URBAN INSTITUTIONAL AND

INFRASTRUCTURE DEVELOPMENT PROGRAM


(UIIDP) MIS
SYSTEM REQUIREMENT SPECIFICATION
for
CONSULTANCY SERVICES FOR DEVELOPMENT,
INSTALLATION, IMPLEMENTATION AND
COMMISSIONING OF THE UIIDP MANAGEMENT
INFORMATION SYSTEM APPLICATION (MIS)

Submitted To:
Ministry of Urban and
Infrastructure Development

Contract No: ET-MUDH-162373-CS-QCBS OCTOBER 2021


Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:2 of 696


Software Requirement Specification

REVISION HISTORY

REV Description of Change Author/ Reviewer Effective Date

1.0 Preparation of document Abhikrit Singh 20/09/2021

Review of document Deepak Kumar Das 18/10/2021


1.0

Incorporation of user matrix Abhikrit Singh 22/10/2021


1.0
and process flows.

Review of document Deepak Kumar Das 28/10/2021


1.0

Review of document Prajna Mishra 29/10/2021


1.0

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:3 of 696


Software Requirement Specification

INDEX

1 Introduction ................................................................................................................ 17
1.1 Purpose .................................................................................................................. 17
1.2 Project Scope of Work & features ........................................................................... 17
1.3 Definitions, Acronyms, and Abbreviations ............................................................... 19
1.4 References .............................................................................................................. 20

2 Overall Description ..................................................................................................... 22


2.1 Product Features .................................................................................................... 22
2.2 Member Users ........................................................................................................ 23
2.3 Operating Environment .......................................................................................... 24
2.4 Design & Implementation Constraint ..................................................................... 25
2.5 User Documentation............................................................................................... 25
2.6 Dependencies ......................................................................................................... 26
2.7 Out of Scope .......................................................................................................... 26

3 Functional Requirement ............................................................................................. 27


3.1 Program Coordination ............................................................................................ 27
3.1.1 Annual Work Budget [REQ-001] ......................................................................... 27
3.1.2 Staff Evaluation [REQ-002] ................................................................................. 29
3.1.3 Non-Thematic Areas [REQ-003] ......................................................................... 31
3.1.4 MoUs [REQ-004] ................................................................................................ 33
3.1.5 Conducted APA [REQ-005]................................................................................. 34
3.1.6 Consolidated strategy and action plan for addressing weakness identifies in the
APA [REQ-006] .............................................................................................................. 36
3.1.7 Annual Action Plan [REQ-007]............................................................................ 38
3.1.8 VfM Audit Scheduling [REQ-008] ....................................................................... 41
3.1.9 Performance Evaluation Criteria [REQ-009] ........................................................ 42
3.1.10 Review and Approval [REQ-010] ........................................................................ 44
3.1.11 VfM Recommendation [REQ-011] ...................................................................... 45

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:4 of 696


Software Requirement Specification

3.1.12 Field Visit Request [REQ-012]............................................................................. 47


3.1.13 Field Visit Approval [REQ-013] ........................................................................... 50
3.1.14 Field Visit Report [REQ-014] ............................................................................... 51
3.1.15 AWP Budget - (Follow Up Activities) [REQ-015] ................................................. 55
3.1.16 Implementation of AWP [REQ-016] .................................................................... 57
3.1.17 Tracking progress of activities under Annual Action Plan [REQ-017] .................. 59
3.2 Monitoring and Evaluation ..................................................................................... 64
3.2.1 UIIDP Performance [REQ-018]............................................................................ 64
3.2.2 Monthly Progress report Submission of ULG [REQ-019] ..................................... 66
3.2.3 Annual Progress report Submission of ULG [REQ-020] ....................................... 68
3.2.4 Annual Action Plan [REQ-021]............................................................................ 70
3.2.5 Review and Approval [REQ-022] ........................................................................ 73
3.2.6 Field Visit Request [REQ-023]............................................................................. 75
3.2.7 Field Visit Report [REQ-024] ............................................................................... 77
3.2.8 Tracking progress of activities under Annual Action Plan [REQ-025] .................. 80
3.3 Project Engineering ................................................................................................ 85
3.3.1 Project Cost [REQ-026] ...................................................................................... 85
3.3.2 Field Supervision [REQ-027] ............................................................................... 87
3.3.3 Contract Management [REQ-028] ...................................................................... 89
3.3.4 Time & Cost Claims from Contractors [REQ-029] ............................................... 91
3.3.5 Infrastructure Project [REQ-030] ........................................................................ 93
3.3.6 Annual Action Plan [REQ-031]............................................................................ 96
3.3.7 Review and Approval [REQ-032] ........................................................................ 99
3.3.8 Tracking progress of activities under Annual Action Plan [REQ-033] ................ 101
3.3.9 Checklists against which infrastructure projects are assessed [REQ-034] .......... 105
3.3.10 Project site/ field supervision and monitoring of all Engineering projects [REQ-
034] 108
3.3.11 Field Visit Request [REQ-035]........................................................................... 110
3.3.12 Field Visit Report [REQ-036] ............................................................................. 112
3.3.13 Capacity Building Plan [REQ-037]..................................................................... 116

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:5 of 696


Software Requirement Specification

3.3.14 Bills of Quantities [REQ-038] ............................................................................ 120


3.3.15 Financial Schedules [REQ-039] ......................................................................... 121
3.3.16 Material Test Results [REQ-040] ....................................................................... 125
3.3.17 Monitoring and Evaluation Report [REQ-041] .................................................. 128
3.3.18 New Project Setup [REQ-042] .......................................................................... 131
3.4 Municipal Finance and Revenue............................................................................ 133
3.4.1 Different types of revenue [REQ-043]............................................................... 133
3.4.2 State Revenue Progress [REQ-044]................................................................... 134
3.4.3 Annual Action Plan [REQ-045].......................................................................... 138
3.4.4 Tracking progress of activities under Annual Action Plan [REQ-046] ................ 141
3.4.5 Revenue Enhancement Plan [REQ-047] ............................................................ 145
3.4.6 Analysis of arrears [REQ-048] ........................................................................... 158
3.4.7 Municipal Finance and Revenue Progress Report [REQ-049] ............................ 161
3.4.8 Field Visit Report [REQ-050] ............................................................................. 166
3.4.9 Capacity Building Plan [REQ-051]..................................................................... 170
3.5 Financial Management ......................................................................................... 174
3.5.1 Financial Management M & E Data [REQ-052] ................................................. 174
3.5.2 Count and reconciliation of fixed assets [REQ-053] .......................................... 177
3.5.3 Audit Progress [REQ-054] ................................................................................ 180
3.5.4 Financial Audit [REQ-055] ................................................................................ 182
3.5.5 Annual Action Plan [REQ-056].......................................................................... 183
3.5.6 Tracking progress of activities under Annual Action Plan [REQ-057] ................ 186
3.5.7 Field Visit Request [REQ-058]........................................................................... 190
3.5.8 Field Visit Report [REQ-059] ............................................................................. 193
3.5.9 Capacity Building Plan [REQ-060]..................................................................... 196
3.6 Environment Management ................................................................................... 199
3.6.1 Project Screening [REQ-061] ............................................................................ 199
3.6.2 ESMS & RS [REQ-062]...................................................................................... 203
3.6.3 Annual Environment Performance audit [REQ-063] .......................................... 208
3.6.4 Environment Management Plan [REQ-064] ...................................................... 209

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:6 of 696


Software Requirement Specification

3.6.5 Annual Action Plan [REQ-065].......................................................................... 212


3.6.6 Tracking progress of activities under Annual Action Plan [REQ-066] ................ 215
3.6.7 Environment Audit [REQ-067] .......................................................................... 219
3.6.8 ESIA (Environment and social impact assessment) [REQ-068] ........................... 222
3.6.9 Field Visit Request [REQ-069]........................................................................... 225
3.6.10 Field Visit Report [REQ-070] ............................................................................. 227
3.7 Social Development .............................................................................................. 231
3.7.1 Project Screening [REQ-071] ............................................................................ 231
3.7.2 ESMS & RS [REQ-072]...................................................................................... 235
3.7.3 Resettlement Action Plan [REQ-073] ................................................................ 237
3.7.4 Social Audit Review [REQ-074] ......................................................................... 240
3.7.5 Annual Action Plan [REQ-075].......................................................................... 242
3.7.6 Tracking progress of activities under Annual Action Plan [REQ-076] ................ 245
3.7.7 Field Visit Request [REQ-077]........................................................................... 249
3.7.8 Field Visit Report [REQ-078] ............................................................................. 251
3.7.9 Capacity Building Plan [REQ-079]..................................................................... 255
3.8 Infrastructure Asset Management ......................................................................... 258
3.8.1 Asset Condition Assessment Indicator [REQ-080]............................................. 258
3.8.2 Infrastructure Asset Inventory [REQ-081] ......................................................... 259
3.8.3 Asset condition assessment [REQ-082] ............................................................ 270
3.8.4 Infrastructure asset management [REQ-083] .................................................... 275
3.8.5 Asset Management Plan [REQ-084] ................................................................. 280
3.8.6 Asset maintenance plan [REQ-085] .................................................................. 288
3.8.7 3-Year Rolling Program [REQ-086] ................................................................... 291
3.8.8 Annual Action Plan [REQ-087].......................................................................... 293
3.8.9 Tracking progress of activities under Annual Action Plan [REQ-088] ................ 295
3.8.10 Field Visit Request [REQ-089]........................................................................... 299
3.8.11 Field Visit Report [REQ-090] ............................................................................. 302
3.8.12 Capacity Building Plan [REQ-091]..................................................................... 305
3.9 Urban Land Management ..................................................................................... 309

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:7 of 696


Software Requirement Specification

3.9.1 Land Management M & E Data [REQ-092] ....................................................... 309


3.9.2 Land Registration, inventory, Release, Development, Banking [REQ-093] ......... 317
3.9.3 Action Plan [REQ-094] ..................................................................................... 320
3.9.4 Tracking progress of activities under Annual Action Plan [REQ-095] ................ 322
3.9.5 Field Visit Request [REQ-096]........................................................................... 327
3.9.6 Field Visit Report [REQ-097] ............................................................................. 329
3.9.7 Capacity Building Plan [REQ-098]..................................................................... 333
3.10 Urban Planning ................................................................................................ 337
3.10.1 Proposal feasibility assessment [REQ-099] ....................................................... 337
3.10.2 Urban Plan Supervision Data [REQ-100] ........................................................... 339
3.10.3 Proposal assessment criteria [REQ-101] ........................................................... 341
3.10.4 EIA Report Review [REQ-102] ........................................................................... 343
3.10.5 Review and approval of Structural Plan [REQ-103] ........................................... 344
3.10.6 Urban Planning M & E Report [REQ-104] ......................................................... 346
3.10.7 Annual Action Plan [REQ-105].......................................................................... 349
3.10.8 Tracking progress of activities under Annual Action Plan [REQ-106] ................ 352
3.10.9 Field Visit Request [REQ-107]........................................................................... 357
3.10.10Field Visit Report [REQ-108] ............................................................................. 359
3.10.11Capacity Building Plan [REQ-109]..................................................................... 362
3.11 Planning and Budgeting .................................................................................. 365
3.11.1 Potential Projects [REQ-110] ............................................................................ 365
3.11.2 Citizen participation in Planning Progress [REQ-111] ....................................... 367
3.11.3 Capital Investment Plan [REQ-112]................................................................... 370
3.11.4 Matching funds [REQ-113] ............................................................................... 384
3.11.5 Checklist for Review of CIP [REQ-114] .............................................................. 386
3.11.6 Develop budget forecasts using base-year budgets [REQ-115] ........................ 388
3.11.7 Review and Approval [REQ-116] ...................................................................... 390
3.11.8 Planning and Budgeting M & E Data [REQ-117] ............................................... 392
3.11.9 CIPs Progress Report [REQ-118]....................................................................... 398
3.11.10Annual Action Plan [REQ-119].......................................................................... 401

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:8 of 696


Software Requirement Specification

3.11.11Tracking progress of activities under Annual Action Plan [REQ-120] ................ 404
3.11.12Field Visit Request [REQ-121]........................................................................... 408
3.11.13Field Visit Report [REQ-122] ............................................................................. 411
3.11.14Capacity Building Plan [REQ-123]..................................................................... 414
3.12 Procurement Management .............................................................................. 418
3.12.1 Proposal Evaluation [REQ-124]......................................................................... 418
3.12.2 List of Applicable Procurement Documents [REQ-125] ..................................... 419
3.12.3 Procurement Audit Data [REQ-126] ................................................................. 422
3.12.4 Delivered Procured Goods [REQ-127] .............................................................. 424
3.12.5 Procurement Audit Performance Status Report [REQ-128] ............................... 426
3.12.6 Ineligible Firms / Individuals [REQ-129] ............................................................ 429
3.12.7 Supplier and Consultant Details [REQ-130] ...................................................... 431
3.12.8 Annual Action Plan [REQ-131].......................................................................... 433
3.12.9 Procurement Status for EFY [REQ-132] ............................................................. 437
3.12.10Procurement Outcomes for EFY [REQ-133] ...................................................... 445
3.12.11Tracking progress of activities under Annual Action Plan [REQ-134] ................ 452
3.12.12Field Visit Request [REQ-135]........................................................................... 457
3.12.13Field Visit Report [REQ-136] ............................................................................. 459
3.12.14Capacity Building Plan [REQ-137]..................................................................... 462
3.13 Capacity Building ............................................................................................. 466
3.13.1 Self-Assessment [REQ-138] .............................................................................. 466
3.13.2 Training Recordings [REQ-139] ........................................................................ 468
3.13.3 Training Evaluation [REQ-140] ......................................................................... 471
3.13.4 Capacity Building Plan [REQ-141]..................................................................... 474
3.13.5 Capacity Building Plan Implementation Report [REQ-142] ............................... 477
3.13.6 Review and Approval [REQ-143] ...................................................................... 479
3.13.7 Annual Action Plan [REQ-144].......................................................................... 481
3.13.8 Capacity Building Progress Report [REQ-145] .................................................. 484
3.13.9 Tracking progress of activities under Annual Action Plan [REQ-146] ................ 488
3.13.10Field Visit Request [REQ-147]........................................................................... 492

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:9 of 696


Software Requirement Specification

3.13.11Field Visit Report [REQ-148] ............................................................................. 494


3.13.12Capacity Building Plan [REQ-149]..................................................................... 497
3.14 LED and Job Creation....................................................................................... 501
3.14.1 Business Idea Competition Data [REQ-150] ...................................................... 501
3.14.2 LED and Job Creation Plan [REQ-151] .............................................................. 503
3.14.3 LED and Job Creation M & E Report [REQ-152] ................................................ 505
3.14.4 Temporary Jobs [REQ-153] .............................................................................. 513
3.14.5 Firm Jobs [REQ-153] ........................................................................................ 520
3.14.6 Challenges Faced by MSEs [REQ-154] .............................................................. 528
3.14.7 Annual Action Plan [REQ-155].......................................................................... 530
3.14.8 Tracking progress of activities under Annual Action Plan [REQ-156] ................ 533
3.14.9 Field Visit Request [REQ-157]........................................................................... 538
3.14.10Field Visit Report [REQ-158] ............................................................................. 540
3.14.11Capacity Building Plan [REQ-159]..................................................................... 543
3.15 Urban Resilience and DRM .............................................................................. 546
3.15.1 Risk Priority [REQ-160] ..................................................................................... 546
3.15.2 Institution participating in risk analysis [REQ-161]............................................ 547
3.15.3 Urban Resilience performance scoring matrix [REQ-162] ................................. 549
3.15.4 Risk Analysis Summary [REQ-163] .................................................................... 551
3.15.5 DRM and Emergency Response Plan [REQ-164] ............................................... 554
3.15.6 Urban Resilience and DRM M&E Report [REQ-165] ......................................... 555
3.15.7 Annual Action Plan [REQ-166].......................................................................... 558
3.15.8 Tracking progress of activities under Annual Action Plan [REQ-167] ................ 561
3.15.9 Field Visit Request [REQ-168]........................................................................... 567
3.15.10Field Visit Report [REQ-169] ............................................................................. 569
3.15.11Capacity Building Plan [REQ-170]..................................................................... 572
3.16 Gender Management ....................................................................................... 575
3.16.1 Gender Audit [REQ-171] .................................................................................. 575
3.16.2 Gender Main Streaming [REQ-172] .................................................................. 577
3.16.3 Employment Mainstreaming [REQ-173] ........................................................... 581

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:10 of 696


Software Requirement Specification

3.16.4 Employment Empowerment [REQ-174] ............................................................ 584


3.16.5 Women Participation and community dialogue [REQ-175]............................... 586
3.16.6 Gender Development Plan [REQ-176] .............................................................. 591
3.16.7 Gender Development M&E Data [REQ-177] ..................................................... 594
3.16.8 Annual Action Plan [REQ-178].......................................................................... 601
3.16.9 Tracking progress of activities under Annual Action Plan [REQ-179] ................ 603
3.16.10Field Visit Request [REQ-180]........................................................................... 609
3.16.11Field Visit Report [REQ-181] ............................................................................. 611
3.16.12Capacity Building Plan [REQ-182]..................................................................... 614
3.17 Complain Management ................................................................................... 618
3.17.1 Procurement Complain [REQ-183] ................................................................... 618
3.17.2 ULG APA Complain [REQ-184] ......................................................................... 620
3.17.3 RIAs APA Complain [REQ-185] ......................................................................... 622
3.17.4 Registering Grievances [REQ-186] .................................................................... 624
3.17.5 Complain Assignment [REQ-187] ..................................................................... 626
3.18 System Administration ..................................................................................... 628
3.18.1 User Information [REQ-188] ............................................................................. 628
3.18.2 Region Detail [REQ-189] .................................................................................. 631
3.18.3 ULG Detail [REQ-190]....................................................................................... 633
3.18.4 User Permission [REQ-191] .............................................................................. 635
3.18.5 Focal Persons [REQ-192] .................................................................................. 636
3.19 Document Management .................................................................................. 638
3.19.1 Document Upload [REQ-193]........................................................................... 638
3.20 UIIDP Website [REQ-194] ................................................................................. 641

4 Report Screen ............................................................................................................ 642


4.1 Program Coordination .......................................................................................... 642
4.1.1 VfM Recommendation Report ......................................................................... 642
4.1.2 Annual Staff Performance Evaluation Report .................................................... 642
4.1.3 Monitoring report on implementation of AWP ................................................ 643
4.1.4 UIIDP AWP Budget .......................................................................................... 643

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:11 of 696


Software Requirement Specification

4.1.5 UIIDP Regional AWP Budget ............................................................................ 643


4.1.6 VfM Audit Progress Report .............................................................................. 644
4.1.7 Final Field Visit Report ..................................................................................... 644
4.1.8 Review and Approve Report ............................................................................ 644
4.2 Monitoring and Evaluation ................................................................................... 644
4.2.1 Annual Action Plan .......................................................................................... 644
4.2.2 Field Visit Report ............................................................................................. 645
4.2.3 Capacity Building Plan ..................................................................................... 645
4.2.4 Reports on Result Framework .......................................................................... 645
4.3 Project Engineering .............................................................................................. 645
4.3.1 Project Engineering M & E Report ................................................................... 645
4.3.2 Project Cost Report .......................................................................................... 646
4.3.3 Contract Management Report ......................................................................... 646
4.3.4 Annual Action Plan .......................................................................................... 646
4.3.5 Field Visit Report ............................................................................................. 646
4.3.6 Capacity Building Plan ..................................................................................... 646
4.3.7 Infrastructure Projects ...................................................................................... 647
4.4 Municipal Finance and Revenue............................................................................ 647
4.4.1 State Revenue Progress ................................................................................... 647
4.4.2 Municipal Finance and Revenue Progress Report ............................................. 647
4.4.3 Revenue Enhancement Plan ............................................................................. 648
4.4.4 Annual Action Plan .......................................................................................... 648
4.4.5 Field Visit Report ............................................................................................. 648
4.4.6 Capacity Building Plan ..................................................................................... 649
4.5 Financial Management ......................................................................................... 649
4.5.1 Finance Management M&E Report .................................................................. 649
4.5.2 Count and Reconciliation of fixed assets .......................................................... 649
4.5.3 Audit Progress Report...................................................................................... 649
4.5.4 Annual Action Plan .......................................................................................... 650
4.5.5 Field Visit Report ............................................................................................. 650

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:12 of 696


Software Requirement Specification

4.5.6 Capacity Building Plan ..................................................................................... 650


4.6 Environment Management ................................................................................... 650
4.6.1 Environment Management M&E Report .......................................................... 650
4.6.2 Environment and social audit report ................................................................ 651
4.6.3 Project Screening Report ................................................................................. 651
4.6.4 ESIA Report ..................................................................................................... 651
4.6.5 Environment Management Plan ....................................................................... 651
4.6.6 Annual Environment Performance Audit Report ............................................... 652
4.6.7 Annual Action Plan .......................................................................................... 652
4.6.8 Field Visit Report ............................................................................................. 652
4.6.9 Capacity Building Plan ..................................................................................... 652
4.7 Social Development .............................................................................................. 653
4.7.1 Social Development M&E Report ..................................................................... 653
4.7.2 Environment and Social Audit Report .............................................................. 653
4.7.3 Project Screening Report ................................................................................. 653
4.7.4 Resettlement Action Plan ................................................................................. 653
4.7.5 ESIA Report ..................................................................................................... 654
4.7.6 Annual Action Plan .......................................................................................... 654
4.7.7 Field Visit Report ............................................................................................. 654
4.7.8 Capacity Building Plan ..................................................................................... 654
4.8 Infrastructure Asset Management ......................................................................... 655
4.8.1 Infrastructure Asset Inventory .......................................................................... 655
4.8.2 Asset Condition Assessment ............................................................................ 656
4.8.3 Asset Management Plan .................................................................................. 657
4.8.4 Infrastructure asset management M&E Report ................................................ 658
4.8.5 Annual Action Plan .......................................................................................... 659
4.8.6 Field Visit Report ............................................................................................. 659
4.8.7 Capacity Building Plan ..................................................................................... 659
4.9 Urban Land Management ..................................................................................... 660
4.9.1 Urban Land Management M&E Data ............................................................... 660

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:13 of 696


Software Requirement Specification

4.9.2 Land Registration............................................................................................. 660


4.9.3 Annual Action Plan .......................................................................................... 661
4.9.4 Field Visit Report ............................................................................................. 661
4.9.5 Capacity Building Plan ..................................................................................... 661
4.10 Urban Planning ................................................................................................ 661
4.10.1 Proposal Progress Report ................................................................................ 661
4.10.2 Urban Planning M&E Report............................................................................ 662
4.10.3 Annual Action Plan .......................................................................................... 662
4.10.4 Field Visit Report ............................................................................................. 662
4.10.5 Capacity Building Plan ..................................................................................... 662
4.11 Planning and Budgeting .................................................................................. 662
4.11.1 Planning and Budgeting Progress Report......................................................... 662
4.11.2 CIP Progress Report ......................................................................................... 663
4.11.3 Matching Funds Progress Report ..................................................................... 664
4.11.4 Annual Action Plan .......................................................................................... 664
4.12 Procurement Management .............................................................................. 664
4.12.1 Procurement Audit Status Report .................................................................... 664
4.12.2 Procurement Management M&E Report .......................................................... 665
4.12.3 Annual Action Plan .......................................................................................... 665
4.13 Capacity Building ............................................................................................. 665
4.13.1 Self – assessment ............................................................................................. 665
4.13.2 Training Evaluation .......................................................................................... 665
4.13.3 Capacity Building Plan Implementation Report ................................................ 666
4.13.4 Capacity Building Progress Report ................................................................... 666
4.13.5 Annual Action Plan .......................................................................................... 666
4.13.6 Field Visit Report ............................................................................................. 666
4.13.7 Capacity Building Plan ..................................................................................... 666
4.14 LED and Job Creation....................................................................................... 667
4.14.1 Business Idea Competition Report ................................................................... 667
4.14.2 Job Creation Plan ............................................................................................. 667

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:14 of 696


Software Requirement Specification

4.14.3 Led and Job Creation M&E Report ................................................................... 667


4.14.4 Temporary Jobs Report .................................................................................... 668
4.14.5 Firm Jobs Report.............................................................................................. 668
4.14.6 Annual Action Plan .......................................................................................... 668
4.14.7 Field Visit Report ............................................................................................. 668
4.14.8 Capacity Building Plan ..................................................................................... 669
4.15 Urban Resilience and DRM .............................................................................. 669
4.15.1 Institutions participating in risk analysis ........................................................... 669
4.15.2 Urban Resilience performance scoring matrix .................................................. 669
4.15.3 Risk Analysis Summary..................................................................................... 669
4.15.4 Urban Resilience and DRM Progress Report..................................................... 670
4.15.5 Annual Action Plan .......................................................................................... 670
4.15.6 Field Visit Report ............................................................................................. 670
4.15.7 Capacity Building Plan ..................................................................................... 670
4.16 Gender Development....................................................................................... 671
4.16.1 Gender Audit ................................................................................................... 671
4.16.2 Gender Mainstreaming .................................................................................... 671
4.16.3 Employment Mainstreaming ............................................................................ 671
4.16.4 Employment Empowerment ............................................................................. 671
4.16.5 Women Participation and community dialogue ............................................... 672
4.16.6 Gender Development Plan ............................................................................... 672
4.16.7 Annual Action Plan .......................................................................................... 672
4.16.8 Field Visit Report ............................................................................................. 672
4.16.9 Capacity Building Plan ..................................................................................... 672
4.17 Complain Management ................................................................................... 673
4.17.1 Procurement Complain .................................................................................... 673
4.17.2 ULG APA Complains......................................................................................... 673
4.17.3 Region APA Complains .................................................................................... 673
4.17.4 Complain Assigned .......................................................................................... 674
4.18 System Administration ..................................................................................... 674

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:15 of 696


Software Requirement Specification

4.18.1 User Information.............................................................................................. 674


4.18.2 ULG Detail Report ............................................................................................ 674
4.18.3 Regional Detail Report ..................................................................................... 674
4.18.4 User Permission Report.................................................................................... 675
4.18.5 Focal Person Report ......................................................................................... 675
4.19 Document Management ......................................................................................... 675
4.19.1 Data of Document Uploaded ............................................................................ 675

5 User Responsibility Matrix ....................................................................................... 676


5.1 Program Coordination .............................................................................................. 676
5.2 Monitoring and Evaluation ....................................................................................... 677
5.3 Project Engineering .................................................................................................. 678
5.4 Municipal Finance and Revenue................................................................................ 679
5.5 Finance Management ............................................................................................... 680
5.6 Environment Management ....................................................................................... 681
5.7 Social Development .................................................................................................. 682
5.8 Infrastructure asset management ............................................................................. 683
5.9 Urban Land Management and Urban Planning ......................................................... 684
5.10 Planning and Budgeting ......................................................................................... 685
5.11 Procurement Management ..................................................................................... 686
5.12 Capacity Building .................................................................................................... 687
5.13 LED and Job Creation.............................................................................................. 687
5.14 Urban Resilience and DRM ..................................................................................... 688
5.15 Gender Development ............................................................................................. 688
5.16 System Admin ........................................................................................................ 689

6 External Interfaces .................................................................................................... 689


6.1 Hardware/Network Interfaces ................................................................................... 689
6.2 Software Interfaces ............................................................................................... 689
6.3 Communication Interfaces .................................................................................... 690

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:16 of 696


Software Requirement Specification

7 Non Functional Requirement ................................................................................... 690


a. Integration Requirement .......................................................................................... 690
b. Availability Requirement .......................................................................................... 694
c. Reliability Requirement ............................................................................................ 695
d. Security Requirement............................................................................................... 695

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:17 of 696


Software Requirement Specification

1 Introduction

1.1 Purpose

The purpose of the document is to describe the functional and non-functional requirements of
Urban Institutional and Infrastructure Development Program Management Information system
(UIIDP MIS). The functional requirement will be broken down according to the business
requirement, for better understanding and tracking of the project. The non-functional points will
provide the information about dependency of the project with other external and internal entities.

1.2 Project Scope of Work & features

The scope of the assignment will be mainly focused on the 117 cities participating in the UIIDP
as well as the UIIDP Regional and Federal Implementing Agencies. However, the UIIDP MIS is
expected to work for all ULGs which Ministry of Urban and Infrastructure Development (MUID)
may decide in the future to add to the program and/or to benefit from the system.

Functional Scope

The functional scope of the UIIDP MIS comprises of the following thematic area:

a. Implementation of UIIDP MIS application software with the following modules:

i. Project Coordination

ii. Monitoring and evaluation

iii. Project engineering

iv. Municipal Finance and Revenue

v. Financial Management

vi. Environment Management

vii. Social Development

viii. Infrastructure asset Management

ix. Land Management

x. Urban Planning

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:18 of 696


Software Requirement Specification

xi. Planning and Budgeting

xii. Procurement

xiii. Capacity Building

xiv. LED and Job Creation

xv. Urban Resilience and DRM

xvi. Gender Development

xvii. Complaint Management

xviii. System Administration

xix. Document Management

xx. UIIDP Website

b. Integration with the following systems:

i. Integrated Financial Management Information System (IFMIS)

ii. Integrated Budget and Expenditure (IBEX)

iii. Standard Integrated Government Tax Administration System (SIGTAS)

iv. Systematic Tracking on Exchanges in Procurement (STEP)

v. Web Based Revenue Management System

vi. Cadastre

vii. Geographical Information System (GIS)

viii. AutoCAD

c. CSM / AFRICOM is expected to develop the system that supports English and the
official Amharic language, as well as the following regional languages - Afaan
Oromo, Somali, Tigrinya and Afaraf.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:19 of 696


Software Requirement Specification

1.3 Definitions, Acronyms, and Abbreviations

SL# Term Definition

1 Admin Administration

2 BoFED Bureau of Finance and Economic Development

3 BRD Business Requirement Document

4 EFY End of Financial Year

5 FDRE Federal Democratic Republic of Ethiopia

6 FMT Federal Mobile Team

7 GUI Graphical User Interface

8 IR Inception Report

9 MIS Management Information System

10 MoF Ministry of Finance

11 MUID Ministry of Urban and Infrastructure Development

12 SA Security Architecture

13 SDLC Software Development Life Cycle

14 SRS System Requirement Specification

15 SSL Secure Sockets Layer

16 TDD Test Driven Development

17 UIIDP Urban Institutional and Infrastructure Development Program

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:20 of 696


Software Requirement Specification

1.4 References

Reference Document
SL#

Scope document - ULGDP II - Detailed design (Volume 1) V3.0, ULGDP II - Detailed design
1
(Volume 2) - Implementation Plan V3.0

MOM of System Study


2

3 Final Inception Report V1.3

4 UIIDP Capacity Building manual

5 UIIDP Annual Performance Assessment Guideline

6 Local Economic Development Guideline

7 Implementation Strategy for Asset Management

8 Gender and Development Manual

9 Critical Mass Security Requirement

10 TOR for APA (Annual Performance Assessment)

11 Pre-APA Self-Assessment Guideline

12 TOR and Program Schedule for QAR (Quality Assurance Review)

13 Field visit request forms

14 Disbursement Request & Approval Formats

15 Capital Investment Planning Manual

16 GIS Manual

17 Asset Management Plan Manual

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:21 of 696


Software Requirement Specification

18 Model AMP (Asset Management Planning)

19 AMP Implementation Strategy

20 REP (Revenue Enhancement Planning) Manual

21 IBEX System Manual

22 Financial management manuals and guidelines from MOFEC

23 Resettlement System Guidelines for UIIDP

24 Audit Manuals and Guidelines

25 ULGDP II/UIIDP Monitoring, Evaluation and Reporting System and Guidelines for Federal
Level (Volume 1, 2 and 3)

26 Annual progress reports template

27 ULGDP II APA reports (1st , 2nd and 3rd )

28 Field work report template

29 Standard Monthly Engineering progress report

30 Field visit request format

31 Monthly Progress report template

32 Annual action plan template

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:22 of 696


Software Requirement Specification

2 Overall Description

2.1 Product Features

The proposed UIIDP MIS Design (Thematic Area-based) as illustrated in the Concept and
Preliminary design is in this section broken down to the lowest descriptive detail in terms of
module objective, proposed functionality based on each Thematic Area business processes
and Module data interactions/ interdependencies. The detailed description covers the 16 core
MIS modules based on Program Thematic Areas and 4 support modules.

i. Project Coordination

ii. Monitoring and evaluation

iii. Project engineering

iv. Municipal Finance and Revenue

v. Financial Management

vi. Environment Management

vii. Social Development

viii. Infrastructure asset Management

ix. Land Management

x. Urban Planning

xi. Planning and Budgeting

xii. Procurement

xiii. Capacity Building

xiv. LED and Job Creation

xv. Urban Resilience and DRM

xvi. Gender Development

xvii. Complaint Management

xviii. System Administration

xix. Document Management

xx. UIIDP Website

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:23 of 696


Software Requirement Specification

2.2 Member Users

The UIIDP MIS users have been divided into four different types: -

1. UIIDP ULG Focal Persons


- These types of users will be managing the MIS in context with thematic areas at
ULG Level. They will be filling data forms to execute processes under different
thematic areas as per there assigned roles and responsibilities. They will be
generating, viewing, and monitoring the progress status of the processes through
reports at ULG level. They will be querying on data of their respective ULG in MIS.

2. UIIDP Regional Mobile Teams (RMTs)


- These types of users will be managing the MIS in context with thematic areas at
Regional Level. They will be filling data forms in order to execute processes under
different thematic areas at Regional Level as per their assigned roles and
responsibilities. They will be generating, viewing, and monitoring the progress
status of the processes through reports at Regional Level. They will be giving
reviews and approval on the reports for different processes coming from their
respective ULGs. They will be querying on data of their respective Region in MIS.

3. UIIDP Federal Mobile Team (FMT)


- These types of users will be managing the MIS in context with thematic areas at
Federal Level. They will be filling data forms in order to execute processes under
different thematic areas at Federal Level. They will be generating, viewing, and
monitoring the progress status of the processes through various reports at Federal
Level. They will be giving reviews and approval on the reports for different
processes coming from ULGs and Regions. They will be querying on consolidated
data coming from the ULGs and Regions. These types of users will also be
managing the MIS as System admin who can create users and user responsibilities.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:24 of 696


Software Requirement Specification

4. UIIDP Non-Thematic Users


- These types of users will be working on the processes which are not coming under
the sixteen thematic areas. They will be viewing the reports from the external
interface integrated with the MIS. They will be viewing the report of the Audit,
Progress, Action Plan executed under thematic areas as a source of information.

2.3 Operating Environment

a. Software Requirement (Web)

Sl. No Category Description

1. Operating System Windows

2. Platform/ Language Java, Spring, JPA/Hibernate,

3. Database MySQL

4. Web Server Apache

5 Application Server Tomcat 8

6. Scripting languages Java Script/ JQuery

b. Hardware Requirement

Sl.
No Category Description

Minimum 2 x Eight core processor with 1.86 GHz or

1 Hardware platform above; Processor should be latest series/generation

for the server

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:25 of 696


Software Requirement Specification

Disk Space and Memory


2
Requirements Disk Space - 500 GB

3 RAM Memory 16 GB for Application and 32 GB for DB

Server/Application
4
Accessed Through Browser

5 Bandwidth required 5-6 Mbps dedicated

2.4 Design & Implementation Constraint

 Interface with other system is dependent on web services still being developed by
other team members.
 The application shall use a layered architecture, whereby each layer may only access
the layer directly.
 All application software shall be modularized into classes using object-oriented design
principles
 All web application components will be written in Java with MySQL database.

2.5 User Documentation

User manual must be created to help users of the application to understand the basic flow as
well as each and every details of the application. It will also distribute as the hands out for the
trainee during the training period.

System Installation and Operation Manual would be shared which will facilitate the users in
successfully using the software package.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:26 of 696


Software Requirement Specification

2.6 Dependencies

The dependencies are:


 Preproduction and production hosting environment is required in client end to host the
application.
 SMS gateway to be provided to avail SMS notifications in the application.
 Mail content to be provided for mail body of the application at any point of transaction
through application.
 Escalation matrix for Complain Management system, approval hierarchy and upper level
action taking authorities for all modules are required to configure the application.
 Defining the List of Designations of officials along with their roles and responsibility in the
MIS.

2.7 Out of Scope

The following conditions are to be consider as “out of scope” for the project:

 Integration with any applications unless it is captured in the SRS and System Design
document.
 Development of Mobile Application.
 System software license procurement & renewal such as operating system,
 database licenses, or any license software which is required for internal
consumption at MUID.
 Hardware and deployment infrastructure such as server, storage, Data center, DR
site etc.
 Any other activities, which is not included or not captured in SRS and System Design
document.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:27 of 696


Software Requirement Specification

3 Functional Requirement

3.1 Program Coordination

3.1.1 Annual Work Budget [REQ-001]

Description
This function is used to Capture Annual Work Budget and Plan and generate a report on
Annual Work Budget and Plan

Inputs

The contents of Annual Work Budget are:

Financial Year User will Select the Financial Year

Level User will Select the Level from ( Federal , Regional , ULG )

Region User Will Select the region for which Annual Work Budget and Plan is
being captured

ULG User Will Select the ULG for which Annual Work Budget and Plan is being
captured

Project User will Select the Project

Category User Will Select the Project Category ( Schedule 1 , Schedule 2 , Schedule
3)

Project cost User will enter the project cost

Budget For EFY User will enter the Budget for Financial Year

Output Indicator / Unit User will enter the Output Indicator / Unit of Measure
of Measure

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:28 of 696


Software Requirement Specification

Period of User will select the period of implementation ( Quarter )


Implementation

Cash Flow User Will enter the cash flow amount

Annual Total User will enter the amount of annual

Expenditure Code User will select the expenditure code from ( BI Code, General Ledger,
Subsidiary ledger )

Button Submit This Button will submit the Data for Annual Work Budget and Plan

Button Reset This Button will reset the entered data for Annual Work Budget and Plan

Button Cancel This Button will terminate the process of capturing data for Annual Work
Budget and Plan

Data Capture Diagram

Annual Work Budget

Financial Year Level Region ULG


Select Year Select Level Select Region Select ULG

Project Category Project Cost


Select Project Select Category

Budget For EFY Output Indicator Period of Implementation

Cash Flow Annual Total Expenditure Code

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:29 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.2 Staff Evaluation [REQ-002]

Description
This function is used to captured data for staff Evaluation and generate a report on the staff
evaluation

Inputs

The contents of staff evaluation are:

Name of Staff User will enter the name of the staff

Review Period User will select the review period in Quarter

Date of Review User will select the data of review from the calendar

Evaluator User will enter the name of the evaluator

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:30 of 696


Software Requirement Specification

Performance Indicator

Category User will select the category for staff evaluation

Sub - Category User will select the sub-category for staff evaluation

Description User will enter the description in text field

Maximum-Points User will enter the maximum points awarded for staff who is being
evaluated.

