLIC Of Tm£ pMIL0'Pl*£S
D E P A R T M E N T OF P U B L IC W O R K S A N D H IG H W A Y S DETAILED ENGINEERING PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F B R ID G E -
P A L A W A N 3R D M A LIN A C BR. (B0C 178PW )
G E N E R A L N O TE S REYNARD G LAGASCA IMELDA M. VALDESTAMON
D IS T R IC T E N G IN E E R IN G O F F IC E
A L O N G P U E R T O P IN C E S A S O U TH RD ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
PUERTO PRINCESA CITY. PALAWAN / ENGINEER i CHIEF PLANNING AN D D E SIG N SEC T IO N OIC. ASS STANTT C STRICT ENGINEER DISTRICT EN G IN E E R
PUERTO PRINCESA CITY
DATE: DATE.
TOPOGRAPHIC PLAN
SCALE 1:500

PROJECT NAME AND LOCATION SHEET CONTENTS: DRAFTEDt PREPARED RECOMMENDED •


REPUBLIC OF THE PHILIPPINES
D E P A R TM E N T OF P U B L IC W O R K S A N D H IG H W A Y S □ ETAILEC ENGINEERING PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F B R ID G E -
P A L A W A N 3R D M A L IN A O BR. (B 00 1 7 8 P W )
T O P O G R A P H IC P L A N ALBINO D. SOCRATES, JR.
A LO N G P U E R T O P IN C E S A S O U T H RD REYNARD G. LAGASCA ALBERTqjgJONSQN JR. IMELDA M. VALDESTAMON RO M M EL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E C H IE F PLANNING AND D E SIG N SE C T IO N OIC. ASSISTANT DISTRICT ENGINEER D STRICT ENGINEER
PUERTO PRINCESA CITY PUERTO PRINCESA CITY, PALAWAN
3*11 / DATE- DATE;
WIDENING OF WIDENING OF
APPROACH SLAB WIDENING OF BRIDGE APPROACH SLAB

v / / ^ v
/ / / ■■ . ■■■■ ■■

REMOVE AND REPLACE


EXISTING APPROACH SLAB

4 TO CITY PROPER
/ / / ' / / / ' . ' / / / / / S ' , / / ' / , 777 y / / o ? / /// y 7 2 7 7 Z Z Z ''■ / 7 7 / 7 7 7 7 '/ y / ' . / _ / / •'■ V / /
/ '
/ /

' 7 / / ' . > 7 7 ' . 7 7 7 . / / ' V 7 //j


REMOVE AND REPLACE
EXISTING APPROACH SLAB

/
___________

WIDENING OF WIDENING OF
WIDENING OF BRIDGE
APPROACH SLAB APPROACH SLAB

,* » — &

, BRIDGE LAY-OUT SHOWING GENERAL PLAN


SC ALE 1.100

JA ■ 4 T
O
f
REPUBLIC THE PWIL*»f>1M6S
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV-B
PROJECT NAME AMO LOCATION

DETAJLED ENGINEERING PLAN FOR


WIDENING OF BRIDGE-
SHEET CONTENTS DRAFTED / PWtPAHED

wIn s /
M N rrrs e RECOMMEMOEO « ' w M i l WO

BRIDGE LAY-OUT SHOWING


l f l l l PALAWAN 3RD MALINAO BR (B00178PW)
ALONG PUERTO PINCESA SOUTH RD GENERAL PLAN r e y I ^ ^ g^ a g a s c a A L B E R T O V iiO N S O N JR IMELDA M. VALDESTAMON ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
DISTRICT ENGINEERING OFFICE 7 V 44 J
• «njERTOPfliNcta*arr PUERTO PRiMCESA CITY. PALAWAN INGINCEH II CHIEF P1AMMNG AMO Ota*OM SECT.ON OIC. ASSISTANT DtBTRtCT FN&NEER 0*3,B»_’ 1«"-•»* 1• v ± y
OATl W f" DATE QATE ton
START OF BRIDGE END OF BRIDGE
BACK OF BACKWALL BACK OF BACKWALL
STA. = 27+162.00 STA. = 27+192.00
ELEV. = 10.36M ELEV. = 10.36M
N= 9°41'28.75"
E = 118°41'52.10"E \
\\ 30000
9400 9390 9400

ill! iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiimiiinnnniHioo /
tu tm rn c a tio m DESCRIPTION

CLAYEY SAND
POORLY-GRADED SAND
SILTY SAND
LOW PLASTICITY SILT
LOW PLASTICITY CLAY
HIGH PLASTICITY CLAY
CLAYEY GRAVEL
MEFl _WFl ‘HM SILTY GRAVEL
POORLY GRADED GRAVEL

MEFL

BOREHOLE 1 2100 1800 BOREHOLE 1


STA. 3 0 + 7 1 1 .0 0 STA. 30+ 7 3 1 .0 0
ELEV A T IO N = 5 .798 REINFORCED CONCRETE, SEE DETAIL-
ELEV A T IO N =5.728
W ATER LEVEL DEPTH=6M WATER LEVEL DEPTH=6M
TO BE TRIMMED
DEPTH SPT N BLOWS/30 cm . 2500 2700 DEPTH SPT N-BLOWS/30 cm .
0 20 40 60 m 0 20 4 0 60
\ R E IN F O R C E D C O N C R E T E , S E E D E T A IL

1 -
GC \ SC \
1

2 -
t 2
SC -
SP-SM
3 - 3
SP-SM Gray, BOULDERS
4 - 4 -

5 Gray, BOULDERS 5 - Gray, BOULDERS

6 6
SP-SM SP
7 - 7 -

8 -
8
SP Gray, BOULDERS
Li
9 9
Gray, BOULDERS Gray, BOULDERS
10 10

11 11
SP -
SP
12 12
Gray, BOULDERS SC
13 13 -

14 - SM 14 -
SM
15 15
SC-SM SC-SM
16 -
GENERAL ELEVATION AND BORING LOG 16 -
-
17 -
SCALE 1:100
17 -

DRILLING TERMINATED AT30.0m DRILLING TERMINATED AT 30.0m

PROJECT NAME AND LOCATION . SHEET CONTENTS DRAFTED I PREPARED RECOMMENDED


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B L IC W O R K S A N O H IG H W A Y S DETAILED EN G INE ER IN G PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F BR ID G E- G E N E R A L E L E V A T IO N
P A L A W A N 3RD M A LIN A O BR (BCC178PW )
A N D B O R IN G LO G REYNARD G LAGASCA IMELDA M. VALDESTAMON ALBINO D. SOCRATES, JR,
D IS T R IC T E N G IN E E R IN G O F F IC E
A L O N G P U E R T O P IN C E S A S O U TH RD ROMMEL P. AGUIRRE
PUERTO PRINCESA CITY PUERTO PR IN C ES A CITY. PALAW AN CHIEF. PLANNING AND DESIGN SECTION O C ASS STAtsT H.STRirT ENGINEER ClSTR'CT ENGINEER
DATE: DATE:
cc

