QUALITY FORMAT

(To be maintained by Site Engineer)


ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING savills
P.ject Date:
Area/ Building
Description of Work/ Drg Ref. l :11 PEarSe
Time:S124
Pre Pour
Required Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory Ch ecued
Corrosion treatment of bars,if required, satisfactory
eheced
Bar sizes and Spacing correct
|Bar lap lengths as per the drawing9
As pEFLLAcoirg
Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
No. of the Bolts
9 Bolts Top Level
10 Verticality of Bolts Approved -uom pjuoM
11 Bolt top from templatee
12 Distance between Grid &Template centre
13 Achor Bolt Top covering before concreting 13 MM1aSmM
Shuttering provided, if required.
15 |Mix design for Pedestal approved? (specify Grade, Slump)
16 M2Sm-2
Theoretical concrete volume? (From ounding level to cutoff level)oLK
17
md lo.lkn
Compaction of concrete.
Post Pour
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22
Curing for7days.
Remarks

Note: Record typical dimensional check on reverse of this format

PE6 ENGINEER
ak
SITE ENGINEER SAVILLS
QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project Date
Area / Building Time: 4 L) 22|
Description of Work/ Drg Ref. X1 32 podet Cul r t
Pre Pour
Required Actual RemarksS
Bar bending schedules approved
Bar bending and cutting satisfactory Checked
Corrosion treatment of bars, if required, satisfactory
ChecK ed
Bar sizes and Spacing correct
Bar lap lengths as per the drawing AS dfatrio|
Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
No. of the Bolts
Bolts Top Level
10 Verticality of Bolts Approved
1oma Uom
Bolt top from template
12 Distance between Grid & Template centre
13 Achor Bolt Top covering before concreting
t3fmp13m
14 Shuttering provided, if required.
15 Mix cesign for Pedestal approved? (specify Grarie, Slump)
m-25 2S
16 Theoretical concrete volume? (From founding levelto cutofflevel) .183
17 Compaction of concrete.
Post Pour
|u3trtg
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
Verticality of Bolts Approved
2 Curing for 7 days.
emarks:

Note: Record typical dimensional check on reverse ofthis format

SITE ENGINEER SAVILLS


PEB ENGINEER
QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) cONCRETING savills
Project Date:

Area/ Building Time: 3131)22


Description of Work/ Drg Ref. O PPdes+e CcaH
Pre Pour Requlred Actual Remarks
Bar bending schedules approved pE cCita
Bar bending and cutting satisfactory AS
Corrosion treatment of bars, if requlred, satisfactory
Bar sizes and Spacing correct
Bar lap lengths as per the drawing
As PEr dort9
As d 6t9
Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
|No. of the Bolts 6
Bolts Top Level 4 Lo rmm
10 Verticality of Bolts Approved
11 Bolt top from template
12 |Distance between Grid & Template centre 13sm 3 Sm
13 Achor Bolt Top covering before concreting
14 Shuttering provided, if required.
15 Mix design for Pedestal approved? (specify Grade, Slump) m 2S -2 S
16 Theoretical concrete volume? (From founding level to cutoff level)|
17 Compaction of concrete. U2tHa le te Vibfo-o
Post Pour
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7 days.
Rmarks:

Note Record typical dimensional check on reverse of this format

YaL SAVILLS
PEB ENGINEER SITE ENGINEER
QUALITY FORMAT
(To be maintained by
Engineer)
ArvinD CHECK R
FOR PEDESTAL (ANCHOR BOLT) CONCRETINGG
savills
Project
Date
Area/ Building
Time: S) 1)22
Description of Work/ Drg Ref. X-9 PFdesrer
Pre Pour
Required Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory daa
-

Corrosion treatment of bars, if required, satisfactory SS PA ofitotrta


4 Bar sizes and Spacing correct
5 Bar lap lengths as per the drawing AS A daO
6 Cover to bottom bars, side barS, top bars correct As
7 7 Cover blocks approved including fixing
8 No. of the Bolts
9 Bolts Top Level 6
10 Verticality of Bolts Approved
11 Bolt top from template
12 Distance between Grid &Template centre
13 Achor Bolt Top covering before conareting 13Cmm |13Sm
14 Shuttering provided, if required.
15
|Mix design for Pedestal approved? (specify Grade, Slump)
16
Theoretical concrete volume? (From founding level to cutoff level) m-2 m-2
17 Compaction of concrete.
Post Pour uztig ee vibfa
18 Greesing of Bolt Threads
Top of Pedestal
20 Top of Bolt
21 |Verticality of Bolts Approved
22 Curing for 7 days.
Remarks:

Note Record typical dimensional check on reverse of this format

PEB ENGINEER SITE ENGINEER SAVILLS


QUALITY FORMAT
(To bo malintalned by site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project Date: J|221
Area /Bulldling Time
Description of Work/ Drg Ref.
Pre Pour Requlred Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory
Checka
C he chdo
Corroslon treatment of bars, If requlred, satistactory
4
Bar slzes and Spacing correct
Bar lap lengths as perthe drawing
6 Cover to bottom bars,slde bars, top bars correct L
Cover blocksapprovedIncluding fixlng
No. of the Bolts
Bolts Top Level
10 Verticality of Bolts Approved
11 Bolt top from template
12
Distance between Grid &Template centre
13 Achor Bolt Top covering before concreting
14 Shuttering provided, If required.
15 Mix design for Pecdestalapproved? (speclfy Grale, Slump) m2 92s
16
Theoretical concrete volume?(From foundinglevelto cutofflevel) 62m3
17 Compaction of concrete.
Post Pour
UStaVibat
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7days.
Remarks:

Note Record typical dimensional check on reverse of thls format

PEB ENGINEER SITE ENGINEER SAVILLS


QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project Date: 122
Area Building Time
Description ofWork/ Drg Ref.X pedefu
Pre Pour Required Actual Remarks
Bar bending schedules approved Chececd
Bar bending and cutting satisfactory
Corrosion treatment of bars, if required, satisfactory A6 CPOUed
Bar sizes and Spacing correct
Bar lap lengths as per the drawing
AR Pe2 h e d trt
5 Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
No. of the Bolts
9 Bolts Top Level
10 Verticality of Bolts Approved
11 Bolt top from template
12 Distance between Grid & Template centre
+Luo m Omm
13 Achor Bolt Top covering before concreting
13 mn13s mln
Shuttering provided, if required.
Mix design for Pedestal approved? (specify Gra:ie, Slump) -2 m-21
16 Theoretical concrete volume? (From found1ng level to cutoff level)
:7 Compaction of concrete.
022 m
Post Pour
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7 days.
Remarks:

|Note Record typical dimensional check on reverse of this format

PEB ENGINEER
a
SITE ENGINEER SAVILLS
QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) cONCRETING
savills
Project Date
Area Building
Time: $ (22
Ccscription of Work / Drg Ref.
K-Ju
Pre Pour
PEd eJUL
Required Actual Remarks
1 Bar bending schedules approved
2 Bar bending and cutting satisfactory ASPA
Corrosion treatment of bars, if required, satisfactory ASPf
Bar sizes and Spacing correct
Bar lap lengths as per the drawing As
Cover to bottom bars, side bars, top bars correct dfakbing
Cover blocks approved including fixing
8 No. of the Bolts
9 Bolts Top Level 6
10 Verticality of Bolts Approved
11 Bolt top from template
12 Distance between Grid &Template centre
13 Achor Bolt Top covering before concreting +0-0 0 m_
14 Shuttering provided, if required.
15 Mix design for Pedestal approved? (specify Grade, Slump) m-2
16 Theoretical concrete volume? (From founding level to cutoff level)||
17
Compaction of concrete.
Post Pour uSirigpie ihfral3
18 Greesing of Bolt Threads
19
Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7 days.
Remarks

Note Record typical dimensional check on reverse of this format

PEB ENGINEER SITE ENGINEER SAVILLS


QUALITY FORMAT
(To be maintained by Site Engineer)
/ VIND CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project Date
Area /Building Time S7 I 2
Description of Work/ Drg Ref.
X- CCHto
P e Ou Required
Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory AG
Corrosion treatment of bars, if required, satisfactory
Bar sizes and Spacing correct
Bar lap lengths as per the drawing AS Df daodi
Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
No. of the Bolts
Bolts Top Level
10 |Verticality of Bolts Approved -1S om M- n ro
11 Bolt top from template
12 Distance between Grid &Template centre
13 Achor Bolt Top covering before concreting Om m
14 Shuttering provided, if required.
15 Mix design for Pedestal approved? (specify Grade, Slump)
16 Theoretical concrete volume? (From founding level to cutoff level)
m.2 S|
17 Compaction of concrete. -IkIm3
Post Pour UrhCa
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
.. 21 |Verticality of Bolts Approved
22 Curing for 7days.
Remarks:

Note Record typical dimensional check on reverse of this format

Ya
PEB ENGINEER SITE ENGINEER
SAVILLS
QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project
Date
Area/ Building
Time
Description of Work / Drg Ref. X 12
Pre Pour
Bar bending schedules approved Required Actual Remarks
2 Bar bending and cutting satisfactory As DA
Corrosion treatment of bars, if required, satisfactory R P
Bar sizes and Spacing correct
Bar lap lengths as per the drawing
Cover to bottom bars, side bars, top bars correct dilacOia
Cover blocks approved including fixing
No. of the Bolts
Bolts Top Level
10 Verticality of Bolts Approved 16omrM-I£oHI)_
11 Bolt top from template
12 Distance between Grid &Template centre
13
Achor Bolt Top covering before concreting O mm O mm
14 Shuttering provided, if required.
15 Mix design for Pedestal approved? (specify Grade, Slump)
16 Theoretical concrete volume? (From founding level to Cutoff level)|m:a
0. 8 MÜ|
17
Compaction of concrete.
Post Pour
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21
Verticality of Bolts Approved
22 Curing for 7 days.
Remarks:

Note Record typical dimensional check on reverse of this format

PEB ENGINEER SITE ENGINEER SAVILLS


QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) cONCRETING
savills
Project: Date
Area Building Time: | 1 22|
Description of Work/ Drg Ref.
X-1P
Pre Pour | Required Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory dlcoMG
Corrosion treatment of bars, if required, satisfactory
-
dlaoiie_
Bar sizes and Spacing correct
Bar lap lengths as per the drawing AR Dei icitG
Cover to bottom bars, side bars, top bars correct _dfal G
Cover blocks approved including fixing
8 No. of the Bolts
9 Bolts Top Level
10 Verticality of Bolts Approved (S | -tuom
11 Bolt top from template
12 Distance between Grid & Template centre
13 Achor Bolt Top covering before concreting Om m_ mM
Shuttering provided, if required.
15 Mix design for Pedestal approved? (specify Grade, Slump)
16 Theoretical concrete volume? (From founding level to cutoff level) i
17 Compaction of concrete. m|O.Lfa
Post Pour
18 Greesing of Bolt Threads
I9 Top of Pedestal
20 Top of Bolt
Verticality of Bolts Approved
22 Curing for 7 days.
Remarks:

Note Record typical dimensional check on reverse of this format

PEB ENGINEER
yar
SHE ENGINEER SAVILLS
QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project Date
Area / Building Time
Description of Work/ Drg Ref. XU- o PfdeAt CC t9
Pre Pour Reequirec Actual Remarks
Bar bending schedules approved As
Bar bending and cutting satisfactory
Corrosion treatment of bars, if required, satisfactory
4
Bar sizes and Spacingcorrect s pe dfdirtg
5
Bar lap lengths as per the drawing
Cover to bottom bars, side bars, top bars correct
Cover blocks approved including fixing
8 No. of the Bolts 6
9 Bolts Top Level
somM-iuoMM
10 Verticality of Bolts Approved
L
11 Bolt top from template
12 Distance between Grid & Template centre
m mO
13 |Achor Bolt Top covering before concreting
14 Shuttering provided, if required.
15 Mix design for Pedestalapproved? (Specify Grade, Slump) m:2 m2|
16 Theoretical concrete volume? (Fromfounding level to Cutofflevel) 0-Lmo.
17 Compaction of concrete.
Post Pouur
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7 days.
RemarksS

Note: Record typical dimensional check on reverse of this format

PEB ENGINEER SITE ENGINEER SAVILLS


QUALITY FORMAT
(To be maintained by Site Engineer)
ArvinD CHECK FOR PEDESTAL (ANCHOR BOLT) CONCRETING
savills
Project: Date
Area Building Time
Description of Work/ Drg Ref. Xg-J
Pre Pour
Ped eA _
Required Actual Remarks
Bar bending schedules approved
Bar bending and cutting satisfactory AS Pe do Oi Hg
Corrosion treatment of bars, if required, satisfactory pLdtaboiMG
Bar sizes and Spacing correct
Bar lap lengths as per the drawing ASPP dfce2
Cover to bottom bars, side bars, top bars correct _P2| dfatG
Cover blocks approved including fixing
8 No. of the Bolts
9 Bolts Top Level
10 |Verticality of Bolts Approved
11 |Bolt top from template
12 Distance between Grid & Template centre
13 Achor Bolt Top covering before concreting
14 Shuttering provided, if required.
5 Mix design for Pedestal approved? (specify Grade, Slump)
16 Theoretical concrete volume? (From founding level to cutoff level - 1 m o-Ifms
17 Compaction of concrete.
Post Pour
18 Greesing of Bolt Threads
19 Top of Pedestal
20 Top of Bolt
21 Verticality of Bolts Approved
22 Curing for 7 days.
Remarks:

Note : Record typical dimensional check on reverse of this format

PEB ENGINEER SITE-ENGINEER SAVILLS