Scoring Method User will enter the scoring method in text field

Points Awarded User will enter the points awarded to staff who is being evaluated

Button Submit This Button will submit the Data for staff performance and evaluation

Button Reset This Button will reset the entered data for staff performance and
evaluation

Button Cancel This Button will terminate the process of capturing data for staff
performance and evaluation

Data Capture Diagram

Staff Evaluation

Name of Staff Review Period Date of Review Evaluator


Select Date Select ULG

Performance Indicator

Category Sub- Category Description

Maximum-Points Scoring Method Points Awarded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:31 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.3 Non-Thematic Areas [REQ-003]

Description
This function is used to capture data for Non-Thematic Areas and generate a report on Non-
Thematic Areas.

Inputs

The contents of Non-Thematic Areas are:

Area Name User will enter the non-thematic area name

Description User will enter the description in text field

Approval Status User will select the approval status ( Pending , Approved, Rejected )

Category User will select the category of Non-Thematic Areas

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:32 of 696


Software Requirement Specification

Button Submit This Button will submit the Data for Non-Thematic Areas

Button Reset This Button will reset the entered data for Non-Thematic Areas

Button Cancel This Button will terminate the process of capturing data for Non-
Thematic Areas

Data Capture Diagram

Non-Thematic Areas

Area Name Description

Approval Status Category


Select Approval Status Select Category

Submit Reset Cancel

Figure 2

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:33 of 696


Software Requirement Specification

3.1.4 MoUs [REQ-004]

Description
This function is used to capture MoUs data between UIIDP and other federal and regional
agencies.

Inputs

The contents of MoUs are:

Agency Name User will enter the agency name

Level User will select the Level from ( Federal , Regional , ULG )

Category User will select the category of MOUs

MoU Document User will Upload the Document

Approval Status User will select the approval status ( Pending , Approved, Rejected )

Button Submit This Button will submit the data for MOUs

Button Reset This Button will reset the entered data for MOUs

Button Cancel This Button will terminate the process of capturing data for MOUs

Data Capture Diagram

MoUs
Agency Name Level Category
Select Level Select Category

MoU Document Approval Status

Upload Document Select Approval Status

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:34 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.5 Conducted APA [REQ-005]

Description
This function is used to capture annual conducted APA data.

Inputs

The contents of Conducted APA are:

Name of APA Firm User will enter the name of the APA Firm

Financial Year User will select the financial year

APA Number User will enter the APA Number

Planned Date User will enter the planned date from calendar

Actual Date ( 61 Cities User will enter the date for conducted APA
in Oromia and

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:35 of 696


Software Requirement Specification

SNNPRS)

Actual Date (56 Cities in User will enter the date for Conducted APA

Amhara,Tigray,
Afar,Benishangu,

IGumuz,Gambella,Harar

i,Somali,Dire Dawa)

Button Submit This Button will submit the data for conducted APA

Button Reset This Button will reset the entered data for conducted APA

Button Cancel This Button will terminate the process of capturing data for APA

Data Capture Diagram

Conducted APA

Name of APA Firm Financial Year APA Number Planned Date


Select Date

Actual Date ( 61 Cities in Oromia and SNNPRS)


Select Date

Actual Date (56 Cities in Amhara,Tigray,Afar,Benishangu,I Gumuz, Gambella,Harari,Somali,Dire Dawa)


Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:36 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.6 Consolidated strategy and action plan for addressing weakness identifies in the
APA [REQ-006]

Description
This function is used to Consolidate strategy and action plan for addressing weakness
identifies in the APA.

Inputs

The contents of Consolidated strategy and action plan for addressing weakness identifies in
the APA are:

Financial Year User will select the Financial Year

APA User will enter the APA

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:37 of 696


Software Requirement Specification

Issue to address User will enter the issue to address in text field

Action to address issue User will enter the action to be taken for addressing the issue in text field

Responsible Party User will enter the name of responsible party name

Timeline User will select the timeline ( Quarter )

Button Submit This Button will submit the data to Consolidate strategy and action plan
for addressing weakness identifies in the APA

Button Reset This Button will reset the entered data to Consolidate strategy and action
plan for addressing weakness identifies in the APA

Button Cancel This Button will terminate the process of capturing data to Consolidate
strategy and action plan for addressing weakness identifies in the APA

Data Capture Diagram

Consolidated strategy and action plan for addressing weakness identifies in the
APA
Financial Year APA Issue to address
Select Year

Action to address issue Responsible Party Timeline

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:38 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.7 Annual Action Plan [REQ-007]

Description
This function is used for Preparation of program coordination annual action plans and Review
/ approval of Program Coordination Annual Action plans. The final reviewed annual action plan
will be sent to Monitoring and Evaluation for Final Approval

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:39 of 696


Software Requirement Specification

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:40 of 696


Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:41 of 696


Software Requirement Specification

3.1.8 VfM Audit Scheduling [REQ-008]

Description
This function is used for Value for Money (VfM) audit scheduling and coordination.

Inputs

The contents of VfM Audit Scheduling are:

Start Date of Audit User will enter the date from calendar

End Date of Audit User will enter the data from calendar

Submission Date of User will enter the data from calendar

audit report to bureau


Submission Date of

audit report to bureau

by regional

coordinator

Button Submit This Button will submit the data for VfM Audit Scheduling

Button Reset This Button will reset the entered data for VfM Audit Scheduling

Button Cancel This Button will terminate the process of capturing data for Vfm Audit
Scheduling

Data Capture Diagram

VfM Audit Scheduling


Start Date of Audit End Date of Audit Date of Submission of
the audit report to bureua
by regional coordinator

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:42 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.9 Performance Evaluation Criteria [REQ-009]

Description
This function is used to Performance Evaluation Criteria for staff Evaluation

Inputs

The contents of Performance Evaluation Criteria are:

Category User will enter the category in text field

Sub-Category User will enter the subcategory under category in text field

Description User will enter the description under subcategory which is under
category in text field

Button Submit This Button will submit the data for Performance Evaluation Criteria

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:43 of 696


Software Requirement Specification

Button Reset This Button will reset the entered data for Performance Evaluation
Criteria

Button Cancel This Button will terminate the process of capturing data for Performance
Evaluation Criteria

Data Capture Diagram

Performance Evaluation Criteria

Performance Criteria

Category Sub- Category Description

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:44 of 696


Software Requirement Specification

3.1.10 Review and Approval [REQ-010]

Description
This function is used for Review and Approval of documents, data and reports coming from
different thematic areas.

Inputs

The contents of Review and Approval are:

Action User will select the action from ( Accepted , Rejected )

Comments User will add comments for there action

Button Submit This Button will submit the data for Review and approval

Button Reset This Button will reset the entered data for Review and approval

Button Cancel This Button will terminate the process of capturing data for review and
approval

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:45 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.11 VfM Recommendation [REQ-011]

Description
This function is used to Capture Data for VfM Recommendation and generate report Of VfM
Recommendation.

Inputs

The contents of VfM Recommendation are:

Proportion of User will enter the numeric value for the proportion of recommendation
Recommendation of of previous VfM Audit addressed
Previous VfM Audit

Addressed

ULG Name User will select the ULG Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:46 of 696


Software Requirement Specification

Region Name User will select the Region Name

Financial Year User will select the Financial Year

Number of Vfm User will enter the numeric value for number of VfM recommendation of

Recommendation of prior year


Prior Year

Number of addressed User will enter the numeric value for the number of addressed
Recommendation recommendation

Percentage of This field will be automatically calculated considering the number of VfM

Addressed recommendation of prior year and number of addressed


Recommendation recommendation

Button Submit This Button will submit the data for VfM Recommendation

Button Reset This Button will reset the entered data for VfM Recommendation

Button Cancel This Button will terminate the process of capturing data for VfM
Recommendation

Data Capture Diagram

VfM Recommendation
Propoortion of Recommendation
of Previous VfM Audit Addressed ULG Name Region Name
Select ULG Select Region

Number of Vfm Recommendation Number of addressed


Financial Year of Prior Year Recommnedation

Percentage of Addressed
Recommendation

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:47 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.12 Field Visit Request [REQ-012]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:48 of 696


Software Requirement Specification

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown
ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar
requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:49 of 696


Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:50 of 696


Software Requirement Specification

3.1.13 Field Visit Approval [REQ-013]

Description
This function is used to approve the Field Visit request from all other thematic areas.

Inputs

The contents of Field Visit Approval form are:

Approval Person User will enter the name of Approval Person

Date of Approved User will select the date from calendar

Date of allowed / User will select the date from calendar

permitted

Button Submit This Button will submit the data for field visit request approval

Button Reset This Button will reset the entered data for field visit request approval

Button Cancel This Button will terminate the process of capturing data for field visit
request approval

Data Capture Diagram

Field Visit Request Action


Approval Person Date of Approved Date of allowed / Permitted

Actual field / site visit started


Select Region

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:51 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.14 Field Visit Report [REQ-014]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:52 of 696


Software Requirement Specification

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:53 of 696


Software Requirement Specification

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )


uploaded

Detail Monitoring User will select the value from ( Yes , No )


progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:54 of 696


Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:55 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.15 AWP Budget - (Follow Up Activities) [REQ-015]

Description
This function is used to capture data for AWP Budget - (Follow up Activities) and generate
report at ULG and Regional Level user.

Inputs

The contents of AWP Budget - (Follow up Activities) are:

Activity User will enter the name of activity in text field

Annual Budget EFY User will enter the value of annual budget in numeric value

Current Status User will enter the current status

Next Action User will enter the next action in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:56 of 696


Software Requirement Specification

Deadline User will select the deadline from the calendar

Actual User will select the actual date from the calendar

Responsibility for User will enter the responsibility for action and follow up in Bureau /
action and follow Agency in text field.
up in Bureau / Agency

Responsibility for User will enter the responsibility for action and follow up in PPMD in text
action and follow up in field.
PPMD

Button Submit This Button will submit the entered data for action follow up on AWP

Button Reset This Button will reset the entered data for action follow up on AWP

Button Cancel This Button will terminate the process of capturing data for action follow
up on AWP

Data Capture Diagram

AWP Budget - ( Follow Up Activities)

Activity Annual Budget EFY Cuurent Status Next Action

Deadline Action
Select Date

Responsibility for action and follow up in Bureau / Agency

Responsibility for action and follow up in PPMD

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:57 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.16 Implementation of AWP [REQ-016]

Description
This function is used to generate progress monitoring report on implementation of the AWP.

Inputs

The contents of Implementation of AWP are:

Financial Year User will select the value of financial year

Level User will select the Level from ( Federal, Regional , ULG )

ULG name User will select the ULG Name

Region name User will select the Region Name

Thematic Area User will select the thematic area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:58 of 696


Software Requirement Specification

Output Indicator /Unit User will enter the output indicator / unit of measure in text field
of Measure

Period User will select the value from Quarter

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for implementation of AWP

Button Reset This Button will reset the entered data for implementation of AWP

Button Cancel This Button will terminate the process of capturing data for
implementation of AWP

Data Capture Diagram

Implementation of AWP

Financial Year Level ULG Name Region Name


Select Financial Year Select Level Select ULG Select Region

Thematic Area Output Indicator / Period Planned


Unit of Measure
Select Thematic Area

Actual Perentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:59 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.1.17 Tracking progress of activities under Annual Action Plan [REQ-017]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:60 of 696


Software Requirement Specification

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:61 of 696


Software Requirement Specification

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:62 of 696


Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:63 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:64 of 696


Software Requirement Specification

3.2 Monitoring and Evaluation

3.2.1 UIIDP Performance [REQ-018]

Description
This function is used to capture data for result framework data (UIIDP Performance)

Inputs

The contents of UIIDP Performance are:

PDO Level Result User will enter the PDO Level result indicator in text field

Indicator

Core User will enter the Core in text field

DLI User will select the DLI from ( DLI 1 To DLI 10 )

Unit Measure User will select the unit measure

Baseline Financial Year User will enter the value in numeric field

Actual Financial Year 2 User will enter the value in numeric field

Target Financial Year 2 User will enter the value in numeric field

Actual Financial Year 3 User will enter the value in numeric field

Target Financial Year 3 User will enter the value in numeric field

Actual Financial Year 4 User will enter the value in numeric field

Target Financial Year 4 User will enter the value in numeric field

Actual Financial Year 5 User will enter the value in numeric field

Target Financial Year 5 User will enter the value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:65 of 696


Software Requirement Specification

Frequency User will enter the frequency value in text field

Data User will enter the data source / methodology in text field
Source/Methodology

Responsibility for Data User will enter the responsibility for data collection in text field

Collection

Intermediate Result User will enter the intermediate result area in text field

Area

Button Submit This Button will submit the entered data for UIIDP Performance

Button Reset This Button will reset the entered data for UIIDP Performance

Button Cancel This Button will terminate the process of capturing data for UIIDP
Performance

Data Capture Diagram

UIIDP Performance
PDO Level Result Indicator Core DLI

Unit Measure Baseline Financial Year 1 Actual Finacial Year 2

Target Financial Year 2 Actual Finacial Year 3 Target Financial Year 3

Actual Financial Year 4 Target Finacial Year 4 Actual Financial Year 5

Targer Financial Year 5 Frequency Data Source/Methodology

Responsibilty for Data Collection Intermediate Result Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:66 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.2.2 Monthly Progress report Submission of ULG [REQ-019]

Description
This function is used to capture data for Monthly Progress report Submission of ULG.

Inputs

The contents of Monthly Progress report Submission of ULG are:

Financial Year User will select the financial Year from dropdown

ULG name User will select the ULG Name from dropdown

Month User will select the month from dropdown

Submission Deadline User will select the submission deadline date from the calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:67 of 696


Software Requirement Specification

Date Submitted to User will select the date submitted to region from the calendar
Region

Button Submit This Button will submit the entered data for monthly progress report
submission

Button Reset This Button will reset the entered data for monthly progress report
submission

Button Cancel This Button will terminate the process of capturing data for monthly
progress report submission

Data Capture Diagram

Monthly Progress report Submission of ULG


Financial Year ULG Name Month
Select Financial Year Select ULG Select Month

Submission Deadline Date Submitted to Region


Select Date Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:68 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.2.3 Annual Progress report Submission of ULG [REQ-020]

Description

This function is used to capture data for Annual Progress report Submission of ULG.

Inputs

The contents of Annual Progress report Submission of ULG are:

Financial Year User will select the financial Year from dropdown

ULG name User will select the ULG Name from dropdown

Month User will select the month from dropdown

Submission Deadline User will select the submission deadline date from the calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:69 of 696


Software Requirement Specification

Date Submitted to User will select the date submitted to region from the calendar
Region

Button Submit This Button will submit the entered data for annual progress report
submission

Button Reset This Button will reset the entered data for annual progress report
submission

Button Cancel This Button will terminate the process of capturing data for annual
progress report submission

Data Capture Diagram

Annual Progress report Submission of ULG


Financial Year ULG Name Month
Select Financial Year Select ULG Select Month

Submission Deadline Date Submitted to Region


Select Date Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:70 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.2.4 Annual Action Plan [REQ-021]

Description
This function is used for Preparation of program coordination annual action plans and Review
/ approval of Program Coordination Annual Action plans. The final reviewed annual action plan
will be sent to Monitoring and Evaluation for Final Approval

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:71 of 696


Software Requirement Specification

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:72 of 696


Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:73 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.2.5 Review and Approval [REQ-022]

Description
This function is used for Review and Approval of documents, data and reports coming from
different thematic areas.

Inputs

The contents of Review and Approval are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:74 of 696


Software Requirement Specification

Action User will select the action from ( Accepted , Rejected )

Comments User will add comments for there action

Button Submit This Button will submit the data for Review and approval

Button Reset This Button will reset the entered data for Review and approval

Button Cancel This Button will terminate the process of capturing data for review and
approval

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:75 of 696


Software Requirement Specification

3.2.6 Field Visit Request [REQ-023]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:76 of 696


Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:77 of 696


Software Requirement Specification

3.2.7 Field Visit Report [REQ-024]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:78 of 696


Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:79 of 696


Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:80 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.2.8 Tracking progress of activities under Annual Action Plan [REQ-025]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:81 of 696


Software Requirement Specification

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:82 of 696


Software Requirement Specification

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:83 of 696


Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:84 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:85 of 696


Software Requirement Specification

3.3 Project Engineering

3.3.1 Project Cost [REQ-026]

Description
This function is used to support extensive capture of project cost data.

Inputs

The contents of hierarchy level are:

ULG name User will select the ULG name from dropdown

Financial year User will select the financial year from dropdown

Project name User will select the project name from dropdown list

Project start Date User will select the project start date from calendar

Item User will select the item from dropdown list

Category User will select the category from dropdown list

Unit Cost User will enter the unit cost in numeric field

Quantity User will enter the quantity in numeric field

Total Cost Total cost will be calculated using Unit cost and Quantity

Date of Expenditure User will select the date of expenditure from calendar

Total Project Cost User will enter the total project cost in numeric field

Percentage of spent This will be calculated using total cost and total project cost

Project Budget

Button Submit This Button will submit the entered data for Project Cost

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:86 of 696


Software Requirement Specification

Button Reset This Button will reset the entered data for Project Cost

Button Cancel This Button will terminate the process of capturing data for Project Cost

Data Capture Diagram

Project Cost

ULG name Financial year Project name Project start Date


Select ULG Select year Select name Select Date

Cost Details

Item Category Unit Cost Quantity


Select Item

Total Cost Date of Expenditure Total Project Cost Percentage of spent


Project Budget

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:87 of 696


Software Requirement Specification

3.3.2 Field Supervision [REQ-027]

Description
This function is used for extensive capture of Field supervision data.

Inputs

The contents of field supervision are:

ULG Name User will select the ULG name from dropdown list

Project name User will select the project name from dropdown list

Supervision Start Date User will select the supervision start date from the calendar

Supervision End Date User will select the supervision end date from the calendar

Focal persons in charge User will enter the name of focal persons incharge of supervision in text

of supervision field

Findings

Finding User will enter the findings in text field

Category User will enter the category in text field

Description of Finding User will enter the description of findings in text field

Action User will enter the action in text field

Party Responsible User will enter the party responsible in text field

Timeline User will select the timeline in quarter

Button Submit This Button will submit the entered data for Field Supervision

Button Reset This Button will reset the entered data for Field Supervision

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:88 of 696


Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Field
Supervision

Data Capture Diagram

Field Supervision
ULG Name Project name Supervision Start Date Supervision End Date
Select name Select date Select date

Focal persons in charge of supervision

Findings
Finding Category Description of Finding

Action Party Responsible Timeline

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:89 of 696


Software Requirement Specification

3.3.3 Contract Management [REQ-028]

Description
This function is used to capture Contract Management data.

Inputs

The contents of contract management are:

ULG name User will select the ULG name from the dropdown list

Financial year User will select the financial year from the dropdown list

Contract status User will select the contract status from (Preparation, signed,
Implementation, Closed)

Contractor name User will enter the contractor name in text field

Responsible party User will enter the responsible party in text field

Contract cost User will enter the contract cost in numeric field

Project name User will select the project name from dropdown list

Contract timeline User will select the contract timeline from calendar

Claims details (If any) User will enter the claim details in text field

Supervision period User will select the supervision period in quarter

Contract start date User will select the contract start date from calendar

Contract completion User will select the contract completion date from calendar

date

Project engineers in User will enter the project engineers in charge in text field

charge

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:90 of 696


Software Requirement Specification

Button Submit This Button will submit the entered data for Contract Management

Button Reset This Button will reset the entered data for Contract Management

Button Cancel This Button will terminate the process of capturing data for Contract
Management

Data Capture Diagram

Contract Management

ULG name Financial year Contract status Contractor name


Select year Select Status

Responsible party Contract cost Project name Contract timeline

Claims details (If any) Supervision period Contract start date


Select Date

Contract completion date Project engineers in charge


Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:91 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.4 Time & Cost Claims from Contractors [REQ-029]

Description
This function is used to capture data for time and cost claims from contractors
Inputs

The contents of time and cost claims are:

Request date User will select the request date from the calendar

Approval status User will select the approval status from the dropdown list

Approval date (if User will select the approval date from the calendar
approved)

Approved by (if User will enter the person name who has approved in text field

approved)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:92 of 696


Software Requirement Specification

Claim category (cost or User will select the claim category from ( Cost, Time )
time)

Claim User will enter the claim in text field

Button Submit This Button will submit the entered data for time and cost claims

Button Reset This Button will reset the entered data for time and cost claims

Button Cancel This Button will terminate the process of capturing data for time and cost
claims

Data Capture Diagram

Time & Cost Claims from Contractors


Request date Approval status Approval date (if approved)
Select Date Select Status Select Date

Approved by (if approved) Claim category (cost or time) Claim

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:93 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.5 Infrastructure Project [REQ-030]

Description
This function is used to capture records of all infrastructure projects being implemented at the
city, reginal and federal level.

Inputs

The contents of Infrastructure project are:

Project Name User will select the project name from dropdown list

Unit User will select the unit from dropdown list

Measurement User will enter the measurement in text field

Contract Amount User will enter the contract amount in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:94 of 696


Software Requirement Specification

Contract Start Date User will select the contract start date from calendar

Contract Completion User will select the contract completion date from calendar
Date

Annual Physical Plan User will enter the annual physical plan in numeric field

Annual Financial Plan User will enter the annual financial plan in numeric field

Physical Achievement User will enter the physical achievement this month in numeric field
this Month

Financial Achievement User will enter the financial achievement this month in numeric field

this month

Physical User will enter the physical achievement to date in numeric field
Achievement to date

Financial Achievement User will enter the financial achievement to date in numeric field
to date

Physical Achievement This will be calculated using annual physical plan and physical

in % to date from achievement to date value


annual Plan

Financial achievement This will be calculated using annual financial plan and financial

in % to date from achievement to date value

annual plan

Physical Achievement This will be calculated using contract amount and physical achievement

in % to date from to date value

Contract

Financial achievement This will be calculated using contract amount and financial achievement

in % to date from to date value

contract

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:95 of 696


Software Requirement Specification

Time elapsed in % User will enter the time elapsed in percentage

Comments User will enter the comments / contractual problem faced in text field
/Contractual Problem
Faced

Button Submit This Button will submit the entered data for Infrastructure Projects

Button Reset This Button will reset the entered data for Infrastructure Projects

Button Cancel This Button will terminate the process of capturing data for Infrastructure
Projects

Data Capture Diagram

Infrastructure Project
Project Name Unit Measurement Contract Amount

Contract Start Date Contract Completion Annual Physical and Financial Plan
Date

Physical and Fiancial Physical and Financial Physical and Financial Physical and Financial
Achievement this Month Achievement to date Achievement in % Achievement in %
to date from annual to date from Contract
Plan

Time elapsed in % Comments /Contractual Problem Faced

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:96 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.6 Annual Action Plan [REQ-031]

Description
This function is used for Preparation of project engineering annual action plans and Review /
approval of Project engineering Annual Action plans. The final reviewed annual action plan will
be sent to Monitoring and Evaluation for Final Approval

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:97 of 696


Software Requirement Specification

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:98 of 696


Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:99 of 696


Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.7 Review and Approval [REQ-032]

Description
This function is used to Review and Approve Asset Management Plan, Capital Investment Plan,
Procurement Plan and Revenue Enhancement Plan from their respective thematic areas.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:100 of


696
Software Requirement Specification

Inputs

The contents of Review and approve are:

Action User will select the action from ( Accepted , Rejected )

Comments User will enter the comments in text field

Button Submit This Button will submit the data for review and approval

Button Cancel This Button will reset the entered data for review and approval

Button Reset This Button will terminate the process of capturing data for review and
approval

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:101 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.8 Tracking progress of activities under Annual Action Plan [REQ-033]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:102 of


696
Software Requirement Specification

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:103 of


696
Software Requirement Specification

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:104 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:105 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.9 Checklists against which infrastructure projects are assessed [REQ-034]

Description
This function is used to capture data for capturing checklists against which infrastructure
projects are assessed.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:106 of


696
Software Requirement Specification

Inputs

The contents of Checklists are:

Community Discussion User will select the value from ( Yes , No )

for Project selection

Project Prioritization User will select the value from ( Yes , No )

Checking the project User will select the value from ( Yes , No )

against the structural

plan

Environment Impact User will select the value from ( Yes , No )

assessment

Social Safeguard User will select the value from ( Yes , No )

Inspection

Availability of design, User will select the value from ( Yes , No )

specification and BOQ

Tender Document User will select the value from ( Yes , No )

Preparation

Bid Evaluation User will select the value from ( Yes , No )

Award Notification User will select the value from ( Yes , No )

Button Submit This Button will submit the entered data for Checklists

Button Reset This Button will reset the entered data for Checklists

Button Cancel This Button will terminate the process of capturing data for Checklists

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:107 of


696
Software Requirement Specification

Data Capture Diagram

Checklist
Community Discussion Project Prioritization Checking the Project Environment Impact
for Project Selection against the structural Assessment
Plan

Social Safeguard Availability of Design, Tender Document Bid Evaluation


Inspection Specification and BOQ Preparation

Award Notification

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:108 of


696
Software Requirement Specification

3.3.10 Project site/ field supervision and monitoring of all Engineering projects [REQ-
034]

Description

This function is used to capture data of Project site/ field supervision and monitoring of all
Engineering projects

Inputs

The contents of project site / field supervision are:

Project name User will select the project name from the dropdown list

Focal persons in charge User will enter the focal persons in charge of supervision in text field

of supervision

ULG name User will select the ULG Name from dropdown list

Evidence User will enter the evidence in text field

Category User will enter the category in text field

Strengths User will enter the strengths in text field

Weakness User will enter the weakness in text field

Remarks User will enter the remarks in text field

Activity User will enter the activity in text field

Responsible person User will enter the responsible person name in text field

Timeline for the User will select the timeline in quarter.

activity execution

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:109 of


696
Software Requirement Specification

Button Submit This Button will submit the entered data for project site / field
supervision

Button Reset This Button will reset the entered data for project site / field supervision

Button Cancel This Button will terminate the process of capturing data for Project site /
field supervision

Data Capture Diagram

Project site/ field supervision and monitoring of all Engineering projects


Project name Focal persons in charge of supervision ULG name
Select Project Select ULG

Evidence Category Strengths

Weakness Remarks Activity

Responsible person Timeline for the activity execution

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:110 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.11 Field Visit Request [REQ-035]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:111 of


696
Software Requirement Specification

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown
ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:112 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.12 Field Visit Report [REQ-036]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:113 of


696
Software Requirement Specification

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field
ULGs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:114 of


696
Software Requirement Specification

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field


to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )


progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:115 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:116 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.13 Capacity Building Plan [REQ-037]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:117 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:118 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:119 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:120 of


696
Software Requirement Specification

3.3.14 Bills of Quantities [REQ-038]

Description
This function is used to capture data for bills of quantities under project management for
Project engineering.

Inputs

The contents of Bills of quantities are:

Description User will enter the description in text field

Unit User will select the unit from dropdown

Quantity User will enter the quantity in numeric field

Unit Price User will enter the unit price in numeric field

Total Amount This will be calculated using Quantity and unit price

Button Submit This Button will submit the entered data for bills of quantities

Button Reset This Button will reset the entered data for bills of quantities

Button Cancel This Button will terminate the process of capturing data for bills of
quantities

Data Capture Diagram

Bills of Quantities

Description Unit Quantity


Select Status

Unit Price Total Amount

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:121 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.15 Financial Schedules [REQ-039]

Description

This function is used to capture data of financial schedules and enable reviewers to incorporate
comments

Inputs

The contents of financial schedules are:

Project Name User will select the project name from dropdown

Total Project Cost

Contract Amount User will enter the contract amount in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:122 of


696
Software Requirement Specification

Variation User will enter the variation in numeric field

Total cost User will enter the total cost in numeric field

Payment

Advance Payment ( Birr )

Advance Payment User will enter the advance payment in numeric field

Advance Repayed User will enter the advance repayed in numeric field

Outstanding advance User will enter the outstanding advance in numeric field

Interim Payment ( Birr )

Previous User will enter the previous value in numeric field

Current User will enter the current value in numeric field

To Date User will enter the current value in numeric field

Retention

Retention Holded User will enter the Retention Holded value in numeric field

Retention Returned User will enter the Retention Returned value in numeric field

Outstanding Retention User will enter the Outstanding Retention value in numeric field

Financial Gurantee

Advance Gurantee

Start Date User will select the start date from the calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:123 of


696
Software Requirement Specification

End Date User will select the end date from the calendar

Extended Date User will select the extended date from the calendar

Performance Gurantee

Start Date User will select the start date from the calendar

End Date User will select the end date from the calendar

Extended Date User will select the extended date from the calendar

Button Submit This Button will submit the entered data for financial schedules

Button Reset This Button will reset the entered data for financial schedules

Button Cancel This Button will terminate the process of capturing data for financial
schedules

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:124 of


696
Software Requirement Specification

Data Capture Diagram

Financial Schedules
Project Name

Total Project Cost

Contract Amount Variation Total Cost

Payment
Advance Payment ( Birr )

Advance Payment Advance Repayed Outstanding advance

Interim Payments

Previous Current Todate

Retention

Retention Holded Retention Returned Outstanding Retention

Outstanding Payment

Financial Gurantee
Advance Gurantee

Start Date End Date Extended Date

Performance Gurantee

Start Date End Date Extended Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:125 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.3.16 Material Test Results [REQ-040]

Description
This function is used to capture material test results from the contractors.

Inputs

The contents of Material Test Results are:

Project User will select the project name from dropdown

Site User will select the site from dropdown

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:126 of


696
Software Requirement Specification

Employer User will enter the employer name in text field

Contractor User will enter the contractor name in text field

Consultant User will enter the consultant name in text field

Testing Lab User will enter the testing lab name in text field

Testing Number User will enter the testing number modality in text field

Modality

Kind of Material Tested User will enter the kind of material tested in text field

Specfied Quality User will enter the specified quality in text field

Recommendation of User will enter the Recommendation of Designer or Consultant or

Designer or Consultant Supervisor in text field

or Supervisor

Button Submit This Button will submit the entered data for material test results

Button Reset This Button will reset the entered data for material test results

Button Cancel This Button will terminate the process of capturing data for material test
results

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:127 of


696
Software Requirement Specification

Data Capture Diagram

Material Test Results


Project Site Employer Contractor
Select Project Name

Consultant Testing Lab

Testing Number Kind of Material Specfied Quality


Modality Tested

Recommendation of Designer or Consultant or Supervisor

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:128 of


696
Software Requirement Specification

3.3.17 Monitoring and Evaluation Report [REQ-041]

Description
This function is used to capture data for monitoring and evaluation of Project Engineering.

Inputs

The contents of M & E Project Engineering are:

ULG Name User will select the ULG name from dropdown

Name of Project User will select the project name from dropdown

Unit of Measurement User will select the unit of measurement from dropdown

Planned for Year User will enter the planned for year value in numeric field

From Month User will select the From month from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage achieved This value will be obtained using planned and actual values

Up to Month User will select the Up to month from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage achieved This value will be obtained using planned and actual values

Button Submit This Button will submit the entered data for M & E Report

Button Reset This Button will reset the entered data for M & E Report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:129 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for M & E Report

Data Capture Diagram

M & E Report

ULG Name Name of Project Unit of Measurement Planned for year

From Month

Planned Actual Percentage Achieved

Up to Month

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:130 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:131 of


696
Software Requirement Specification

3.3.18 New Project Setup [REQ-042]

Description
This function is used to capture data for new projects going to be taken under UIIDP.

Inputs

The contents of New Project Setup are:

Project Name User will enter the name in text field

Description User will enter the project description in text field

Project DLIs User will select the DLIs from dropdown list

ULG Name User will select the ULG Name from dropdown list

Thematic Area User will select the thematic area name from dropdown list

Focal Person User will select the focal person name from dropdown list

Project Total Budget User will enter the Project Total Budget in numeric field

Source of Fund User will enter the source of fund in text field

Project Start Date User will select the date from calendar

Project Duration User will enter the number of month in numeric field

Planned Project end User will select the date from calendar

date

Project Status User will select the project status from dropdown list

Actual Project End Date User will select the date from calendar

Button Submit This Button will submit the entered data for Project Setup

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:132 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for Project Setup

Button Cancel This Button will terminate the process of capturing data for Project Setup

Data Capture Diagram

New Project SetUp


Project Name Description Project DLIs ULG Name

Thematic Area Focal Person Name Project Total Budget Source of Fund

Project Start Date Project Duration Planned Project end Project Status
Date

Actual Project end


Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:133 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4 Municipal Finance and Revenue

3.4.1 Different types of revenue [REQ-043]

Description
This function is used to capture different types of revenue generated by each city or region.

Inputs

The contents of different types of revenue will be obtained through API from IFMIS / IBEX

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:134 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.2 State Revenue Progress [REQ-044]

Description
This function is used to capture all State Revenue Progress data.

Inputs

The contents of State Revenue Progress are:

Period User will select the period from Quarter dropdown

Level User will select the level from ( Federal, Regional, ULG )

ULG Name User will select the ULG name from dropdown

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:135 of


696
Software Requirement Specification

Region name User will select the region from dropdown

ULGS that achieve an increase of state revenue of at least 10% over the previous
year

Actual Financial Year 1 User will enter the value in numerical field

Planned Financial User will enter the value in numerical field

Year2

Actual Financial Year 2 User will enter the value in numerical field

Actual as % of planned This will be calculated using planned and actual financial for 2nd year

value

% Increase This will be calculated using actual financial year 2 and actual financial
year 1

At least 10 % (Y/N) User will select the value from ( Yes, No )

State Revenue performance for the quarter and half year

Planned for the year User will enter the value in numeric field

Planned quarter 1 User will enter the value in numeric field

Actual Quarter 1 User will enter the value in numeric field

Percentage achieved This will be calculated using planned and actual value for quarter 1
quarter 1

Planned quarter 2 User will enter the value in numeric field

Actual Quarter 2 User will enter the value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:136 of


696
Software Requirement Specification

Percentage achieved This will be calculated using planned and actual value for quarter 2
quarter 2

Planned quarter 3 User will enter the value in numeric field

Actual quarter 3 User will enter the value in numeric field

Percentage achieved This will be calculated using planned and actual value for quarter 3
quarter 3

Planned quarter 4 User will enter the value in numeric field

Actual quarter 4 User will enter the value in numeric field

Percentage achieved This will be calculated using planned and actual value for quarter 4

quarter 4

Button Submit This Button will submit the entered data for state revenue progress

Button Reset This Button will reset the entered data for state revenue progress

Button Cancel This Button will terminate the process of capturing data for state revenue
progress

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:137 of


696
Software Requirement Specification

Data Capture Diagram

State Revenue Progress


Period Level ULG Name
Select Period Select Level Select ULG

Region name

ULGS that achieve an increase of state revenue of atleast 10% over the previous year

Actual Financial Planned Financial Actual Financial Actual as % of


Year 1 Year 2 Year 2 planned

% Increase At least 10 % (Y/N)

State Revenue performance for the quarter and half year


Planned for the year Planned quarter 1 Actual Quarter 1 Percentage achieved
quarter 1

Planned quarter 2 Actual Quarter 2 Percentage achieved Planned quarter 3


quarter 2

Actual quarter 3 Percentage achieved Planned quarter 4 Actual quarter 4


quarter 3

Percentage achieved
quarter 4

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:138 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.3 Annual Action Plan [REQ-045]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:139 of


696
Software Requirement Specification

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:140 of


696
Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:141 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.4 Tracking progress of activities under Annual Action Plan [REQ-046]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:142 of


696
Software Requirement Specification

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:143 of


696
Software Requirement Specification

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:144 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:145 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.5 Revenue Enhancement Plan [REQ-047]

Description
This function is used to capture data for Revenue enhancement plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:146 of


696
Software Requirement Specification

Inputs

The contents of hierarchy level are:

ULG Name User will select the ULG name from dropdown list

Total Population User will enter the total population in numeric field

Revenue sources

Revenue Item User will enter the revenue item in text field

Category User will enter the category in text field

Account Number User will enter the account number in text field

Trend analysis for 3-5 Years

Ethiopian Fiscal Year User will select the value from dropdown list

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Actual vs Planned This value will be calculated using planned and actual value

Actual Growth Rate This value will be calculated using planned and actual value

Assessment of Planning Capacity

Revenue Item User will enter the revenue item in text field

Account Number User will enter the account number in text field

Planned Revenue User will enter the planned revenue in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:147 of


696
Software Requirement Specification

Actual Revenues User will enter the actual revenue in numeric field

Actual Vs Planned This will be calculated using Planned and actual revenue value

Percentage of total This will be calculated using Planned and actual revenue value
own revenue

Assessment of contribution of each municipal revenue sources

Revenue Item User will enter the revenue item in text field

Account Number User will enter the account number in text field

Planned Revenue User will enter the planned revenue in numeric field

Actual Revenues User will enter the actual revenue in numeric field

Contribution of This will be calculated using value of planned revenue

planned revenue to the

total

Contribution of actual This will be calculated using value of actual revenue

revenue collected to
the total percentage

Prioritization, impact and risk of appearance of difficulties in past revenue


performance

Revenue Item User will enter the revenue item in text field

Account Number User will enter the account number in text field

Number of arrear files User will enter the number of arrear files in numeric field

Age of arrears User will enter the age of arrears in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:148 of


696
Software Requirement Specification

Amount of overdue tax User will enter the amount of overdue tax in birr in numeric field
in birr

Amount of fine in birr User will enter the amount of fine in birr in numeric field

Fine as % of total This value will be calculated using amount of overdue tax and amount
overdue tax of fine value

Possible reasons for User will enter the possible reasons for arrears in text field

arrears

Impact on revenue User will select the Impact from ( Very Low, Low , High , Very High )

Performance

Three year past revenue analysis

Revenue Item User will enter the revenue item in text field

Account Number User will enter the account number in text field

Category User will enter the category in text field

Planned Revenue 3rd User will enter the value in numeric field.
Year Past

Planned Revenue 2nd User will enter the value in numeric field.

Year Past

Planned Revenue User will enter the value in numeric field.


current year

Actual Revenue 3rd User will enter the value in numeric field.
Year Past

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:149 of


696
Software Requirement Specification

Actual Revenue 2nd User will enter the value in numeric field.
Year Past

Actual Revenue User will enter the value in numeric field.

Current Year

Actual vs Planned 3rd This value will be calculated using actual and planned for 3rd Year Past.

Year Past

Actual vs Planned 2nd This value will be calculated using actual and planned for 2nd Year Past.

Year Past

Actual vs Planned This value will be calculated using actual and planned for Current Year

Current Year

Three Year Total This value will be calculated using Actual Revenue 3rd Year Past, Actual
Revenue 2nd Year Past , Actual Revenue Current Year

Share of Actual 3rd Year This value will be calculated using Actual 3rd Year Revenue and three year
revenue to three year total value.

actual total

Share of Actual 2nd Year This value will be calculated using Actual 2nd Year Revenue and three

revenue to three year year total value.

actual total

Share of Actual current This value will be calculated using Actual Current Year Revenue and three
Year revenue to three year total value.
year actual total

Analysis of past expenditure items

Expenditure item User will enter the expenditure item in text field

Account Number User will enter the account number in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:150 of


696
Software Requirement Specification

Total city population User will enter the value in numeric field
Planned for 3rd year

Total city population User will enter the value in numeric field

Planned for 2nd year

Total city population User will enter the value in numeric field

Planned for Current


year

Total city population User will enter the value in numeric field
Actual for 3rd Year

Total city population User will enter the value in numeric field
Actual for 2nd Year

Total city population User will enter the value in numeric field

Actual for Current Year

Actual vs Planned 3rd This will be calculated using value of Total city population planned for
Year Past 3rd year and Total city population actual for 3rd Year.