I
11Q 0

= o c □ ID □
1150
-I I
C
/ = v _ j 9
y iMo 1250

■ I I S

' zz^zzzzzzn f / J i $ 0 0 $ $
<, > / / V / / ,'/ 7 // / /

W tw /y lm Z
s //A / / / s/ / / . * / / '§ § > , * * * * *
rTjrr'7 7 / 7 ’, 7 7 '7 , 7 /
4 TO CITY PROPER

N 7

■> 7 7 ^ , 7 7 ^ : / / > : -777


I 7A W M
I P *
*7*777777777? ,
/•

=□ c □ d □

J ✓/ > tI / / M
'. / / / ■. / */ 7. > § I i
J 900
4M W 0

-n
i
- n i
“ 15H"
[)
1H0
9
i

i g! 1250 1250

2100 1800 2500 2700


------- ™j

TO* I tO

- S t t M . 'S u B © ©
• . •

-s a w r © ©

___ _ AAUTA1

____. » * jT * i4 * a f \ FOUNDATION PLAN


f \ FOUNDATION PLAN i SCALE;------------------------------- T ” FOUNDATION PLAN
t t t e ------------------------------- r w
SCALE rw
W

PROJECTNAMEAhOLOCATION SHEETCONTENTS DRAFTEEi PRBPARED mmm RfCOUMEttEO «r» MO


U U HEPUBLICOf THEPMH^PINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERINGPLANFOR
I A t REGIONAL OFFICE W-B WIDENING OF BRIDGE-
A V i 'F f PALAWAN 3RD MALINAO BR <600178PW)
FOUNDATION PLAN J * * * ’ r z \
ALONG PUERTO PINCESA SOUTH RD re y n « A d g. la g a s c a A L B E R T O i^ J O N S O N JR IMELDA M. VALDESTAMON ALBINO D. SOCRATES. JR ROMMEL P. AGUIRRE
DISTRICT ENGINEERING OFFICE PUERTO PR'NCESACITY, PALAWAN 7 ENGINEER11 i. CHIEF FlANMMGANDOC6<ONSECTION OC ASSISTANTOIS~H'CTENGINEER DilTRtCTFNQ*CER y j* y
• PUERTOPRiMCflA CTTY
MTV DATE DATt
REINFORCEMENT SCHEDULE & BAR BENDING DIAGRAM

SUBSTRUCTURE (ABUTMENT,FOUNDATION & WINGWALL)

REINFORCEMENT
BENDING BAR DIM ENSION mm) LENGTH TOTAL
SIZE UNIT W T SID TOTAL REMARKS
DIAGRAM MARK QTY SPACING(mm) SHAPE PER LENGTH
(mm) a b c (kg/m) ES WEIGHT (kg)
BAR(m) (m)
B1 28 18 400 F 260 3173 6606 118908 4 833 1 574682 QUANTITIES ARE
B2 16 36 AS SHOW N D 3580 150 3730 134 280 1 578 1 211 894 FOR TW O (2)
V
• B3 28 18 400 260 3173 6606 118 908 4833 1 574682 ABUTMENTS
© B4
i. 16 36 AS SHOW N D 3580 150 3730 134 280 1 578 1 211 894
• W1 28 74 100 J 3280 1050 500 5880 435 120 4833 1 2,102.935
*' G) 1 W2 28 26 300 J 3280 1050 500 5880 152 880 4833 1 738 869
------ '~Jr,------ W3 16 32 300 B 3580 500 4080 130 560 1 578 1 206 024
O W4 16 104 AS SHOW N A 1040 150 1340 139 360 1 578 1 219910
» W5 28 36 200 J 2400 1050 500 5000 180 000 4 833 1 869940
W6 28 36 200 J 2400 1050 500 5000 180 000 4.833 1 869 940
0 W7 16 20 300 D 3580 500 4080 81 600 1
1.578 128765
W8 16 108 AS SHOW N A 1040 150 1340 144 720 1 578 1 228 368
Y? • F1 28 52 200 D 4450 1050 5500 286 000 4833 1 1,382238
HC1 G ) F2 28 52 200 D 4450 1050 5500 286 000 4 833 1 1,382 238
• F3 28 46 200 B 5050 1050 7150 328 900 4833 1 1,589 574
F4 28 46 B 5050 1050 7150 328 900 4833 1 1,589.574
J o • F5 16 312 AS SHOW N A 1030 270 1570 489 840 1 578 1 772 968
F6 28 40 200 D 4450 1050 5500 220 000 4833 1 1,063 260
F7 28 40 200 D 4450 1050 5500 220 000 4833 1 1,063.260
F8 28 46 200 B 3750 1050 5850 269 100 4833 1 1.300 560
i s F9 28 46 200 B 3750 1050 5850 269 100 4 833 1 1.300 560
F10 16 216 AS SHOW N A 1030 270 1570 339 120 1.578 1 535 131
WW 1 12 4 AS SHOW N E 3540 540 1250 5330 21 320 0 888 2 37 864
•1 © •
WW2 12 16 200 C 3865 3865 61 840 0 88 8 2 109.828
WW3 16 38 200 F 100 1600 3300 125400 1.578 2 395 762
.1 o ft 2370 MAX 2970 max
t WW4 28 36 AS SHOW N D 570 MIN 600 1170 min 37 260 4 833 2 360 155
WW5 28 12 100 H 3900 600 5100 61 200 4 833 2 591 559
. 0 3540 MAX 4740 max
WW6 28 34 100 I 1260 MIN 600 600 2460 min 61 200 4.833 2 591 559
ft 2370 MAX 3570 max

