S1  Continuous duty The motor operates at a continuous load for sufficient time to
enable machine to reach thermal equilibrium. 
S2 Short Time duty Operation at a load for a time not sufficient to reach thermal
equilibrium, followed by enough time for the motor to cool
down.
S3  Intermittent periodic duty Series of identical duty cycles each a constant load for a period,
followed by a rest period. Thermal equilibrium is not reached
during the cycle.
S4 Intermittent periodic duty Similar to S3, but there is a significant starting time within the
with starting periodic operation.
S5 Intermittent periodic duty Sequence of identical duty cycles - starting, operation, braking
with electric braking and rest.  Again thermal equilibrium is not reached.
S6 Continuous operation Identical duty cycles with a period at load followed by a period
periodic duty at no load.  Difference between S1 is that the motor runs at
no-load, without actual stopping.
S7 Continuous operation As per S6, but with a significant starting and electric breaking
periodic duty with electric periods.  Again motor operates at no-load for  period instead
braking of stopped. 
S8 Continuous operation Series of identical repeating duty cycles, where within each
periodic duty with related cycle the motor operates at several different load levels and
load/speed changes speed. There is not stopped time and thermal equilibrium is not
reached.
S9 Duty with non-periodic Load and speed vary periodically within the permissible
load and speed operating range. Frequent overloading may occur.
variations    
S10 Duty with discrete constant Duty with discrete number of load/speed combinations, with
loads and speeds these maintained long enough to reach thermal equilibrium.