Actual vs Planned 2nd This will be calculated using value of Total city population planned for

Year Past 2nd year and Total city population actual for 2nd Year.

Actual vs Planned This will be calculated using value of Total city population planned for

Current Year Current year and Total city population actual for current Year.

Source of finance User will enter the source of finance in text field

Financial Balance

Actual own source of User will enter the value in numeric field

revenue last year

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:151 of


696
Software Requirement Specification

Actual own source of User will enter the value in numeric field
revenue 2nd year ago

Actual own source of User will enter the value in numeric field

revenue 3rd year ago

Actual Expenditure for User will enter the value in numeric field

last year

Actual Expenditure for User will enter the value in numeric field

2 years ago

Actual Expenditure for User will enter the value in numeric field

3 years ago

Financial Balance This will be calculated using actual own source revenue last year and

Revenue vs actual expenditure last year value.

Expenditure for last

year

Financial Balance This will be calculated using actual own source revenue 2 year ago and

Revenue vs actual expenditure 2 year ago value.


Expenditure for 2 years

ago

Financial Balance This will be calculated using actual own source revenue 3 year ago and
Revenue vs actual expenditure 3 year ago value.
Expenditure for 3 years

ago

Financial performance indicators

Item description User will enter the item description in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:152 of


696
Software Requirement Specification

Municipal revenue or User will select from ( Municipal Revenue , Municipal Expenditure )
expenditure

First year value User will enter the value in numeric field

Second year value User will enter the value in numeric field

Third year value User will enter the value in numeric field

Average value This will be calculated using First Year Value, Second Year Value, Third
Year Value

Total revenue per Year This will be calculated using First Year Value, Second Year Value, Third

Year Value

Total expenditure per This will be calculated using First Year Value, Second Year Value, Third

year Year Value

Future expenditure requirements

Expenditure item User will enter the expenditure item in text field

Account Number User will enter the account number in text field

Planned expenditure User will enter the planned expenditure in numeric field

Source of finance User will enter the source of finance in text field

Population User will enter the population in numeric field

Revenue enhancement plan

Revenue item User will enter the revenue item in text field

Account Number User will enter the account number in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:153 of


696
Software Requirement Specification

Planned Revenue User will enter the planned revenue in numeric field

Percentage of total User will enter the percentage of total planned revenue in percentage
planned revenue field

Per capita planned User will enter the per capita planned revenue in numeric field

revenue

Total Projected User will enter the total projected revenue in numeric field

revenue

Summary of future estimated revenue and expenditure requirement

Account Number User will enter the account number in text field

Revenue item User will enter the revenue item in text field

Category User will enter the category in text field

First year value User will enter the value in numeric field

Second Year Value User will enter the value in numeric field

Third year value User will enter the value in numeric field

Total for three year This value will be calculated using First Year Value , Second Year Value,
Third Year Value

Total per category This value will be calculated using category , First Year Value , Second
Year Value, Third Year Value

Summary of strategies for each issue

Revenue Item User will enter the revenue item in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:154 of


696
Software Requirement Specification

Issues found in past User will enter the issues found in past revenue performance analysis in
revenue performance text field

analysis

Formulated Strategies User will enter the formulated strategies in text field

Responsible User will enter the responsible organization in text field


organization

Timing User will select the value from ( 1st Year, 2nd Year, 3rd Year )

Remark User will enter the remark in text field

Button Submit This Button will submit the entered data for Revenue Enhancement Plan

Button Reset This Button will reset the entered data for Revenue Enhancement Plan

Button Cancel This Button will terminate the process of capturing data for Revenue
Enhancement Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:155 of


696
Software Requirement Specification

Data Capture Diagram

Revenue Enhancement Plan


ULG Name Total Population
Select ULG

Revenue sources
Revenue Item Category Account Number
Select Item

Trend analysis for 3-5 Years


Ethiopian Fiscal Year Planned Actual Actual vs Planned
Select Item

Actual Growth Rate

Assesment of Planning Capacity


Revenue Item Account Number Planned Revenue Actual Revenues
Select Item

Actual Vs Planned Percentage of


total own revenue

Assesment of contribution of each municipal revenue sources


Revenue Item Account Number Planned Revenue Actual Revenues
Select Item

Contribution of planned Contribution of


revenue to the total actual revenue collected
Percentage to the total percentage

Prioritization, impact and risk of appearnace of difficulties in past revenue


performance
Revenue Item Account Number Number of arrear files Age of arrears
Select Item

Amount of overdue Amount of fine Fine as % of total Possible reasons


tax in birr in birr overdue tax for arrears

Impact on revenue
Performance
Select Impact

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:156 of


696
Software Requirement Specification

Three year past revenue analysis


Revenue Item Account Number Category Planned Revenue 3rd
Year Past
Select Item

Planned Revenue 2nd Planned Revenue Actual Revenue 3rd Actual Revenue 2nd
Year Past current year Year Past Year Past

Actual Revenue Actual vs Planned Actual vs Planned Actual vs Planned


Current Year 3rd Year Past 2nd Year Past Cuurent Year

Three Year Total Share of each revenue


to three year actual
total

Analysis of past expenditure items


Expenditure item Account Number Total city population Total city population
Planned Actual
Select Item

Actual vs Planned Actual vs Planned Actual vs Planned Source of finance


3rd Year Past 2nd Year Past Cuurent Year

Financial Balance
Actual own source Actual own source Actual own source Actual Expenditure
of revenue last year of revenue 2nd year ago of revenue 3rd year ago for last year

Actual Expenditure Actual Expenditure Financial Balance Financial Balance


for 2 years ago for 3 years ago Revenue vs Expenditure Revenue vs Expenditure
for last year for 2 years ago

Financial Balance
Revenue vs Expenditure
for 3years ago

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:157 of


696
Software Requirement Specification

Financial performance indicators


Item description Municipal revenue First year value Second year value
or expenditure

Third year value Average value Total revenue per Total expenditure
Year per year

Future expenditure requirements


Expenditure item Account Number Planned expenditure Source of finance

Population

Revenue enhancement plan


Revenue item Account Number Planned Revenue Percentage of total
planned revenue

Per capita planned Total Projected


revenue revenue

Summary of future estimated revenue and expenditure requirement


Account Number Revenue item category First year value

Second year value Third year value Total for three year Total per category

Overall total

Summary of strategies for each issue


Revenue Item Issues found in past revenue performance analysis

Formulated Strategies Responsible organization

Timing Remark

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:158 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.6 Analysis of arrears [REQ-048]

Description
This function is used to capture data for Analysis of arrears.

Inputs

The contents of Analysis of Arrears are:

Recording of Debtors

Date of bill used User will enter the date of bill used from calendar

Name of debtor ( Tax User will enter the name of debtor in text field
Payer )

Amount Due

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:159 of


696
Software Requirement Specification

Arrears User will enter the arrears in text field

Current Billed Amount User will enter the current billed amount in numeric field

Penalty User will enter the penalty in numeric field

Total This will be calculated using Current Billed amount and Penalty Value

Status of Payment User will select the status of payment from dropdown

Remark User will enter the remark in text field

Summary of Arrears

Tax revenue from User will enter the value of tax revenue from municipal services in
municipal services numeric field

Recurrent Account User will enter the recurrent account number in text field

Number

Number of arrear files User will enter the number of arrear files in numeric field

Age of arrears from User will select the age of arrears from calendar

Age of arrears to User will select the age of arrears to from calendar

Amount of overdue tax User will enter the amount of overdue tax in birr in numeric field
in Birr

Amount of fine in Birr User will enter the amount of fine tax in birr in numeric field

Fine as % of total This will be calculated using amount of overdue tax and amount of fine
overdue tax in birr value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:160 of


696
Software Requirement Specification

Possible reasons for User will enter the possible reasons for arrears in text field
arrears

Button Submit This Button will submit the entered data for analysis of arrears

Button Reset This Button will reset the entered data for analysis of arrears

Button Cancel This Button will terminate the process of capturing data for analysis of
arrears

Data Capture Diagram

Analysis of Arrears
Recording of Debtors

Date of Bill Used Name of Debtor


( Tax Payer )

Amount Due

Arrears Current Billed Amount Penalty Total

Status of Payment Remark

Summary of Arrears

Tax Revenues from Recurrent Account Number of Arrear Age of Arrears


Municipal Services Number files ( from - to )

Amount of Overdue Amount of fine in Fine as % of total Possible Reasons for


tax in Birr Birr overdue tax Arrears

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:161 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.7 Municipal Finance and Revenue Progress Report [REQ-049]

Description
This function is used to capture Municipal Finance and Revenue Progress Report.

Inputs

The contents of Municipal Finance and Revenue Progress Report are:

Level User will select the Level from ( Federal , Regional , ULG )

Region User will select the region from dropdown list

ULG User will select the ULG from dropdown list

ULGs that achieve an increase of own source municipal revenue (excluding


landlease income) of at least 10 percent over the previous year under UIIDP

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:162 of


696
Software Requirement Specification

From Month User will select the month date from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using Planned and actual Value

To Month User will select the month date from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using Planned and actual Value

ULGs that achieve an increase of own source municipal revenue (including


landlease income) of at least 10 percent over the previous year under UIIDP

From Month User will select the month date from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using Planned and actual Value

To Month User will select the month date from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using Planned and actual Value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:163 of


696
Software Requirement Specification

Button Submit This Button will submit the entered data for Municipal finance and
revenue progress report

Button Reset This Button will reset the entered data for Municipal finance and revenue
progress report

Button Cancel This Button will terminate the process of capturing data for Municipal
finance and revenue progress report

Data Capture Diagram

Municipal Finance and Revenue Progress Report ( Monthly Report )


Level Region ULG
Select Level Select Region Select ULG

ULGs that achieve an increase of own source municipal revenue (excluding landlease
income) of at least 10 percent over the previous year under UIIDP

From Month

Planned Actual Percentage Achieved

Up to Month

Planned Actual Percentage Achieved

ULGs that achieve an increase of own source municipal revenue (including landlease
income) of at least 10 percent over the previous year under UIIDP

From Month

Planned Actual Percentage Achieved

Up to Month

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:164 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:165 of


696
Software Requirement Specification

3.4.8 Field Visit Request

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:166 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.4.8 Field Visit Report [REQ-050]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:167 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:168 of


696
Software Requirement Specification

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field
collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field


to resolve issues

Feedback letter User will select the value from ( Yes , No )


uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report

uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:169 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:170 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.4.9 Capacity Building Plan [REQ-051]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:171 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:172 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:173 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:174 of


696
Software Requirement Specification

3.5 Financial Management

3.5.1 Financial Management M & E Data [REQ-052]

Description
This function is used to capture data for M & E Reporting data are:

Inputs

The contents of Financial Management M & E Data are:

Level User will select the level from ( Federal , Regional , ULG )

Period User will select the Month

Timely Financial Reporting

ULG Name User will select the ULG Name from the dropdown list

Region Name User will select the region from the dropdown list

Financial Year User will the Financial Year from the dropdown list

Quarter User will select the Quarter from the dropdown list

Deadline Date User will select the date from calendar

Date Submitted User will select the date from calendar

Monthly Cash and bank reconciliation reports submitted to BoFED / ZoFED

ULG Name User will select the ULG Name from the dropdown list

Region Name User will select the region from the dropdown list

Financial Year User will the Financial Year from the dropdown list

Month User will select the month from dropdown list

Deadline date User will select the date from calendar

Date Submitted User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:175 of


696
Software Requirement Specification

Internal audit , quarterly reports submitted to BoFED / ZoFED

ULG Name User will select the ULG Name from the dropdown list

Region Name User will select the region from the dropdown list

Financial Year User will the Financial Year from the dropdown list

Quarter User will select the Quarter from the dropdown list

Deadline Date User will select the date from calendar

Date Submitted User will select the date from calendar

Count and reconciliation of fixed assets and stock inventory

ULG Name User will select the ULG Name from the dropdown list

Region Name User will select the region from the dropdown list

Financial Year User will the Financial Year from the dropdown list

Date of Count User will select the date from calendar

Button Submit This Button will submit the data for Financial Management M&E

Button Reset This Button will reset the entered data for Financial Management M&E

Button Cancel This Button will terminate the process of capturing data for Financial
Management M&E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:176 of


696
Software Requirement Specification

Data Capture Diagram

Financial Management and Program accounting M&E Data


Level Period
Select Level Select Period

Timely Financial Reporting


ULG Region Financial Year Quarter
Select ULG Select Region

Deadline Date Date Submitted


Select Date Select Date

Monthly cash and bank reconcillation reports submitted to BOFED


ULG Region Financial Year Month
Select ULG Select Region

Deadline Date Date Submitted

Internal audit, quarterly reports submitted to BOFED/ZoFED


ULG Region Financial Year Quarter
Select ULG Select Region

Deadline Date Date Submitted

Count and reconcillation of fixed assets and stock inventory (only annual reports)
ULG Region Financial Year Date of Count
Select ULG Select Region

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:177 of


696
Software Requirement Specification

Process Flow Diagram

3.5.2 Count and reconciliation of fixed assets [REQ-053]

Description
This function is used to capture data for count and reconciliation of fixed assets.

Inputs

The contents of Count and reconciliation of fixed assets are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:178 of


696
Software Requirement Specification

Financial Year User will select the financial year from dropdown list

Quarter User will select the Quarter from dropdown list

ULG Name User will select the ULG Name from the dropdown list

Date of Count User will select the date of count from calendar

Asset name and type User will the select the asset name and type from dropdown list

Asset Condition User will select the Asset condition from the dropdown list

Asset Value User will enter the asset value in numeric field

Asset Purchase Date User will select the date from calendar

Asset Description User will enter the asset description modality in text field
Modality

Quality of stock count User will enter the quality of stock count in text field

Obsolete quantity User will the enter the obsolete quantity in numeric field

Damaged Quantity User will the enter the damaged quantity in numeric field

Asset Location User will enter the asset location in text field

Button Submit This Button will submit the data for Count and reconciliation of asset
data

Button Reset This Button will reset the entered data for Count and reconciliation of
asset data

Button Cancel This Button will terminate the process of capturing data for Count and
reconciliation of asset data

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:179 of


696
Software Requirement Specification

Data Capture Diagram

Count and reconcillation of fixed assets


Financial Year Quarter ULG Name Date of count
Select Quarter Select ULG Select Date

Asset name and type Asset condition Asset Value Asset Purchase Date

Asset Description Quantity of stock Obsolete Quantity


Modality count

Damaged Quantity Asset Location

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:180 of


696
Software Requirement Specification

3.5.3 Audit Progress [REQ-054]

Description
This function is used to capture data for timely preparation audit progress report.

Inputs

The contents of Audit Progress are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG name from dropdown list

Region User will select the Region Name from the dropdown list

Financial Year User will select the financial year from the dropdown list

Date offinancial User will the select the date from calendar
account submitted to
ORAG

Date of Audit Report User will the select the date from calendar
( EC & GC )

Date submitted for User will the select the date from calendar
Deadline

Audit Submitted User will select the value from dropdown


Category

State of Audit User will select the value from (Adverse, Disclaimer, Opinion, qualifies or
unqualified)

Audit Compliance User will select the follow up from previous year audit value

Button Submit This Button will submit the data for Audit Progress Report

Button Reset This Button will reset the entered data for Audit Progress Report

Button Cancel This Button will terminate the process of capturing data for Audit
Progress Report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:181 of


696
Software Requirement Specification

Data Capture Diagram

Audit Progress
Level ULG Region Financial Year
Select Level Select ULG Select Region Select Thematic Area

Date of Final Account Date of Audit Audit Submitted Audite submitted


Submitted to ORAG Report (EC and GC) Before Deadline Category (Clean or Unclean)

State of Audit Audit Compliance


Select State

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:182 of


696
Software Requirement Specification

3.5.4 Financial Audit [REQ-055]

This function is used to capture data for financial audit progress.

Inputs

The contents of Financial Audit are:

Financial Year User will select the year from dropdown list

Quarter User will select the quarter from dropdown list

ULG Name User will select the ULG Name from the dropdown list

Audit Start Date User will select the date from calendar

Audit Completion Date User will select the date from calendar

Date of Audit Report User will select the date from calendar

Submission

Button Submit This Button will submit the data for Financial Audit

Button Reset This Button will reset the entered data for Financial Audit

Button Cancel This Button will terminate the process of capturing data forFinancial
Audit

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:183 of


696
Software Requirement Specification

Data Capture Diagram

Financial Audit
Financial Year Quarter ULG Name Audit Type
Select Year Select Quarter Select ULG Select Audit Type

Audit Start Date Audit Completion Date of Audit Report


Submitted to ORAG Date Submission

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.5.5 Annual Action Plan [REQ-056]

Description
This function is used to capture Annual Action Plan data for Financial Management.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:184 of


696
Software Requirement Specification

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:185 of


696
Software Requirement Specification

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:186 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.5.6 Tracking progress of activities under Annual Action Plan [REQ-057]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of tracking progress of activities are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:187 of


696
Software Requirement Specification

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:188 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:189 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:190 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.5.7 Field Visit Request [REQ-058]

Description

This function is used to Capture Field Visit Work Request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:191 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:192 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:193 of


696
Software Requirement Specification

3.5.8 Field Visit Report [REQ-059]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:194 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:195 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:196 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.5.9 Capacity Building Plan [REQ-060]

Description
This function is used to add Capacity Building Plan for Financial Management area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:197 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:198 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:199 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6 Environment Management

3.6.1 Project Screening [REQ-061]

Description
This function is used to capture Environment Project screening data.

Inputs

The contents of Environment Project Screening Data are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:200 of


696
Software Requirement Specification

Project Name User will select the project name from dropdown list

ULG Name User will select the ULG Name from dropdown list

Location User will enter the location

Estimated Cost User will enter the estimated cost in numeric field

Proposed Date of Works User will select the date from calendar
Commencement

Technical drawing and User will select the value from ( Yes , No )
specifications reviewed

Site Selection

Physical Data User will enter the physical data in text field

Extensions of or changes User will select the value from ( Yes , No )


to existing alignment
(Yes/No)

Any existing property to User will select the value from ( Yes , No )
transfer to Project
(Yes/No)

Any Plans new User will select the value from ( Yes , No )
for
Construction (Yes/No)

Impact identification and classification

Issues User will enter the issues in text field

Site sensitivity with User will select the value from ( Low , Medium , High )
explanation ( Low,
Medium ,High)

Rating User will enter the rating in numeric field

Checklist of impacts

Type of projects User will enter the type of projects in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:201 of


696
Software Requirement Specification

List of the checklist User will enter the list of checklist items in text field
items

Potential for adverse User will enter the potential for adverse impact in text field
impact

General questions that apply for all types of projects and subprojects

Question category User will enter the question category in text field

List of questions User will enter the list of questions in text field

List of answers (Yes / User will select the list of answers from ( Yes , No )
No)

Categorization and recommendations

Category of the project User will select the category of project from ( Schedule 1, Schedule 2,
Schedule 1,2,or 3 Schedule 3 )

Recommendation User will enter the recommendation in text field

Submit Button This Button will submit the entered data for project screening

Reset Button This Button will reset the entered data for project screening

Cancel Button This Button will terminate the process of capturing data for project
screening

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:202 of


696
Software Requirement Specification

Data Capture Diagram

Project Screening
Project name ULG name Location Estimated Cost

Proposed date of Technical drawing and


works commencement specifications reviewed
( Yes / No )

Site selection

Physical data Extensions of or Any existing property Any Plans for new
changes to existing to transfer to Project Construction
alignment (Yes / No) Yes / No (Yes / No )

Impact identification and classification

Issues Site sensitivity with explanation ( Low, Medium ,High)

Rating

Checklist of impacts

Type of projects List of the checklist items

Potential for adverse


imapct

General questions that apply for all types of projects and subprojects

Question category List of questions List of answers (Yes / No)

Categorization and recommendations

Category of the project Recommendation


Schedule 1,2,or 3

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:203 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.2 ESMS & RS [REQ-062]

Description
This function is used to capture ESMS & RS (Environmental and social management system
and resettlement system)

Inputs

The contents of ESMS & RS are:

ULG User will select the ULG Name from dropdown list

Total number of CIP User will enter the value in numeric field

Projects

Total Number of User will select the month from dropdown list
Projects Screened as

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:204 of


696
Software Requirement Specification

per ESMF screening


During the month

Categorization and recommendation from ESMF Screening form

Number categorized User will enter the value in numeric field

under schedule 1

(Requires EIA)

Number categorized User will enter the value in numeric field

under schedule 2
(Requires

Environmental review
report)

Number categorized User will enter the value in numeric field

under schedule 3 ( No

Potential Impacts)

Number of Projects User will enter the value in numeric field


(Under the category of

no further action to be

taken)

REPA Decision

Number submitted by User will enter the value in numeric field

ULG to REPA

Number Accepted User will enter the value in numeric field

Number subject to User will enter the value in numeric field

Revision

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:205 of


696
Software Requirement Specification

Implementation of REPA Decision

Number of EIAs User will enter the value in numeric field

completed

Number of environ User will enter the value in numeric field

mental review report

completed

Button Submit This Button will submit the entered data for ESMS & RS

Button Reset This Button will reset the entered data for ESMS & RS

Button Cancel This Button will terminate the process of capturing data for ESMS & RS

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:206 of


696
Software Requirement Specification

Data Capture Diagram

ESMS & RS

ULG Total number of Total Number of


CIP Projects Projects Screened
during month
Select ULG

Categorization and recommendation from ESMF Screening form

Number categorized Number categorized Number categorized


under schedule 1 under schedule 2 under schedule 3
(Requires EIA) (Requires Environmental ( No Potential
review report) Impacts)

REPA Decision

Number submitted Number Accepted Number subject to


by ULG to REPA Revision

Implementation of REPA Decision

Number of EIAs Number of environ-


completed for mental review
report completed

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:207 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:208 of


696
Software Requirement Specification

3.6.3 Annual Environment Performance audit [REQ-063]

Description
This function is used to add Annual Environment Performance audit by authorized users having
Add rights or Manage rights.

Inputs

The contents of hierarchy level are:

Region Name User will select the Region name from dropdown list

Audit Started User will select the audit started date from calendar

Audit Completed User will select the audit completed date from calendar

Audit Report User will select the audit report submitted to MUDCo date from calendar

Submitted to MUDCo

Financial Year User will select the financial year from dropdown list

Button Submit This Button will submit the entered data for Audit Environmental
Performance Audit.

Button Reset This Button will reset the entered data for Audit Environmental
Performance Audit

Button Cancel This Button will terminate the process of capturing data for Audit
Environmental Performance Audit

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:209 of


696
Software Requirement Specification

Data Capture Diagram

Annual Environment performance audit

Region Name Audit Started Audit Completed Audit Report


Submitted to MUDCo

Financial Year

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.6.4 Environment Management Plan [REQ-064]

Description
This function is used to capture Environment Management Plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:210 of


696
Software Requirement Specification

Inputs

The contents of Environment Management Plan are:

ULG name User will select the ULG Name from dropdown list

Region name User will select the Region Name from dropdown list

Project name User will select the Project Name from dropdown list

Potential Environment User will enter the potential environment impacts in text field
Impacts

Proposed Mitigation User will enter the proposed mitigation measures in text field

Measures

Responsibility for User will enter the responsibility for implementing the mitigation
implementing the measures in text field

mitigation measures

Responsibility for User will enter the responsibility for monitoring in text field

monitoring

Time horizon

Mitigation User will enter the mitigation in text field

Monitoring User will enter the monitoring in text field

Cost Estimates

Mitigation User will enter the mitigation in text field

Monitoring User will enter the monitoring in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:211 of


696
Software Requirement Specification

Button Submit This Button will submit the entered data for Environment Management
Plan

Button Reset This Button will reset the entered data for Environment Management
Plan

Button Cancel This Button will terminate the process of capturing data for Environment
Management Plan

Data Capture Diagram

Environment Management Plan


ULG name Region name Project name Potential Environment
Impacts

Proposed Mitigation Measures Responsibility for


implementing the
mitigation measures

Responsibility for monitoring

Time horizon

Mitigation Monitoring

Cost Estimates

Mitigation Monitoring

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:212 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.5 Annual Action Plan [REQ-065]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:213 of


696
Software Requirement Specification

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:214 of


696
Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:215 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.6 Tracking progress of activities under Annual Action Plan [REQ-066]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:216 of


696
Software Requirement Specification

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:217 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:218 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:219 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.7 Environment Audit [REQ-067]

Description
This function is used to capture Environment audit data.

Inputs

The contents of Environment Audit are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:220 of


696
Software Requirement Specification

ULG Name User will select the ULG Name from dropdown list

Region Name User will select the Region name from dropdown list

Start Date of Audit User will select the date from calendar

End Date of Audit User will select the date from calendar

Submission Date of User will select the date from calendar

Audit Report

Findings of the Audit Report

Findings Description User will enter the findings description in text field

Project Name User will select the project name from dropdown list

Action to be taken User will enter the action to be taken in text field

Responsible Party User will enter the responsible party in text field

Timeline for Action User will select the timeline for action in quarter

Action Implementation User will select the action implementation status from dropdown list
Status

Button Submit This Button will submit the entered data for Environment Audit

Button Reset This Button will reset the entered data for Environment Audit

Button Cancel This Button will terminate the process of capturing data for Environment
Audit

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:221 of


696
Software Requirement Specification

Data Capture Diagram

Environment Audit

ULG Name Region Name Start Date of Audit End Date of Audit
Select ULG Select Region Select Date Select Date

Submission Date
of Audit Report

Findings of the Audit Report

Findings Description Project Name Action to be taken

Responsible Party Timeline for Action Action Implementation


Status

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:222 of


696
Software Requirement Specification

Process Flow Diagram

Figure 3

3.6.8 ESIA (Environment and social impact assessment) [REQ-068]

Description
This function is used to capture ESIA data.

Inputs

The contents of ESIA are:

Executive Summary User will enter the executive summary in text field

Policy , Legal and User will enter the policy , legal and administrative framework in text
administrative field
framework

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:223 of


696
Software Requirement Specification

Project Description User will enter the project description in text field

Baseline Data User will enter the baseline data in text field

Environment and Social User will enter the environment social impacts in text field
Impacts

Analysis of Alternatives User will enter the analysis of alternatives in text field

Environment This will come from the data captured for environment management
Management Plan plan

Appendixes

List of ESIA Report User will enter the list of ESIA report preparers in text field

Preparers

References User will enter the references in text field

Record of interagency User will Upload the record of interagency and consultation meeting

and consultation

meeting

Table Presenting the User will upload the table presenting the relevant data

relevant data

List of associated User will enter the list of associates reports in text field
reports

Button Submit This Button will submit the entered data for ESIA

Button Reset This Button will reset the entered data for ESIA

Button Cancel This Button will terminate the process of capturing data for ESIA

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:224 of


696
Software Requirement Specification

Data Capture Diagram

ESIA ( Environment and social impact assessment)


Executive Summary Policy , Legal and administrative framework

Project Description Baseline Data

Environment and Social Impacts Analysis of Alternatives

Environment Management Plan

Appendixes :-

List of ESIA Report Preparers Refernces

Record of interagency and consultation meeting Table Presenting the relevant data

List of associated reports

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:225 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.9 Field Visit Request [REQ-069]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:226 of


696
Software Requirement Specification

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar
Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:227 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.6.10 Field Visit Report [REQ-070]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:228 of


696
Software Requirement Specification

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field
ULGs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:229 of


696
Software Requirement Specification

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field


to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )


progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:230 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:231 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7 Social Development

3.7.1 Project Screening [REQ-071]

Description
This function is used to capture Environment Project screening data.

Inputs

The contents of Environment Project Screening Data are:

Project Name User will select the project name from dropdown list

ULG Name User will select the ULG Name from dropdown list

Location User will enter the location

Estimated Cost User will enter the estimated cost in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:232 of


696
Software Requirement Specification

Proposed Date of Works User will select the date from calendar

Commencement

Technical drawing and User will select the value from ( Yes , No )

specifications reviewed

Site Selection

Physical Data User will enter the physical data in text field

Extensions of or changes User will select the value from ( Yes , No )

to existing alignment

(Yes/No)

Any existing property to User will select the value from ( Yes , No )

transfer to Project
(Yes/No)

Any Plans for new User will select the value from ( Yes , No )

Construction (Yes/No)

Impact identification and classification

Issues User will enter the issues in text field

Site sensitivity with User will select the value from ( Low , Medium , High )
explanation ( Low,

Medium ,High)

Rating User will enter the rating in numeric field

Checklist of impacts

Type of projects User will enter the type of projects in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:233 of


696
Software Requirement Specification

List of the checklist User will enter the list of checklist items in text field

items

Potential for adverse User will enter the potential for adverse impact in text field

impact

General questions that apply for all types of projects and subprojects

Question category User will enter the question category in text field

List of questions User will enter the list of questions in text field

List of answers (Yes / User will select the list of answers from ( Yes , No )

No)

Categorization and recommendations

Category of the project User will select the category of project from ( Schedule 1, Schedule 2,

Schedule 1,2,or 3 Schedule 3 )

Recommendation User will enter the recommendation in text field

Submit Button This Button will submit the entered data for project screening

Reset Button This Button will reset the entered data for project screening

Cancel Button This Button will terminate the process of capturing data for project
screening

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:234 of


696
Software Requirement Specification

Data Capture Diagram

Project Screening
Project name ULG name Location Estimated Cost

Proposed date of Technical drawing and


works commencement specifications reviewed
( Yes / No )

Site selection

Physical data Extensions of or Any existing property Any Plans for new
changes to existing to transfer to Project Construction
alignment (Yes / No) Yes / No (Yes / No )

Impact identification and classification

Issues Site sensitivity with explanation ( Low, Medium ,High)

Rating

Checklist of impacts

Type of projects List of the checklist items

Potential for adverse


imapct

General questions that apply for all types of projects and subprojects

Question category List of questions List of answers (Yes / No)

Categorization and recommendations

Category of the project Recommendation


Schedule 1,2,or 3

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:235 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7.2 ESMS & RS [REQ-072]

Description
This function is used to ESMS & RS data for social development thematic area

Inputs

The contents of ESMS and RS are:

ULG name User will select the ULG Name from dropdown list

Month User will select the month from dropdown list

Total number of User will enter the value in numeric field


Projects in CIP

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:236 of


696
Software Requirement Specification

Total Number Screened User will enter the value in numeric field
as per RSG Screening

Form

Number of Projects User will enter the value in numeric field

(Under the category of

no further action to be
taken)

Number of RAP User will enter the value in numeric field


completed

Number RAP not User will enter the value in numeric field

completed

Button Submit This Button will submit the entered data for ESMS & RS

Button Reset This Button will reset the entered data for ESMS & RS

Button Cancel This Button will terminate the process of capturing data for ESMS & RS

Data Capture Diagram

ESMS & RS

ULG name Total number Total number of Number of Projects


of projects in CIP Projects screened (Under the category
of no further action
to be taken)

Number of RAP Number of RAP


completed not completed

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:237 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7.3 Resettlement Action Plan [REQ-073]

Description
This function is used to resettlement action plan data under social development thematic area

Inputs

The contents of resettlement action plan are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:238 of


696
Software Requirement Specification

ULG name User will select the ULG Name from dropdown list

Region name User will select the Region Name from dropdown list

Project name User will select the Project Name from dropdown list

Project Social Impact User will enter the potential environment impacts in text field

Proposed Mitigation User will enter the proposed mitigation measures in text field
Measures

Responsibility for User will enter the responsibility for implementing the mitigation

implementing the measures in text field


mitigation measures

Responsible for User will enter the responsibility for monitoring in text field

monitoring

Time horizon

Mitigation User will enter the mitigation in text field

Monitoring User will enter the monitoring in text field

Cost Estimates

Mitigation User will enter the mitigation in text field

Monitoring User will enter the monitoring in text field

Button Submit This Button will submit the entered data for Resettlement Action Plan

Button Reset This Button will reset the entered data for Resettlement Action Plan

Button Cancel This Button will terminate the process of capturing data for Resettlement
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:239 of


696
Software Requirement Specification

Data Capture Diagram

Resettlement Action Plan


ULG name Region name Project name Project Social Impact

Proposed Mitigation Measures Responsibility for


implementing the
mitigation measures

Responsibility for monitoring

Time horizon

Mitigation Monitoring

Cost Estimates

Mitigation Monitoring

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:240 of


696
Software Requirement Specification

3.7.4 Social Audit Review [REQ-074]

Description
This function is used to capture Social Audit Review Data.

Inputs

The contents of Social Audit Review are:

ULG Name User will select the ULG Name from dropdown list

Region Name User will select the Region name from dropdown list

Start Date of Audit User will select the date from calendar

End Date of Audit User will select the date from calendar

Submission Date of User will select the date from calendar

Audit Report

Findings of the Audit Report

Findings Description User will enter the findings description in text field

Project Name User will select the project name from dropdown list

Action to be taken User will enter the action to be taken in text field

Responsible Party User will enter the responsible party in text field

Timeline for Action User will select the timeline for action in quarter

Action Implementation User will select the action implementation status from dropdown list

Status

Button Submit This Button will submit the entered data for Environment Audit

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:241 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for Environment Audit

Button Cancel This Button will terminate the process of capturing data for Environment
Audit

Data Capture Diagram

Environment and Social Audit

ULG Name Region Name Start Date of Audit End Date of Audit
Select ULG Select Region Select Date Select Date

Submission Date
of Audit Report

Findings of the Audit Report

Findings Description Project Name Action to be taken

Responsible Party Timeline for Action Action Implementation


Status

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:242 of


696
Software Requirement Specification

Figure 2

3.7.5 Annual Action Plan [REQ-075]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:243 of


696
Software Requirement Specification

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:244 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:245 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7.6 Tracking progress of activities under Annual Action Plan [REQ-076]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:246 of


696
Software Requirement Specification

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:247 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:248 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:249 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7.7 Field Visit Request [REQ-077]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:250 of


696
Software Requirement Specification

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar
requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:251 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.7.8 Field Visit Report [REQ-078]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:252 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:253 of


696
Software Requirement Specification

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field
collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field


to resolve issues

Feedback letter User will select the value from ( Yes , No )


uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report

uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:254 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:255 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.7.9 Capacity Building Plan [REQ-079]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:256 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:257 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:258 of


696
Software Requirement Specification

3.8 Infrastructure Asset Management

3.8.1 Asset Condition Assessment Indicator [REQ-080]

Description
This function is used to capture asset condition assessment indicator which will be used to
assess the assets

Inputs

The contents of Asset Condition Assessment Indicator are:

Level User will select the Level from ( Federal , Regional , ULG )

Descriptor User will enter the descriptor in text field

General Description User will enter the general description in text field

Button Submit This Button will submit the data for Asset Condition Assessment
Indicator

Button Reset This Button will reset the entered data for Asset Condition Assessment
Indicator

Button Cancel This Button will terminate the process of capturing data for Asset
Condition Assessment Indicator

Data Capture Diagram

Asset Condition Assesment Indicator


Level Descriptor General Description

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:259 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.2 Infrastructure Asset Inventory [REQ-081]

Description
This function is used to capture data of Infrastructure Asset Inventory.