M WW7 16 24 300 H 570 MIN 600 600 1770 min 32 040 1.578 2 101 118
V © 1 WW8 16 4 300 H 3900 600 600 5100 20 400 1 578 2 64 382
\m 3540 MAX 4740 max
WW9 16 12 300 I 1260 MIN 600 600 2460 min 21 600 1 578 2 68 170
W W 10 16 4 AS SHOW N G 520 5300 5820 23 280 1.578 2 73 472
WW11 16 168 AS SHOW N A 150 900 151 200 1 578 2 477 187
TOTAL 21.788 323

TOTAL 21.788.32 kgs

TOTAL KGS GR 40= 3,842 74 1O m m 0 to 1 6m m 0

TOTAL KGS GR 60= 17,945.59 2Omm0 to 36m m 0

I «M 0 lO C A T O * C O N t tM T t O M T T tD / W l f M I D
W * A C * T r« rr« L # *M C t
DEPARTMENT O f PUBLIC WORKS ANO HIG HW A Y* DfTAft.10 (NCMIIRMC; PIAM POR — U r—
R fO O N N . o r r c i WiOCNiNO O f BRfOOE
PALAWAN 3RD MALINAO BR (B00178PW)
ALONG PUERTO PINCESA SOUTH RD FOOTING. ABUTMENT ft WINGWALL LAGASCA A LB E R TO # JONSON JR IMELDA M VALDESTAMON ALBINO D. SOCRATES, JR. ROMMEL P AGUIRRE
DISTRICT ENGINEERING OFFICE »\J*RTO PfUNCtlA OT BAR BENDING DIAGRAM / rN C M tta <C H K a | f ( t O M
I COT
<L
RO ADW AY

($>
1.5% FIN. ELEV. = 10.36 -\5 %

i _____
u

A A S H T O T Y P E IV-B G IR D E R '/■
/ / A A S H T O T Y P E IV-B G IR D E R

\ / N.

ABUTM ENT
r 1
ABUTM ENT

\ [
161 4 @ 350 [2 1 s

840 SECTION
SCALE 1:50

w
*Tf— 6 M M 0 SPIRAL
P IT C H = 5GMM
AROUND ANCHOR
•---------6M M 0 SPIRAL
P IT C H = 50M M
650 300
AROUND ANCHOR
BAR (T Y P .)
BAR (TY P .) I200 I
200 BO
i
7N

TOP OF ABU TM EN T v TOP OF ABUTM ENT


'- a
SEE DETAIL
6M.
— 20 M M 0 x 2200 — 20 MM 0 x 2 2 0 0 w L1 0 0« 75 x 16
A N C H O R BAR A N C H O R BAR
36 x 6 x 25 0 L O N G
A N C H O R BAR
ELASTOMERIC BEARING PAD
@ 30 0 {T Y P .)

/ ANCHOR BAR DETAILS C O M P R E S S IB L E


J O IN T F ILL E R CORBEL
SCALE 1 :5 0

AASHTO GIRDER TYPE IV-B


" 2 LAYER 25MM THICK DETAIL
(7Q0MM X 5 00 M M )
80G41 E L A S T O M E R IC B E A R IN G P A D S SCALE NTS
D U R O 60

¥
20M M 0
A N C H O R BAR @ E X P A N S IO N

20 M M 0 AN C H O R BAR / T \
A S P H A L T FILLE D
S T E E L C ASIN G

' ANCHOR BAR SLOT


SCALE NTS SECTION
W SC ALE 1:5 0
ELASTOMERIC BEARING PAD PLAN
w I SCALE NTS

PROJECT NAME AND LOCATION SHEET CONTENTS DRAFTED/PREPARED SUBMITTED RECOMMENDED:


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B L IC W O R K S A N D H IG H W A Y S DETAILED ENGINEERING PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F B R ID G E - S E C T IO N , A N C H O R B A R D E T A ILS
P A L A W A N 3R D M A L IN A O B R . (B 00 1 7 8 P W )
A N C H O R BA R S L O T D E T A IL,
D IS T R IC T E N G IN E E R IN G O F F IC E A L O N G P U E R T O P IN C E S A S O U T H RD IMELDA M. VALDE STAM O N ALBINO D. SOCRATES, JR. RO MMEL P. AGUIRRE
PUERTO PRINCESA CITY PUERTO PRINCESA CITY, PALAWAN E L A S T O M E R IC B E A R IN G PA D P L A N CHIEF PLANNING AND DESIGN SECTION OIC. ASSISTANT DISTRICT ENGINEER DISTR IC T ENGINEER
DATE: DATE:
®©
2 LAYER 25MM THICK
TYPC»V-B 2 LAYER 25MM THICK (7D0MM X 5C0MM)
AASHTO (700MM X500MM) ELASTOMERIC BEARING PADS
GIROCR ELASTOMERIC BEARING PADS DURO GO

IN T E N T IO N A L L Y R O U G H E N E D
/
25M M TH K.
PR E F O R M E D
JO IN T FILLER
DURO 60

T
SURFACE ~ ~

/ \ 5-12MM 0 .
BAR (STR.)
12M M 0 .
@ 200 O.C.

4 • 16MM 0 -
8 - 16M M 0 TIE S
BARS (STR ) E Q U A LLY S P A C E D

R IS E R D E TA IL R IS E R S E C T IO N
Vi
R ISER FOR A A S H T O G IR D E R
SC ALE 1 :2 0
' \ SHEAR KEY DETAIL
) SCALE 1:50
50M M x500M M x7 00M M CHROLOPRENE
RUBBER BEARING PAD WITH INNER
STEEL PLATE

D IA P H R A G M + 25M M T H K
PREFO RM ED
E X P A N S IO N '
25M M T H K J O IN T F ILLE R
POF ABUTMENT
PR E FO R M E D
- 4 -1 6 M M 0
EX P A N S IO N 4 -1 6 M M 0
B AR S (S T R .)
J O IN T FILLE R | BARS (S T R .)"
- 7 -1 6 M M 0 TIE S
4 -1 6 M M 0 E Q U ALLY SPACED
7 -1 6 M M 0 T IE S _
BA R S (S T R .)
E Q U A L LY S P A C E D
S -1 6 M M 0 TIES
EQ UALLY S P A C E D " V

, SHEAR KEY SECTION , DETAIL (END BLOCK) END BLOCK SECTION


V ; SCALE 1:50 SCALE 1:50 SCALE 1:50
> ELASTOMERIC BEARING PAD
SCALE NTS

PROJECT NAME AND LOCATION ' SHEET CONTENTS DRAFTED/PREPARED RECOMMENDED :


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B L IC W O R K S A N D H IG H W A Y S DETAILEC ENGINEERING PLAN FOR
W ID E N IN G O F B R ID G E - S H E A R KEY D E TA IL, S H E A R K E Y S E C T IO N
REGIONAL OFFICE IV-B
P A L A W A N 3R D M A LIN A O BR. (B 00 1 7 8 P W ) EN D B L O C K D E T A IL, EN D B L O C K S E C T IO N
A LO N G P U E R T O P IN C E S A S O U T H RD R E G A R D G IL AGASCA IM ELDA M. VA LDE STAM O N ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E R IS E R D E TA IL, R IS E R S E C T IO N
PUERTO PRINCESA CITY. PALAWAN CHIEF. PLANNING AND DESIGN SECTION c ic . ASSISTANT DISTRICT ENGINEER ■ ■ . r - 1.
PUERTO PRINCESA CITY
E L A S T O M E R IC B E A R IN G PAD DATE: DATE.
NOTES
1. C O N C R E T E :
C O N C R E T E S H A L L C O N F O R M TO T H E R E Q U IR E M E N T S OF C L A S S A A C O N C R E T E .
W IT H 27.6 M Pa C Y LIN D E R S T R E N G T H A N D 1 9.0m m M A X IM U M A G G R E G A T E SIZE.
SEE PILE SCHEDULE
2 R E IN F O R C E N M E N T ■
A A LL R E IN F O R C IN G S T E E L S H A LL BE D E F O R M E D B A R S C O M F O R M IN G TO A S S H T O
M31 (A S T M A 6 1 5 ) G R A D E 40.
N FLATSLAB BRIDGES,
BEND BARS INTO A 032M M DOWELS B. S P LIC E S OF A D J A C E N T L O N G IT U D IN A L S T E E L S H A LL BE S T A G G E R R E D 100 BAR
LAVER IMMEDIATELY D IA M E T E R S A P A R T . L E N G T H O F S P L IC E S S H A LL BE lOOOmm FO R 0 2 5 AN D
BELOW TOP SLAB STEEL. 1300m m FO R 0 2 f i A N D 170 0m m FO R 0 3 2 .

01 0 SPACER
RiNG BAR
•a C. S P IR A L -T IE S S H A L L B E W E L D E D A T S P L IC E S .

3 D R I V IN G :
PILE SPLICING EPOXY
A PILE H E A D S S H A L L BE P R O T E C T E D F R O M D IR E C T IM P A C T O F T H E H A M M E R BY
C U S H IO N B L O C K S C O N S IS T IN G O F S E V E R A L B LO C K S O F W O O D O R O F O T H E R
+
mHim • A P P R O V E D M A T E R IA L S .
B PILES S H A L L BE D R IV E N TO A D E P T H T H A T W IL L P R O D U C E T H E R EQ U IR E D A L LO W A B LE
B E A R IN G C A P A C IT Y -

v =S>
4 PILE F O U N D A T IO N D E S IG N :
A IN P IL E -B E N T P IE R S , P ILE L E N G T H S S H A LL BE D E T E R M IN E D B Y T H E E N G IN E E R /
C O N S U L T A N T BA S E D O N T H E A L L O W A B L E P ILE B E A R IN G C A P A C IT Y S P E C IF IE D B E LO W .
B, IN C O L U M N -B E N T P IE R S , THE N U M B E R , LO C A T IO N AN D L E N G T H O F P ILE S S H A LL BE
D E T E R M IN E D B Y T H E E N G IN E E R /C O N S U L T A N T B A SE D O N T H E LO A D IN G IN F O R M A T IO N
- k O N G l REINP G IV E N IN T H E P IE R D E T A ILS .

5. PILE S P L IC E :

ELEVATION SECTION A P ILE S M A Y B E S P L IC E D O N L Y IF S T R IC T L Y N E C E S S A R Y A N D A P P R O V E D B Y T H E E N G IN E E R .


P IL E SP LIC E S S H A LL BE L O C A T E D AT LE A S T 10m B E LO W T H E E X IS T IN G G R O U N D L E V E L
B P ILE S P L IC E S H A L L D E V E L O P 100% A X IA L, A N D 50% B E N D IN G O F THE C A P A C IT Y OF
I ____ j PILE SPLICE DETAIL T H E P IL E S E C T IO N W H E R E T H E S P L IC E IS LO C A T E D .

NOT TO SCALE
6. A L L O W A B L E P ILE B E A R IN G C A P A C IT Y : 5 00 kN P ER PILE

7. M IN IM U M H A M M E R E N E R G Y R A T IN G = 5 5 k N -m

8 B A S IS F O R C O M P U T IN G A L L O W A B L E P IL E B E A R IN G C A P A C IT Y :

/ 167 e h Eh \ / W r + 0 ,1 G W p \
P flll= ( S + 2.54 ) ( W i + Wp J
\ / \ J
0 1 0 SPIRAL-TIE
W KRC
"
Pall = A LL O W A B L E P ILE B E A R IN G C A P A C IT Y ( kN )
eh = H A M M E R E F F IC IE N C Y
Eh = H A M M E R E N E R G Y R A T IN G (kN -m )
W r = W E IG H T OF RAM (kN)
+ W p = W E IG H T O F P ILE A N D O T H E R D R IVE N W E IG H T S (kN )
S = A V E R A G E P E N E T R A T IO N P ER B L O W FO R T H E LAS T
150m m O F D R IV IN G (m m )

jr . LAP LENGTH
9. T E S T PILES

TE ST P ILE S S H A L L BE D R IV E N W IT H T H E S A M E H A M M E R U SE D F O R D R IV IN G R E G U LA R
E LE V A T IO N P ILE S A N D M A Y B E P A R T OF F O U N D A T IO N IF A P P R O V E D B Y T H E EN G IN E ER .
... ,,.
\ 10. P IC K -U P P O IN T S :
P IC K -U P P O IN T S S H A LL B E M A R K E D O N A LL P ILE S A N D A LL L IF T IN G SH ALL BE
—LON G! REINF DO NE A T T H E S E P O IN T S .