Inputs

The contents of Infrastructure asset inventory are:

Movement Network

Movement Network User will select the movement network asset category from dropdown list
Asset category

Movement Network User will select the movement network asset category unit of

asset category unit of measurement from dropdown list

measurement

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:260 of


696
Software Requirement Specification

Movement Network Asset Category Classification

Roads

Road Type User will select the road type from dropdown list

Primary Road (KM) User will enter the value of primary road in Kilometer ( Numeric field )

Secondary Road (KM) User will enter the value of secondary road in Kilometer ( Numeric field)

Collectors and Local User will enter the value of collectors and local road in Kilometer ( Numeric
Road (KM) field )

Total (KM) This will be calculated using Primary Road , Secondary Road, Collectors
and Local Road

Pedestrian Walkways

Pedestrian walkway User will select the pedestrian type from dropdown list.

type (KM)

Pedestrian walkway on User will enter the value of pedestrian walkway on primary road in
Primary Road (KM) Kilometer ( Numeric field )

Pedestrian walkway on User will enter the value of pedestrian walkway on secondary road in

secondary Road (KM) Kilometer ( Numeric field )

Pedestrian walkways User will enter the value of pedestrian walkway on collectors and local

on collectors and Local road in Kilometer ( Numeric field )


Road (KM)

Total (KM) This will be calculated using Pedestrian walkway on Primary Road,
Secondary Road, Collectors and Local Road

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:261 of


696
Software Requirement Specification

Road Structure

Road Structure type User will select the road structure type from dropdown list

(KM)

Road structure on User will enter the road structure on primary road in numeric field

Primary Road (NO)

Road structure on User will enter the road structure on secondary road in numeric field

secondary Road (NO)

Road Structure on User will enter the road structure on collectors and local road in numeric

collectors and Local field


Road (NO)

Total (NO) This will be calculated using Road structure on Primary Road , Secondary
Road , Collectors and Local Road

Street Lights

Street Light type (KM) User will select the street light type from dropdown list

Street Light on Primary User will enter the street lights on primary road in numeric field
Road (NO)

Street Light on User will enter the street lights on secondary road in numeric field

secondary Road (NO)

Street Light on User will enter the street lights on collectors and local road in numeric
collectors and Local field

Road (NO)

Total (NO) This will be calculated using Street Lights on Primary Road , Secondary
Road, Collectors and Local Road

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:262 of


696
Software Requirement Specification

Construction Machinery and Vehicles

Machinery User will select the machinery type from dropdown list

Amount User will select the amount in numeric field

Remark User will enter the remarks in text field

Drainage Network

Drainage Network User will select the drainage network asset category from dropdown list
Asset category

Drainage Network User will select the drainage network asset category unit of measurement

asset category unit of from dropdown list

measurement

Drainage Network Asset Category Classification

Drains by Road Classification

Drain Type User will select the drain type from dropdown list

Drain on Primary Road User will enter the drains on primary road in kilometer ( Numeric field)

(KM)

Drain on Secondary User will enter the drains on secondary road in kilometer ( Numeric field)

Road (KM)

Drain on Collectors and User will enter the drains on collectors and local road in kilometer
Local Road (KM) ( Numeric field)

Total Drain (KM) This will calculates using the drain on primary road, secondary road,
collectors and local road.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:263 of


696
Software Requirement Specification

Water Supply

Water Supply Asset User will select the water supply asset category from dropdown list

category

Water Supply asset User will select the water supply asset category unit of measurement from

category unit of dropdown list

measurement

Water Supply Asset Category Classification

Water Supply Network by feature class

Description User will enter the description in text field

Unit User will enter the unit in text field

Items User will enter the items in text field

Quantity User will enter the quantity in numeric field

Water Supply Sub User will select water supply sub category from dropdown list

category

Type User will select the type from dropdown list

Total (NO) User will enter the Total ( Number ) in numeric field

Length User will enter the length in numeric field

Width ( Diameter) User will enter the width in numeric field

Sanitation

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:264 of


696
Software Requirement Specification

Sanitation Asset User will select the sanitation asset category from dropdown list
category

Sanitation asset User will select the sanitation asset category unit of measurement from

category unit of dropdown list

measurement

Sanitation Asset User will select the sanitation asset category classification from dropdown
Category Classification list

Sanitation Facilities User will enter the sanitation facilities and description in text field
Description

Unit User will enter the unit in text field

Items User will enter the items in text field

Quantity User will enter the quantity in numeric field

Solid Waste Management

Solid waste User will select the solid waste management asset category from

management asset dropdown list


category

Solid waste User will select the solid waste management asset category unit of

management asset measurement from dropdown list


category unit of

measurement

Solid waste User will select the solid waste management asset category classification
management asset from dropdown list

category classification

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:265 of


696
Software Requirement Specification

Solid waste User will enter the solid waste management description in text field
management

Description

Unit User will enter the unit in text field

Items User will enter the items in text field

Quantity User will enter the quantity in numeric field

Greenery and Parks

Greenery and parks User will select the greenery and park asset category from dropdown list.
asset category

Greenery and parks User will select the greenery and parks asset category unit of

asset category unit of measurement from dropdown list

measurement

Greenery and parks User will select the greenery and parks asset category classification from

asset category dropdown list

classification

Greenery and parking User will select the greenery and parks sub-category from dropdown list

sub-category

Greenery and parking User will enter the greenery and parking details in text field
details

Facilities for social and economic development

Social and Economic User will select the social and economic development facility asset

Development Facility category from dropdown list

asset category

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:266 of


696
Software Requirement Specification

Social and Economic User will select the social and economic development facility asset
Development Facility category unit of measurement from dropdown list

asset category unit of


measurement

Social and economic User will select the social and economic development facility asset

development facility category classification from dropdown list


asset category

classification

Social and economic development facility details

Kind of facility User will enter the kind of facility in text field

Location User will enter the location in text field

Unit User will enter the unit in text field

Quantity User will enter the quantity in numeric field

Functionality User will enter the functionality in text field

Remark User will enter the remark in text field

Button Submit This Button will submit the data for Asset inventory

Button Reset This Button will reset the entered data for Asset inventory

Button Cancel This Button will terminate the process of capturing data for Asset
inventory

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:267 of


696
Software Requirement Specification

Data Capture Diagram

Infrastructure Asset Inventory

Movement Network
Movement Network Movement Network
Asset category asset category unit
of measurement

Movement Network Asset Category Classification


Roads

Road Type Primary Road (KM) Secondary Road (KM) Collectors and
Local Road (KM)

Total (KM)

Pedestrian Walkways

Pedestrian walkway Pedestrian walkway Pedestrian walkway Pedestrian walkways


type (KM) on Primary Road (KM) on secondary on collectors and Local
Road (KM) Road (KM)

Total (KM)

Road Strcuture

Road Strcuture Road structure Road structure Road Strcuture


type (KM) on Primary Road (NO) on secondary on collectors and Local
Road (NO) Road (NO)

Total (NO)

Street Lights

Street Light Street Light Street Light Street Light


type (KM) on Primary Road (NO) on secondary on collectors and Local
Road (NO) Road (NO)

Total (NO)

Construction Machinery and Vehicles

Machinery Amount Remark

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:268 of


696
Software Requirement Specification

Drainage Network
Drainage Network Drainage Network
Asset category asset category unit
of measurement

Drainage Network Asset Category Classification


Drains by Road Classification

Drain Type Drain on Drain on Drain on


Primary Road (KM) Secondary Road (KM) Collectors and
Local Road (KM)

Total Drain (KM)

Water Supply
Water Supply Water Supply
Asset category asset category unit
of measurement

Water Supply Asset Category Classification


Water Supply Network by feature class

Description Quantity with unit Water Supply


and items Sub category

Type Total (NO) Length Width ( Diameter)

Sanitation
Sanitation Sanitation
Asset category asset category unit
of measurement

Sanitation Asset Category Classification

Sanitation Facilities Description Quantity with unit


and items

Solid Waste Management


Solid Waste Solid Waste Manage-
Management ment asset category
Asset Category unit of measurement

Solid waste Management asset Category Classification

Solid waste management Description Quantity with unit


and items

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:269 of


696
Software Requirement Specification

Greenery and Parks


Greenery and Parks Greenery and parks
Asset Category asset category unit
of measurement

Greenery and parks asset Category Classification

Greenery and Greenery and


parking sub- parking details
category

Facilities for social and economic development


Social and Economic Social and Economic
Development Facility Development Facility
asset category asset category unit
of measurement

Social and economic development facility asset category Classification

Social and economic development facility details

Kind of facility Location Unit Quantity

Functionality Remark

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:270 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.3 Asset condition assessment [REQ-082]

Description
This function is used to capture data for asset condition assessment.

Inputs

The contents of Asset condition assessment are:

Movement Network asset condition assessment

Movement Network User will select the Movement Network asset category from dropdown
Asset category list ( Roads, Pedestrian walkways, Road Structures, Street Lights,
Construction Machinery and Vehicles )

Deterioration Area User will enter the value in numeric field

(m2)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:271 of


696
Software Requirement Specification

Total Area (m2) User will enter the value in numeric field

Total Number User will enter the value in numeric field

Percentage This will be calculated using Deterioration area and total area
Deteriorated

No. of Potholes User will enter the value in numeric field

Total Length User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Drainage Network asset condition assessment

Road Drainage Type User will select the road drainage type from dropdown list

Total Length (Km) User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Water supply asset condition assessment

Water supply User will select the water supply sub-category from dropdown list

subcategory

Type User will select the type from dropdown list

Total No. User will enter the value in numeric field

Total Length (Km) User will enter the value in numeric field

Width (Diameter) User will enter the value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:272 of


696
Software Requirement Specification

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Sanitation asset condition assessment

Sanitation asset User will select the sanitation asset category from dropdown list

category

Asset type User will select the asset type from dropdown list

Total No. User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Solid waste management asset condition assessment

Solid waste manage- User will select the solid waste management asset category from

ment asset category dropdown list

Asset type User will select the asset type from dropdown list

Total No. User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Greenery and parks asset condition assessment

Greenery and parks User will select the Greenery and parks asset category from dropdown
asset category list

Asset type User will select the asset type from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:273 of


696
Software Requirement Specification

Total No. User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Social and Economic Development facilities asset condition assessment

Social and economic User will select the social and economic development facilities asset
development facilities category from dropdown list

asset category

Asset type User will select the asset type from dropdown list

Total No. User will enter the value in numeric field

Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )

Button Submit This Button will submit the data for Asset Condition

Button Reset This Button will reset the entered data for Asset Condition

Button Cancel This Button will terminate the process of capturing data for Asset
Condition

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:274 of


696
Software Requirement Specification

Data Capture Diagram

Asset condition assessment

Movement Network asset condition assessment


Movement Network
Asset category

Detoriation Area (m2) Total Area (m2) Total Number Percentage Detoriated

No. of Potholes Total Length Condition

Drainage Network asset condition assessment

Road Drainage Type Total Length (Km) Condition

Water supply asset condition assessment

Water supply sub- Type Total No. Total Length (Km)


category

Width (Diameter) Condition

Sanitation asset condition assessment

Sanitation asset Asset type Total No. Condition


category

Solid waste management asset condition assessment

Solid waste manage- Asset type Total No. Condition


ment asset category

Greenery and parks asset condition assessment

Greenery and parks Asset type Total No. Condition


asset category

Social and Economic Development facilities asset condition assessment

Social and economic Asset type Total No. Condition


development facilities
asset category

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:275 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.4 Infrastructure asset management [REQ-083]

Description
This function is used to capture Infrastructure asset management data.

Inputs

The contents of Infrastructure asset management are:

ULG User will select the ULG name from dropdown list

Name of Project User will select the name of project from dropdown list

Infrastructure asset User will select the infrastructure asset category from dropdown list

category

Unit of measurement User will select the unit of measurement from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:276 of


696
Software Requirement Specification

Planned for Financial User will enter the value in numeric field
Year

From Month User will enter the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage This will be calculated using planned and actual value

To Month User will enter the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage This will be calculated using planned and actual value

O & M Budgets

ULG Name User will select the ULG name from dropdown list

Project Name User will select the name of project from dropdown list

Annual Physical User will enter the value in numeric field

Annual Financial User will enter the value in numeric field

From Month User will enter the date from calendar

Planned Physical User will enter the value in numeric field

Actual Physical User will enter the value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:277 of


696
Software Requirement Specification

Percentage Physical This will be calculated using planned and actual physical value

Planned Financial User will enter the value in numeric field

Actual Financial User will enter the value in numeric field

Percentage Financial This will be calculated using planned and actual financial value

To Month User will enter the date from calendar

Planned Physical User will enter the value in numeric field

Actual Physical User will enter the value in numeric field

Percentage Physical This will be calculated using planned and actual physical value

Planned Financial User will enter the value in numeric field

Actual Financial User will enter the value in numeric field

Percentage Financial This will be calculated using planned and actual financial value

Button Submit This Button will submit the data for infrastructure asset management

Button Reset This Button will reset the entered data for infrastructure asset
management

Button Cancel This Button will terminate the process of capturing data for infrastructure
asset management

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:278 of


696
Software Requirement Specification

Data Capture Diagram

Infrastructure asset management


ULG Name Name of Project Infrastructure asset Unit of Measurement
category

Planned for Financial


Year

From Month

Planned Actual Percentage Achieved

To Month

Planned Actual Percentage Achieved

O & M Budgets per financial year

ULG Name Name of Project Annual Financial Annual Physical


Budget Budget

From Month

Planned Financial Actual Financial Percentage Achieved Financial

Planned Physical Actual Physical Percentage Achieved Physical

To Month

Planned Financial Actual Financial Percentage Achieved Financial

Planned Physical Actual Physical Percentage Achieved Physical

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:279 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:280 of


696
Software Requirement Specification

3.8.5 Asset Management Plan [REQ-084]

Description
This function is used to capture Asset Management Plan which will be sent to other thematic
areas for review and approval

Inputs

The contents of Asset Management are:

Asset Management Team organization

Position User will enter the position in text field

Name User will enter the name in text field

Qualifications User will enter the qualification in text field

Contact Details User will enter the contact details in text field

Infrastructure asset definition categories

Strategic Activity Area User will select the strategic activity area from ( Movement Network,
Water supply network, Environmental services, social and economic
services )

Physical Asset Category User will select the physical asset category from dropdown list

Asset Category Departmental Responsibility

Asset category User will select the asset category from dropdown list

Responsible Body User will enter the responsible body name in text field

Responsible Person/ User will enter the responsible person / Group in text field

Group

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:281 of


696
Software Requirement Specification

Remarks User will enter remarks in text field

Asset Inventory

Upload Asset Inventory User will upload the asset inventory report
Report

Asset condition assessment

Upload Asset condition User will upload the asset condition assessment report
assessment Report

Maintenance Budget Guide for each asset

Routine and Periodic maintenance activities

Feature Class User will enter the feature class in text field

Normal Maintenance User will enter the normal maintenance activity in text field

Activity

Frequency of User will enter the frequency of operation in text field


Operation

Unit Cost User will enter the unit cost in numeric field

Budget for the activity User will enter the budget for activity in numeric field

Cost summary breakdown by activity area and asset category

Strategic Activity area User will select the strategic activity area from ( Movement Network,
Water supply network, Environmental services, social and economic
services )

Item User will enter the item in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:282 of


696
Software Requirement Specification

Cost (EB) Operation User will enter the cost ( EB ) operation in numeric field

Total Cost User will enter the total cost in numeric field

Cost breakdown of the maintenance deficit for major assets

Asset Category User will select the asset category from dropdown list

Asset category type User will select the asset category type from dropdown list

Unit of measure User will select the unit of measure from dropdown list

Quantity User will enter the quantity value in numeric field

Unit Rate ( EB ) User will enter the Unit rate ( EB ) in numeric field

Cost ( EB ) User will enter the cost ( EB ) in numeric field

Total Cost User will enter the total cost ( EB ) in numeric field

Replacement cost and residual value of all assets

Replacement cost and residual value of all assets by strategic and supportive activity.

Strategic and User will select the strategic and supportive activity area from

supportive activity area ( Movement Network, Water supply network, Environmental services,

social and economic services )

Replacement Cost User will enter the replacement cost in numeric field

Residual Value User will enter the residual value in numeric field

Total Budget for User will enter the total budget for normal maintenance in numeric field

Normal maintenance

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:283 of


696
Software Requirement Specification

Costs and prioritized new works projects

Cost of new works projects by activity area

Strategic and User will select the strategic and supportive activity area from
supportive activity area ( Movement Network, Water supply network, Environmental services,

social and economic services )

Cost of new works User will enter the cost of new works project in numeric field

projects

Total Budgets User will enter the total budgets in numeric field

Normal maintenance User will enter the total budget for normal maintenance in numeric field
or new works project

Implementation schedule for new works projects for year 1

Approval User will select the approval status from ( Accepted , Rejected )

Date of tender User will select the date from calendar


Invitation

Date of tender closure User will select the date from calendar

Date of signing of a User will select the date from calendar

Contract

Date of start of activity User will select the date from calendar

Date of Project User will select the date from calendar

Completion

Date of handover to User will select the date from calendar

the city

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:284 of


696
Software Requirement Specification

Date when the new User will select the date from calendar
project is entered into

the database for


existing assets

New work projects started against project approved for AMP Year-2

Strategic and User will select the strategic and supportive activity area from
supportive activity ( Movement Network, Water supply network, Environmental services,

areas
social and economic services )

No. of Projects User will enter the value in numeric field


approved

Cost of projects User will enter the value in numeric field

approved

No. of projects started User will enter the value in numeric field

Cost of Projects started User will enter the value in numeric field

Total This will be calculated using cost of projects approved and started

Monthly schedule of maintenance deficit activities for Year 1

Approval User will select the approval status from ( Accepted , Rejected )

Date of signing of a User will select the date from calendar

Contract

Date of start of activity User will select the date from calendar

Date of completion of User will select the date from calendar

activity

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:285 of


696
Software Requirement Specification

Date when the User will select the date from calendar
condition of the asset is

updated

Maintenance activities completed against approved

Strategic and User will select the strategic and supportive activity area from

supportive activity ( Movement Network, Water supply network, Environmental services,


areas social and economic services )

No. of activities User will enter the value in numeric field


approved

Cost of activities User will enter the value in numeric field

approved

No. of activities User will enter the value in numeric field

completed

Cost of activities User will enter the value in numeric field

completed

Total This will be calculates using cost of activities approved and completed

Button Submit This Button will submit the data for Asset management plan

Button Reset This Button will reset the entered data for Asset management plan

Button Cancel This Button will terminate the process of capturing data for Asset
Management Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:286 of


696
Software Requirement Specification

Data Capture Diagram

Asset Managemnet Plan

Asset Management Team organization

Position Name Qualifications Contract Details

Infrastructure asset definition categories

Strategic Activity Area Physical Asset Category

Asset Management Team organization

Asset category Responsible Body Responsible Person/ Remarks


Group

Asset Inventory

Upload Asset Inventory Report

Asset condition assessment

Upload Asset condition assessment Report

Maintenance Budget Guide for each asset

Routine and Periodic maintenance activities

Feature Class Normal Maintenance Frequency of Unit Cost


Activity Operation

Budget for the


activity

Cost summary breakdown by activity area and asset category

Strategic Activity Item Cost (EB) Total Cost


area Operation

Cost breakdown of the maintenance deficit for major assets

Asset Category Asset category type Unit of measure Qunatity

Unit Rate ( EB ) Cost ( EB ) Total Cost

Replacement cost and residual value of all assets

Replacement cost and residual value of all assets by strategic and supportive activity.

Strategic and supp- Replacement Cost Residual Value Total Budget for Normal
ortive activity area maintenance

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:287 of


696
Software Requirement Specification

Costs and prioritised new works projects

Cost of new works projects by activity area

Strategic and supp- Cost of new works Total Budgets Normal maintenance
ortive activity area projects or new works project

Implemenation schedule for new works projects for year 1

Approval Date of tender Date of tender Date of signing of a


Invitation closure Contract

Date of start of Date of Project Date of handover to Date when the new
activity Completion the city project is entered into
the database for existing
assets

New work projects started against project approved for AMP Year-2

Strategic and suppo- No. of Projects Cost of projects No. of projects started
rtive activity areas approved approved

Cost of Projects Total


started

Monthly schedule of maintenance deficit activities for Year 1

Approval Date of signing of a Date of start of Date of completion


Contract activity of activity

Date when the


condition of the asset
is updated

Maintenance activities completed against approved

Strategic and suppo- No. of activities Cost of activities No. of activities


rtive activity areas approved approved completed

Cost of activities Total


completed

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:288 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.6 Asset maintenance plan [REQ-085]

Description
This function is used to capture asset maintenance plan.

Inputs

The contents of Asset Maintenance Plan are:

Budget costs for normal maintenance by activity area

Strategic and User will select the strategic and supportive activity area from

supportive activity ( Movement Network, Water supply network, Environmental services,


areas
social and economic services )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:289 of


696
Software Requirement Specification

Budget for routine and User will enter the value in numeric field
periodic maintenance

(EB/ Year)

Total Budget for User will enter the value in numeric field

normal maintenance

Budget allocation for maintenance activities

Budget Source User will enter the budget source in text field

Budget Amount User will enter the budget amount in numeric field

Final maintenance budget for the year

Strategic and User will select the strategic and supportive activity area from
supportive activity ( Movement Network, Water supply network, Environmental services,

areas
social and economic services )

Budget for reducing User will enter the value in numeric field

the budget deficit

Total Budget User will enter the value in numeric field

Button Submit This Button will submit the data for Asset maintenance plan

Button Reset This Button will reset the entered data for Asset maintenance plan

Button Cancel This Button will terminate the process of capturing data for asset
maintenance plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:290 of


696
Software Requirement Specification

Data Capture Diagram

Asset maintenance plan

Budget costs for normal maintenance by activity area

Strategic and suppo- Budget for routine Total Budget for


rtive activity areas and periodic maintenance normal maintenance
(EB/ Year)

Budget allocation for maintenance activities

Budget Source Budget Amount

Final maintenance budget for the year

Strategic and suppo- Budget for reducing Total Budget


rtive activity areas the budget deficit

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:291 of


696
Software Requirement Specification

3.8.7 3-Year Rolling Program [REQ-086]

Description
This function is used to capture new work projects and the maintenance activities budgets to
a 3-year rolling program.

Inputs

The contents of 3-Year Rolling Program are:

New work projects and the maintenance activities budgets to a 3-year rolling
program.

Strategic activity areas User will select the strategic and supportive activity area from

( Movement Network, Water supply network, Environmental services,


social and economic services )

Budget Year 1 User will enter the value in numeric field

Budget Year 2 User will enter the value in numeric field

Budget Year 3 User will enter the value in numeric field

Total Budget This will be calculated using Budget Year 1 , Budget Year 2 , Budget Year
3

Category User will select the category from ( Maintenance , New Work )

Button Submit This Button will submit the data for 3-year rolling program

Button Reset This Button will reset the entered data for 3-year rolling program

Button Cancel This Button will terminate the process of capturing data for 3-year rolling
program

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:292 of


696
Software Requirement Specification

Data Capture Diagram

3-Year Rolling Program

New Works projects and the maintenance activities budgets to a 3-Year rolling Program

Strategic acitivity area Budget Year 1 Budget Year 2 Budget Year 3

Category

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:293 of


696
Software Requirement Specification

3.8.8 Annual Action Plan [REQ-087]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:294 of


696
Software Requirement Specification

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:295 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.9 Tracking progress of activities under Annual Action Plan [REQ-088]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:296 of


696
Software Requirement Specification

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:297 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:298 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:299 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.10 Field Visit Request [REQ-089]

Description

This function is used to Capture Field Visit Work Request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:300 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:301 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:302 of


696
Software Requirement Specification

3.8.11 Field Visit Report [REQ-090]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:303 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:304 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:305 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.8.12 Capacity Building Plan [REQ-091]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:306 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:307 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:308 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:309 of


696
Software Requirement Specification

3.9 Urban Land Management

3.9.1 Land Management M & E Data [REQ-092]

Description
This function is used to Capture Data for Urban Land Management M & E Data for generating
M & E Report

Inputs

The contents of Land Management M & E Data are :-

Region name User will select the Region Name from dropdown list

ULG name User will select the ULG Name from dropdown list

Financial Year User will select the financial year from dropdown list

Unit of Measurement User will select the unit of measurement from dropdown list

No. of Plots released through allocation / allotment

From Month User will select the date from calendar

Residential

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Commercial

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Other

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:310 of


696
Software Requirement Specification

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

To Month User will select the date from calendar

Residential

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Commercial

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Other

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

No. of Plots released through auction / bidding

From Month User will enter the date from calendar

Residential

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Commercial

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:311 of


696
Software Requirement Specification

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Other

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

To Month User will select the date from calendar

Residential

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Commercial

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Other

Number User will enter the number in numeric field

Hectares User will enter the hectares in numeric field

Number of organized files of parcels of landholdings which are made ready for adjucation and
registration as per the annual plan cascaded from the region to the city

For Month User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:312 of


696
Software Requirement Specification

Planned number of User will enter the value in numeric field

files to be ready for


adjucation and
registration for the

year

Planned number of User will enter the value in numeric field

files to be ready for

adjucation and
registration during the
month

Actual number of files User will enter the value in numeric field

to be ready for

adjucation and

registration during the

month

% Achieved This will be calculated using planned and actual value during the month

Adjucated parcels of landholdings which are made ready for registration as per the approvals of

adjucation and registration commission and as per the annual plan cascaded from the region to the

city

For Month User will select the date from calendar

Planned number of User will enter the value in numeric field


adjucated parcels to be

ready for the


registration for the

year

Planned number of User will enter the value in numeric field

adjucated parcels to be

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:313 of


696
Software Requirement Specification

ready for the

registration during the


month

Actual number of User will enter the value in numeric field

adjucated parcels to be

ready for the

registration during the

month

% Achieved This will be calculated using planned and actual value during the month

Registered parcels of landholdings as per the annual plan cascaded from the region to the
city

For Month User will select the date from calendar

Planned number of User will enter the value in numeric field

registered parcels for

the year

Planned number of User will enter the value in numeric field


registered parcels

during the month

Actual number of User will enter the value in numeric field

registered parcels

during the month

% Achieved This will be calculated using planned and actual value during the month

Button Submit This Button will submit the data for Urban Land Management M & E data

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:314 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for Urban Land Management M
& E data

Button Cancel This Button will terminate the process of capturing data for Urban Land
Management M & E data

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:315 of


696
Software Requirement Specification

Land Management M&E Data


Region Name ULG Name Financial Year Unit Measurement

No of plots of Land released through Allocation / Allotment

From Month
Residential

Number Hectares

Commercial

Number Hectares

Other ( Social, etc)

Number Hectares

To Month
Residential

Number Hectares

Commercial

Number Hectares

Other ( Social, etc)

Number Hectares

No of plots of Land released through Auction

From Month
Residential

Number Hectares

Commercial

Number Hectares

Other ( Social, etc)

Number Hectares

To Month
Residential

Number Hectares

Commercial

Number Hectares

Other ( Social, etc)

Number Hectares

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:316 of


696
Software Requirement Specification

Number of Organized Files of Parcels of landholdings which are made ready for adjudication and
registration as per the Annual Plan cascaded from the Region to the city.

For Month

Planned number of Planned number of Actual number of % Achieved


files to be ready for files made ready for files made ready for
adjucation and adjucation and adjucation and
registration for the registration during registration during
Year month month

Adjudicated parcels of landholdings which are made ready for registration as per the approvals of adjudication
and registration commission and as per the Annual Plan cascaded from the Region to the city

For Month

Planned number of Planned number of Actual number of % Achieved


adjucated parcels adjucated parcels adjucated parcels
ready for the ready for the ready for the
registration for the registration during registration during
Year the month the month

Registered Parcels of landholdings as per the Annual Plan cascaded from the Region to the city

For Month

Planned number of Planned number of Actual number of % Achieved


Registered parcels Registered parcels Registered parcels
for the year during the Month during Month

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:317 of


696
Software Requirement Specification

Process Flow Diagram

3.9.2 Land Registration, inventory, Release, Development, Banking [REQ-093]

Description
This function is used to Land Registration, inventory, Release, Development, Banking

Inputs

The contents Land Registration, inventory, Release, Development, Banking are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:318 of


696
Software Requirement Specification

Region name User will select the Region Name from dropdown list

ULG name User will select the ULG Name from dropdown list

Sub – city name User will select the sub-city name from dropdown list

Woreda User will select the Woreda name from dropdown list

Kebela User will select the kebela name from dropdown list

Land registration serial User will enter the UPIN in numeric field

number(UPIN)

Allotment or Auction User will select the value from ( Allotment , Auction )

Owner User will enter the name of owner in text field

Lease User will enter the lease information in text field

Plot number User will enter the plot number in text field

Land description User will enter the land description in text field

Land dimension User will enter the land dimension in numeric field

Land category User will enter the land category in text field

Button Submit This Button will submit the data for Land Registration.

Button Reset This Button will reset the entered data for Land Registration

Button Cancel This Button will terminate the process of capturing data for Land
Registration

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:319 of


696
Software Requirement Specification

Data Capture Diagram

Land Registration, inventory, Release, Development, Banking


Region Name ULG Name Sub-City Name Woreda

Kebele Land Registration Allotment or Auction owner


serial Number (UPIN)

Lease Plot Number Land Description

Land Dimension Land Category

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:320 of


696
Software Requirement Specification

3.9.3 Action Plan [REQ-094]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:321 of


696
Software Requirement Specification

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:322 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.9.4 Tracking progress of activities under Annual Action Plan [REQ-095]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:323 of


696
Software Requirement Specification

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:324 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:325 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:326 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:327 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.9.5 Field Visit Request [REQ-096]

Description

This function is used to Capture Field Visit Work Request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:328 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:329 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.9.6 Field Visit Report [REQ-097]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:330 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:331 of


696
Software Requirement Specification

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field
collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text

recommendation made field


to resolve issues

Feedback letter User will select the value from ( Yes , No )


uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report

uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:332 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:333 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.9.7 Capacity Building Plan [REQ-098]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:334 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:335 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:336 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:337 of


696
Software Requirement Specification

3.10 Urban Planning

3.10.1 Proposal feasibility assessment [REQ-099]

Description
This function is used to capture extensive recording of all Proposal Feasibility Assessment

Inputs

The contents of Proposal feasibility assessment Data are :

ULG Name User will select the ULG name from dropdown list

Region Name User will select the Region name from dropdown list

Proposal User will enter the proposal in text field

Period User will select the value of period from quarter

Date Received User will select the date from calendar

Project Type User will select the value of project type from dropdown list

Financial Year User will select the value of financial year from dropdown list

Total Area in Hectare User will enter the total area in numeric field

Assessment criteria User will select the assessment criteria from dropdown list

Assessment remarks / User will enter the assessment remarks / recommendation in text field

recommendation

Approval Status User will select the approval status from ( Accepted , Rejected )

Button Submit This Button will submit the data for proposal feasibility assessment data

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:338 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for proposal feasibility assessment
data

Button Cancel This Button will terminate the process of capturing data for proposal
feasibility assessment data

Data Capture Diagram

Proposal feasibility assessment data


Region Name ULG Name Proposal Name Period

Date Received Project Type Financial Year Total Area in Hectare

Assessment criteria Assessment Remark/ Approval Status


Recommendation

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:339 of


696
Software Requirement Specification

Figure 2

3.10.2 Urban Plan Supervision Data [REQ-100]

Description
This function is used to capture Urban Plan Supervision data.

Inputs

The contents of Urban Plan Supervision Data are :

ULG name User will select the ULG Name from dropdown list

Region name User will select the region name from dropdown list

Period User will select the period from quarters

Project name User will select the project name from dropdown list

Financial year User will select the financial year from dropdown list

Supervision start date User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:340 of


696
Software Requirement Specification

Supervision end date User will select the date from calendar

Site name User will select the site name from dropdown list

Infrastructure type User will select the infrastructure type from dropdown list

Supervisory remark User will enter the supervisory remark in text field

Button Submit This Button will submit the data for urban plan supervision

Button Reset This Button will reset the entered data for urban plan supervision

Button Cancel This Button will terminate the process of capturing data for urban plan
supervision

Data Capture Diagram

Urban Plan Supervision Data


ULG Name Region Name Period Project Name

Financial Year Supervision Period Site Name Infrastructure type

Supervisory Remarks

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:341 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.10.3 Proposal assessment criteria [REQ-101]

Description
This function is used to capture proposal assessment criteria which will be used to assess

Proposal feasibility.

Inputs

The contents of proposal assessment criteria are :

Assessment criteria User will enter the assessment criteria in text field

Button Submit This Button will submit the data for assessment criteria

Button Reset This Button will reset the entered data for assessment criteria

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:342 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for assessment
criteria

Data Capture Diagram

Proposal assessment criteria


Assessment Criteria

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:343 of


696
Software Requirement Specification

3.10.4 EIA Report Review [REQ-102]

Description
This function is used to capture data for reviewing EIA report coming from environment

Management

Inputs

The contents of EIA Report Review are :

ULG Name User will select the ULG name from dropdown list

Region Name User will select the region name from dropdown list

EIA Report Serial User will enter the EIA Report serial number in text field

Number

Period User will select the period from quarters

Review Remarks User will enter the review remarks in text field

Button Submit This Button will submit the data for EIA Report Review

Button Reset This Button will reset the entered data for EIA Report Review

Button Cancel This Button will terminate the process of capturing data for EIA Report
Review

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:344 of


696
Software Requirement Specification

Data Capture Diagram

EIA Review
ULG Name Region Name EIA Report serial Period
Number

Review Remarks

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.10.5 Review and approval of Structural Plan [REQ-103]

Description
This function is used to capture data for reviewing structural plan coming from AUTOCAD

Inputs

The contents of Structural Plan review are :

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:345 of


696
Software Requirement Specification

Action User will select the action from ( Accepted , Rejected )

Comments User will enter the comments in text field

Button Submit This Button will submit the data for structural plan review

Button Reset This Button will reset the entered data for structural plan review

Button Cancel This Button will terminate the process of capturing data for structural
plan review

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:346 of


696
Software Requirement Specification

3.10.6 Urban Planning M & E Report [REQ-104]

Description
This function is used to capture data for Urban Planning M & E Report

Inputs

The contents of Urban Planning M & E are :

ULG User will select the ULG name from dropdown list

Type of Urban Plan User will select the type or urban plan from dropdown list

Approval and Validity of Plan

Technical endorsement User will select the date from calendar


of BUDCo / RUPI Date

Technical endorsement User will select the year from dropdown list

of BUDCo / RUPI Year

Council of Ministers User will select the date from calendar

Approval Date

Council of Ministers User will select the year from dropdown list
Approval Year

Planning in period User will select the year from dropdown list

Remaining time in User will select the year from dropdown list

Financial Year CIP

Number of CIP Projects User will enter the number of CIP Projects in numeric field
( Works )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:347 of


696
Software Requirement Specification

Structural Plan approval of CIP Projects

Number of CIP Projects User will enter the number of CIP Projects for which site plan issued in
for which site plan numeric field

issued

Number of CIP Projects User will enter the number of CIP Projects for which right of way

for which right of way standards issued in numeric field

standards issued

Button Submit This Button will submit the data for Urban Planning M & E

Button Reset This Button will reset the entered data for Urban Planning M & E

Button Cancel This Button will terminate the process of capturing data for Urban
Planning M & E

Data Capture Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:348 of


696
Software Requirement Specification

Urban Planning M & E

ULG Name Type of Urban Plan

Approval and Validity of Plan

Urban Plan Type Urban Plan Technical Urban Plan Technical Urban Plan Council
Endorsement Date Endorsement Year Minutes of Approval
of BUDCo of BUDCo Date

Urban Plan Council Planning in Period Remaining time in


Minutes of Approval
Year

Structure Plan Approval of CIP Projects

Number of CIP Number of CIP Number of CIP


Projects ( Works ) Projects for which Projects for which
Site plan issued Right of way
Standards issued

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:349 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.10.7 Annual Action Plan [REQ-105]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:350 of


696
Software Requirement Specification

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:351 of


696
Software Requirement Specification

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:352 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.10.8 Tracking progress of activities under Annual Action Plan [REQ-106]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:353 of


696
Software Requirement Specification

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:354 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:355 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:356 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:357 of


696
Software Requirement Specification

3.10.9 Field Visit Request [REQ-107]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:358 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:359 of


696
Software Requirement Specification

3.10.10 Field Visit Report [REQ-108]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:360 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:361 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:362 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.10.11 Capacity Building Plan [REQ-109]

Description

This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:363 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:364 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:365 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11 Planning and Budgeting

3.11.1 Potential Projects [REQ-110]

Description
This function is used to capture data of screening data on potential projects.

Inputs

The contents of Potential Projects are:

Name of Project User will select the name of project from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:366 of


696
Software Requirement Specification

Name of Kebele User will select the name of Kebele from dropdown list

Community Group City User will enter the community group city office from proposed in text
office from proposed field

Button Submit This Button will submit the data for screening data on potential projects

Button Reset This Button will reset the entered data for screening data on potential
projects

Button Cancel This Button will terminate the process of capturing data for screening
data on potential projects

Data Capture Diagram

Potential Projects
Name of Project Name of Kebele Community Group
City office from
from proposed

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:367 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.2 Citizen participation in Planning Progress [REQ-111]

Description
This function is used to add Citizen Participation in Planning Progress.

Inputs

The contents of Citizen Participation are:

ULG name User will select the ULG name from dropdown list

Type of Meeting User will enter the type of meeting in text field

Community Group / User will enter the community group / city of official participated in text

City Officials field

No. of Participants

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:368 of


696
Software Requirement Specification

Male User will enter the value in numeric field

Female User will enter the value in numeric field

Transgender User will enter the value in numeric field

Percentage %

Group total as % of This will be calculated using value of male , female , transgender
Total

Female share % This will be calculates using female and total of male , female , transgender

Button Submit This Button will submit the data for citizen participation in planning
process

Button Reset This Button will reset the entered data for citizen participation in planning
process

Button Cancel This Button will terminate the process of capturing data for citizen
participation in planning process

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:369 of


696
Software Requirement Specification

Data Capture Diagram

Citizen participation in Planning Progress


ULG name Type of Meeting Community Group /
City Officials

No. of Participants

Male Female Transgender

Percentage %

Group total as % Female share %


of Total

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:370 of


696
Software Requirement Specification

3.11.3 Capital Investment Plan [REQ-112]

Description
This function is used to add Capital Investment Plan which will be sent to other thematic areas
for review and approval.