Q.3QL Q.7QL

PILE E LE V A TIO N A - M • ftuo


mw vm
NOT TO SC ALE
1 P O IN T P IC K -U P
S E C T IO N
P IL E S C H E D U L E

SIZE
LONGITUDINAL REINF W E LD E D S P IR A L- 0.21 L Q.SSL
TYPE
(mm) TIE S P LIC E D ETAIL
QTY. BAR SIZE
iOO» 100* 1 7 0 *0 1 0 * 0
NOT TO SC ALE
C 4df)x400 8 28

PILE TIP FOR HARD D R IV IN G


NOT TO SC ALE

2 P O IN T PIC K -U P

T H E USE OF S P E C IA L E M B E D D E D O R A T T A C H E D LIF T IN G D E V IC E S S H A L L BE
S U B J E C T T O T H E A P P R O V A L O F T H E E N G IN E E R

PROJECT NAME AND LOCATION SHEET CONTENTS DRAFTED I PREPARED RECOMMENDED


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T O F P U B L IC W O R K S A N D H IG H W A Y S DETAILED ENGINEERING PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F B R ID G E - T Y P IC A L R E IN F O R C E D
P A L A W A N 3R D M A LIN A O BR. (B 00 1 7 8 P W )
C O N C R E T E PILE D E TA IL REYNARD G. LAGASCA ROMMEL P. AGUIRRE
- d \
A L O N G P U E R T O P IN C E S A S O U T H RD IM E L D A M. V A L D E S T A M O N ALBINO D. SOCRATES, JR.
D IS T R IC T E N G IN E E R IN G O F F IC E
PUERTO PRINCESA CITY PUERTO PRINCESA CITY, PALAWAN CHIEF, PLANNING AND DESIGN SECTION
DATE:
OIC. ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER
w
TABLE OF VERTICAL DISTANCE (Y) FROM BOTTOM OF GIRDER
5 0 L /4 U2 3U4 L
2 '• 2
5
8 2
o
r-.
C ABLE 1
C ABLE 2
20G.GG
5 0 0 .0D
12 0.40
2 1 6 .2 0
9 0.0 0
S 0.00
12 0.40
2 1 6 .2 0
2 00 .0 0
5 00 .0 0

II C ABLE 3 0 0 0 .0 0 31190 9 0 .0 0 3 1 1 ,9 0 8 00 .0 0
C ABLE 4 1 10 0.00 4 07 .7 0 9 0.0 0 4 0 7 .7 0 1 100.00

-------------- ’ *
— ■ -------- TABLE OF TENSION FORCES
CABLE J A C K IN G F O R C E (P o) E F F E C T IV E P R E S T R E S S IN G F O R C E (Pe)

7275 7275 7273


NO (N ) (N)
7273
1 1 37 5 0 0 0 1081337.01
L = 291 00 MM 2 1 37 5 0 0 0 1 0 7 0 1 0 1 .9 5
3 13 7 5 0 0 0 1 05 9 0 8 5 .4 2
4 1 37 5 0 0 0 1 04 8 2 5 3 .8 7

00
6 - 2OMM0 CONT. r
30
6-2O M M 0 CONT. H
7 -12MM0 EQUALLY SPACED ° SI 6 - 2OMM0 CONT.
12MM0 STIRRUP @100
12MM0 STIRRUPS @ 100 A
8
-
12MM0 STIRRUPS @ 100 b 12MM0 STIRRUPS @ 100 @
si
6 - 12MM0 12MM0 STIRRUPS @ 100 ©

12MM0 STIRRUPS @ 100 C


* 6 - 12MM0
.
2 - 2OMM0 CONT. 12MM0 STIRRUPS @ 100 ©
5 4 s
4 - 28MM0 CONT. Y 2 - 2OMM0 CONT.
— 2 - 2OMM0 CONT. 4 -2 8 M M 0 CONT.
12MM0 TIES EQUALLY SPCD. ---- ----- 4 - 2OMM0 CONT.
SECTION SECTION @ MIDSPAN
DETAIL 15 J SCALE 1:50 SCALE 1:200
1 SCALE 1:50
15 •
a a
3-1 6 M M 0 CONT.
CABLE NO. 1 (10T12.7MM) cN / a

CABLE NO. 2 (10T 12.7MM) 12MM0 ADDITIONAL STUDS @ 100 0


b
CABLE NO. 3 (10T 12.7MM) \x
12MM0 STIRRUPS @100 ©
CABLE NO. 4 (10T12.7MM)
a a
/ 6 - 12MM0

C □

BAR BENDING DIAGRAM


2-1 6 M M 0 CONT.
3-1 6 M M 0 CONT.
BAR BENDING DIAGRAM
15 J SCALE 1:50
SECTION
15 J SCALE 1:50

B - CABLE NO. 4 (10T12.7MM)


\ / CABLE NO. 3 (10T 12.7MM)
) SCALE 1:50
V15 CABLE NO. 2 (10T 12.7MM)
NOTES: 11T 12.7MM CABLE NO. 1 (10T12.7MM)
1. ADDITIONAL BARS AT GIRDER ENDS ARE ONLY APPLICABLE
10-
AT CONTINUOUS SUPPORTS.
2. FABRICATION SHOP DRAWINGS OF PSC GIRDERS SHALL BE
SUBJECT FOR REVIEW AND APPROVAL BY THE ASSIGNED FIELD ENGINEER.
ALL DATA / DIMENSIONS SHOWN HERE SHALL BE REVIEWED DURING
CONSTRUCTION. V VIEW @ MIDSPAN \ VIEW @ END BLOCK
3. QUANTITY ESTIMATE IS PER PIECE, BAR SCHEDULE 15 I SCALE 1:50
NOT NEEDED. 15 J SCALE 1:50

PROJECT NAME AND LOCATION : SHEET CONTENTS : D R A FTED / PREPARED RECOMMENDED:


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B LIC W O R K S AN D H IG H W A Y S DETAILED ENGINEERING PLAN FOR

r? \
REGIONAL OFFICE IV-B W ID E N IN G O F BR ID G E- G IR D E R D IA P H R A G M , D E C K S L A B
P A L A W A N 3R D M A LIN A O BR (B 00 1 7 8 P W )
A LO N G P U E R T O P IN C E S A SO U TH RD
S E C T IO N A N D D E T A ILS REYNARD G, LAG ASC A IM ELDA M. VALDESTAM ON ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E l EN G IN E E R II
PUERTO PRINCESA CITY, PALAWAN CHIEF, PLANNING AND DESIGN SECTION OIC. ASSISTANT DISTRICT ENGIN EER DISTRICT ENG INEER
PUERTO PRINCESA CITY
DATE: DATE:
©

30000
16MM0 @ 150 O.C. / q i f c q ' i 16MM0 @ 250 O.C. , . ____
16MM0 @ 250 O.C. __ TOP BARS 1 ' 1'< ! > '
to p bars vzy v TOP BARS KU
16MM0 @ 250 O.C. , ''r~ 16MM0 @ 250 O.C 16MM0 @ 250 O.C.
@250 O.C. f l T N / S ' l ( B ) (S3 J-----
TOP BARS VC/ TOP3 BARS 'O / \ 3 / TOP BARS

11900 12000
7400

in
i-
z
o LU
z 5
5 LU
£ Q
O or
3= o
CO LL
L__ J
u. Z 700 700 700
3 * LU
700
*5
7 Z Z
/ / / V / z ^ / z z v / z z 7/ / / 5 v / / V s /y /T T A
/

✓ z v /A r ///v /////A
/
'7 7 7 ^ 7 /7 7 7 / V / / / y / / ^ T / / / / / / / / / / / / / ,? '
/ / / _ ' * / / ' . / / / ' < / / / * / / ' / / / * , / / / ' s / / ' / / / . ' . / / / ’ s / / ' . / / / . * * / / / S / / * . / / / s / / ' / / /

' / / / / / / / '* / / ' ' / / / V / / ' 7 / / / ', / / / / , / / ' 7 7 7 7 / / / . ' / / / -//S 7 , / / /. y / / / V / / "7/7 ^ 7 7 7 7 ^ 7 7 7 7
/\ /
tf>
Z
IU / / ' _
o 5
y lu
± u
5 tr

i(/)s±
ti. w
_ j tr
< 5
X *

o
m
700 700
_12Q0Q_
7400 o f d ia p h r a g m H. O F D IA PH R A G M 11900
16MM0
IM U @ 150 O.C
® 13U U
BOT BARS
.O . I D H e e l
16)156) 16MM0 @ 150 O.C. ($7 )— I
BOT. BARS V ly 16MM0 @ 100 O.C. f D 16MM0 @ 300 O.C.
BOT. BARS ' ADDITIONAL BOT. BARS^ “ : )
i 6Mbot@baks ° ° I B )(S 4|
16MM0 @ 150 O.C.
BOT. BARS \ D J V i3 '
16MbMo0t@b : 5rOsOC ( bT saV -

DECK SLAB TOP REINFORCEMENT PLAN


e
REPUBLIC OF THE PHILIPPINES
PROJECT NAME AND LOCATION SHEET CONTENTS DRAFTED/PREPARED /
///#
/ /
X tUMtfTTVO RECOMMENDED w « o

DETAILED ENGINEERING PLAN FOR


D E P A R TM E N T OF P U B LIC W O R K S A N D H IG H W A Y S
REGIONAL OFFICE IV-B
P A L A W A N 3R D
W ID E N IN G OF BR1DGE-
M A L IN A O BR . (B 00 1 7 8 P W )
D E C K SLAB
J r ( ,f* >
A L O N G P U E R T O PIN C E S A S O U TH RD r e Vn a r d g la g a s c a A L B E R T O ^ j o n s o n jf t IM ELDA M. VALDESTAM ON A LB IN O D. SO C R ATES, JR. ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E V *4 1
PUERTO PRINCESA CITY, PALAWAN R E IN F O R C E M E N T P L A N f iN 6 M m * CHIEF PLANNING AND DESIGN SECTION QIC. ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PUERTO PRINCESA CITY
P*Tt - DATE: DATE: MU
3355
1205 3790 3790 3355 1205
-CLEAR W IDENIN6-
SIDEWALK EXISTING LANE EXISTING LANE CLFAR WIDENING WIDTH SIDEWALK
WIDTH

ROADWAY

1%s F fM. ELEV. = 12.161 1 5 o/o


1.5% 1.5% 1.5%
1 % S

- - ® @ 3 > ®®®~-
/ X
0 --- -----
i !_________ i I__________I

2250 1670 2400 1200 1200 2400 1670 2250

DECK SLAB SECTION


SCALE 1:50

REINFORCEMENT SCHEDULE & BAR BENDING DIAGRAM FOR SLAB


SUPERSTRUCTURE (DECK SU \B ) - 2 SIDES LEFT & RIGHT

■ ®
REINFORCEMENT
------------© —
BENDING BAR DIMENSION(m m) LENGTH TOTAL
SIZE SPACING UNIT W T TOTAL CONCRETE
DIAGRAM MARK QTY SHAPE PER LENGTH
(mm) (mm) a b c d (kg/m) WEIGHT (kg)
BAR(m) (m)
— — « - 0
S1 16 38 250 B 11900 100 -
--------- @
© S2 16 38 250 B 12000 - -
12000
12000
456 00
456 00
1 578
1.578
719 568
719 568

V / b| ~~lb S3 16 38 250 E 7400 100 • 7.500 285 00 1.578 449730

© S4 16 62 150 B 9650 100 9750 130 80 1 578 206 402


b a S5 16 31 150 B -
12000 12 000 372 00 1 578 587 016
S6 16 31 150 B 7400 100 • 7 500 232 50 1.578 366885
. © /bJL
~~c\ a
S7
S8
16
16
31
31
150
150
B
E
12000
11900
-
100
-
-
12 000
12 000
372.00
372 00
1.578
1.578
587.016
587 016
51
-------------© - — ©

“I ©• “I
S9 16 201 150 B 4450 100 4 550 191 84 1 578 302 724
S10 16 301 100 D 4450 100 - 4 550 136955 1 578 2,161 150
— ® S11 16 101 300 B 4450 100 - 4 550 459.55 1.578 725 170
H1 12 12 *\S SHOWN E 30000 - - - 30 000 360 00 0 888 319 680
------ v ..> -
©a H2 12 202 300 C 470 160 160 300 1 390 28078 0 888 249 333
V / H3 12 202 300 F 470 160 750 300 1 680 339 36 0 888 301 352

(f) TOTAL 8,282 609


A DECK SLAB SECTION
SCALE 121
TOTAL KGS GR 40= 8,282.61 1Omm0to16mm0

TOTAL KGS GR 60= 2Omm0 to 36mm0

n— w m n — M f f O m t lN I ) c«**T to .-p m • tm c m ~ m -. f U / * * * rn to ■ IM •W M D M l NO a n a t tifi