Inputs

The contents of Capital Investment Plan are:

ULG Name User will select the ULG Name from dropdown list

Region name User will select the Region Name from dropdown list

Population size User will enter the population size in numeric field

Growth rate User will enter the growth rate of population in percentage

Name of Mayor User will enter the name of mayor in text field

Name of City Manager User will enter the name of city manager in text field

Party responsible for User will enter the party responsible for CIP in text field

the CIP

Period of CIP (Financial User will select the period of CIP from dropdown list

years)

Financial Data

Capital budget item User will enter the capital budget item in text field

Projected budget 1st User will enter the value in numeric field
Financial year

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:371 of


696
Software Requirement Specification

Projected budget 2nd User will enter the value in numeric field
Financial year

Projected budget 3rd User will enter the value in numeric field

Financial year

Total budget per item This will be calculated using capital budget item , Projected budget 1st
financial year , Projected budget 2nd Financial year, Projected budget 3rd
Financial year

Total budget per This will be calculated using capital budget item , Projected budget 1st

financial year financial year , Projected budget 2nd Financial year, Projected budget 3rd
Financial year

Multi-year budget forecast

City Own revenues

Revenue item User will enter the revenue item in text field

Forecast for 1st User will enter the value in numeric field

Financial year

Forecast for 2nd User will enter the value in numeric field

Financial year

Forecast for 3rd User will enter the value in numeric field
Financial year

Total budget per item This will be calculated using revenue item , Forecasted Revenue 1st
financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:372 of


696
Software Requirement Specification

Total budget per This will be calculated using revenue item , Forecasted Revenue 1st
financial year financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year

City operating expenditures

Expenditure item User will enter the expenditure item in text field

Forecast for 1st User will enter the value in numeric field

Financial year

Forecast for 2nd User will enter the value in numeric field

Financial year

Forecast for 3rd User will enter the value in numeric field

Financial year

Total budget per item This will be calculated using expenditure item , Forecasted 1st financial
year , Forecasted 2nd Financial year, Forecasted 3rd Financial year

Total budget per This will be calculated using expenditure item , Forecasted 1st financial

financial year year , Forecasted 2nd Financial year, Forecasted 3rd Financial year

Operation surplus for User will enter the operation surplus for each year in numeric field

each year

Capital revenue

Revenue item User will enter the revenue item in text field

Forecast for 1st User will enter the value in numeric field
Financial year

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:373 of


696
Software Requirement Specification

Forecast for 2nd User will enter the value in numeric field
Financial year

Forecast for 3rd User will enter the value in numeric field

Financial year

Total budget per item This will be calculated using revenue item , Forecasted Revenue 1st
financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year

Total budget per This will be calculated using revenue item , Forecasted Revenue 1st

financial year financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year

Summary of past 3 years capital investment

Capital expenditure User will enter the capital expenditure item in text field

item

Amount for 1st financial User will enter the value in numeric field

year

Amount for 2nd User will enter the value in numeric field

financial year

Amount for 3rd User will enter the value in numeric field

financial year

The three years rolling plan

Item description User will enter the item description in text field

Category User will enter the category in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:374 of


696
Software Requirement Specification

Part (Municipal User will select the value from ( Municipal function , State function )
function or state

function)

Unit of measure User will enter the unit of measure in text field

Quantity User will enter the quantity in numeric field

Unit cost User will enter the unit cost in numeric field

Priority User will select the priority from ( Low , Medium , High )

Budget for 1st year User will enter the value in numeric field

Budget for 2nd year User will enter the value in numeric field

Budget for 3rd year User will enter the value in numeric field

Total budget per item This value will be calculated using item description , Budget for 1st Year,
Budget for 2nd Year, Budget for 3rd Year

Total budget per This value will be calculated using category , Budget for 1st Year, Budget
category for every year for 2nd Year, Budget for 3rd Year

Total budget per year This value will be calculated using item description, category, Budget for
1st Year, Budget for 2nd Year, Budget for 3rd Year

Overall total budget This value will be calculated using item description, category, Budget for
per year 1st Year, Budget for 2nd Year, Budget for 3rd Year

Detailed project plan

Item description User will enter the item description in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:375 of


696
Software Requirement Specification

Category User will enter the category in text field

Part (Municipal User will select the value from ( Municipal function , State function )
function or state

function)

Unit of measure User will enter the unit of measure in text field

Quantity User will enter the quantity in numeric field

Unit cost User will enter the unit cost in numeric field

Total cost This will be calculated using Unit of measure , Quantity, Unit Cost

Funding sources User will enter the funding sources in text field

Funding amount for User will enter the funding amount for each source in numeric field

each source

Total cost for each item This will be calculated using item description , unit of measure , quantity,

unit of cost

Total cost for each This will be calculated using item description , unit of measure , quantity,
category per funding unit of cost, funding amount for each source

source

Overall total costs This will be calculated using item description , category, unit of measure ,
quantity, unit of cost

Maintenance budgets

Item description User will enter the item description in text field

Category User will enter the category in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:376 of


696
Software Requirement Specification

Asset item description User will enter the asset item description in text field

1st Year budget User will enter the value in numeric field

2nd Year budget User will enter the value in numeric field

3rd Year budget User will enter the value in numeric field

Total budget per year This will be calculated using item description , 1st year budget, 2nd year
budget, 3rd year budget

Total budget per item This will be calculated using item description , 1st year budget, 2nd year
budget, 3rd year budget

Staffing plan

Infrastructure category User will enter the infrastructure category in text field

Responsible User will enter the responsible department in text field


department

Number of required User will enter the number of required staff in numeric field

staff

Number of available User will enter the number of available staff in numeric field
staff

Job Creation Plan Data from LED and Job Creation Module

Action Plan Data from AWP in the program coordination module

Procurement plan data from procurement module

Capacity Building data from the CB module

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:377 of


696
Software Requirement Specification

Current status infrastructure data from the AMP

Goals and Objectives

Item Number User will enter the item number in text field

Goal User will enter the goal in text field

Objectives User will enter the objectives in text field

Participatory group

Citizen group User will enter the citizen group in text field

Number of male User will enter the number of male in numeric field

Number of female User will enter the number of female in numeric field

Total This will be calculated using number of male , number of female value

Identification of low carbon and resilient alternatives

Project Name User will select the project name from dropdown list

Conventional approach User will enter the conventional approach / design in text field

/ design

Low carbon and User will enter the low carbon and resilient alternative designs

resilient alternative considered in text field

designs considered

Select approach / User will select the approach / design from dropdown list
design

Justification User will enter the Justification in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:378 of


696
Software Requirement Specification

Annual Action plan for CIP Implementation

Pillar User will enter the pillar in text field

Category User will enter the category in text field

Project User will select the project from dropdown list

Output indicator/ Unit User will enter the output indicator / unit of measure in text field
of measure

Quarter 1 User will enter the Quarter 1 implementation financial in numeric field

implementation
Financial

Quarter 1 User will enter the Quarter 1 implementation physical in numeric field

implementation

Physical

Quarter 2 User will enter the Quarter 2 implementation financial in numeric field

implementation

Financial

Quarter 2 User will enter the Quarter 2 implementation physical in numeric field

implementation

Physical

Quarter 3 User will enter the Quarter 3 implementation financial in numeric field
implementation

Financial

Quarter 3 User will enter the Quarter 3 implementation physical in numeric field

implementation

Physical

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:379 of


696
Software Requirement Specification

Quarter 4 User will enter the Quarter 4 implementation financial in numeric field
implementation

Financial

Quarter 4 User will enter the Quarter 4 implementation physical in numeric field

implementation

Physical

Annual Total This will be calculates using Quarter 1 , 2, 3 , 4 physical and financial

Remarks User will enter the remarks in text field

Button Submit This Button will submit the data for Capital Investment Plan

Button Reset This Button will reset the entered data for Capital Investment Plan

Button Cancel This Button will terminate the process of capturing data for Capital
Investment Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:380 of


696
Software Requirement Specification

Data Capture Diagram

Capital Investment Plan


ULG Name Region name Population size Growth rate

Name of Mayor Name of City Party responsible Period of CIP


Manager for the CIP (Financial years)

Financial Data

Capital budget item Projected budget Projected budget Projected budget


1st Financial year 2nd Financial year 3rd Financial year

Total budget per Total budget per


item financial year

Multi-year budget forecast

City Own revenues

Revenue item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year

Total budget per Total budget per


item financial year

City operating expenditures

Expenditure item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year

Total budget per Total budget per Operation surplus


item financial year for each year

Capital revenues

Revenue item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year

Total budget per Total budget per Operation surplus


item financial year for each year

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:381 of


696
Software Requirement Specification

Summary of past 3 years capital investment

Capital expenditure Amount for 1st Amount for 2nd Amount for 3rd
item financial year financial year financial year

The three years rolling plan

Item description Category Part (Municipal function Unit of measure


or state function)

Quantity Unit cost Priority Budget for 1st year

Budget for 2nd year Budget for 3rd year Total budget per item Total budget per
category for every
year

Total budget per Overall total budget


part per year

Detailed project plan

Item description Category Part (Municipal function Unit of measure


or state function)

Quantity Unit cost Total cost Funding sources

Funding amount Total cost for Total cost for each Overall total costs
for each source each item category per funding
source

Maintenance budgets

Item description Category Asset item description 1st Year budget

2nd Year budget 3rd Year budget Total budget per year Total budget per item

Staffing plan

Infrastructure Responsible Number of required Number of available


category department staff staff

Job Creation Plan Data from LED and Job Creation Module

Action Plan Data from AWP in the program coordination module

Procurement
Copyrightplan data from
© 2021-22. CSMprocurement module
Technologies (A CMMI ML5 Company). All rights reserved.

Capacity Building data from the CB module


Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:382 of


696
Software Requirement Specification

Goals and Objectives

Item Number Goal Objectives

Participatory group

Citizen group Number of male Number of female Total

Identification of low carbon and resilient alternatives

Project Name Conventional approach Low carbon and Select approach /


/ design resilient alternative design and justification
designs considered

Identification of low carbon and resilient alternatives

Project Name Conventional approach Low carbon and Select approach /


/ design resilient alternative design and justification
designs considered

Annual Action plan for CIP Implementation

Pillar Category Project Output indicator/


Unit of measure

Quarter 1 Quarter 1 Quarter 2 Quarter 2


implementation implementation implementation implementation
Financial Physical Financial Physical

Quarter 3 Quarter 3 Quarter 4 Quarter 4


implementation implementation implementation implementation
Financial Physical Financial Physical

Annual Total Remarks

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:383 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:384 of


696
Software Requirement Specification

3.11.4 Matching funds [REQ-113]

Description
This function is used to capture Matching funds data for capital investment plan

Inputs

The contents of Matching Funds are:

Expected minimum User will enter the value in numeric field

(Birr) as per MUDCo


notification of

indicative or approved

allocation

Budgeted in CIP User will enter the value in numeric field

Percentage budgeted User will enter the percentage in numeric field

in CIP

Actual deposited User will enter the value in numeric field

Percentage of actual This will be calculated using the Budgeted in CIP and actual deposited
value

Date deposited User will select the date from the calendar

Financial year User will select the financial year from calendar

Button Submit This Button will submit the data for Matching Funds

Button Reset This Button will reset the entered data for Matching Funds

Button Cancel This Button will terminate the process of capturing data for Matching
Funds

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:385 of


696
Software Requirement Specification

Data Capture Diagram

Matching funds
Expected minimum Budgeted in CIP Percentage Actual deposited
(Birr) as per MUDCo budgeted in CIP
notification of
indicative or
approved allocation

Percentage of actual Date deposited Financial year

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:386 of


696
Software Requirement Specification

3.11.5 Checklist for Review of CIP [REQ-114]

Description
This function is used to capture data of Checklist for Review of Capital Investment Plan.

Inputs

The contents of Checklists for review of CIP are:

ULG name User will select the ULG name from dropdown list

Region name User will select the Region name from dropdown list

Population size User will enter the population size in numeric field

Assumed rate of User will enter the assumed rate of growth in percentage in numeric field
Growth

Contact details User will enter the contact details in numeric field

Review items

Description of item User will enter the description of item in text field

Reference User will enter the reference in text field

Yes or No User will select the value from ( Yes, No )

Comment User will enter the comments in text field

Other general User will enter the other general comments in text field

comments

Conclusions User will enter the conclusions in text field

Recommendations User will enter the recommendations in text field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:387 of


696
Software Requirement Specification

Button Submit This Button will submit the data for Checklists for review of CIP.

Button Reset This Button will reset the entered data for Checklists for review of CIP.

Button Cancel This Button will terminate the process of capturing data for Checklists
for review of CIP.

Data Capture Diagram

Checklist for Review of CIP


ULG name Region name Population size Assumed rate of
Growth

Contact details

Review items

Description of item Reference Yes or No Comment

Other general comments Conclusions Recommendations

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:388 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.6 Develop budget forecasts using base-year budgets [REQ-115]

Description
This function is used to develop budget forecasts using base-year budgets.

Inputs

The contents of Budget Forecast are:

Acc / No. User will enter the Account Number in text field

Revenue Item User will enter the revenue item in text field

Sub-Category of User will enter the subcategory of revenue item in text field

Revenue Item

Year 1 User will enter the value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:389 of


696
Software Requirement Specification

Year 2 User will enter the value in numeric field

Year 3 User will enter the value in numeric field

Total This will be calculated using Year 1 , Year 2 , Year 3, Revenue item , sub-
category of revenue item

Button Submit This Button will submit the data for Developing Budget Forecast

Button Reset This Button will reset the entered data for Developing Budget Forecast

Button Cancel This Button will terminate the process of capturing data for Developing
Budget Forecast

Data Capture Diagram

Develop budget forecasts using base-year budgets

Acc / No. Revenue Item Sub-Category of Year 1


Revenue Item

Year 2 Year 3 Total

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:390 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.7 Review and Approval [REQ-116]

Description
This function is used to Review and Approve Revenue Enhancement Plan coming from
Municipal Finance and Revenue and Asset Management Plan coming from Infrastructure asset
management

Inputs

The contents of Review and approval are:

Action User will select the action from ( Accepted, Rejected )

Comments User will enter the comments in text field

Button Submit This Button will submit the data for Review and approval

Button Reset This Button will reset the entered data for Review and approval

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:391 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Review and
approval

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:392 of


696
Software Requirement Specification

3.11.8 Planning and Budgeting M & E Data [REQ-117]

Description
This function is used to capture data for Planning and Budgeting Monitoring and Evaluation
Data.

Inputs

The contents of Planning and Budgeting M & E are:

Level User will select the level from ( Federal , Regional , ULG )

Participation of Citizens in the planning process. No. of public consultations (lower


level and city level)

Initial Public Consultants separate for Women at Kebele Level

Date (s) of Meeting User will select the date from calendar

Number Attended User will enter the number attended in numeric field

Initial Public Consultants separate for Men at Kebele Level

Date (s) of Meeting User will select the date from calendar

Number Attended User will enter the number attended in numeric field

Initial Public Consultants - Combined Meeting for Women and Men at Kebele Level

Date (s) of Meeting User will select the date from calendar

Number of Men User will enter the number attended in numeric field

Number of Women User will enter the number attended in numeric field

Total Participants This will be calculated using number of men and number of women value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:393 of


696
Software Requirement Specification

Percentage (%)Women This will be calculated using number of women and total participants

Meeting for final choice of investment at City Level

Date (s) of Meeting User will select the date from calendar

Number of Men User will enter the number attended in numeric field

Number of Women User will enter the number attended in numeric field

Total Participants This will be calculated using number of men and number of women value

Percentage (%)Women This will be calculated using number of women and total participants

Participation of citizens in the planning process: Increase in no. of people involved


from prior year to the current year

Total No. of Participant for the three meeting ( CIP of Prior Year )

Men User will enter the number of men in numeric field

Women User will enter the number of women in numeric field

Total This will be calculated using number of men and number of women value

Percentage (%)Women This will be calculated using number of women and total participants

Total No. of Participant for the three meeting ( CIP of Current Year )

Men User will enter the number of men in numeric field

Women User will enter the number of women in numeric field

Total This will be calculated using number of men and number of women value

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:394 of


696
Software Requirement Specification

Percentage (%)Women This will be calculated using number of women and total participants

Budget Reliability for City Administration Total Budget (Annual) (Capital +


Recurrent) for EFY

City Administrative Capital Budget

From Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using Planned and actual value

To Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using Planned and actual value

City Administration Recurrent Budget

From Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using Planned and actual value

To Month User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:395 of


696
Software Requirement Specification

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using Planned and actual value

Button Submit This Button will submit the data for Planning and Budgeting M & E

Button Reset This Button will reset the entered data for Planning and Budgeting M&E

Button Cancel This Button will terminate the process of capturing data for Planning and
Budgeting M & E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:396 of


696
Software Requirement Specification

Data Capture Diagram

Planning and Budgeting M&E Progress


Level

Participation of Citizens in the planning process. No. of public consultations (lower level and
city level)

Initial Public Consultants separate for Men at Kebele Level

Date (s) of Meeting Number Attended

Initial Public Consultants separate for Women at Kebele Level

Date (s) of Meeting Number Attended

Initial Public Consultants - Combined Meeting for Women and Men at Kebele Level

Date (s) of Meeting Number of Men Number of Women Total Participants

Percentage (%)
Women

Meeting for final choice of investment at City Level

Date (s) of Meeting Number of Men Number of Women Total Participants

Percentage (%)
Women

Participation of citizens in the planning process: Increase in no. of people involved from
prior year to the current year

Total No. of Participant for the three meeting ( CIP of Prior Year )

Men Women Total Percentage (%)


Women

Total No. of Participant for the three meeting ( CIP of Current Year )

Men Women Total Percentage (%)


Women

Budget Reliability for City Administration Total Budget (Annual) (Capital + Recurrent) for EFY

ULG Name Financial Year Budget for Financial Year

City Administration Capital Budget

From Month

Planned Actual Percentage Achieved

To Month

Planned Actual Percentage Achieved

City Administration Recurrent Budget

From Month

Planned Actual Percentage Achieved

To Month

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:397 of


696
Software Requirement Specification

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:398 of


696
Software Requirement Specification

Figure 2

3.11.9 CIPs Progress Report [REQ-118]

Description
This function is used to capture CIPs Progress Report

Inputs

The contents of CIPs Progress report are:

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:399 of


696
Software Requirement Specification

Level User will select the level from ( Regional , Federal , ULG )

CIP preparation & approval process by city council & region

Region name User will select the region name from dropdown list

ULG name User will select the ULG name from dropdown list

Financial year User will select the financial year from dropdown list

Date approved by city User will select the date from the calendar
council (EC and GC)

Date approved by User will select the date from the calendar

region (EC and GC)

CIP budgets: Expenditures and utilization rates

Region name User will select the region name from dropdown list

ULG name User will select the ULG name from dropdown list

Financial year User will select the financial year from dropdown list

CIP for the Year User will enter the value in numeric field

From Month User will select the date from the calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Utilization Rate This will be calculated using Planned and actual value

To Month User will select the date from the calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:400 of


696
Software Requirement Specification

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Utilization Rate This will be calculated using Planned and actual value

Button Submit This Button will submit the entered data for CIP Progress Report

Button Reset This Button will reset the entered data for CIP Progress Report

Button Cancel This Button will terminate the process of capturing data for CIP Progress
Report

Data Capture Diagram

CIPs Progress Report


Level

CIP preparation & approval process by city council & region

Region name ULG name Financial year Date approved by


city council (EC and GC)

Date approved by
region (EC and GC)

CIP budgets: Expenditures and utilization rates

ULG Name Name of Project Financial year CIP Total for Year

From Month

Planned Actual Utilization Rate

To Month

Planned Actual Utilization Rate

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:401 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.10 Annual Action Plan [REQ-119]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:402 of


696
Software Requirement Specification

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:403 of


696
Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:404 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.11 Tracking progress of activities under Annual Action Plan [REQ-120]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:405 of


696
Software Requirement Specification

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:406 of


696
Software Requirement Specification

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:407 of


696
Software Requirement Specification

Data Capture Diagram

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:408 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.12 Field Visit Request [REQ-121]

Description

This function is used to Capture Field Visit Work Request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:409 of


696
Software Requirement Specification

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )

work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:410 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:411 of


696
Software Requirement Specification

3.11.13 Field Visit Report [REQ-122]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:412 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:413 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:414 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.11.14 Capacity Building Plan [REQ-123]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:415 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:416 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:417 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:418 of


696
Software Requirement Specification

3.12 Procurement Management

3.12.1 Proposal Evaluation [REQ-124]

Description
This function is used to capture Proposal Evaluation Data

Inputs

The contents of Proposal Evaluation are:

Minutes of Technical User will enter the minutes of technical proposal opening in text field

Proposal opening

Minutes of Financial User will enter the minutes of financial proposal opening in text field
Proposal opening

Evaluation report User will Upload the evaluation report in pdf format

Prior review of Bid User will enter the prior review of bid document in text field

Document

Negotiation User will enter the negotiation in text field

Button Submit This Button will submit the data for Proposal Evaluation

Button Reset This Button will reset the entered data for Proposal Evaluation

Button Cancel This Button will terminate the process of capturing data for Proposal
Evaluation

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:419 of


696
Software Requirement Specification

Data Capture Diagram

Proposal Evaluation
Minutes of Technical Minutes of Financial Evaluation report Prior review of Bid
Proposal opening Proposal opening Document

Negotiation

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

3.12.2 List of Applicable Procurement Documents [REQ-125]

Description
This function is used to capture list and content of applicable procurement proclamations,
regulations, directives, manuals, circulars, standard bidding documents and templates.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:420 of


696
Software Requirement Specification

Inputs

The contents of List of Applicable Procurement documents are:

Title User will enter the title in text field

Objective/ Purpose/ User will enter the objective/purpose/scope of application in text field

Scope of Application

Number User will enter the number in numeric field

Date Issued User will select the date from calendar

Amendments / User will enter the amendments / changes in financial year in text field

Changes in Financial
Year

Number Amendment User will enter the number in numeric field

change

Date of amendment User will select the date from the calendar

change

Impact of change in User will enter the impact of change in VfM and fairness compared to

VfM and Fairness baseline

Compared to Baseline

Button Submit This Button will submit the data for List of Applicable Procurement
Documents

Button Reset This Button will reset the entered data for List of Applicable Procurement
Documents

Button Cancel This Button will terminate the process of capturing data for

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:421 of


696
Software Requirement Specification

Data Capture Diagram

List of Applicable Procurement


Title Objective/ Purpose/ Scope of Application

Number Date Issued

Ammendments / Number and date of Impact of change


Changes in Financial Ammendment change in VfM and Fairness
Year Compared to Baseline

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:422 of


696
Software Requirement Specification

3.12.3 Procurement Audit Data [REQ-126]

Description
This function is used to capture procurement audit data.

Inputs

The contents of Procurement Audit Data are:

Financial year User will select the financial year from dropdown list

Responsible agency User will enter the responsible agency name in text field
(RPPPA)

Audit Start date User will select the date from calendar

Audit completion date User will select the date from calendar

Audit report User will select the date from calendar

submission date

Submitted to User will enter the name to whom audit report has been submitted in
text field

Button Submit This Button will submit the data for Procurement Audit Data

Button Reset This Button will reset the entered data for Procurement Audit Data

Button Cancel This Button will terminate the process of capturing data for Procurement
Audit Data

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:423 of


696
Software Requirement Specification

Data Capture Diagram

Procurement Audit Data


Financial year Responsible agency Audit Start date Audit completion
(RPPPA) date

Audit report Submitted to


submission date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:424 of


696
Software Requirement Specification

3.12.4 Delivered Procured Goods [REQ-127]

Description
This function is used to capture data for Delivered Procured Goods.

Inputs

The contents of Delivered Procured Goods are:

Item name User will enter the name of item in text field

Quantity User will enter the quantity in numeric field

Unit price User will enter the Unit Price in numeric field

Total price This will be calculated using values of Quantity, Unit Price

Supplier/Vendor User will enter the supplier/vendor details in text field


details

Specifications of the User will enter the specifications of the item in text field

item

Purchase order code User will enter the purchase order code in text field

Button Submit This Button will submit the data for Delivered Procured Goods

Button Reset This Button will reset the entered data for Delivered Procured Goods

Button Cancel This Button will terminate the process of capturing data for Delivered
Procured Good

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:425 of


696
Software Requirement Specification

Data Capture Diagram

Delivered Procured Goods


Item name Quantity Unit price Total price

Supplier/Vendor Specifications Specifications Purchase order code


details of the item of the item

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:426 of


696
Software Requirement Specification

3.12.5 Procurement Audit Performance Status Report [REQ-128]

Description
This function is used to capture procurement Audit performance status report data.

Inputs

The contents of procurement audit performance status are:

ULG name User will select the ULG name from dropdown list

Procurement audit User will select the procurement audit timeline from calendar
timeline

Audit completion User will upload the audit completion report in pdf
report

Findings

Finding description User will enter the findings description in text field

Rectification plan User will enter the rectification plan in text field

Deadline User will select the deadline date from calendar

Party responsible User will enter the party responsible in text field

status User will select the status from dropdown list

Button Submit This Button will submit the data for Procurement Audit Performance
Status

Button Reset This Button will reset the entered data for Procurement Audit
Performance Status

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:427 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Procurement
Audit Performance Status

Data Capture Diagram

Procurement Audit Performance Status Report


ULG name Procurement Audit completion
audit timeline report

Findings

Finding description Rectification plan

Deadline Party responsible status

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:428 of


696
Software Requirement Specification

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:429 of


696
Software Requirement Specification

3.12.6 Ineligible Firms / Individuals [REQ-129]

Description
This function is used to capture the list of Ineligible Firms / Individuals

Inputs

The contents of Ineligible Firms / Individuals are:

Name of Entity / Firm / User will enter the name of entity / firm / individual in text field

Individual

Address User will enter the address in text field

Reasons or Ground for User will enter the reasons or ground for ineligibility in text field
ineligibility

Start date of User will select the start date of ineligibility from calendar

ineligibility

End date of ineligibility User will select the End date of ineligibility from calendar

Is eligibility automatic User will select the value from ( Yes , No )


after this period

Button Submit This Button will submit the data for List of ineligible firms / individuals

Button Reset This Button will reset the entered data for List of ineligible firms /
individuals

Button Cancel This Button will terminate the process of capturing data for List of
ineligible firms / individuals

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:430 of


696
Software Requirement Specification

Data Capture Diagram

Ineligible Firms / Individuals


Name of Entity / Firm Address Reasons or Ground Start date of
/ Individual for ineligibility ineligibility

End date of Is eligibility automatic


ineligibility after this period

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:431 of


696
Software Requirement Specification

3.12.7 Supplier and Consultant Details [REQ-130]

Description
This function is used to add Supplier and Consultant Details.

Inputs

The contents of Supplier and Consultant Details are:

Name of Supplier User will enter the name of supplier in text field

Supplier / Vendor ID User will enter the supplier / vendor id in text field

Supplier / Vendor Type User will select the supplier / vendor type from dropdown list

Address User will enter the address in text field

The Product / Service User will enter the product / service name supplier can provide

supplier can provide

Email User will enter the mail in text field

Telephone User will enter the telephone in numeric field

Contact Person User will enter the name of contact person in text field

Button Submit This Button will submit the data for Supplier / Vendor Details

Button Reset This Button will reset the entered data for Supplier / Vendor Details

Button Cancel This Button will terminate the process of capturing data for Supplier /
Vendor Details

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:432 of


696
Software Requirement Specification

Data Capture Diagram

Supplier and Consultant Details


Name of Supplier Supplier / Vendor ID Supplier / Vendor Address
Type

The Product / Service supplier can provide Email

Telephone Contact Person

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:433 of


696
Software Requirement Specification

3.12.8 Annual Action Plan [REQ-131]

Description

This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of hierarchy level are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:434 of


696
Software Requirement Specification

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:435 of


696
Software Requirement Specification

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:436 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:437 of


696
Software Requirement Specification

3.12.9 Procurement Status for EFY [REQ-132]

Description

This function is used to capture data for Procurement Status for EFY and generate report
accordingly

Inputs

The contents of Procurement Status are:

For Month User will select the date from calendar

Overall Procurement Status for EFY excluding rolled over projects

Region Name User will select the region name from dropdown list

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Procurement Category User will select the procurement category from dropdown list

Number of Contracts User will enter the values in numeric field


Planned

Number of Contracts User will enter the values in numeric field


not tendered out

Number of Contracts User will enter the values in numeric field

in process

Number of Contracts User will enter the values in numeric field


Signed (not completed)

Number of Contracts User will enter the values in numeric field

Signed (completed)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:438 of


696
Software Requirement Specification

Total Number of This will be calculates using the value of number of contracts signed
Contracts Signed ( completed and not completed )

(completed and not


completed)

Number of Contracts User will enter the values in numeric field

Completed

Percent of Contracts This will be calculated using the value of Number of contracts not
not tendered out tendered out and no of contracts planned

Percentage of This will be calculated using the value of Number of contracts in process

Contracts in process and no of contracts planned

Percentage of This will be calculated using the value of number of contracts signed

Contracts Signed (not ( not completed ) and no of contracts planned

completed)

Percentage of This will be calculated using the value of Number of signed ( completed
Contracts Signed and not completed ) and no of contracts planned

(completed and not

completed)

Percent of contracts This will be calculated using the value of Number of signed ( completed

completed and not completed ) and no of contracts planned

Overall Procurement Status for EFY for rolled over projects

Region Name User will select the region name from dropdown list

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:439 of


696
Software Requirement Specification

Procurement Category User will select the procurement category from dropdown list

Number of Contracts User will enter the values in numeric field


Planned

Number of Contracts User will enter the values in numeric field


not tendered out

Number of Contracts User will enter the values in numeric field


in process

Number of Contracts User will enter the values in numeric field

Signed (not completed)

Number of Contracts User will enter the values in numeric field

Signed (completed)

Total Number of This will be calculates using the value of number of contracts signed

Contracts Signed ( completed and not completed )

(completed and not


completed)

Number of Contracts User will enter the values in numeric field


Completed

Percent of Contracts This will be calculated using the value of Number of contracts not

not tendered out tendered out and no of contracts planned

Percentage of This will be calculated using the value of Number of contracts in process
Contracts in process and no of contracts planned

Percentage of This will be calculated using the value of number of contracts signed

Contracts Signed (not ( not completed ) and no of contracts planned

completed)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:440 of


696
Software Requirement Specification

Percentage of This will be calculated using the value of Number of signed ( completed
Contracts Signed and not completed ) and no of contracts planned

(completed and not


completed)

Percent of contracts This will be calculated using the value of Number of signed ( completed

completed and not completed ) and no of contracts planned

Overall Procurement Status for EFY including rolled over projects

Region Name User will select the region name from dropdown list

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Procurement Category User will select the procurement category from dropdown list

Number of Contracts User will enter the values in numeric field

Planned

Number of Contracts User will enter the values in numeric field

not tendered out

Number of Contracts User will enter the values in numeric field


in process

Number of Contracts User will enter the values in numeric field


Signed (not completed)

Number of Contracts User will enter the values in numeric field


Signed (completed)

Total Number of This will be calculates using the value of number of contracts signed

Contracts Signed ( completed and not completed )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:441 of


696
Software Requirement Specification

(completed and not


completed)

Number of Contracts User will enter the values in numeric field

Completed

Percent of Contracts This will be calculated using the value of Number of contracts not

not tendered out tendered out and no of contracts planned

Percentage of This will be calculated using the value of Number of contracts in process

Contracts in process and no of contracts planned

Percentage of This will be calculated using the value of number of contracts signed
Contracts Signed (not ( not completed ) and no of contracts planned

completed)

Percentage of This will be calculated using the value of Number of signed ( completed

Contracts Signed and not completed ) and no of contracts planned

(completed and not


completed)

Percent of contracts This will be calculated using the value of Number of signed ( completed

completed and not completed ) and no of contracts planned

Button Submit This Button will submit the data for Procurement status

Button Reset This Button will reset the entered data for Procurement status

Button Cancel This Button will terminate the process of capturing data for procurement
status

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:442 of


696
Software Requirement Specification

Data Capture Diagram

Procurement Status for EFY


For the Month

Overall Procurement Status for EFY excluding rolled over projects

Region Name ULG Name Financial Year Procurement Category

Number of Number of Number of Number of


Contracts Planned Contracts not Contracts in Contracts Signed
tendered out process (not completed)

Number of Total Number of Number of Percent of


Contracts Signed Contracts Signed Contracts Contracts not
(completed) (completed and Completed tendered out
not completed)

Percentage of Percentage of Percentage of Percent of


Contracts in Contracts Signed Contracts Signed contracts
process (not completed) (completed and completed
not completed)

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:443 of


696
Software Requirement Specification

Overall Procurement Status for EFY for rolled over projects

Region Name ULG Name Financial Year Procurement Category

Number of Number of Number of Number of


Contracts Planned Contracts not Contracts in Contracts Signed
tendered out process (not completed)

Number of Total Number of Number of Percent of


Contracts Signed Contracts Signed Contracts Contracts not
(completed) (completed and Completed tendered out
not completed)

Percentage of Percentage of Percentage of Percent of


Contracts in Contracts Signed Contracts Signed contracts
process (not completed) (completed and completed
not completed)

Overall Procurement Status for EFY including rolled over projects

Region Name ULG Name Financial Year Procurement Category

Number of Number of Number of Number of


Contracts Planned Contracts not Contracts in Contracts Signed
tendered out process (not completed)

Number of Total Number of Number of Percent of


Contracts Signed Contracts Signed Contracts Contracts not
(completed) (completed and Completed tendered out
not completed)

Percentage of Percentage of Percentage of Percent of


Contracts in Contracts Signed Contracts Signed contracts
process (not completed) (completed and completed
not completed)

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:444 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:445 of


696
Software Requirement Specification

3.12.10 Procurement Outcomes for EFY [REQ-133]

Description
This function is used to capture data of Procurement Outcomes for EFY and generate report
accordingly.

Inputs

The contents of Procurement Outcomes are:

Financial Year User will select the financial year from dropdown list

ULG Name User will select the ULG name from dropdown list

Name of Procurement User will enter the name of procurement in text field

Basic Data

Procurement reference User will enter the procurement reference number in text field

Number

Category of User will select the category of procurement in text field


Procurement

Identification

Package Number User will enter the identification in numeric field

Lot Number User will enter the Lot Number in numeric field

Source of Finance User will enter the source of finance in text field

Procurement Planning

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:446 of


696
Software Requirement Specification

Was the procurement User will select the value from ( Yes, No )
included in the original

procurement plan?

Competitiveness

Procurement Method User will select the procurement method from dropdown list

Cost Management

Original price in the User will enter the value in numeric field
procurement plan

( ETB)

Contract Amount in User will enter the value in numeric field

ETB

Completion Price User will enter the value in numeric field

( Turnout cost ) ( ETB )

Deviation in % b/n This will be calculated using original price in the procurement plan ( ETB )

price in the and Contract Amount in ( ETB )


procurement plan and

contract amount

Deviation in % b / n This will be calculated using Contract Amount in ( ETB ) and completion

contract amount and price ( Turnout Cost ).


completion price
( Turnout Cost )

Procurement cycle time management

Original Planned Procurement cycle time

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:447 of


696
Software Requirement Specification

Original planned date User will select the date from calendar
of procurement

initiation

Original Planned date User will select the date from calendar

of procurement

completion

Total Planned This will be calculated using original planned date of procurement
Procurement cycle time initiation and original planned date of procurement completion
( days )

Actual Procurement cycle time

Actual date of User will select the date from calendar

procurement initiation

Actual date of User will select the date from calendar

procurement
completion

Actual Procurement This will be calculated using actual date of procurement initiation and

cycle time ( days ) actual date of procurement completion

Deviation in % between This will be calculates using Total planned procurement cycle and actual

actual procurement procurement cycle time ( days ) value


cycle time and planned
procurement cycle time

Procurement Complaint Handling

Was ( were ) there User will select the value from ( Yes , No )

complaints

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:448 of


696
Software Requirement Specification

Date(s) of complaint(s) User will select the date from calendar


submitted

Final date of complaint User will select the date from calendar

resolved

Number of days took User will enter the number of days in numeric field

to respond to
complaints

Was ( were ) the User will select the value from ( Yes, No )
complaints responded

within the standard

statutory time(s)

Was ( were ) the User will select the value from ( Yes, No )

complaints resolved

against the ULG?

Button Submit This Button will submit the data for Procurement Outcomes

Button Reset This Button will reset the entered data for Procurement Outcomes

Button Cancel This Button will terminate the process of capturing data for Procurement
Outcomes

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:449 of


696
Software Requirement Specification

Data Capture Diagram

Procurement Outcomes for EFY


Financial Year ULG Name

Basic Data

Procurement Category of
reference no. Procurement

Identification

Package Number Lot Number

Source of Finance

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:450 of


696
Software Requirement Specification

Prcourement Planning

Was the procurement included in the


original procurement plan ?

Competitiveness

Procurement Method

Cost Management

Original price in the Contract amount Completion price


procurement plan ( ETB) in ETB ( Turnout Cost ) (ETB)

Deviation in % b/n Deviation in % b/n


price in the procurement price in the contract amount
plan and contract amount and completion price
( Turnout Cost )

Procurement Cycle Time Management

Original Planned Procurement Cycle Time

original planned original planned Total planned


date of procurement date of prcourement procurement cycle
initiation completion time ( days )

Actual Procurement Cycle Time

Actual date of Actual date of Actual procurement Deviation in %


procurement initation procurement completion cycle time ( days ) between actual
procurement cycle
time and planned
procurement cycle
time

Procurement Complaint Handling

Was ( were ) there Date(s) of complaint(s) Final Date of Number of days took
complaints submitted complaint resolved to respond complaints

Was ( were ) the Was ( were ) the


complaints responded complaints resolved
within the standard againts the ULG ?
statutory time (s)

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:451 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:452 of


696
Software Requirement Specification

3.12.11 Tracking progress of activities under Annual Action Plan [REQ-134]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:453 of


696
Software Requirement Specification

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:454 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Data Capture Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:455 of


696
Software Requirement Specification

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:456 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:457 of


696
Software Requirement Specification

3.12.12 Field Visit Request [REQ-135]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:458 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:459 of


696
Software Requirement Specification

3.12.13 Field Visit Report [REQ-136]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:460 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:461 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:462 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.12.14 Capacity Building Plan [REQ-137]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:463 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:464 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:465 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:466 of


696
Software Requirement Specification

3.13 Capacity Building

3.13.1 Self-Assessment [REQ-138]

Description
This function is used to self-assessment form to be used by the UIIDP and ULGDP II staff to
carry out a self-assessment for the employees under all the thematic areas.

Inputs

The contents of Self-assessment data are:

Names User will enter the name in text field

Age User will enter the age in numeric field

Job title User will enter the job title in text field

Name of institution(or User will select the thematic area from dropdown list

thematic area)

Name of department User will enter the department / unit name in text field

/Unit

Years in organization User will enter the years in organization in numeric field

Highest level of User will select the highest level of education from dropdown list

education

Training received User will enter the training received in text field

List of gaps in the skills User will enter the list of gaps in the skills in text field

List of gaps in the User will enter the list of gaps in the attitude in text field

attitude

Button Submit This Button will submit the entered data for self-assessment

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:467 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for self-assessment

Button Cancel This Button will terminate the process of capturing data for self-
assessment

Data Capture Diagram

Self-Assesment
Names Age Job title Name of institution
(or thematic area)

Name of Years in organisation Highest level Training received


department /Unit of education

List of gaps in the List of gaps in the


skills attitude

`
Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:468 of


696
Software Requirement Specification

Figure 3

3.13.2 Training Recordings [REQ-139]

Description
This function is used to capture training recording for thematic trainees undertaken
periodically at ULGs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:469 of


696
Software Requirement Specification

Inputs

The contents of Training Recordings data are:

Select Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG name from dropdown list

Region Name User will select the Region name from dropdown list

ECSPG Pillar & User will enter the ECSPG Pillar & Capacity Building activities/
Capacity Building investments in text field

activities/ investments

Thematic areas User will select the thematic areas from dropdown list

Gaps identified User will enter the gaps identified in text field

Capacity building User will enter the capacity building modality in text field

modality

Performance User will enter the performance indicators in text field


indicators

Target User will enter the target in text field

Lead person User will enter the lead person responsible in text field

responsible

Year User will select the year from dropdown list

Start date User will select the date from calendar

End date User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:470 of


696
Software Requirement Specification

Resources User will enter the resources required ( budget ) in numeric field
required(budget)

Packaging User will select the value from ( Goods, Works, Services or training )

Button Submit This Button will submit the entered data for Training Recordings

Button Reset This Button will reset the entered data for Training Recordings

Button Cancel This Button will terminate the process of capturing data for Training
Recordings

Data Capture Diagram

Training Recordings
Select Level

ULG name Region Name ECSPG Pillar & Thematic areas


Capacity Building
activities/ investments

Gaps identified Capacity building Performance Target


modality indicators

Lead person Year Start date End date


responsible

Resources Packaging
required(budget)

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:471 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.13.3 Training Evaluation [REQ-140]

Description
This function is used to capture post evaluation of trainings by trainees and other involved
parties

Inputs

The contents of Training Evaluation data are:

Training Date User will select the training date from calendar

Sex User will select the value from ( Male , Female )

Education Level User will select the Education Level from dropdown list

Year of service in area User will enter the year of service in area in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:472 of


696
Software Requirement Specification

Current Position User will enter the current position in text field

Relevance , Effectiveness and Potential Impacts

Description User will enter the description in text field

Rating User will select the rating from ( Poor, Satisfactory, Good , Very Good,
Excellent )

What type of support User will enter the answer in text field
you need to apply the
newly acquired

knowledge and skill?

What are your User will enter the answer in text field

recommendations for

the overall

improvement of

training?

Button Submit This Button will submit the entered data for Training Evaluations

Button Reset This Button will reset the entered data for Training Evaluations

Button Cancel This Button will terminate the process of capturing data for Training
Evaluations

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:473 of


696
Software Requirement Specification

Data Capture Diagram

Training Evaluation

Training Date

Introduction

Sex Education Level Year of Service in area Current Position

Relevance , Effectiveness and Potential Impacts

Description Rating

What type of support you need to apply the newly acquired knowledge and skill ?

What are your recommendations for the overall improvement of training ?

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:474 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.13.4 Capacity Building Plan [REQ-141]

Description
This function is used to Capacity Building Plan data.

Inputs

The contents of Capacity Building Plan data are:

ULG name User will select the ULG name from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:475 of


696
Software Requirement Specification

Region Name User will select the Region name from dropdown list

Pillar User will enter the Pillar in text field

Activity User will enter the activity in text field

Thematic area User will select the thematic areas from dropdown list

Gaps identified User will enter the gaps identified in text field

CB modality User will enter the capacity building modality in text field

Performance indicators User will enter the performance indicators in text field

Target User will enter the target in text field

Lead person User will enter the lead person responsible in text field
responsible

Year User will select the year from dropdown list

Start date User will select the date from calendar

End date User will select the date from calendar

Resources required User will enter the resources required ( budget ) in numeric field

Packaging (goods , User will select the value from ( Goods, Works, Services or training )

works, services or

training)

Button Submit This Button will submit the entered data for Capacity Building Plan

Button Reset This Button will reset the entered data for Capacity Building Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:476 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Capacity
Building Plan

Data Capture Diagram

Capacity Building Plan


ULG name Region name Pillar Activity

Thematic area Gaps identified CB modality Performance


indicators

Target Lead person Year Start date


responsible

End date Resources required Packaging (goods


, works, services
or training)

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:477 of


696
Software Requirement Specification

3.13.5 Capacity Building Plan Implementation Report [REQ-142]

Description
This function is used to Capacity Building Plan Implementation Report data.