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS O tT A U D f« O M H N M C »0 «


J A 1 A T a ic iO M i wiO CNiNG O f &RIOGE
M A IIN A O B R iB O O m P W i OECK SLAB SECTION AND DETAILS J
PALAWAN 3RD
ALONG PUERTO PINCESA SOUTH TO BAR BENDING DIAGRAM RETHARD G LAGASCA ALB ER TO # JONSON JR IMELDA M VALDESTAMON ALBINO 0. SOCRATES. JR ROMMEL P AGUIRRE
DISTRICT ENGINEERING OFFICE -ir r f
FUCRTO’ ftftCKSAC'TV PAOMAM
m u ft*n
w
4207 67 DO 4207

12M M 0 CO NT. . rfiNG BOTTOM REINFORCEMENTS HALF SH OW IN t TOP RE WF OH CEM ENTS 12M W 0 CONT. BARS^
© @ BARS @ 200M M O C "
1 2 M M 0 CONT.
CJ 20G M M O C BARS @ 200MM

©0 1 6 M M 0 CONT. BARS
@ 2Q 0M M O C -
1 2 M M 0 CONT. BAR S ( B X A 3)
- ^ 2 0 0 M M OC
16M M 0 CONT _ 1 2 M M 0 CONT. BARS (
\S /^ D BARS @ 200M M O C — @ 200M M OC
— 1 6 M M 0 CONT. BARS © 0
( 'J T jO 16W M 0 CONT. BARS @ 2 0Q M M O C

@ 200M M O C 12 M M 0 CONT
©0C-
¥I BARS 0 200MM

2 5 *1 2MM SEALANT
■acON: . © @ ®

/ T > SECTION B
21 J SCALE VAQ

1 6 M M 0 @ 600MM

□ exp a n ; io n
LJ
12MM 3 CC N T. B A R S
DOW EL @ 300M M O C \

12M M 0 CONT. BARS 2 WMM OC EXISTING C ONCRETE NEW CONCRETE


PAVEM ENT PAVEMENT
@ 2 0C M M O C

C EM ENT CONCRETE
PAVEM ENT

f 'N SECTION E
APPROACH SLAB REINF. DETAILS 7 J S C ALE VAQ
SCALE 1:100

12MM0 CONT.
25x12M M
BARS @ 200MM

_ 12M M 0 CONT
SEALANT \ IV 12MM0 CONT. ( T V /T i)
25*12M M
SEALANT BARS @ 2DUMM ( ^ C X A 5 )
t \ » ' 2 MMM
BARS @ 200MM
BACK OF 12M M 0 C ONT. / C Y X o y C \ 4EALAH’
BACKWALL ' BARS @ 2 0 0 MM

\
TOP OF NEW OR
■ EXISTING PAVEM ENT (r YaTo\ 12MM0 BARS
^ 3 * @ 200MM
rE t— im . 12MM0 BARS / ' ? Y 7 >

0
y j 12MM __ 16MM0CONT. S T tv T ly T S \ 12M MOBARS
' Q 300MM OC SA
ABUTMENT
REINFORCEMENT
' u
@ 200MM


P tJF BARS @ 200MM K ^ A C ty O j/ ------------ —* - I
5EE DETAL _ ABUTMENT - 1O-1SMU0 BARS
REIN PQHCEMENTS
. 50MM THK LEAN
16MM0 CONT.
12MM PEJF BARS @ 200MM CAA6XA7)
12MM0 BARS
SECTION C
s c A ik n & 12MM0 C O N T / ^ V T oN
BARS @ 2 0 0 M M V ii/C 3 '
d @ 200MM H )^ n

I o

SECTION D (BLOW UP)


___j s c a le nr

PROJECT NAME AND LOCATION SHEET CONTENTS : □ RAFTED/PREPARED SUBMITTED: RECOMMENDED :


REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T OF P U B LIC W O R K S A N D H IG H W A Y S DETAILED ENGINEERING PLAN FOR
R E G IO N A L O F F IC E IV-B W ID E N IN G O F B R ID G E -
D E C K SLA B S E C T IO N A N D D E T A ILS
PALAWAN 3RD M A LIN A O BR (B 00 1 7 8 P W )
r * \
DISTRICT ENGINEERING OFFICE A L O N G P U E R T O P IN C E S A S O U T H RD B A R B E N D IN G D IA G R A M R prNARD G. LAGASCA IM ELDA M. VALDE STAM O N ALBINO D. SOCRATES, JR. RO MMEL P. AGUIRRE
PUERTO PRINCESA CITY PUERTO PRINCESA CITY. PALAWAN ^ t N O M C r f tt CHIEF. PLANNING AND DESIGN SECTION □ IT ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE:
REINFORCEMENT SCHEDULE & BAR BENDING DIAGRAM (ALL DIAPHRAGM)
SUPERSTRUCTURE (ALL DIAPHRAGMS)

REINFORCEMENT
BENDING BAR DIMENSION(mm) LENGTH TOTAL
SIZE SPACING UNIT W T TOTAL CONCRETE REMARKS
DIAGRAM MARK QTY SHAPE PER LENGTH SIDES
(mm) (mm) a b c (kg/m) WEIGHT (kg) VOLUME (m*)
BAR(m) (m)