Inputs

The contents of Capacity Building Plan Implementation Report data are:

ULG name User will select the ULG name from dropdown list

Region Name User will select the Region name from dropdown list

Pillar User will enter the pillar in text field

Activity User will enter the activity in text field

Packaging (goods , User will select the packaging from ( Goods , Works, Services , Training )

works, services or

training)

Thematic area User will select the thematic areas from dropdown list

CB modality User will enter the CB Modality in the text field

Performance indicators User will enter the performance indicators in text field

Target User will enter the target in numeric field

Actual User will enter the actual in numeric field

Start date User will select the date from calendar

End date User will select the date from calendar

Budget in birr User will enter the budget in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:478 of


696
Software Requirement Specification

Actual expenditure in User will enter the actual expenditure in numeric field

birr

Button Submit This Button will submit the entered data for capacity Building
implementation

Button Reset This Button will reset the entered data for capacity building
implementation

Button Cancel This Button will terminate the process of capturing data for capacity
building implementation

Data Capture Diagram

Capacity Building Plan Implementation Report


ULG name Region name Pillar Activity

Packaging (goods Thematic area CB modality Performance


, works, services indicators
or training)

Target Actual Start date End date

Budget in birr Actual expenditure


in birr

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:479 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.13.6 Review and Approval [REQ-143]

Description
This function is used to Review and Approval of capacity building plan coming from all other
thematic areas.

Inputs

The contents of Review and Approval data are:

Action User will select the Action from ( Accepted , Rejected )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:480 of


696
Software Requirement Specification

Comments User will enter the comments in text field

Button Submit This Button will submit the data for Review and Approval

Button Reset This Button will reset the entered data for Review and Approval

Button Cancel This Button will terminate the process of capturing data for Review and
Approval

Data Capture Diagram

Review and Approval


Action Comments
Select Action

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:481 of


696
Software Requirement Specification

3.13.7 Annual Action Plan [REQ-144]

Description
This function is used to capture annual action plan data for Capacity Building Thematic Areas

Inputs

The contents of annual action plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:482 of


696
Software Requirement Specification

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:483 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:484 of


696
Software Requirement Specification

3.13.8 Capacity Building Progress Report [REQ-145]

Description
This function is used to Capacity Building Progress Report data which is monitoring and
evaluation progress report of the Capacity Building Thematic Area.

Inputs

The contents of Capacity Building Progress Report data are:

ULG Name User will select the ULG Name from dropdown list

Financial Year User will select the financial year from dropdown list

Annual CBP Budget User will enter the annual CBP Budget in numeric field

Number of Activities in User will enter the number of activities in CBP in numeric field
CBP

From Month User will select the date from calendar

Financial

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Financial Percent Spent This value will be calculated using Planned and Actual Value

Physical (Number of Activities)

Planned Number of User will enter the planned number of activities in numeric field
Activities

Actual Number of User will enter the actual number of activities completed in numeric field
Activities Completed

Percent activities This value will be calculated using Planned number of activities and
Completed actual number of activities completed value

Up to Month User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:485 of


696
Software Requirement Specification

Financial

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Financial Percent This value will be calculated using Planned and Actual Value

Physical (Number of Activities)

Planned Number of User will enter the planned number of activities in numeric field
Activities

Actual Number of User will enter the actual number of activities completed in numeric field
Activities Completed

Percent activities This value will be calculated using Planned number of activities and
Completed actual number of activities completed value

Detail of Activities

Name of Activity User will enter the name of activity in text field

For Month User will select the date from calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Financial Percent This value will be calculated using Planned and Actual Value

Button Submit This Button will submit the data for Capacity Building M & E

Button Reset This Button will reset the entered data for Capacity Building M & E

Button Cancel This Button will terminate the process of capturing data for Capacity
Building M & E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:486 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Progress Report


Region Name ULG Name Financial Year Annual CBP Budget

Number of Activities
in CBP

From Month

Financial

Planned Actual Financial Percent


Spent

Physical (Number of Activities)

Planned Number Actual Number of Percent activities


of Activities Activities completed
Completed

Up To Month

Financial

Planned Actual Financial Percent


Spent

Physical (Number of Activities)

Planned Number Actual Number of Percent activities


of Activities Activities completed
Completed

Detailed Activities

Name of Activities For Month Planned Actual

Financial Percent

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:487 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:488 of


696
Software Requirement Specification

3.13.9 Tracking progress of activities under Annual Action Plan [REQ-146]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:489 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:490 of


696
Software Requirement Specification

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:491 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:492 of


696
Software Requirement Specification

3.13.10 Field Visit Request [REQ-147]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:493 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:494 of


696
Software Requirement Specification

3.13.11 Field Visit Report [REQ-148]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:495 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:496 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:497 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.13.12 Capacity Building Plan [REQ-149]

Description

This function is used to add Capacity Building Plan for Capacity Building area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:498 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:499 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:500 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:501 of


696
Software Requirement Specification

3.14 LED and Job Creation

3.14.1 Business Idea Competition Data [REQ-150]

Description
This function is used to Business Idea Competition Data.

Inputs

The contents of Business Idea Competition Data are:

ULG Name User will select the ULG name from dropdown list

Deadline of business User will select the date from calendar

Plan submission

Name of People / MSEs User will enter the name of people or name of MSEs who submitted

who submitted business plans in text field

business plans

Rating of business plan User will select the rating from dropdown list

Selected business Plan User will Enter the selected business plan in text field

Support Provided for User will enter the support provided for implementation of business plan
the implementation of in text field

business plan

Business Plan User will select the Business Plan Implementation Status from dropdown

implementation Status list

Button Submit This Button will submit the entered data for Business Idea Competition

Button Reset This Button will reset the entered data for Business Idea Competition

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:502 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Business Idea
Competition

Data Capture Diagram

Business Idea Competition Data


ULG Name Deadline of business Name of People / MSEs Rating of business
Plan submission who submitted plan
business plans

Selected business Support Provided for Business Plan


Plan the implementation implementation Status
of business plan

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:503 of


696
Software Requirement Specification

3.14.2 LED and Job Creation Plan [REQ-151]

Description
This function is used to capture data for the preparation of the LED and job creation plan.

Inputs

The contents of LED and Job Creation Plan are:

Project User will select the project from dropdown list

Category of project User will select the category of project from ( Schedule 1 , Schedule 2,
Schedule 3 )

Unit of Measure User will select the unit of measure from dropdown list

Quantity User will enter the quantity in numeric field

Total Cost User will enter the total cost in numeric field

Implementation Year User will select the implementation year from dropdown list

Permanent Jobs

Number of Males User will enter the number of males in numeric field

Number of females User will enter the number of females in numeric field

Total for permanent This will be calculated using number of males and number of females

jobs value

Temporary Jobs

Number of Males User will enter the number of males in numeric field

Number of females User will enter the number of females in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:504 of


696
Software Requirement Specification

Total for Temporary This will be calculated using number of males and number of females

jobs value

Total for males This will be calculates using Number of males for Permanent Jobs and
Temporary Job.

Total for females This will be calculates using Number of females for Permanent Jobs and
Temporary Job.

Button Submit This Button will submit the entered data for LED and Job Creation Plan

Button Reset This Button will reset the entered data for LED and Job Creation Plan

Button Cancel This Button will terminate the process of capturing data for LED and Job
Creation Plan

Data Capture Diagram

Job Creation Plan


Project Category of project Unit of Measure Quantity

Total Cost Implementation Year

Permanent Jobs

Number of Males Number of females Total for permanent jobs

Temporary Jobs

Number of Males Number of females Total for Temporary jobs

Total for males Total for females

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:505 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.14.3 LED and Job Creation M & E Report [REQ-152]

Description
This function is used to M & E Report.

Inputs

The contents of M & E Report are:

Public Private Dialogues

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:506 of


696
Software Requirement Specification

1st Meeting

Date of 1st Meeting User will select the date from calendar

Number of agreed User will enter the number of agreed actions in numeric field
actions

Number of agreed User will enter the number of agreed action implemented in numeric

action implemented field

2nd Meeting

Date of 2nd Meeting User will select the date from calendar

Number of agreed User will enter the number of agreed actions in numeric field
actions

Number of agreed User will enter the number of agreed action implemented in numeric
action implemented field

3rd Meeting

Date of 3rd Meeting User will select the date from calendar

Number of agreed User will enter the number of agreed actions in numeric field

actions

Number of agreed User will enter the number of agreed action implemented in numeric
action implemented field

No. of MSEs supported through open business plan competition against annual target

ULG Name User will select the ULG Name from dropdown list

Financial Year User will select the financial year from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:507 of


696
Software Requirement Specification

Annual Target User will enter the annual target in numeric field

For Month User will select the date from the calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using the Planned and actual value

No. of MSEs one stop centers (OSC) Supported to be fully functional againts annual taregt

ULG Name User will select the ULG Name from dropdown list

Financial Year User will select the financial year from dropdown list

Annual Target User will enter the annual target in numeric field

For Month User will select the date from the calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using the Planned and actual value

No. of gradudated MSE provided with support from the medium manufacturing enterprises
development unit in the CA Against annual target

ULG Name User will select the ULG Name from dropdown list

Financial Year User will select the financial year from dropdown list

Annual Target User will enter the annual target in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:508 of


696
Software Requirement Specification

For Month User will select the date from the calendar

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be calculated using the Planned and actual value

Status of MSEs One Stop Centre

Name of One Stop User will enter the name of One Stop Centers ( OSC ) in text field
Centers ( OSC )

OSC Catchment Area

For how many people User will enter the number of people in numeric field

(individuals not

households) live
around this OSC?

For how many MSEs User will enter the number of MSEs in numeric field

does the OSC Cater?

Does the OSC cater for User will select the value form ( Yes , No )

15,000 people or
maximum of 500

MSEs?

Staff Positions that are filled

Is the OSC Coordinator User will select the value form ( Yes , No )

Position Filled?

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:509 of


696
Software Requirement Specification

Office Administrator / User will select the value form ( Yes , No )

Secretary / Information
Desk

Job Seekers User will select the value form ( Yes , No )

Registration, Trade

Registration, Trace

License, and TIN

Preparation Expert

Saving and Loan User will select the value form ( Yes , No )
Facilitation officer

Accounts and audition User will select the value form ( Yes , No )
officer

Production and sells User will select the value form ( Yes , No )

site facilitation ,

training industry

extension and market


linkage expert

Graduation / Transfer User will select the value form ( Yes , No )

Facilitation expert

How many positions User will enter the value in numeric field
are filled?

Is the OSC equipped User will select the value form ( Yes , No )

with equipment and

furniture?

Did the OSC Provides User will select the value form ( Yes , No )

fundamental trainings
to staffs, atleast 2 areas

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:510 of


696
Software Requirement Specification

in the OSC service

provision standard
2017

Does the ULG Maintain User will select the value form ( Yes , No )

documents

consultation notes as

an evidence of

Operationality?

Over all is the OSC User will select the value form ( Yes , No )
Functional

Button Submit This Button will submit the entered data for LED and Job Creation M&E

Button Reset This Button will reset the entered data for LED and Job Creation M&E

Button Cancel This Button will terminate the process of capturing data for LED and Job
Creation M&E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:511 of


696
Software Requirement Specification

Data Capture Diagram

M & E Report

Public Private Dialouges

ULG Name Financial Year

1st Meeting

Date of 1st Meeting Number of agreed Number of agreed


actions action implemented

2nd Meeting

Date of 2nd Meeting Number of agreed Number of agreed


actions action implemented

3rd Meeting

Date of 3rd Meeting Number of agreed Number of agreed


actions action implemented

No. of MSEs supported through open business plan competition against annual target

ULG Name Financial Year Annual Target

For Month

Planned Actual Percentage Achieved

No. of MSEs one stop centres(OSC) Supported to be fully functional againts annual taregt

ULG Name Financial Year Annual Target

For Month

Planned Actual Percentage Achieved

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:512 of


696
Software Requirement Specification

No. of gradudated MSE provided with support from the medium manufacturing enterprises
development unit in the CA Against annual target

ULG Name Financial Year Annual Target

For Month

Planned Actual Percentage Achieved

Status of One Stop Centres

Name of one stop


cetres ( OSC)

OSC Catchment Area

For How many For how many Does the OSC Cater
people ( individuals MSEs does the OSC for 15,000 people or
not housheolds ) cater? maximum of 500 MSEs ?
live around this OSC?

Staff Position that are filled

Is the OSC Coordinator Officer administrator Job seekers registration Saving and loan
position filled ? / Secretary / Infor- Trade registration, Trade facilitation officer
not housheolds ) mation desk license, and TIN
live around this OSC? Preparation Expert

Accounts and Production and sells Graduation / Transfer How Many Positions
audition officer site facilitation , facilitation Expert are filled ?
Training industry
extension and market
linkage expert

Were at least 5 key Is the OSC equipped Did the OSC Provides Does the ULG maintain
staff positions filled ? with equipment and fundamental trainings document consultation
furniture ? to staffs, atleast 2 areas notes as an evidence
in the OSC service of operationality ?
provision standard 2017

Overall is the OSC


Functional ?

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:513 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.14.4 Temporary Jobs [REQ-153]

Description
This function is used to capture data for Temporary Jobs and generate progress report for
temporary jobs.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:514 of


696
Software Requirement Specification

Inputs

The contents of Temporary Jobs are:

Level User will select the level from ( Federal , Regional , ULG )

ULG Name User will select the ULG Name from dropdown list

Region Name User will select the Region name from dropdown list

Project Name User will select the project name from dropdown list

Financial Year User will select the financial year from dropdown list

From Month User will select the date from calendar

Temporary jobs planned in CIP by Age Group.

Number of males ( 30 User will enter the value in numeric field


Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Number of females ( 30 User will enter the value in numeric field


Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field
and under)

Total Number(over 30 User will enter the value in numeric field


Years)

Actual temporary created by CIP by age group

Number of males ( 30 User will enter the value in numeric field


Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:515 of


696
Software Requirement Specification

Number of females ( 30 User will enter the value in numeric field


Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field
and under)

Total Number(over 30 User will enter the value in numeric field


Years)

Percentage of achievement

Number of males ( 30 This will be calculates using planned and actual value of number of males
Years and under) ( 30 years and under )

Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )

Number of females ( 30 This will be calculates using planned and actual value of number of
Years and under) females ( 30 years and under )

Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )

Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )

Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )

To Month User will select the date from calendar

Temporary jobs planned in CIP by Age Group.

Number of males ( 30 User will enter the value in numeric field


Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:516 of


696
Software Requirement Specification

Number of females ( 30 User will enter the value in numeric field


Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field
and under)

Total Number(over 30 User will enter the value in numeric field


Years)

Actual temporary created by CIP by age group

Number of males ( 30 User will enter the value in numeric field


Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Number of females ( 30 User will enter the value in numeric field


Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field
and under)

Total Number(over 30 User will enter the value in numeric field


Years)

Percentage of achievement

Number of males ( 30 This will be calculates using planned and actual value of number of males
Years and under) ( 30 years and under )

Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )

Number of females ( 30 This will be calculates using planned and actual value of number of
Years and under) females ( 30 years and under )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:517 of


696
Software Requirement Specification

Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )

Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )

Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )

Button Submit This Button will submit the entered data for Temporary Jobs

Button Reset This Button will reset the entered data for Temporary Jobs

Button Cancel This Button will terminate the process of capturing data for Temporary
Jobs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:518 of


696
Software Requirement Specification

Data Capture Diagram

Temporary Jobs
Level ULG Name Region Name Project Name

From Month

Temporary jobs planned in CIP by Age Group.

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Actual temporary created by CIP by age group

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Percentage of achievement

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

From Month

Temporary jobs planned in CIP by Age Group.

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Actual temporary created by CIP by age group

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Percentage of achievement

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:519 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:520 of


696
Software Requirement Specification

3.14.5 Firm Jobs [REQ-153]

Description
This function is used to capture data for Firm Jobs and generate progress report on Firm Jobs.

Inputs

The contents of Temporary Jobs are:

Level User will select the level from ( Federal , Regional , ULG )

ULG Name User will select the ULG Name from dropdown list

Region Name User will select the Region name from dropdown list

Project Name User will select the project name from dropdown list

Financial Year User will select the financial year from dropdown list

From Month User will select the date from calendar

Planned number of people employed in firms provided with serviced land and/or MSE Sheds under

CIP

Number of males ( 30 User will enter the value in numeric field


Years and under)

Number of males (over User will enter the value in numeric field

30 Years)

Number of females ( 30 User will enter the value in numeric field


Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:521 of


696
Software Requirement Specification

Total Number( 30 Years User will enter the value in numeric field

and under)

Total Number(over 30 User will enter the value in numeric field

Years)

Actual number of people employed in firms provided with serviced land and/or MSE Sheds under

CIP

Number of males ( 30 User will enter the value in numeric field

Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Number of females ( 30 User will enter the value in numeric field

Years and under)

Number of females User will enter the value in numeric field

(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field

and under)

Total Number(over 30 User will enter the value in numeric field

Years)

Percentage of achievement

Number of males ( 30 This will be calculates using planned and actual value of number of males

Years and under) ( 30 years and under )

Number of males (over This will be calculates using planned and actual value of number of males

30 Years) ( Over 30 years )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:522 of


696
Software Requirement Specification

Number of females ( 30 This will be calculates using planned and actual value of number of

Years and under) females ( 30 years and under )

Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )

Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )

Total Number(over 30 This will be calculates using planned and actual value of Total number

Years) (30 Years and Under )

To Month User will select the date from calendar

Planned number of people employed in firms provided with serviced land and/or MSE Sheds under

CIP

Number of males ( 30 User will enter the value in numeric field

Years and under)

Number of males (over User will enter the value in numeric field
30 Years)

Number of females ( 30 User will enter the value in numeric field

Years and under)

Number of females User will enter the value in numeric field

(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field

and under)

Total Number(over 30 User will enter the value in numeric field

Years)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:523 of


696
Software Requirement Specification

Actual number of people employed in firms provided with serviced land and/or MSE Sheds under

CIP

Number of males ( 30 User will enter the value in numeric field

Years and under)

Number of males (over User will enter the value in numeric field

30 Years)

Number of females ( 30 User will enter the value in numeric field

Years and under)

Number of females User will enter the value in numeric field


(over 30 Years)

Total Number( 30 Years User will enter the value in numeric field

and under)

Total Number(over 30 User will enter the value in numeric field

Years)

Percentage of achievement

Number of males ( 30 This will be calculates using planned and actual value of number of males

Years and under) ( 30 years and under )

Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )

Number of females ( 30 This will be calculates using planned and actual value of number of

Years and under) females ( 30 years and under )

Number of females This will be calculates using planned and actual value of number of

(over 30 Years) females ( Over 30 years )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:524 of


696
Software Requirement Specification

Total Number( 30 Years This will be calculates using planned and actual value of Total number

and under) (30 Years and Under )

Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )

Button Submit This Button will submit the entered data for Firm Jobs

Button Reset This Button will reset the entered data for Firm Jobs

Button Cancel This Button will terminate the process of capturing data for Firm Jobs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:525 of


696
Software Requirement Specification

Data Capture Diagram

Firm Jobs
Level ULG Name Region Name Project Name

From Month

Planned number of people employed in firms provided with serviced land and/or MSE
sheds under CIP

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Actual number of people employed in firms provided with serviced land and/or MSE sheds
under CIP

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Percentage of achievement

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:526 of


696
Software Requirement Specification

To Month

Planned number of people employed in firms provided with serviced land and/or MSE
sheds under CIP

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Actual number of people employed in firms provided with serviced land and/or MSE sheds
under CIP

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Percentage of achievement

Number of males Number of males Number of females Number of females


( 30 Years and under) ( Over 30 Years ) ( 30 Years and under ) ( Over 30 Years )

Total Number Total Number


( 30 Years and under) ( Over 30 Years )

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:527 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:528 of


696
Software Requirement Specification

3.14.6 Challenges Faced by MSEs [REQ-154]

Description
This function is used to capture data for handling complaints by capturing challenges that
MSEs in different regions are facing and allow categorization of the challenges.

Inputs

The contents of Challenges Faced By MSEs are:

Region Name User will select the level from ( Federal , Regional , ULG )

ULG Name User will select the ULG Name from dropdown list

Type of MSEs User will select the type of MSEs from dropdown list

Challenges Faced User will enter the challenges faced in text field

Category of challenge User will select the type of challenges from dropdown list

Remedial Measures User will enter the remedial measures planned in text field

Planned

Remedial Measures User will enter the remedial measures planned in text field
Taken

Challenges addressed/ User will enter the value in numeric field

Resolved

Button Submit This Button will submit the entered data for Challenges faced by MSEs

Button Reset This Button will reset the entered data for Challenges faced by MSEs

Button Cancel This Button will terminate the process of capturing data for Challenges
faced by MSEs

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:529 of


696
Software Requirement Specification

Data Capture Diagram

Challenges Faced by MSEs


Region Name ULG Name Type of MSEs Challenges Faced

Category of Challenge Remedial Measures Remedial Measures Challenges addressed


Planned Taken / Resolved

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:530 of


696
Software Requirement Specification

3.14.7 Annual Action Plan [REQ-155]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:531 of


696
Software Requirement Specification

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:532 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:533 of


696
Software Requirement Specification

3.14.8 Tracking progress of activities under Annual Action Plan [REQ-156]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:534 of


696
Software Requirement Specification

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:535 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:536 of


696
Software Requirement Specification

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:537 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:538 of


696
Software Requirement Specification

3.14.9 Field Visit Request [REQ-157]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:539 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:540 of


696
Software Requirement Specification

3.14.10 Field Visit Report [REQ-158]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:541 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:542 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:543 of


696
Software Requirement Specification

3.14.11 Capacity Building Plan [REQ-159]

Description

This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/

Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field
Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field
Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:544 of


696
Software Requirement Specification

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:545 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:546 of


696
Software Requirement Specification

3.15 Urban Resilience and DRM

3.15.1 Risk Priority [REQ-160]

Description
This function is used to Risk Priority data for Identification and preparation of risk matrix.

Inputs

The contents of Risk Priority data are:

Hazards User will enter the hazards in text field

Likelihood User will select the likelihood from ( 0 to 5 Value )

Impact Severity User will select the impact severity from ( 0 to 5 Value )

Risk Score This will calculated using value of likelihood and Impact Severity

Priority This will be calculated based on the value of Risk Score

Button Submit This Button will submit the data for Risk Priority

Button Reset This Button will reset the entered data for Risk Priority

Button Cancel This Button will terminate the process of capturing data for Risk Priority

Data Capture Diagram

Risk Priority
Hazards Likelihood Impact Severity Risk Score

Priority

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:547 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.2 Institution participating in risk analysis [REQ-161]

Description
This function is used to capture data for Institution participating in risk analysis data.

Inputs

The contents of Institution participating in risk analysis data are:

ULG Name User will select the name from dropdown list

Institution Name User will enter the institution name in text field

Expertise User will enter the expertise in text field

Resources that can be User will enter the resources that can be provided in text field

provided

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:548 of


696
Software Requirement Specification

Major Strength User will enter the major strength in text field

Major Weakness User will enter the major weakness in text field

Button Submit This Button will submit the data for Institution Participating in risk
analysis

Button Reset This Button will reset the entered data for Institution Participating in risk
analysis

Button Cancel This Button will terminate the process of capturing data for Institution
Participating in risk analysis

Data Capture Diagram

Institution participating in risk analysis


ULG Name Institution Name Expertise Resources that can
be provided

Major Strength Major Weakness

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:549 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.3 Urban Resilience performance scoring matrix [REQ-162]

Description

This function is used to capture data for Urban Resilience performance scoring matrix data.

Inputs

The contents of Urban Resilience performance scoring matrix data are:

ULG Name User will select the value of ULG Name from dropdown list

Performance User will enter the performance measurement in text field


Measurement

Category User will enter the category in text field

Year assessed User will enter the Year assessed in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:550 of


696
Software Requirement Specification

Maximum Points User will enter the maximum points in numeric field

Evidence to be User will enter the evidence to be produced in text field


Produced

Objective User will enter the objective in text field

Waivers / Exceptions/ User will enter the Waivers / Exceptions / Clarification in text field

Clarification

Button Submit This Button will submit the data for Urban Resilience performance
scoring matrix

Button Reset This Button will reset the entered data for Urban Resilience performance
scoring matrix

Button Cancel This Button will terminate the process of capturing data Urban Resilience
performance scoring matrix

Data Capture Diagram

Urban Resilience performance scoring matrix


ULG Name Performance Category Year assessed
Employment Measurement

Maximum Points Evidence to be Objective Waivers / Exceptions/


Produced Clarification

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:551 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.4 Risk Analysis Summary [REQ-163]

Description

This function is used to capture Risk Analysis Summary data.

Inputs

The contents of Risk Analysis Summary data are:

ULG Name User will select the ULG name from dropdown list

Major Identified User will enter the major identified risk / disaster in text field

risk/disaster

Frequency of User will enter the frequency of occurrence in numeric field

Occurrence

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:552 of


696
Software Requirement Specification

Exposed entity User will enter the exposed entity in text field

Severity Level User will enter the severity level in text field

Extent User will enter the extent in text field

Causes and effects User will enter the cause and effects in text field

Risk Priority

Hazards User will enter the hazards in text field

Likelihood User will select the likelihood from ( 0 to 5 Value )

Impact Severity User will select the impact severity from ( 0 to 5 Value )

Risk Score This will calculated using value of likelihood and Impact Severity

Priority This will be calculated based on the value of Risk Score

Percentage to be affected

Worst Case User will enter the value in numeric field

Most Likely User will enter the value in numeric field

Number and group entities affected

Worst Case User will enter the value in numeric field

Most Likely User will enter the value in numeric field

Button Submit This Button will submit the data for Risk Analysis

Button Reset This Button will reset the entered data for Risk Analysis

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:553 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Risk Analysis

Data Capture Diagram

Risk Analysis Summary


ULG Name Major Identified Frequency of Exposed entity
Employment risk/disaster Occurrence

Severity Level Extent Causes and effects

Risk Priority

Hazards Likelihood Impact Severity Risk Score

Priority

Percentage to be affected

Worst Case Most Likely

Number and group entities affected

Worst Case Most Likely

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:554 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.5 DRM and Emergency Response Plan [REQ-164]

Description

This function is used to capture DRM and emergency response plan with the following forms
(Urban Resilience performance scoring matrix, Institutions participating in risk analysis, Risk
Analysis Summary)

Inputs

The contents of DRM and Emergency plan are including the contents of Urban Resilience
performance scoring matrix, Institutions participating in risk analysis, Risk Analysis Summary.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:555 of


696
Software Requirement Specification

Process Flow Diagram

Figure 1

3.15.6 Urban Resilience and DRM M&E Report [REQ-165]

Description
This function is used to capture Urban Resilience and DRM M&E Report data and generate
report accordingly.

Inputs

The contents of Urban Resilience and DRM M&E Report are:

ULG Name User will select the ULG name from Dropdown list

Urban resilience and DRM Units

Emergency response User will select the value from ( Yes , No )

plan unit established

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:556 of


696
Software Requirement Specification

Risk Map Developed User will select the value from ( Yes , No )

Emergency response User will select the value from ( Yes , No )


plan prepared

Emergency response institutional structure

Name of DRM officer User will enter the name of DRM officer in text field

Name of rapid User will enter the name of rapid assessment officer in text field

assessment officer

Name of emergency User will enter the name of emergency response officer in text field

response officer

Button Submit This Button will submit the data for Urban Resilience and DRM M&E

Button Reset This Button will reset the entered data for Urban Resilience and DRM
M&E

Button Cancel This Button will terminate the process of capturing data for Urban
Resilience and DRM M&E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:557 of


696
Software Requirement Specification

Data Capture Diagram

Urban Resilience and DRM M&E Report


ULG Name

Urban resilience and DRM Units

Emergency response Risk Map Developed Emergency response


plan unit established plan prepared

Emergency response institutional structure

Name of DRM officer Name of rapid Name of emergency


assessment officer response officer

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:558 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.7 Annual Action Plan [REQ-166]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:559 of


696
Software Requirement Specification

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:560 of


696
Software Requirement Specification

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field


support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:561 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.8 Tracking progress of activities under Annual Action Plan [REQ-167]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:562 of


696
Software Requirement Specification

Inputs

The contents of Tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:563 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:564 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:565 of


696
Software Requirement Specification

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:566 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:567 of


696
Software Requirement Specification

3.15.9 Field Visit Request [REQ-168]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar

requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:568 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:569 of


696
Software Requirement Specification

3.15.10 Field Visit Report [REQ-169]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:570 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:571 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:572 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.15.11 Capacity Building Plan [REQ-170]

Description

This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:573 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:574 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:575 of


696
Software Requirement Specification

3.16 Gender Management

3.16.1 Gender Audit [REQ-171]

Description
This function is used to add Gender Audit by authorized users having Add rights or Manage
rights.

Inputs

The contents of Gender Audit are:

Region Name User will select the region name from dropdown list

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Audit report submission User will select the date from calendar

Date

Auditor's Name User will enter the auditor’s name in text field

List of Findings User will enter the list of findings in text field

List of Audit User will enter the list of audit recommendation in text field

Recommendation

Action planned for each User will enter the action plan for each recommendation in text field
recommendation

Focal Person in Charge User will enter the focal person in charge in text field

Timeline User will select the timeline in month from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:576 of


696
Software Requirement Specification

Progress for each action User will mark progress against each action on each recommendation

on each from dropdown list.


recommendation

Button Submit This Button will submit the entered data for Gender Audit

Button Reset This Button will reset the entered data for Gender Audit

Button Cancel This Button will terminate the process of capturing data for Gender
Audit

Data Capture Diagram

Gender Audit
Region Name ULG Name Financial Year Audit report submission
Date

Auditor's Name List of Findings List of Aduit Action planned for


Recommendation each recommendation

Focal Person in Charge

Timeline Progress for each action on each recommendation

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:577 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.2 Gender Main Streaming [REQ-172]

Description
This function is used to capture data for Gender Main Streaming process.

Inputs

The contents of Gender Main Streaming are:

Date of 1st User will select the date from the calendar
Quarter(July - October)

Meeting

Date of 2nd User will select the date from the calendar
Quarter(October-
January) Meeting

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:578 of


696
Software Requirement Specification

Date of 3rd User will select the date from the calendar
Quarter(January-April)

Meeting

Date of 4th User will select the date from the calendar

Quarter(April - July)

Meeting

Financial Year User will select the year from dropdown list

Number of Gender User will enter the value in numeric field

Focal person , sector


officers

attended( Male )

Number of Gender User will enter the value in numeric field

Focal person , sector

officers
attended( Female )

Number of Gender User will enter the value in numeric field

Focal person , sector

officers attended

( Others )

Agenda/ Minutes of the meeting

Planning User will enter the planning in text field

Implementation User will enter the implementation in text field

Monitoring User will enter the monitoring in text field

Evaluation

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:579 of


696
Software Requirement Specification

Achievement User will enter the achievement in text field

Challenge User will enter the challenge in text field

Recommendation User will enter the recommendation in text field

Progress User will enter the progress in text field

Button Submit This Button will submit the entered data for Gender Mainstreaming

Button Reset This Button will reset the entered data for Gender Mainstreaming

Button Cancel This Button will terminate the process of capturing data for Gender
Mainstreaming

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:580 of


696
Software Requirement Specification

Data Capture Diagram

Gender Mainstreaming
Date of 1st Quarter Date of 2nd Quarter Date of 3rd Quarter Date of 4th Quarter
(July - October) (October-January) (January-April) (April - July)
Meeting Meeting Meeting Meeting

Financial Year Number of Gender Number of Gender Number of Gender


Focal person , sector Focal person , sector Focal person , sector
officers attended officers attended officers attended
( Male) ( Fenale ) ( Others )

Agenda/ Minutes of the meeting

Planning Implementation Monitoring

Evaluation

Achievement Challenge Recommendation Progress

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:581 of


696
Software Requirement Specification

3.16.3 Employment Mainstreaming [REQ-173]

Description
This function is used to capture data for Employment Mainstreaming.

Inputs

The contents of Employment Mainstreaming are:

Category of User will select the category of employment from (Temporary Job,

Employment Permanent Job)

Number of Women User will enter the number of women in numeric field

Number of Men User will enter the number of men in numeric field

Total Professional This will be calculated using value of number of women and number of
men.

Percentage Women This will be calculates using Number of women and total professional
value.

Financial Year User will select the financial year from dropdown list

Month User will select the month from Calendar

Gender Focal Person in User will enter the gender focal person in place in text field

place

Educational Back User will enter the educational back ground in text field
Ground

Year of Experience User will enter the year of experience in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:582 of


696
Software Requirement Specification

Annual Gender User will enter the annual gender development plan / budget in numeric
Development field
Plan/Budget

Approved by city User will select the value from ( Yes , No )

Council ( Yes / No)

Consistent with ULG User will select the value from ( Yes, No )
annual plan / Budget
CBP and Gender
guideline

Meeting with gender User will enter the meeting with gender focal persons from each sector

focal persons from office in text field


each sector office

Date of Meeting User will select the date of meeting from calendar

Meeting Number User will entering the meeting number in numeric field

Implementation of User will enter the implementation of gender activities in plan in text
gender activities in field

plan

Number of activities User will enter the number of activities in numeric field

Number Implemented User will enter the number of activities implemented in numeric field

Percentage This will be calculated using the value of Number of activities and
implemented number of activities implemented

Gender Plan Budget User will enter the gender plan budget in numeric field

Actual Spent User will enter the actual spent in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:583 of


696
Software Requirement Specification

Percentage Spent This will be calculated using value of Gender Plan Budget and Actual
Spent

Button Submit This Button will submit the entered data for Employment Mainstreaming

Button Reset This Button will reset the entered data for Employment Mainstreaming

Button Cancel This Button will terminate the process of capturing data for Employment
Mainstreaming

Data Capture Diagram

Employment Mainstreaming
Category of Number of Women Number of Men Total Professional
Employment

Percentage Women Financial Year Month Gender Focal Person


in place

Educational Year of Experience Annual Gender Approved by city


Back Ground Development Plan/ Council ( Yes / No)
Budget

Consistent with ULG Meeting with gender Date of Meeting Meeting Number
annual plan / Budget focal persons from
CBP and Gender each sector office
guideline

Implementation of Number of activities Number Implemented Percentage implemented


gender activities in plan

Gender Plan Budget Actual Spent Percentage Spent

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:584 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.4 Employment Empowerment [REQ-174]

Description
This function is used to capture extensive date for Employment Empowerment.

Inputs

The contents of Employment Empowerment are:

Category of User will select the Category of Employment from dropdown list
Employment

Sub-Category of User will select the sub-category of employment from dropdown list

Employment

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:585 of


696
Software Requirement Specification

Number of Women User will enter the number of women employed in numeric field
Employed

Number of men User will enter the number of men employed in numeric field

Employed

Total This will be calculated using the value of number of men and women

Percentage of Women This will be calculated using number of female and total value

Button Submit This Button will submit the entered data for Economic Empowerment

Button Reset This Button will reset the entered data for Economic Empowerment

Button Cancel This Button will terminate the process of capturing data for Economic
Empowerment

Data Capture Diagram

Employment Empowerment
Category of Sub-Category of Number of Women Number of men
Employment Employment Employed Employed

Total Percentage of Women

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:586 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.5 Women Participation and community dialogue [REQ-175]

Description
This function is used to capture data for Women Participation and community dialogue.

Inputs

The contents of Women Participation and community dialouge are:

ULG Name User will select the name of ULG from dropdown list

Kebele Name User will select the kebele name from dropdown list

Date of Meeting User will select the date from calendar`

Time of Meeting User will select time of meeting from Time

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:587 of


696
Software Requirement Specification

Select Meeting User will select the meeting number from (Meeting Number 1, Meeting
Number Number 2, Meeting Number 3)

Meeting Number 1

Select Male or Women User will select the value from ( Male , Women )

Total Participant User will enter the value in numeric field

Total % of Women User will enter the value in percent

Meeting Number 2

Number of Women User will enter the number of women in numeric field

Number of Men User will enter the number of men in numeric field

Total Participant This will be calculated using values of number of women and number of
men

Total % of Women This will be calculated using values of number of women and total
participant

Meeting Number 3

Number of Women User will enter the number of women in numeric field

Number of Men User will enter the number of men in numeric field

Number of Others User will enter the number of others in numeric field

Total Participants This will be calculated using values of number of women , number of
men and total participants

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:588 of


696
Software Requirement Specification

Total % of Women This will be calculated using values of number of women and total
participants

Agenda User will enter the agenda in text field

Issue noted / Raised by User will enter the issue noted / raised by the public in text field

the Public

Action Plan for each issue

Number of awareness User will enter the value In numeric field


raising workshop /

training on women's
right in workplace

againts annual target

Gender Based Violence User will enter the action plan for gender based violence in text field

Sexual Harassment User will enter the action plan for sexual harassment in text field

Equal Pay and Gender User will enter the action plan for equal pay and gender awareness in
Awareness text field

Other contextual issues User will enter the other contextual issues related to gender at ULGs in

related to gender at text field

ULGs

Button Submit This Button will submit the entered data for Women Participation and
community dialogue

Button Reset This Button will reset the entered data for Women Participation and
community dialogue

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:589 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Women
Participation and community dialogue

Data Capture Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:590 of


696
Software Requirement Specification

Women Participation and community dialogue


ULG Name Kebele Name Date of Meeting Time of Meeting

Select Meeting
Number

Meeting Number 1

Select Male or Women Total Particpant Total % of Women

Meeting Number 2

Number of Women Number of Men Total Particpant Total % of Women

Meeting Number 3

Number of Women Number of Men Number of Others Total Particpants

Total % of Women

Agenda Issue noted / Raised by the Public

Action Plan for each issue

Number of awareness Gender Based Sexual Harrasment Equal Pay and Gender
raising workshop / Violence Awareness
training on women's
right in workplace
againts annual target

Other contextual
issues related to gender
at ULGs

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:591 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.6 Gender Development Plan [REQ-176]

Description
This function is used to capture Gender Development Plan.

Inputs

The contents of Gender Development Plan are:

Region Name User will select the region name from dropdown list

ULG Name User will select the ULG name from dropdown list

Financial Year User will select the financial year from dropdown list

Gender Issue and/or User will select the value from ( Gender Issue , GAD Mandate , Both )

GAD Mandate

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:592 of


696
Software Requirement Specification

Cause of the Gender User will enter the cause of the gender issue in text field
Issue

GAD Result Satement/ User will enter the GAD Result statement / GAD Objective in text field

GAD Objective

Relevant Agency MFO/ User will enter the Relevant agency MFO / PAP in text field

PAP

GAD Activity User will enter the GAD Activity in text field

Output Performance User will enter the output indicators and targets in text field

Indicators and target

GAD Budget User will enter the GAD Budget in numeric field

Source of Budget User will enter the Source of Budget in Text field

Responsible Unit/ User will enter the responsible unit / office in text field

Office

Total Budget User will enter the Total Budget in numeric field

Prepared by (User) User will enter the user information who has prepared the Plan in text
field

Approved by (User) User will enter the user information who has approved the Plan in text
field

Date User will select the date from calendar

Button Submit This Button will submit the entered data for Gender Development Plan

Button Reset This Button will reset the entered data for Gender Development Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:593 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Gender
Development Plan

Data Capture Diagram

Gender Development Plan


Region Name ULG Name Financial Year Gender Issue and/or
GAD Mandate

Cause of the Gender GAD Result Satement/ Relevant Agency MFO/ GAD Activity
Issue GAD Objective PAP

Output Performance GAD Budget Source of Budget Responsible Unit/


Indicators and target Office

Total Budget Prepared by (User) Approved by (User) Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:594 of


696
Software Requirement Specification

Figure 2

3.16.7 Gender Development M&E Data [REQ-177]

Description
This function is used to capture extensive date for Gender Development M&E Data and
generate report accordingly.