a D1 28 12 AS SHOWN A 3720 37 2 0 44 64 4.833 2 431 490


D2 28 12 AS SHOWN B 830 150 0 980 11.76 4.833 2 113.672
(\> D3 28 12 AS SHOWN A 1590 1.590 1908 4.833 2 184.427
D4 28 12 AS SHOWN A 1660 1 660 1992 4833 2 192.547
D5 16 40 AS SHOWN B 830 150 0.980 39.20 1.578 2 123.715 7.020 END
D6 16 16 AS SHOWN A 1740 1.740 27 84 1.578 2 87 863
b a
D7 16 24 AS SHOWN A 2050 205 0 49 20 1.578 2 155 275
D8 16 20 AS SHOWN A 1660 1.660 33 20 1.578 2 104.779
D9 16 16 AS SHOWN B 1365 1.365 21 84 1.578 2 68.927
D10 12 48 AS SHOWN C 200 1305 150 3.310 158 88 0.888 2 282.171
D11 28 12 AS SHOWN A 7875 7.875 94 50 4.833 2 913437
a
D12 28 12 AS SHOWN B 830 150 0.980 11.76 4 833 2 113.672
b b D13 28 12 AS SHOW N A 2050 2.050 24 60 4.833 2 237.784
D14 28 12 AS SHOWN A 1660 150 1.810 21 72 4.833 2 209.946
a D15 16 24 AS SHOW N B 830 150 0.980 23 52 1.578 2 74.229 5.040 INTERMEDIATE
D16 16 16 AS SHOW N A 1740 1.740 27 84 1.578 2 87 863
© D17 16 8 AS SHOW N A 2050 2.050 1640 1.578 2 51.758
D18 16 24 AS SHOWN A 2450 2 450 58 80 1.578 2 185.573
D19 28 12 AS SHOWN B 2250 150 2.400 2880 4 833 2 278.381
D20 12 48 AS SHOWN B 200 1305 150 3.310 158 88 08 8 8 2 282.171
D21 28 12 AS SHOWN B 1090 150 1.240 14 88 4.833 2 143 830

SL B-TOTAL 4,323.51
TOTAL 4,323.51 kgs

TOTAL KGS GR 40= 1,504.32 1O m m 0to16m m 0

TOTAL KGS GR 60= 2.819.19 2O m m 0 to 3 6m m 0

f H O J fO HAtm JM 3 I OCA T O * 1 W IW — ■ fttv u m o J 1 *4 / •u M v r rts Ml C.CAMM HCV D • r mo

D E P A R T M E N T O f P U B L IC W O R K S A M O H IG H W A Y S KTA& 10 U O C lK M i
W W C N IN G O f B * K » G E -
N f C K M k . C0 * K t r v l DIAPHRAGM BAR BENDING
l ! 1 IT PALAWAN 3RD IM ilN A O B « iB 0 0 1 T »W A |
SCHEDULE f 1f \

w w ”
DISTRICT ENGINEERING OFFICE
N M iO C V O ’ t
ALO NG * V € R T O P tN C C S A S O U T H * 0
P V C ffT Q W C I t A MUMMM
R E ?N A R D G L A G A S C A A L B E R T Q j f JO N SO N J R IM E L D A M . V A L D E S T A M O N
CM ** m m M M C M R I O I
A L B IN O 0 . S O C R A T E S . JR .
O C U U T a MT C B T W I K > 4 i •
R O M M E L P A G U IR R E
V 44 J
O A lt • A ft DAT?
J n "
1G M M 0 C R O S S B A R
15O M M 0SCH. 40G.1.
D R A IN PIPE

TO P OF
R O A D W A Y S LA B

10 * 1 0 S Q U A R E BAR
W E L D A R O U N D PIPE
B O T T O M OF D E C K SLAB

PROJECT NAME AND LOCATION - SHEET CONTENTS : D R A FTE D I PREPA RED SUBMITTED: RECOMMENDED
REPUBLIC OF THE PHILIPPINES / /./
D E P A R T M E N T OF P U B L IC W O R K S A N D H IG H W A Y S DETAILED EN G INE ER IN G PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G OF B R ID G E - R A IL P O S T A N D B A L L U S T E R D E T A IL S
P A L A W A N 3R D M A LIN A O B R (B 00178P W ]
S ID E W A L K D E TA ILS , D R AIN D E T A ILS ,
A LO N G P U E R T O P IN C E S A S O U T H RD REYNARD G. LAGASCA ALBERTQ UNONSON JR IM ELDA M. VALDE STAM ON ALBINO D. SOCRATES, JR. ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O F F IC E
PU ER TO PR IN C ES A C ITY, PALAWAN S ID E W A L K B A R B E N D IN G D IA G R A M CHIEF PLANNING AND D E SIG N SEC T IO N QIC. ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PUERTO PRINCESA CITY
DATE DATE.
♦*
- 75MM0 FVC WEEPHOLES
STAGERRED AT 2000mm INTERVAL

1 2 M M 0 R E IN F O R C IN G
S TE E L BAR S S P A C E D © t = 300MM THK. CONCRETE CLASS A STRUCTURAL CONCRETE
CIUMDGIUVE.fflIM'!>*.'
K*OduuacEA ro
0.6CM O.C.

12MM0 DEFCRMED REINFORCING STEEL


6 -1 2 M M 0 R E IN F O R C IN G S T E E L
12MM0 DEFCRMED REINFORCING STEEL BAR SPACED @ 300MM BOTHWAYS.
B AR S W / 1O W M 0 H O O P S
BAR SFAC EC @ 0.30W 0OTHWAYS,
S P A C E D @ 400M M O .C .
- 12MM0 DEFORMED REINFORCING STEEL
EVERY THREAD NOSING

1M x1M x2M G A B IO N W IR E M ESH


W IT H C O M P L E T E A C C E S S O R IE S

GABION BOX DETAIL


f 'n s t a ir d r a in d e t a il S C A LE 1:50
J S c J lE TTsff

0 RC SLOPE PROTECTION DETAIL


S C E l £ ------------------------------------------------------------------- T ^ r

PROJECT NAME AND LOCATION ' SHEET CONTENTS DRAFTED I PREPARED RECOMMENDED
REPUBLIC OF THE PHILIPPINES
D E P A R T M E N T O F P U B L IC W O R K S A N D H IG H W A Y S DETAILED EN G INE ER IN G PLAN FOR
REGIONAL OFFICE IV-B W ID E N IN G O F BR ID G E- T Y P IC A L C O N C R E T E S L O P E

T .
P A L A W A N 3RD M A LIN A O BR. (BOC170PW)
ALO N G P U E R T O P IN C E S A S O U T H RD P R O T E C T IO N D E T A ILS REYN-V^D G LAGASCA A LB ER TQ
-j iF JONSON JR IMELDA M. VALDESTAM ON A L B I N O D. S O C R A T E S , JR, ROMMEL P. AGUIRRE
D IS T R IC T E N G IN E E R IN G O FFIC E ENGINEER II
PU ER TO PR IN C ES A C ITY. PALAW AN CHIEF. PLANNING AN D D E SIG N SEC TIO N QIC, ASSISTANT CISTBICT ENGINEER D IST R IC T EN G IN EER
PUERTO PRINCESA CITY
~ ~ r DATE: DATE:

You might also like