Inputs

The contents of Gender Development M&E Data are:

Category of User will select the Category of Employment from dropdown list
Employment

Sub-Category of User will select the sub-category of employment from dropdown list

Employment

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:595 of


696
Software Requirement Specification

ULG Name User will select the ULG Name from Dropdown list

Name of Project User will select the name of project from dropdown list

From Month User will select the date from the calendar

Planned

Number of Women User will enter the number of women employed in numeric field

Employed

Number of men User will enter the number of men employed in numeric field
Employed

Total This will be calculated using the value of number of men and women

Percentage of Women This will be calculated using number of female and total value

Actual

Number of Women User will enter the number of women employed in numeric field

Employed

Number of men User will enter the number of men employed in numeric field
Employed

Total This will be calculated using the value of number of men and women

Percentage of Women This will be calculated using number of female and total value

To Month User will select the month from calendar

Planned

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:596 of


696
Software Requirement Specification

Number of Women User will enter the number of women employed in numeric field
Employed

Number of men User will enter the number of men employed in numeric field

Employed

Total This will be calculated using the value of number of men and women

Percentage of Women This will be calculated using number of female and total value

Actual

Number of Women User will enter the number of women employed in numeric field
Employed

Number of men User will enter the number of men employed in numeric field

Employed

Total This will be calculated using the value of number of men and women

Percentage of Women This will be calculated using number of female and total value

Detailed activities in Annual Gender Development Plan Budget Utilization per each activity

Name of ULG User will select the ULG name from dropdown list

Name of activity User will enter the name of activity in text field

Financial Year User will select the financial year from dropdown list

Annual Gender User will enter the Annual Gender Development Budget in numeric field
Development Budget

Financial

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:597 of


696
Software Requirement Specification

For Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using the value of planned and actual

To Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using the value of planned and actual

Physical

For Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using the value of planned and actual

To Month User will select the date from calendar

Planned User will enter the value in numeric field

Actual User will enter the value in numeric field

Percentage Achieved This will be calculated using the value of planned and actual

Button Submit This Button will submit the entered data for Gender Development M&E

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:598 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for Gender Development M&E

Button Cancel This Button will terminate the process of capturing data for Gender
Development M&E

Data Capture Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:599 of


696
Software Requirement Specification

Employment Empowerment
Category of Sub-Category of ULG Name Name of Project
Employment Employment

From Month

Planned

No. of Women No . Of Men Total % of Women

Actual

No. of Women No . Of Men Total % of Women

To Month

Planned

No. of Women No . Of Men Total % of Women

Actual

No. of Women No . Of Men Total % of Women

Detailed Activities in Annual Gender Development Plan Budget Utilization per each activity

ULG Name Activity Name Financial Year Annual Budget

Financial

For Month

Planned Actual Percentage Achieved

To Month

Planned Actual Percentage Achieved

Physical

For Month

Planned Actual Percentage Achieved

To Month

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:600 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:601 of


696
Software Requirement Specification

3.16.8 Annual Action Plan [REQ-178]

Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.

Inputs

The contents of Annual Action Plan are:

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG Name

Region Name User will select the Region Name

Thematic Area User will select the Thematic Area

Activities Planned

Financial Year User will select the Financial Year

Office User will select the office from ( Federal , Regional , ULG )

Thematic Area User will select the thematic area

Responsible Person User will enter the name of responsible person in text field

Timeframe (Months) User will enter the number of months

Budget (Birr) User will enter the budget ( in numeric field )

Major Activity User will enter the major activity name in text field

ULGs that need intensive field support

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:602 of


696
Software Requirement Specification

ULG Name User will select the ULG Name

Thematic Area User will select the thematic area

Gaps to be addressed User will enter the gaps to be addressed through technical support in

through technical text field

support

Button Submit This Button will submit the data for Annual Action Plan

Button Reset This Button will reset the entered data for Annual Action Plan

Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan

Data Capture Diagram

Annual Action Plan

Level ULG Name Region Name Thematic Area


Select Level Select ULG Select Region Select Thematic Area

Activities Planned

Financial Year Office Thematic Area Major Activity


Select Office Select Thematic Area

Responsible Person Timeframe(Months) Budget (Birr)

ULGs that need intensive field support

ULG Name Thematic Area Gaps to be addressed through technical support


Select ULG Select Thematic Area

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:603 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.9 Tracking progress of activities under Annual Action Plan [REQ-179]

Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:604 of


696
Software Requirement Specification

Inputs

The contents of tracking progress of activities are:

ULG Name User will select the value of ULG

Name of Activities User will select the name of activities captured under annual action plan.

Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field

Physical

Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial

Quarter 1

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 2

Planned User will enter the planned value in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:605 of


696
Software Requirement Specification

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 3

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Quarter 4

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Consolidated for financial year

Planned User will enter the planned value in numeric field

Actual User will enter the actual value in numeric field

Percentage Achieved This will be automatically calculated using both the planned and actual
value

Button Submit This Button will submit the entered data for tracking progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:606 of


696
Software Requirement Specification

Button Reset This Button will reset the entered data for tracking progress of activities

Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:607 of


696
Software Requirement Specification

Tracking Progress of activities under Annual Action Plan

ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level

Quarter 1

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 2

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 3

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Quarter 4

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Cumulative for Financial Year

Physical

Planned Actual Percentage Achieved

Financial

Planned Actual Percentage Achieved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:608 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:609 of


696
Software Requirement Specification

3.16.10 Field Visit Request [REQ-180]

Description

This function is used to Capture Field Visit Work Request

Inputs

The contents of Field Visit Work Request Data are:

Requesting Person User will enter the name of the person requesting for field visit

Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested

TOR is Uploaded User will select from ( Yes , No )

Name of Project sites in User will select the name of project sites from the dropdown

ULGs

Name of Project ULGs User will select the name of project from dropdown

Start Date of Field User will select the date from calendar

Work

End Date of Field Work User will select the date from calendar

Date of field work User will select the date from calendar
requested

Button Submit This Button will submit the data for field visit request

Button Reset This Button will reset the entered data for field visit request

Button Cancel This Button will terminate the process of capturing data for field visit
request

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:610 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Request


Requesting Person Level of field / site work requested TOR is Uploaded

Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date

End Date of Field Work Date of field visit work requested


Select Date

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:611 of


696
Software Requirement Specification

3.16.11 Field Visit Report [REQ-181]

Description
This function is used to capture the data of Field Visit and generate report accordingly.

Inputs

The contents of Field Visit Report form are:

Name of Field / Site Visited

Kebele User will select the name of Kebele

ULG User will select the name of ULG

Region User will select the name of Region

Progress on the Project Implementation

Name of Project User will select the name of project

Unit User will select the unit

Project Status

Planned User will enter the planned in numeric value

Actual User will enter the actual in numeric value

Progress % This will be automatically calculated using planned and actual value

Remark User will enter the remark in the text field

Technical support provided during monitoring time

On-The Job Training

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:612 of


696
Software Requirement Specification

No. of Trainee User will enter the number of trainees in numeric value

No. of Male User will enter the number of male in numeric value

No. of Female User will enter the number of female in numeric value

Progress Data User will enter the progress data collection and collation in text field

collection and collation

Reporting

Issues identified by User will enter the issues identified by ULGs in text field

ULGs

List of User will enter the list of recommendations made to resolve issues in text
recommendation made field

to resolve issues

Feedback letter User will select the value from ( Yes , No )

uploaded

Detail Monitoring User will select the value from ( Yes , No )

progress report
uploaded

Button Submit This Button will submit the entered data for field visit report

Button Reset This Button will reset the entered data for field visit report

Button Cancel This Button will terminate the process of capturing data for field visit
report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:613 of


696
Software Requirement Specification

Data Capture Diagram

Field Visit Report

Name of Field/ Site Visited

Kebele ULG Region

Progress on the Project Implementation

Name of Project

Project Status

Planned Actual Progress % Remark

Technical Support Provided During Monitoring time

On-the Job Training

No. of Trainees No. of Male No. of Female

Progress Data Collection and Collation

Reporting

Issues Identified By ULGs List of recommendations made to resolve issues

Feedback letter Uploaded Detail Monitoring


Progress report Uploaded

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:614 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.16.12 Capacity Building Plan [REQ-182]

Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area

Inputs

The contents of Capacity Building are:

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region User will select the region from dropdown list

Thematic Areas User will select the thematic area from dropdown list

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:615 of


696
Software Requirement Specification

ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field

investments

Gaps Identified User will enter the gaps identified in text field

Capacity Building User will enter the capacity building modality in text field

Modality

Performance Indicator User will enter the performance indicator in text field

Target User will enter the target in text field

Lead Person User will enter the lead person responsible name in text field

Responsible

Year User will select the year from dropdown list

Start Date User will select the start date from calendar

End Date User will select the end date from calendar

Resources Required User will enter the resources required in text field

Packaging User will enter the packaging in text field

Button Submit This Button will submit the entered data for capacity building plan

Button Reset This Button will reset the entered data for capacity building plan

Button Cancel This Button will terminate the process of capturing data for capacity
building plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:616 of


696
Software Requirement Specification

Data Capture Diagram

Capacity Building Plan


Level ULG Region Thematic Areas
Select Level Select ULG Select Region Select Thematic Area

ECSPG Pillar & Capacity Building activities/ investments Gaps Identified

Capacity Building Performance Target Lead Person


Modality Indicator Responsible

Year Start Date End Date Resources Required


Select Date Select Date

Packaging

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:617 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:618 of


696
Software Requirement Specification

3.17 Complain Management

3.17.1 Procurement Complain [REQ-183]

Description
This function is used to capture Procurement Complain data.

Inputs

The contents of Procurement Complain data are:

Type of Service User will select the type of service from ( Request for Information,
Request for Service )

Name User will enter the name in text field

Location User will enter the location in text field

Contact Number User will enter the contact number in numeric field

Department User will enter the department in text field

Financial Year User will select the financial year from dropdown list

ULG Name User will select the ULG name from dropdown list

Name of Contract User will select the name of contract from dropdown list

Contract Number User will enter the contract number in text field

Complain Description User will enter the Complain description in text field

Nature of Complaint User will select the nature of complaint from dropdown list

Date Received User will select the date from calendar

Date Resolved User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:619 of


696
Software Requirement Specification

Resolution User will enter the resolution in text field

Button Submit This Button will submit the data for Procurement Complaints

Button Reset This Button will reset the entered data for Procurement Complaints

Button Cancel This Button will terminate the process of capturing data for Procurement
Complaints

Data Capture Diagram

Procurement Complain
Name of Contract Contract Number Complain Description

Nature of Complaint Date Received Date Resolved Resolution

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:620 of


696
Software Requirement Specification

3.17.2 ULG APA Complain [REQ-184]

Description
This function is used to ULG APA Complain data.

Inputs

The contents of ULG APA Complain data are:

Type of Service User will select the type of service from ( Request for Information,
Request for Service )

Name User will enter the name in text field

Location User will enter the location in text field

Contact Number User will enter the contact number in numeric field

Department User will enter the department in text field

ULG Name User will select the ULG Name from the dropdown list

Date of assessment User will select the date from calendar

Specific complaint

Category User will select the Value from ( Minimum Conditions , DLI )

Specific disagreements User will enter the specific disagreements and justification in text field

and justification

Response from the User will enter the response from the committee in text field

committee

Button Submit This Button will submit the data for ULG APA Complain

Button Reset This Button will reset the entered data for ULG APA Complain

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:621 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for ULG APA
Complain

Data Capture Diagram

ULG APA Complain


ULG Name Date of assessment

Specific complaint

Category Specific disagreements and justification

Response from the


committee

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:622 of


696
Software Requirement Specification

3.17.3 RIAs APA Complain [REQ-185]

Description
This function is used to capture Regional level RIAs APA Complain data.

Inputs

The contents of RIAs APA Complain data are:

Type of Service User will select the type of service from ( Request for Information,
Request for Service )

Name User will enter the name in text field

Location User will enter the location in text field

Contact Number User will enter the contact number in numeric field

Department User will enter the department in text field

Region Name User will select the region name from dropdown list

Date of assessment User will select the date from calendar

Specific complaint

Category User will select the category from ( Minimum Conditions , DLI )

Specific disagreements User will enter the specific disagreements and justification in text field

and justification

Response from the User will enter the response from the committee in text field

committee

Button Submit This Button will submit the data for Regional APA Complain

Button Reset This Button will reset the entered data for Regional APA Complain

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:623 of


696
Software Requirement Specification

Button Cancel This Button will terminate the process of capturing data for Regional APA
Complain

Data Capture Diagram

RIAs APA Complain


Region Name Date of assessment

Specific complaint

Category Specific disagreements and justification

Response from the


committee

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:624 of


696
Software Requirement Specification

3.17.4 Registering Grievances [REQ-186]

Description
This function is used to Registering Grievances data.

Inputs

The contents of Registering Grievances data are:

Type of Service User will select the service from ( Request for Information, Request for
Service)

Type of User User will select the type of user from ( Public, Internal )

If Public User

Name User will enter the name in text field

Location User will enter the location in text field

Contact Number User will enter the contact number in numeric field

If Internal User

Name User will enter the name in text field

Location User will enter the location in text field

Department User will enter the department in text field

Contact Number User will enter the location in numeric field

ULG Name User will select the ULG name from dropdown list

Complaint Number User will enter the complaint number in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:625 of


696
Software Requirement Specification

Name of recorder User will enter the name of recorder in text field

Address User will enter the address in text field

Date User will select the date from calendar

Description of User will enter the description of complaint in text field

Complaint

Date Received User will select the date from calendar

Date Resolved User will select the date from calendar

Button Submit This Button will submit the data for Grievances

Button Reset This Button will reset the entered data for Grievances

Button Cancel This Button will terminate the process of capturing data for Grievances

Data Capture Diagram

Registering Grievances
ULG Name Complaint Number Name of recorder Address

Date Description of Complaint Date Received

Date Resolved

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:626 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.17.5 Complain Assignment [REQ-187]

Description
This function is used to capture data for complain assigning to concerned thematic area users.

Inputs

The contents of Complain Assignment data are:

Complain Name User will select the Complaint name from dropdown list

Complain Number This will be auto filled as per complaint name

Assigned to

Thematic Area User will select the thematic area from dropdown list

Assigned Date User will select the date from calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:627 of


696
Software Requirement Specification

User to be assigned User will select the user of the concerned thematic area from dropdown
list

Button Submit This Button will submit the data for Complain Assigned

Button Reset This Button will reset the entered data for Complain Assigned

Button Cancel This Button will terminate the process of capturing data for Complain
Assigned

Data Capture Diagram

Complain Assign
Complaint Name Complaint Number

Assigned To

Thematic Area Assigning Date User Assigned

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:628 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.18 System Administration

3.18.1 User Information [REQ-188]

Description
This function is used to capture data for Users who will be operating on the MIS.

Inputs

The contents of User Information are:

Full names User will enter the full name in text field

Category User will select the value from ( focal person , non-thematic area user )

Email address User will enter the email address in text field

Phone number User will enter the phone number in numeric field

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:629 of


696
Software Requirement Specification

Thematic area User will select the thematic area from dropdown list

Organization User will enter the organization name in text field

Date of birth User will select the date from calendar

Address User will enter the address in text field

Commencement Date User will select the date from calendar

End date User will select the date from calendar

Level User will select the level from ( Federal , Regional , ULG )

ULG User will select the ULG from dropdown list

Region name User will select the ULG from dropdown list

Next of Kin Details User will enter the next of kin details in text field

Button Submit This Button will submit the data for User Information

Button Reset This Button will reset the entered data for User Information

Button Cancel This Button will terminate the process of capturing data for User
Information

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:630 of


696
Software Requirement Specification

Data Capture Diagram

User Information
Full Names Category Email Address Phone Number

Thematic Area Organization Date of Birth Address

Commencement Date End Date Level ULG

Region Name Next of Kin Details

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:631 of


696
Software Requirement Specification

3.18.2 Region Detail [REQ-189]

Description
This function is used to capture data for Region Detail

Inputs

The contents of Region Detail are:

Region name User will enter the name of region in text field

RIA address User will enter the RIA Address in text field

Number of Regional User will enter the number of regional mobile teams in numeric field

mobile teams

Number of ULGs User will enter the number of ULGs in numeric field

Name of ULGs User will enter the name of ULG in numeric field

Address of the city User will enter the address of the city administration for each office in

administration for each text field

office

Button Submit This Button will submit the data for Regional Detail

Button Reset This Button will reset the entered data for Regional Details

Button Cancel This Button will terminate the process of capturing data for Regional
Detail

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:632 of


696
Software Requirement Specification

Data Capture Diagram

Region Detail
Region Name RIA Address Number of Regional Number of ULGs
mobile teams

Name of ULGs Address of the city administration for each office

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:633 of


696
Software Requirement Specification

3.18.3 ULG Detail [REQ-190]

Description
This function is used to ULG Detail

Inputs

The contents of ULG Detail are:

ULG name User will enter the name of ULG in text field

Region name User will select the name of Region from dropdown list

Number of Kebele User will enter the number of Kebele in numeric field

Kebele Names User will enter the names of kebele in text field

Total Population User will enter the total population in numeric field

Total Population below User will enter the total population below 15 years in numeric field

15 Years

Total Population User will enter the total population between 15 and 50 years in numeric

between 15 and 50 field


Year

Total Population above User will enter the total population above 50 years in numeric field

50 Years

Button Submit This Button will submit the data for ULG Detail

Button Reset This Button will reset the entered data for ULG Detail

Button Cancel This Button will terminate the process of capturing data for ULG Detail

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:634 of


696
Software Requirement Specification

Data Capture Diagram

ULG Detail
ULG Name Region Name Number of Kebele Kebele Names

Total Population Total Population Total Population


below 15 Years between 15 and 50 Year

Total Population
above 50 Years

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:635 of


696
Software Requirement Specification

3.18.4 User Permission [REQ-191]

Description
This function is used to capture data for User Permission.

Inputs

The contents of User Permission Detail are:

User group ID User will enter the group ID in numeric field

User group name User will enter the group name

Responsibilities User will select the responsibilities from ( Creator , Reviewer , Approver ,
Viewer )

Modules accessibility User will select the modules accessibility from dropdown list

Button Submit This Button will submit the data for User Permission

Button Reset This Button will reset the entered data for User Permission

Button Cancel This Button will terminate the process of capturing data for User
permisson

Data Capture Diagram

User Permission
User group ID User group name Responsibilities Modules accessibility

Submit Reset Cancel

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:636 of


696
Software Requirement Specification

Process Flow Diagram

Figure 2

3.18.5 Focal Persons [REQ-192]

Description
This function is used to capture data for Focal Persons

Inputs

The contents of Focal Persons detail are:

Focal Persons name User will enter the name in text field

Focal persons date of User will select the date from the calendar
birth

Commencement date User will select the date from the calendar

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:637 of


696
Software Requirement Specification

End date User will select the date from the calendar

Thematic Area User will select the thematic area from dropdown list

Level User will select the level from ( Federal , Regional , ULG )

ULG name User will select the ULG name from dropdown list

Region name User will select the region name from dropdown list

Button Submit This Button will submit the data for Focal Persons

Button Reset This Button will reset the entered data for Focal Persons

Button Cancel This Button will terminate the process of capturing data for Focal Persons

Data Capture Diagram

Focal Persons
Focal Person Name Focal Person Date Commencement End Date
of Birth Date

Thematic Area Level ULG Name Region Name

Submit Reset Cancel

Figure 1

Process Flow Diagram

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:638 of


696
Software Requirement Specification

Figure 2

3.19 Document Management

3.19.1 Document Upload [REQ-193]

Description
This function is used to capture data before uploading documents.

Inputs

The contents of Document Upload are:

Title User will enter the title in text field

Description User will enter the description in text field

Category User will select the document category from dropdown list

Sub-Category

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:639 of


696
Software Requirement Specification

Thematic Area User will select the thematic area from dropdown field

Version User will enter the version in text field

Index User will enter the index in text field

Tags User will enter the tags in text field

Level User will select the level from ( Federal , Regional , ULG )

ULG Name User will select the ULG from dropdown list

Region Name User will select the region name from dropdown list

Commencement Date User will select the date from calendar

Upload Document User will select the date from calendar

Button Submit This Button will submit the data for Document Upload

Button Cancel This Button will reset the entered data for Document Upload

Button Reset This Button will terminate the process of capturing data for Document
Upload

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:640 of


696
Software Requirement Specification

Data Capture Diagram

Document Upload
Title Description Category

Sub-Category

Thematic Area Version Index

Tags Level ULG Name


Select Level

Region Name Upload Document

Submit Reset Cancel

Figure 1

Process Flow Diagram

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:641 of


696
Software Requirement Specification

3.20 UIIDP Website [REQ-194]

Description
This function is used to provide an alternative link to the MIS. The website will avail all the
information that the program may want to convey to the general public

Inputs

The contents of website are:

Home Page User will view the following sections through Home Page :
 Upcoming program events in different ULGs
 News regarding the program
 Jobs available under the UIIDP projects

About UIIDP User will view the information of the program’s background such as cities
and objective through About UIIDP section.

Projects User will view the different public projects in each ULG or Region under
the UIIDP program through Project Section

Public Notices User will view the following public notices through Public Notices :
 Local tender notices
 Open Business idea competition plan schedules and details
 Women participation meetings schedules
 Planning participation meeting schedule
 Public Private Dialogue
 Land lease information
 ULG performance reports

Contact Us User will view the “contact us” page for public contact UIIDP offices by
sending an enquiry or a comment by prompting the user to input the
following details:

 Names (first name and surname)

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:642 of


696
Software Requirement Specification

 Email address
 Phone number
 Message

ULG Or Regional office User after selecting ULG or regional office, will view the following

information for the selected ULG:

 Contact person
 Phone number
 Email
 Address
 Working hours

4 Report Screen

4.1 Program Coordination

4.1.1 VfM Recommendation Report

VfM Recommendation

Region Select Region ULG Select ULG Financial Year Select Year

Search

Proportion of previous Number of VfM Number of Percentage of


SI# ULG Name Region Name Financial Year Recommendations addressed addressed
VfM Audit addressed
of Prior year recommendations recommendations

Figure 1

4.1.2 Annual Staff Performance Evaluation Report

Annual Staff Performance Evaluation Report

Name of Staff ULG Name Select ULG From Date of Select Date To Date of Select Date
Evaluation Evaluation
Level Select Level Region Select Region Thematic Area Select Thematic Area Year Select Year

Search

Self-Evaluation Evaluation Score By


SI# Name of Staff Review Period Level ULG Year Date of Evaluation Overall Performance
Score Coordinator

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:643 of


696
Software Requirement Specification

4.1.3 Monitoring report on implementation of AWP

Monitoring report on implementation of AWP

Financial Year Select Year ULG Name Select ULG Thematic Area Select Thematic Area

Level Select Level Region Select Region

Search

SI# Finacial Year Level ULG Region Thematic Area Output Indiactor Period Planned Actual Percentage Achieved

Figure 3

4.1.4 UIIDP AWP Budget

UIIDP AWP and Budget

Financial Year Select Year Activity Select Activity Deadline Select Date

Search

Responsibility for action Responsibility for


SL# Activity Annual Budget EFY Cuurent Status Next Action Deadline Action and follow up in Bureau action and follow
/ Agency up in PPMD

Figure 4

4.1.5 UIIDP Regional AWP Budget

Regional AWP and Budget

Financial Year Select Year Activity Select Activity Deadline Select Date

Search

Responsibility for action Responsibility for


SL# Activity Annual Budget EFY Cuurent Status Next Action Deadline Action and follow up in Bureau action and follow
/ Agency up in PPMD

Figure 5

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:644 of


696
Software Requirement Specification

4.1.6 VfM Audit Progress Report

Audit Progress Report

Start Date End Date


Start Date End Date
of Audit of Audit

Search

Submission Date of Audit


SI# Start Date of Audit End Date of Audit report to bureua by regional
coordinator

Figure 6

4.1.7 Final Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 7

4.1.8 Review and Approve Report

Reviewed and Approved Documents

Status Select Status

Search

SI# Document Name Approved Rejected Comments

Figure 8

4.2 Monitoring and Evaluation

4.2.1 Annual Action Plan

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:645 of


696
Software Requirement Specification

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 1

4.2.2 Field Visit Report


Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 2

4.2.3 Capacity Building Plan


Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 3

4.2.4 Reports on Result Framework


Result Framework

DLI From Year Select Year To Year Select Year

Search

PDO level Result Baseline Actual (Financial Target(Financial Actual (Financial Target(Financial Actual (Financial Target(Financial Actual (Financial Target(Financial Reponsibility for Intermediate Results
Core DLI Unit of Measure Frequency Data Source
SI# Indicators (Financial Year 1) Year 2) Year 2) Year 3) Year 3) Year 4) Year 4) Year 5) Year 5) Data Collection Area

Figure 4

4.3 Project Engineering

4.3.1 Project Engineering M & E Report

Project Engineering M&E Report

ULG Name Select ULG Project Name Select Project

Search

From Month To Month


SI# ULG Name Name of Project Unit of Measurement Planned for Year Planned Actual % Achieved Planned Actual %Achieved

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:646 of


696
Software Requirement Specification

4.3.2 Project Cost Report

Project Cost Report

ULG Name Select ULG Financial Year Select Year Project Name Select Project

Project Start Date Select Date

Search

Cost Details
SI# ULG Name Financial Year Project Name Project Start Date Percentage of spent
Item Category Unit cost Quantity Total Cost Date of Expenditure Total Project Cost
project budget

Figure 2

4.3.3 Contract Management Report

Contract Management Report

ULG Name Select ULG Financial Year Select year Project Name Select Project

Contract Status Select Status Contract Start Date Select Date

Search

Claims Details (if any)


SI# ULG Name Financial Year Contract Status Contractor Name Responsible Party Contract Cost Project Name Contract Timeline Supervision period Contract start date Contract completion date Project engineers in charge
Request Approval Status Approval Date Approved By Claim Category Claim

Figure 3

4.3.4 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 4

4.3.5 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 5

4.3.6 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 6

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:647 of


696
Software Requirement Specification

4.3.7 Infrastructure Projects

Infrastructure Project

Project Name Contract Start Date Contract Completion Date

Search

Contract Completion Annual Physical and Physical and Fiancial Physical and Financial Physical and Financial Achievement Physical and Financial Achievement Time elapsed in %
SI# Project Name Unit Measurement Contract Amount Contract Start Date Comments /Contractual Problem Faced
Date Financial Plan Achievement this Month Achievement to date in % to date from annual Plan in % to date from Contract

Figure 7

4.4 Municipal Finance and Revenue

4.4.1 State Revenue Progress

State Revenue Progress Report

Period Select Period Level Select Level Region Name Select Region

ULG Name Select ULG

Search

ULGS that achieve an increase of state revenue of atleast 10% over the previous year State Revenue Performance
SI# Period Level Region ULG From Month To Month
Actual FY 1 Planned FY 2 Actual FY2 Actual % of Planned % Increase At least 10% Financial Year Planned for the Year
Planned Actual % Achieved Planned Actual % Achieved

Figure 1

4.4.2 Municipal Finance and Revenue Progress Report

Municipal finance and Revenue Report

Level Select Level Region Select Region ULG Select ULG

Search

ULGs that achieve an increase of own source municipal revenue ( Excluding Land Lease Income) of at least 10 percent over the previous year under UIIDP

From Month To Month


SI# Region Name ULG Name APA Financial Year
Planned Actual % Achieved Planned Actual % Achieved

ULGs that achieve an increase of own source municipal revenue ( Including Land Lease Income) of at least 10 percent over the previous year under UIIDP

From Month To Month


SI# Region Name ULG Name APA Financial Year
Planned Actual % Achieved Planned Actual % Achieved

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:648 of


696
Software Requirement Specification

4.4.3 Revenue Enhancement Plan

Revenue Enhancement Plan

ULG Select ULG


Search

Revenue Sources

SI# Revenue item Category Account Number

Trend Analysis for 3-5 Years

SI# Ethiopian fiscal Year Planned Actual Actual vs planned Actual growth rate

Assesment of Planning Capacity

Percentage of total
SI# Revenue Item Account Number Planned Revenue Actual Revenue Actual vs planned
own revenue

Assesment of contribution of each municipal revenue source

Contribution of Contribution of actual


SI# Revenue Item Account Number Planned Revenue Actual Revenue planned revenue to revenue collected
the total % to the total %

Prioritization , impact and risk of appearance of difficulties in past revenue performance

Amount of overdue Amount of fine in Fine as % of total Possible reason for Impact on revenue
SI# Revenue Item Account Number Number of arrear files Age of arrears
tax in birr Birr overdue tax arrears performance

Three Year past revenue analysis

Planned Revenue Actual Revenue Share of each revenue to three years actual total
SI# Revenue Item Account Number Category Three Year Total
3rd Year Past 2nd Year Past Current Year 3rd Year Past 2nd Year Past Current Year 3rd Year Share 2nd Year Share Current Year Share
Total

Analaysis of past expenditure items

Total city population Total city population Actual Vs Planned


SI# Expenditure items Account Number Source of Finance
Planned Actual 3rd Year Past 2nd Year Past Current Year

Financial Balance

SI# Actual Own source of revenue Actual Expenditure Financial balance , revenue vs eexpenditure
3 years ago 2 Years ago Last Year 3 years ago 2 Years ago Last Year 3 years ago 2 Years ago Last Year

Financial Performance Indicators

Municipal revenue Total revenue Total expenditure


SI# Item Description First Year Value Second Year Value Third year value Average Value
or expenditure Per year Per Year

Future Expenditure requirements

SI# Expenditure item Account Number Planned expenditure Source of finance Population

Revenue Enhancement Plan

Percentage of total Per capita planned Total Projected


SI# Revenue Item Account Number Planned revenues
planned revenue revenue Population

Summary of future estimated revenue and exoenditure requirement

SI# Account Number Revenue item Category First Year value Second Year value Third Year Value

Total

Summary of strategies for each issue

Responsible
Revenue Item Issues found in past revenue performance analysis Formulated strategies Timing Remark
SI# Organization

Figure 3

4.4.4 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 4

4.4.5 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 5

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:649 of


696
Software Requirement Specification

4.4.6 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 6

4.5 Financial Management

4.5.1 Finance Management M&E Report

Financial Management and Program accounting M&E Data

Financial Year Region Name ULG Name

Search

Timely Financial Reporting Monthly cash and bank reconcillation reports submitted to BOFED Internal Audit, quaterly reports submitted to BOFED / ZoFED Count and Reconcillation of fixed assets
SI# ULG Region Financial Year
Quarter Deadline Date Date Submitted Month Deadline Date Date Submitted Quarter Deadline Date Date Submitted Date of Count

Figure 1

4.5.2 Count and Reconciliation of fixed assets

Count and reconcillation of fixed assets

Financial Year Quarter ULG Name

Search

Asset Description Quantity of stock


SI# Financial Year Quarter ULG Name Date of count Asset name and type Asset condition Asset Value Asset Purchase Date Obsolete Quantity Damaged Quantity Asset Location
Modality count

Figure 2

4.5.3 Audit Progress Report

Audit Progress

ULG Region Financial Year

Search

Date of Final Account Date of Audit Audit Submitted Audite submitted


SI# Level ULG Region Financial Year State of Audit Audit Compliance
Submitted to ORAG Report (EC and GC) Before Deadline Category

Figure 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:650 of


696
Software Requirement Specification

4.5.4 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 4

4.5.5 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 5

4.5.6 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 6

4.6 Environment Management

4.6.1 Environment Management M&E Report

Environment Management M&E Report ( ESMS & RS )

ULG Name Select ULG

Search
Month Cummulative
Categorization and recommendation from ESMF Screening form REPA Decision Implemenation of REFCC Decision Categorization and recommendation from ESMF Screening form REPA Decision Implemenation of REFCC Decision
Total Number of CIP
Total Number of Total Number Number categorized Number categorized Number categorized Number of Projects Number submitted Number Accepted Number subject to Number of EIAs Number of environ- Total Number of Number categorized Number categorized Number categorized Number of Projects Number submitted Number Accepted Number subject to Number of EIAs Number of environ-
SI# ULG Name Projects planned to % Achieved
CIP Projects Projetc Screened under schedule 1 under schedule 2 under schedule 3 (Under the category by ULG to REPA Revision completed for mental review Projects screened under schedule 1 under schedule 2 under schedule 3 (Under the category by ULG to REPA Revision completed for mental review
be screened
during Month (Requires EIA) (Requires Environmental( No Potential of no further action schedule 1 Project report completed for (Requires EIA) (Requires Environmental
( No Potential of no further action schedule 1 Project report completed for
review report) Impacts) to be taken) schedule 2 Project review report) Impacts) to be taken) schedule 2 Project

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:651 of


696
Software Requirement Specification

4.6.2 Environment and social audit report

Environment and social audit report

Region Name Select Region ULG Name Select ULG Start Date of Audit Select Date End Date of Audit Select Date

Search

Submission date of Findings


SI# Region Name ULG Name Start Date of Audit End Date of Audit Audit Report Action Implementation
Findings Description Project Name Action to be taken Responsible Party Timeline for action
Status

Figure 2

4.6.3 Project Screening Report

Project Screening Report

Project Name Select Project ULG Name Select ULG

Search

Site Selection Impact Identification and Classification Chechklists of Impacts General Questions that apply for all types of projects and sub projects Categorisation and recommendations
Proposed Date of Work Technical Drawing Extension of changes Any Existing property Any Plans for Site sensitivity Type of Projects List of Checklist Potential for Question Category List of Questions List of Answers Category of the Recommendation
SI# Project Name ULG Name Location Estimated Cost Physical Data
Commencement and specifications to existing alignment to transfer to New construction Issues (With Explaination) Rating Items adverse impact ( Yes / No) Project
reviewed ( Y/N) (Y/N) Project (Y/N) (Y/N)

Figure 3

4.6.4 ESIA Report

ESIA Report

Policy , Legal and Analysis of Environment Appendixes


Administrative Environment and social Alternatives Management Plan List of ESIA Report Record of intragency Trable Presenting List of associated
SI# Executive Summary Project Description Baseline Data
Framework Impacts Preparers References and consultation the relevant data reports
Meeting

Figure 4

4.6.5 Environment Management Plan

Environment Management Plan

Region Name Select Region ULG Name Select ULG Project Name Select Project

Search

Potential Environment Proposed Mitigation Responsibility for Respomsible for Time Horizon Cost Estimates
SI# Region Name ULG Name Project Name Impacts Measures Implementing the Monitoring
Mitigation Monitoring Mitigation Monitoring
mitigation measures

Figure 5

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:652 of


696
Software Requirement Specification

4.6.6 Annual Environment Performance Audit Report

Annual Environment performance audit report

ULG Name Select ULG

Search

SI# ULG Name Date Audit Started Date Audit completed Date Audit Report
By Region By Region Received by ULG
from Region

Figure 6

4.6.7 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 7

4.6.8 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 8

4.6.9 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 9

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:653 of


696
Software Requirement Specification

4.7 Social Development

4.7.1 Social Development M&E Report

Social Development M&E Report

ULG Name Select ULG

Search

SI# ULG Name Total Number Total Number Number Requiring Number RAP Number RAP not Percentage of Percentage of
of CIP Projects screened as per RSG RAP Completed Completed Project screened RAP completed
Screening form

Figure 1

4.7.2 Environment and Social Audit Report

Environment and social audit report

Region Name Select Region ULG Name Select ULG Start Date of Audit Select Date End Date of Audit Select Date

Search

Submission date of Findings


SI# Region Name ULG Name Start Date of Audit End Date of Audit Audit Report Action Implementation
Findings Description Project Name Action to be taken Responsible Party Timeline for action
Status

Figure 2

4.7.3 Project Screening Report

Project Screening Report

Project Name Select Project ULG Name Select ULG

Search

Site Selection Impact Identification and Classification Chechklists of Impacts General Questions that apply for all types of projects and sub projects
Categorisation and recommendations
Proposed Date of Technical Drawing Extension of changes Any Existing property Any Plans for Site sensitivity Type of Projects List of Checklist Potential for Question Category List of Questions List of Answers Category of the Recommendation
SI# Project Name ULG Name Location Estimated Cost Physical Data
Work Commencement and specifications to existing alignment to transfer to New construction Issues (With Explaination) Rating Items adverse impact ( Yes / No) Project
reviewed ( Y/N) (Y/N) Project (Y/N) (Y/N)

Figure 3

4.7.4 Resettlement Action Plan

Resettlement Action Plan

Project Name Select Project Region Name Select Region ULG Name Select ULG

Search

Potential Social Proposed Mitigation Responsibility for Responsible for Time Horizon Cost Horizon
SI# Project Name Region Name ULG Name Impact Measures implementing the Monitoring Mitigation Monitoring Mitigation Monitoring
Mitigation measures

Figure 4

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:654 of


696
Software Requirement Specification

4.7.5 ESIA Report

ESIA Report

Policy , Legal and Analysis of Environment Appendixes


Administrative Environment and Alternatives Management Plan List of ESIA Report Record of intragency Trable Presenting List of associated
SI# Executive Summary Project Description Baseline Data
Framework social Impacts Preparers References and consultation the relevant data reports
Meeting

Figure 5

4.7.6 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 6

4.7.7 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 7

4.7.8 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 8

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:655 of


696
Software Requirement Specification

4.8 Infrastructure Asset Management

4.8.1 Infrastructure Asset Inventory

Infrastructure Asset Inventory

Asset Condition

Search

Collectors and
SI# Road Type Primary Road (KM) Secondary Road (KM) Total (KM)
Local Road (KM)

Pedestrian Walk on collectors and Local


SI# on Primary Road (KM) on secondary Road ( KM) Total (KM)
Away Type ( Km) Road (KM)

Street Light Street Light


Street Light on primary
SI# Street Light Type on secondary on collectors and Local Total (NO)
road ( NO)
Road (NO) Road (NO)

SI# Machinery Amount Remark

Drain on
SI# Drain Type Drain on Drain on Collectors and Total Drain (KM)
Primary Road (KM) Secondary Road (KM) Local Road (KM)

Quantity with unit Water Supply


SI# Description Type Total (NO) Length Width ( Diameter)
and items Sub category

SI# Sanitation Facilities Description Quantity with unit of items

Greenery and
parking sub-
SI# category Greenery and Park Details

SI# Kind of facility Location Unit Quantity Functionality Remark

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:656 of


696
Software Requirement Specification

4.8.2 Asset Condition Assessment

Asset condition assessment

Asset Condition

Search

Movement Network
SI# Total Area (m2) Total Number Percentage Detoriated No. of Potholes Total Length Condition
Asset category

SI# Road Drainage Type Total Length (Km) Condition

Water supply sub-


SI# Type Total No. Total Length (Km) Width (Diameter) Condition
category

Sanitation asset
SI# Asset type Total No. Condition
category

Solid waste manage-


SI# Asset type Total No. Condition
ment asset category

Greenery and parks


SI# Asset type Total No. Condition
asset category

Social and economic


SI# development facilitiesAsset type Total No. Condition
asset category

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:657 of


696
Software Requirement Specification

4.8.3 Asset Management Plan

Asset Managemnet Plan

Asset Management Team organization

SI# Position Name Qualifications Contract Details

Infrastructure asset definition categories

SI# Strategic Activity Area Physical Asset Category

Asset Management Team organization

Responsible Person/
SI# Asset category Responsible Body Remarks
Group

Asset Inventory

SI# Asset Inventory Report

Asset condition assessment

SI# Asset condition assessment Report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:658 of


696
Software Requirement Specification

Maintenance Budget Guide for each asset

Routine and Periodic maintenance activities

Normal Maintenance Frequency of Budget for the


SI# Feature Class Unit Cost
Activity Operation activity

Cost summary breakdown by activity area and asset category

Strategic Activity Cost (EB)


SI# Item Total Cost
area Operation

Cost breakdown of the maintenance deficit for major assets

SI# Asset Category Asset category type Unit of measure Qunatity Unit Rate ( EB ) Cost ( EB ) Total Cost

Replacement cost and residual value of all assets

Replacement cost and residual value of all assets by strategic and supportive activity.

Strategic and supp- Total Budget for Normal


SI# Replacement Cost Residual Value
ortive activity area maintenance

Costs and prioritised new works projects

Cost of new works projects by activity area

Strategic and supp- Cost of new works Normal maintenance


SI# Total Budgets
ortive activity area projects or new works project

Implemenation schedule for new works projects for year 1

Date when the new


project is entered into
SI# Approval Date of tender Date of tender Date of signing of a Date of start of Date of Project Date of handover to the database for existing
Invitation closure Contract activity Completion the city assets

New work projects started against project approved for AMP Year-2

Strategic and suppo- No. of Projects Cost of projects No. of projects started Cost of Projects Total
SI#
rtive activity areas approved approved started

Monthly schedule of maintenance deficit activities for Year 1

Date when the


SI# Approval Date of signing of a Date of start of Date of completion condition of the asset
Contract activity of activity is updated

Maintenance activities completed against approved

Strategic and suppo- No. of activities Cost of activities No. of activities Cost of activities Total
SI#
rtive activity areas approved approved completed completed

Figure 3

4.8.4 Infrastructure asset management M&E Report

Infrastructure asset management Progress Report

ULG Name Project Name

Search

Planned for Financial From Month To Month


SI# ULG Name Name of Project Infrastructure asset Category Unit of Measurement
Year Planned Actual Percentage Achieved Planned Actual Percentage Achieved

O&M Budget FOR EFY


Annual EFY for the months of ----
Name of reporting period from ----- to --- Reporting period from ---- to --- EFY---
ULG
SI# Project/A Percent
Name Financial Planned Percent
ctivity Physical Financial Planned Actual
(Budget) Financial Actual Financial (Birr) Physical
(Planned) Executio Physical Physical
(Birr) (Birr) Execution
n

Figure 4

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:659 of


696
Software Requirement Specification

4.8.5 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 5

4.8.6 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 6

4.8.7 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 7

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:660 of


696
Software Requirement Specification

4.9 Urban Land Management

4.9.1 Urban Land Management M&E Data

Land Management M&E Data

ULG Name

Search

CUMULATIVE AT START OF THE MONTH


Annual Plan for EFY 2013 NUMBER OF PLOTS OF LAND RELEASED THROUGH ALLOCATION/ALLOTMENT
RESIDENTIAL COMMERCIAL/INDUSTRIAL OTHERS (SOCIAL, ETC) TOTAL
ULG Number of Plots Hectares Number Hectares Number Hectares Number Hectares Number Hectares

CUMULATIVE AT START OF THE MONTH


Annual Plan for EFY 2013 NUMBER OF PLOTS OF LAND RELEASED THROUGH AUCTION/BIDDING
RESIDENTIAL COMMERCIAL/INDUSTRIAL OTHERS (SOCIAL, ETC) TOTAL
ULG Number of Plots Hectares Number Hectares Number Hectares Number Hectares Number Hectares

MONTH
Annual Plan
Total Number JULY-AUGUST (HAMLE)
ULG
of Files for EFY Planned Number of Actual Number of Files
2013 Files made ready for made ready for
Percentage
adjudication and adjudication and
Achieved
registration during the registration during the
Month Month

Annual Plan MONTH


Total Number
of Adjudicated
ULG Parcels ready
for JULY-AUGUST (HAMLE)
registration Actual Number of
Planned Number of Adjudicated Parcels
for EFY 2013
Adjudicated Parcels approved by Percentage
ready for registration Commission and ready Achieved
during the Month for registration during
the Month

Annual Plan MONTH


Total Number
ULG of Registered
Parcels for EFY JULY-AUGUST (HAMLE)
2013 Planned Number of Actual Number of
Percentage
Parcels Registered Parcels Registered
Achieved
during the Month during the Month

Figure 1

4.9.2 Land Registration

Land Registration, inventory, Release, Development, Banking

Region Name ULG Name Sub-city Select Sub-City Woreda Select Woreda Kebele Select Kebele

Search

SI# Region Name ULG Name Sub-City Name Woreda Kebele Land Registration serial
Allotment Auctionowner
Numberor(UPIN) Lease Plot Number Land Description Land Dimension Land Category

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:661 of


696
Software Requirement Specification

4.9.3 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 3

4.9.4 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 4

4.9.5 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 5

4.10 Urban Planning

4.10.1 Proposal Progress Report

Proposal Progress Report

Region Select Region ULG Select ULG Proposal Name Select Proposal Period Select Period

Date Received Select Date Financial Year Select Year

Search

Assessment
Total Area in
SL# Region Name ULG Name Proposal Name Period Date Received Project Type Financial Year Assessment Criteria Remark/ Approval Status
Hectare
Recommendation

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:662 of


696
Software Requirement Specification

4.10.2 Urban Planning M&E Report

Urban Planning M & E Report

ULG Name Select ULG Type of Urban Plan Select Type

Search

Approval and Validity of Plan Structural Plan Approval of CIP Project


Urban Plan Number of CIP
Urban Plan Council Urban Plan Council Number of CIP
SL# ULG Name Type of Urban Plan Technical Number of CIP Projects for which
Urban Plan Type Minutes of Minutes of Planning in Period Remaining time in Projects for which
Endorsement Date Projects ( Works ) Right of way
Approval Date Approval Year Site plan issued
of BUDCo Standards issued

Figure 2

4.10.3 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 3

4.10.4 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 4

4.10.5 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 5

4.11 Planning and Budgeting

4.11.1 Planning and Budgeting Progress Report

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:663 of


696
Software Requirement Specification

Planning and Budgeting Progress Report

Region Name Select Region ULG Name Select ULG

Search

Particpation of Citizens in the planning process. No. of Public consultations ( lower level and city level )

Meeting Category Meeting Date Number of attendes Total Particpant % of Women


SI# Region ULG
Men Women

Particpation of citizen in the planning process , Increase in number of people involved from prior year to the current year

Financial Category Meeting Date Number of attendes % of Women Increase in male Increase in female Increase in total
SI# Region ULG
Men Women attendes attendes attendes

Budget Reliability for city administration total budget ( Annual )

Budget Category Budget Amount Variance Variance less than


SI# Region ULG Actual Amount
10%

Budget Reliability for city administration for capital budget (per quarter )

Budget Category Annual Budget Actual for Quarter Percent of execution Variance less than
SI# Region ULG Quarter
10%

Figure 1

4.11.2 CIP Progress Report

CIP Progress Report

Region Name Select Region ULG Name Select ULG

Search

CIP Preparation and approval process by city council and region

Financial Year EC or GC Date Approved Date Approved


SI# Region ULG
By city council By region

CIP Budgets : Expenditures and Utilisation rates

Annual Budget Quarter Percent of Execution


SI# Region ULG Actual

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:664 of


696
Software Requirement Specification

4.11.3 Matching Funds Progress Report

Matching funds Report

SI# Expected minimum Budgeted in CIP Percentage budgeted in CIP Actual deposited Percentage of actual Date deposited Financial year
(Birr) ass per MUDCo
notification of
indicative or
approved allocation

Figure 3

4.11.4 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 4

4.12 Procurement Management

4.12.1 Procurement Audit Status Report

Procurement Audit Performance Status Report

ULG Name

Search

Findings
Audit
Procurement audit
SL# ULG name completion Finding
timeline Rectification plan Deadline Party responsible Deadline status
report description

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:665 of


696
Software Requirement Specification

4.12.2 Procurement Management M&E Report

Procurement Management M & E

Procurment Category

Search

EFY (NEW PROJECTS EXCLUDING ROLLED OVER PROJECTS)

Number of Number of Number of Number of Total Number of Contracts Number of Percent of Percentage of Percentage of Percentage of Contracts Percent of
S. N Procurement Category Number of
Contracts not Contracts in Contracts Signed Contracts Signed Signed (completed and not Contracts Contracts not Contracts in Contracts Signed Signed (completed and not contracts
Contracts Planned
tendered out process (not completed) (completed) completed) Completed tendered out process (not completed) completed) completed

1
2
3
4

EFY (ROLLED OVER PROJECTS)


Number of Number of Number of Number of Total Number of Contracts Number of Percent of Percentage of Percentage of Percentage of Contracts Percent of
S. N Procurement Category Number of
Contracts not Contracts in Contracts Signed Contracts Signed Signed (completed and not Contracts Contracts not Contracts in Contracts Signed Signed (completed and not contracts
Contracts Planned
tendered out process (not completed) (completed) completed) Completed tendered out process (not completed) completed) completed
1
2
3
4

EFY (TOTAL NEW & ROLLED PROJECTS)


Number of Number of Number of Number of Total Number of Contracts Number of Percent of Percentage of Percentage of Percentage of Contracts Percent of
S. N Procurement Category Number of
Contracts not Contracts in Contracts Signed Contracts Signed Signed (completed and not Contracts Contracts not Contracts in Contracts Signed Signed (completed and not contracts
Contracts Planned
tendered out process (not completed) (completed) completed) Completed tendered out process (not completed) completed) completed
1 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2
3
4

S.No. Name of Procurement Basic Data Procurement Planning Competitiveness Cost Management Procurement cycle time Management(Procurement Initiation-Contract Procurement Compliant handling
Procurement Category of Identification Source of Finance Was the Procurement included Procurement Original Price in Contract Completion Price Diviation in % b/n Price in Diviation in % Original Planned Procurement Actual Procurement Cycle Time Was (Were) there Date(s) of Final date(s) of Number of Was(Were) the Was(Were) the
Reference No. Procurement Package Lot in the original Procurement Method the Amount in ETB (Turnout Cost)(ETB) the Procurement Plan and b/n contract Cycle Time complaint(s) complaint(s) comlaint(s) Days took to complaint(s) complaint(s)
Number Number Plan? Procurement contract amount amount Original Original Total Actual Actual Actual Deviation

Figure 2

4.12.3 Annual Action Plan

4.13 Capacity Building

4.13.1 Self – assessment

Self-Assesment
Name Age Job Title Thematic Area

Search

SI# Names Age Job title Name of institution Name of department /Unit
Years in organisation Highest level Training received List of gaps in the List of gaps in the
(or thematic area) of education skills attitude

Figure 1

4.13.2 Training Evaluation

Training Evaluation

Training Date

Search

Year of service in the Relevance , Effectiveness , Impact


SI# Training Date Sex Education Level area Current Position Rating What type of support What are your
you need to apply recommendation for
the newly acquired the improvement of
knowledge or skill over all training process?

Figure 2

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:666 of


696
Software Requirement Specification

4.13.3 Capacity Building Plan Implementation Report

Capacity Building Plan Implementation Report

Region Name ULG Name Thematic Area

Search

SI# ULG name Region Name Pillar Activity Packaging Thematic area CB modality Performance indicators Target Actual Start date End date Budget in birr Actual expenditure in birr

Figure 3

4.13.4 Capacity Building Progress Report

Capacity Building Progress Report


Region Name ULG Name

Search

SI# Region Name ULG Name Financial Year Annual CBP Budget Number of Activities From Month To Month
in CBP Planned Actual %Financial Spent Planned Actual %Physical Spent Planned Actual %Financial Spent Planned Actual %Physical Spent

Figure 4

4.13.5 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 4

4.13.6 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 5

4.13.7 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 6

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:667 of


696
Software Requirement Specification

4.14 LED and Job Creation

4.14.1 Business Idea Competition Report

Business Idea Competition Data

ULG Name Rating

Search

Name of People / MSEs Rating of business Selected business Support Provided for Business Plan
SI# ULG Name Deadline of business who submitted plan Plan the implementation implementation Status
Plan submission business plans of business plan

Figure 1

4.14.2 Job Creation Plan

Job Creation Plan

Project Name Project Category

Search

SI# Project Category of project Unit of Measure Quantity Total Cost Implementation Year Category of Jobs Male Female Total

Figure 2

4.14.3 Led and Job Creation M&E Report

M & E Report

Region Name ULG Name Financial Year

Month
Search

Public Private Dialouges

Number of agreed
SI# Region Name ULG Name Financial Year Category of Meeting Date of Meeting Number of agreed actions
action Implemented

No. of MSEs supported through open business plan competition against annual target

SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved

No. of MSEs one stop centres(OSC) Supported to be fully functional againts annual taregt

SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved

No. of gradudated MSE provided with support from the medium manufacturing enterprises development unit in the CA Against
annual target

SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved

Functionality indicators
OSC catchment area Staff positions that are filled Did the OSC Does the ULG
Name of For how many Does the OSC Production and provides maintain
Office Job Seekers is the OSC equipped
One Stop people For how cater for 15,000 Is the OSC Sells Site Graduation/ Were at least fundamental documents Overall, is the
S.No Administrator/ Registration, Trade How many with equipment and
Centers (individuals not many MSEs people or coordinator Accounts and Facilitation, Transfer 5 key staffs trainings to consultation OSC functional?
Secretary/ Registration, Trade positions are furniture? Yes/
(OSC) households) live does the OSC maximum of 500 position Audit Officer Training Industry facilitation positions staffs, at least notes as an Yes/ No
Information License, and TIN filled? Yes/No No/Yes
around this cater? MSEs? filled? Extension and expert filled? Yes/No 2 areas in the evidence of
Desk preparation Expert
OSC? Yes/No Market Linkage OSC Service operationality? Yes

Figure 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:668 of


696
Software Requirement Specification

4.14.4 Temporary Jobs Report

Temporary Jobs

ULG Name

Search

For Month
Temporary Jobs Planned in CIP by Age Group Actual Temporary Jobs Created by CIP by Age Group Percent Achievement
NAME OF
Males Females Total Males Females Total Males Females Total
ULGs
S/N 30 years and Over 30 Total Males 30 years and Over 30 years Total Females Over 30 years Total Percent Female 30 years and Over 30 Total Males 30 years and Over 30 years Total Females 30 years Over 30 Total Percent 30 years Over 30 Total 30 years Over 30 Total 30 years Over 30 Total

To Month
Temporary Jobs Planned in CIP by Age Group Actual Temporary Jobs Created by CIP by Age Group Percent Achievement
Males Females Total Males Females Total Males Females Total
NAME OF
30 years 30 years 30 years 30 years
ULGs 30 years and Over 30 30 years and 30 years and Over 30 30 years and Over 30 Percent Over 30 Over 30 Over 30
Total Males Over 30 years Total Females Over 30 years Total Percent Female Total Males Over 30 years Total Females and Total and Total and Total and Total
under years under under years under years Female years years years
S/N under under under under

Figure 4

4.14.5 Firm Jobs Report

Firm Jobs

ULG Name

Search

For Month
Planned Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Actual Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Percent Achievement
Name of
Males Females Total Males Females Total Males Females Total
ULGs
S/N 30 years and Over 30 Total Males 30 years and Over 30 years Total Females Over 30 years Total Percent Female 30 years and Over 30 Total Males 30 years and Over 30 years Total Females 30 years Over 30 Total Percent 30 years Over 30 Total 30 years Over 30 Total 30 years Over 30 Total

To Month
Planned Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Actual Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Percent Achievement
Males Females Total Males Females Total Males Females Total
Name of
30 years 30 years 30 years 30 years
ULGs 30 years and Over 30 30 years and 30 years and Over 30 30 years and Over 30 Percent Over 30 Over 30 Over 30
Total Males Over 30 years Total Females Over 30 years Total Percent Female Total Males Over 30 years Total Females and Total and Total and Total and Total
under years under under years under years Female years years years
S/N under under under under

Figure 5

4.14.6 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 6

4.14.7 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 7

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:669 of


696
Software Requirement Specification

4.14.8 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 8

4.15 Urban Resilience and DRM

4.15.1 Institutions participating in risk analysis

Institution participating in risk analysis Report

ULG Name Institution Name

Search

Resources that can


SL# ULG Name Institution Name Expertise Major Strength Major Weakness
be provided

Figure 1

4.15.2 Urban Resilience performance scoring matrix

Urban Resilience performance scoring matrix Report

ULG Name Category Year assessed

Search

Waivers /
Performance Evidence to be
SL# ULG Name Category Year assessed Maximum Points Objective Exceptions/Clarifica
Measurement Produced
tion

Figure 2

4.15.3 Risk Analysis Summary

Risk Anlaysis Summary

ULG Name Severity Level

Search

Major Identified Frequency of


SL# ULG Name Exposed entity severity level extent cause and effects Risk Priority Percentage to be affected Number and group entities affected
risk / disaster occurrence

Impact Likelihood Impact Severity Risk Score Priority Worst Case Most Likely Worst Case Most Likely

Figure 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:670 of


696
Software Requirement Specification

4.15.4 Urban Resilience and DRM Progress Report

Urban Resilience and DRM M&E Report

ULG Name

Search

Urban Resilence and DRM Units Emergency Response institutional structure

SL# ULG Name


Emergency Emergency Name of emergency
Name of DRM
response plan unit Risk Map Developed response plan Name of rapid response plan
Officer
established prepared assessment officer officer

Figure 4

4.15.5 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 5

4.15.6 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 6

4.15.7 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 7

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:671 of


696
Software Requirement Specification

4.16 Gender Development

4.16.1 Gender Audit

Gender Audit

Region Name ULG Name Financial Year Audit Report Submission Date

Search

Audit report submission List of Aduit Action planned for


SI# Region Name ULG Name Financial Year Auditor's Name List of Findings Timeline Progress for each action on each recommendation
Date Recommendation each recommendation

Figure 1

4.16.2 Gender Mainstreaming

Gender Mainstreaming

Meeting Date of
Financial Year
Number Meeting

Search

Number of Gender
Focal person , sector Focal person , sector Focal person , sector Agenda of the Meetings
SI# Meeting Number Date of Meeting Financial Year
officers attended officers attended officers attended
( Male) ( Fenale ) ( Others ) Planning Implementation Monitoring Achievement Challenge Recommendation Progress

Figure 2

4.16.3 Employment Mainstreaming

Employment Mainstreaming

Category of Employment

Search

Annual Gender annual plan / Budget Meeting with gender Implementation of Number of Number
SI# Category of Number of Women Number of Men Total Professional Percentage Women Financial Year Month Gender Focal Person Educational Year of Experience Development Plan/ Approved by city CBP and Gender focal persons from Date of Meeting Meeting Number
gender activities in activities Implemented % Implemented Gender Plan Budget Actual Spent % Spent
Employment in place Back Ground Budget Council ( Yes / No) guideline each sector office Plan

Figure 3

4.16.4 Employment Empowerment

Employment Empowerment

Category of Employment Sub-Category of Employment ULG Name of Project

Search

Category of Sub-Category of ULG Name Name of Project


SI# From Month No. of Male No. of Female Total % women To Month No. of Male No. of Female Total % women
Employment Employment Employed Employed

Detailed Activities in Annual Gender Development Plan Budget Utilization per each activity

ULG Name Activity Name Financial Year Annual Budget


SI# Budget Category From Month Planned Actual % Achieved To Month Planned Actual % Achieved
Employment Employment Employed Employed

Figure 4

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:672 of


696
Software Requirement Specification

4.16.5 Women Participation and community dialogue

Women Participation and community dialogue

ULG Name Kebele Name Meeting Number Date of Meeting

Search

Number of awareness
raising workshop / Other contextual
Equal Pay and Gender
SI# ULG Name Kebele Name Date of Meeting Time of Meeting Meeting Number Number of Male Number of Female Total Particpant % of Women training on women's Gender Based Violence
Sexual Harrasment issues related to gender
awareness
right in workplace at ULGs
againts annual target

Figure 5

4.16.6 Gender Development Plan

Gender Development Plan

Region Name ULG Name Financial Year

Search

SI# Region Name ULG Name Financial Year Gender Issue and/or Cause of the Gender GAD Result Satement/ Relevant Agency MFO/ GAD Activity GAD Budget Source of Budget Responsible Unit/ Total Budget Prepared by (User) Approved by (User) Date
GAD Mandate Issue GAD Objective PAP Office

Figure 6

4.16.7 Annual Action Plan

Annual Action Plan

Level Select Level Region Select Region ULG Select ULG

Financial Year Thematic Area

Search

ULG that need intensive field support


SI# Level Region ULG Thematic Area Financial Year Office Responsible Person Timeframe Budget Major Activity
ULG Name Thematic Area Gaps to be Addressed

Figure 7

4.16.8 Field Visit Report

Field Visit Report

Region Select Region ULG Select ULG Kebele Select Kebele Name of Project

Search

Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded

Figure 8

4.16.9 Capacity Building Plan

Capacity Building Plan

Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date

Search

SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging

Figure 9

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:673 of


696
Software Requirement Specification

4.17 Complain Management

4.17.1 Procurement Complain

Procurement Complain

Name of Contract Contract Number Date Received

Date Resolved

Search

SI# Name of Contract Contract Number Complain Description Nature of Complaint Date Received Date Resolved Resolution

Figure 1

4.17.2 ULG APA Complains

ULG APA Complain

ULG Name Date of assessment

Search

Specific Complaint
SI# ULG Name Date of assessment Specific disagreements Response from
Category
and justifications the comiittee

Figure 2

4.17.3 Region APA Complains

RIAs APA Complain

Region Name Date of assessment

Search

Specific Complaint
SI# Region Name Date of assessment Specific disagreements Response from
Category
and justifications the comiittee

Figure 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:674 of


696
Software Requirement Specification

4.17.4 Complain Assigned

Complain Assigned

Region Name Date of assessment

Search

Assigned to
SI# Complain Name Complain Number
Thematic Area Assigned Date User Assigned

Figure 4

4.18 System Administration

4.18.1 User Information

User Information Report

Name Category Thematic Area Organization

Search

SL# Full Names Category Email Address Phone Number Thematic Area Organization Date of Birth Address Level ULG Region Name Next of Kin Details

Figure 1

4.18.2 ULG Detail Report

ULG Detail Report

ULG

Search

Total Population Total Population Total Population


SL# ULG Name Region Name Number Of Kebele Kebele Names Total Population
Below 15 Years below 15 and 50 above 50 Years

Figure 2

4.18.3 Regional Detail Report

Region Detail Report

Region

Search

Address of the city


Number of Regional
SL# Region Name RIA Address Number Of ULGs Name Of ULGs administration for
Mobile Teams
each office

Figure 3

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:675 of


696
Software Requirement Specification

4.18.4 User Permission Report

User Permission Report

User Group ID User Group Name

Search

SL# User Group ID User Group Name Responsibilites Modules Accessibility

Figure 4

4.18.5 Focal Person Report

Focal Persons Report

Focal Person Name Commencement Date End Date

Thematic Area Level ULG

Search

Focal Person Date Commencement


SL# Focal Person Name Of Birth Date End Date Thematic Area Level ULG Name Region Name

Figure 5

4.19 Document Management

4.19.1 Data of Document Uploaded

Document Upload

Region Name ULG Name Thematic Area

Submit

Sub-Category
SI# Title Description Category Tags Level ULG Name Region Name Upload Document
Thematic Area Version Index

Figure 1

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:676 of


696
Software Requirement Specification

5 User Responsibility Matrix

5.1 Program Coordination

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare, Review and Approve
Create Read Update Create Read Update Create Read Update
MoUs
Review and Approve Training
Read Update Read Update Read Update
Programs

Review and Approve Training ToRs Read Update Read Update Read Update

Review M&E Reports Read Update Read Update Read Update

Annual Staff Performance Create Read Update


Review Staff Evaluation Read Update Read Update Read Update

Review APA Complaints Read Update Read Update Read Update

Consolidate APA Complaints Create Read Update Read Update Read Update
Vfm Audit Create Read Update Read Update

View VfM Report Read Update Read Update Read

Develop/Update Manuals Create Read Update Delete Read Update Create Read Update
Review and Approve/Reject Field
Create Read Update Read Update Read Update
Visit Requests
Prepare and Review Field Visit
Create Read Update Create Read Update
Report
Review and Approve/Reject Annual
Read Update Read Update Read Update
Action Plans
Track Progress of activities in
Read Read Create Read Update
annual action plan
Prepare and Review Progress
Create Read Update Read Update
Reports
View APA Reports Read
Comment on APA Report Create Update
Prepare IPF ToRs Create Read Update
View Procurement Audit Reports Read

View Environment Audit Reports Read

APA Read Read Create Read Update


Document Report Create Read Update Create Read Update Create Read Update
Non-thematic Areas Read Read Create Read Update
Preparation of Annual Work Budget
Read Read Create Read Update
Plan
Report of UIIDP AWP and Budget Create Read Update Read Read
Report of Regional AWP and
Create Read Update Read
Budget
Monitoring report on
Read Read Create Read Update
implementation of AWBP

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:677 of


696
Software Requirement Specification

5.2 Monitoring and Evaluation

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare, Review and consolidate
Read Update Create Read Update Create Read Update
action plan
Track Progress of activities in
Read Read Create Read Update
annual action plan
Set Performance Indicators Create Read Update
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate M&E
Create Read Update
Report
Prepare Filed Visit Request Create Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update
Report
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Result Framework Create Read Update
Progress Report Create Read Update Read Read
Urban Development Program Read Read Create Read Update
M&E Actual Plan Management The System is consolidating , reviewing , approving different thematic area action plan
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:678 of


696
Software Requirement Specification

5.3 Project Engineering

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team

Review AMP Read Update Read Update Read Update

Review REP Read Update Read Update Read Update

Review CIP Read Update Read Update Read Update

View PO Requisition Read Read Read Update

Prepare and Review Bid Documents Create Read Update Read Update

Bid Evaluation Read Update Read Update Read Update

Prepare and Review Contracts Create Read Update Read Update Read Update

Review Contract Claims Read Update

Infrastructure Projects Create Read Update Create Read Update Create Read Update
Review Infrastructure Design Read Update

Prepare Filed Visit Request Create Read Update Create Read Update

Prepare and Review Field Visit


Create Read Update Create Read Update Create Read Update
Report
Prepare and Review M&E Report Create Read Update Create Read Update Create Read Update
Prepare and Review Annual Action
Create Read Update Create Read Update Create Read Update
Plan
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review,Update,Upload Manuals
Read Update
and Guidelines
Project Cost Create Read Update Create Read Update Create Read Update
Field Supervision Create Read Update Read Read
Material Test Create Read Update Read Read
Financial Schedules The System is reviewing Financial Schedules
Bills Create Read Update Read
Project Work Progress The System is retriving of Project Work Progress (Overall, Regional,ULG)
View GIS Interface Read Read Read
View Cadastre Interface Read Read Read

View APA Reports Read Read Read


Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:679 of


696
Software Requirement Specification

5.4 Municipal Finance and Revenue

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team

View IBEX Revenue Sources Read

Prepare and Review REP Create Read Update Read Update Read Update
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate progress
Read Update
report

Prepare field visit request Create Read Update Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare Annual Action Plan Create Read Update
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Revenue Data Will be coming from IBEX / IFMIS Team
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:680 of


696
Software Requirement Specification

5.5 Finance Management

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team

Review AMP, REP, CIP Read Update Read Update Read Update

IBEX Data Capture Create Update Create Read Update


Prepare and Review Financial
Create Read Update Create Read Update Read Update
Reports
Open/Close Periods Update Create Read Update

Review Audit Reports Read Update Read Update

View Audit Reports Read Update

Internal Audit Review Transactions Read Update

Review audit rectification plans Read Update

Enter Fixed Assets Create Read Update

View Fixed Assets Read

Enter Stock Card Data Create Read Update

View Stock Card Data Read

Enter Bin Card Data Create Read Update

View Bin Card Data Read

Prepare and Review Annual Fixed


Create Read Update
Asset Inventory Stock Count
View Annual Fixed asset inventory Read
View Final Summary Report of
stock discrepancies and Read Update
recommendations
Prepare field visit request Create Read Update

Prepare Field visit reports Create Read Update

Review,Update,Upload Manuals
Read Update
and Guidelines
Prepare and Review M&E Report Create Read Update
Review and consolidate progress
Create Read Update
report
Preparation of annual action plan Create Read Update
Track Progress of activities in
Read Read Create Read Update
annual action plan
Budget The system is preparing Program Budgets and also developing Budget Forecasts using base-year budgets
Payable Management
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:681 of


696
Software Requirement Specification

5.6 Environment Management

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter Project Screening Create Update
Prepare and Review Project
Create Read Update
Screening Report

View Project Screening Report Read Read

Prepare and Review EIA ToRs for


Create Read Update
Schedule 1

View EIA ToRs for Schedule1 Read Read

Prepare and Review EIAs for


Create Read Update
Schedule 2

View EIAs for Schedule 2 Read Read

Prepare and Review EMP for


Create Read Update
Schedule 3

View EIAs for Schedule 3 Read Read Update

Prepare and review field visit


Create Read Update Create Read Update
requests
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare and Review M&E Report Create Read Update Read Update Read Update
Prepare and Review Annual Action
Create Read Update Create Read Update Create Read Update
Plan
Track Progress of activities in
Read Read Create Read Update
annual action plan
Environment Performance Audit The system is capturing data and generating report for environment audit performance.
View Environment Performance
Read Read Read
Audit Report
Prepare and Review Environment
Performance Audit Rectification Create Read Update Read Update
Plan
View Environment Performance
Read Update
Audit Rectification status report

Review,Update,Upload Manuals
Read Update
and Guidelines
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:682 of


696
Software Requirement Specification

5.7 Social Development

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Project Screening Create Update

View Screening Report Read Read Read

Project Screening Form Create Update


Prepare and Review Resettlement
Create Read Update
Action Plan

View Resettlement Action Plan Read Read

Prepare and Review ESIA Create Read Update


View ESIA Read Read

Prepare Field Visit Requests Read Update Create Read Update


Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare and Review M&E Report Create Read Update Create Read Update Create Read Update
Prepare and Review Annual Action
Create Read Update Create Read Update Create Read Update
Plans
Track Progress of activities in
Read Read Create Read Update
annual action plan
Audit Review Report Create Read Update Read Read
View APA Report Read Read Read
Comment on APA Report Create Update Create Update
Review , Update,Upload Manuals
Create Read Update
and Guidelines

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:683 of


696
Software Requirement Specification

5.8 Infrastructure asset management

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter Asset Condition Create Update
Prepare and Review Asset
Create Read Update
Condition Status Report

View Asset Condition Status Report Read Read

Prepare and Review AMP Create Read Update Read Update


Review AMP Read Update

View Maintenance Report Read Update

Visit New Projects Read Update


Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate progress
Create Read Update
reports
Prepare Field Visit Requests Create Create Read Update

Prepare and Review Annual Action


Create Read Update Create Read Update Create Read Update
Plan
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review and Update GIS Interface
Create Read Update
Asset Inventory
View GIS Interface Asset Inventory Read Read
View Cadastre Interface Read Read Read

View APA Reports Read Update Read Read


Comment on APA Report Create Update Create Update
Assesment Indicator Create Read Update Read Read
Inventory Create Read Update Read Read

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:684 of


696
Software Requirement Specification

5.9 Urban Land Management and Urban Planning

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Structural
Create Read Update Read Update
Plans

View Structural Plans Read

View Implementation Records Read Read Read


Prepare and Review Infrastructure
Create Read Update Read Update
Dev. Plans

View Infrastructure Dev. Plans Read

Proposal Feasibilty Assesment Create Read Update Read Update Read


Prepare and Review Proposal
Create Read Update Read Update Read Update
Assessment Criteria
Review Proposals Create Read Update Read Update Read Update
Review EIAs Read Update Read Update Read Update

Review City Land Map Read Update


View City Land Map Read
Select Land to be Developed Read Update
View Land to be Developed Read Read
Select Serviced Land to be Leased Read Update
View Service Land to be Leased Read Read
Prepare Media Notice of Land to be
Create Read Update
Leased
View Media notice of land to be
Read
leased
Land Registration Create Read Update Create Read Update Read

Update Land Register Read Update

View Land Register Read

Land Management Create Read Update Create Read Update Read


Land Inventory Data The system is extracting land inventory data from GIS
Land Management Practices Will be Uploaded in DMS
Prepare and Review M&E Report Create Read Update Create Read Update
Prepare field visit request Create Read Update Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare and consolidate progress
Create Read Update
reports
Annual action plan Create Read Update
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review,Update,Upload Manuals
Create Read Update
and Guidelines
View GIS Interface Read Read Read
View Cadastre Interface Read Read Read

View AutoCAD Interface Read Read


View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:685 of


696
Software Requirement Specification

5.10 Planning and Budgeting

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Set, Review,Approve/Reject
Create Read Update
Standards and Indicators

View Set Standards and Indicators Read

Review REP Read Update

View REP Read

Review AMP Read Update

View AMP Read

Screening On Potential Projects Create Read Update Read Read

View Screening Report Read Read

Citizen Participation Create Read Update Read Read


Prepare and Review Draft CIP Create Read Update
Review CIP Read Update
Review Draft/Mid-Year CIP Read Update Read Update
Prepare and Review Revised CIP Read Update
Project Plan Create Read Update Read Read
Budgets Forecast
CIP Implementation Report The system is Preparing CIP Implementation Report and getting approved by City Cabinet.
Prepare and Review M&E Report Create Read Update Create Read Update Create Read Update
View APA Reports Read Read
Comment on APA Report Create Update Create Update
View Audit Reports Read

Review,Update,Upload Manuals
Create Read Update
and Guidelines

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:686 of


696
Software Requirement Specification

5.11 Procurement Management

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Procurement
Create Read Update
Strategies
Review Procurement Strategies Read Update
View WB Procurement Guidelines Read
Prepare and Review Procurement
Create Read Update
Plan

Review Procurement Plan Read Update

Prepare and Review Procurement


Create Read Update Delete Read
ToRs, EOIs, RFQs, RFPs
Review Procurement
Read Update Create Read Update
ToRs,EOIs,RFQs,RFPs
Prepare and Review PO
Create Read Update Read Update
Requisitions, LPOs
Procurement Audit Create Read Update Create Read Update Create Read Update
Procurement Audit Performance
Create Read Update Create Read Update Create Read Update
Status

Review Procurement Audit Report Read Update

View Procurement Audit Reports Read Read

Prepare and Review Procurement


Create Update
Audit Rectification Plan

Review Procurement Audit


Read Update
Rectification Plan

View Procurement Audit


Read Update
Rectification Status Report

Prepare Field Visit Requests Create Read Create Read Update

Prepare and Review Field Visit


Create Read Update Create Read Update
Report
Prepare and Review M&E Report Create Update Create Read Update
Review and consoildate progress
Read Update
reports

Prepare and Review Annual Action


Create Read Update Create Read Update Create Read Update
Plan
Dissemination of Procurement Plan Create Read Update Read Read
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Proposal Evaluation Create Read Update Read Read
Applicable Procurement Upload In DMS
Procured Goods Create Read Update Create Read Update Create Read Update
Registration Create Read Update Read Read
Suppliers and Consultants Create Read Update Create Read Update Create Read Update
Ineligible Firm Create Read Update Create Read Update Create Read Update
Contract Management Create Read Update Read Read
Bidding Progress Report Create Read Update Read Read
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:687 of


696
Software Requirement Specification

5.12 Capacity Building

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Capacity
Create Read Update Create Read Update Read Update
Assessment Report
Prepare and Review Capacity Needs
Create Read Update Create Read Update Create Read Update
and Gaps Analysis
Prepare and Review Capacity
Create Read Update Create Read Update Create Read Update
Building Plan
Capacity Building Report Create Read Update
Prepare and Review ToRs (Provide
Create Read Update Create Read Update Create Read Update
Support to Other FPs)
Prepare and Review Training
Create Read Update Create Read Update Create Read Update
Evaluation Plan
Prepare and Review Training
Create Read Update Create Read Update Create Read Update
Evaluation Report
Training Thematic trainees Create Read Update Read Read
Evaluation by trainees Create Read Update Create Read Update Create Read Update
Prepare and Review M&E Report Create Read Update Create Read Update Create Read Update
Prepare and review field visit
Create Read Update Create Read Update
requests
Prepare and review field visit
Create Read Update Create Read Update
reports
Prepare Annual Action Plan Create Read Update
Review,Update,Upload Manuals
Create Read Update
and Guidelines
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

5.13 LED and Job Creation

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Complaints Create Read Update Read Read
Capture Business Idea Competition Create Read Update Read Read
View Prior Year LED and Job
Read
Creation Plan
Prepare and Review LED and Job
Create Read Update Read Update Read Update
Creation Plan
Prepare and Review Dialogue
Create Read Update Read Update Create Read Update
Report and Action Plan

Review Public Dialogue Meeting Read Update

Prepare and Review MSEs Selection


Create Read Update Read Update Read Update
Criteria
Prepare and Review MSEs Selection
Create Read Update Read Update Read Update
Report
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate progress
Create Read Update
report
Prepare field visit request Create Read Update Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Job Creation Report Create Read Update Read Read
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Prepare Annual Action Plan Create Read Update
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:688 of


696
Software Requirement Specification

5.14 Urban Resilience and DRM

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter and Prioritise Identified Risks Create Read Update

View Identified Risk Read Read

Prepare and Review Risk Maps Create Read Update

View Risk Maps Read Read

Institution Participation Create Read Update Read Read


Prepare and Review DRM and
Create Read Update Read Update Read Update
Emergency Response Plans
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate progress
Create Read Update
reports
Prepare field visit request Create Read Update Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare Annual Action Plan Create Read Update
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Track Progress of activities in
Read Read Create Read Update
annual action plan
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

5.15 Gender Development

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
View Prior Year Gender
Read
Development Plan
Prepare and Review Annual Gender
Create Read Update Read Update Read Update
Development Plan
Prepare and Review Dialogue
Create Read Update Read Update
Report and Action Plan
Prepare and review community
Create Read Update
dialogue tools
Prepare and Review M&E Report Create Read Update Create Read Update
Review Progress Reports Create Read Update
Review and consolidate progress
Create Read Update
reports
Prepare and approve field visit
Create Read Update Create Read Update
requests
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Preparation of annual action plan Create Read Update

Program Performance Report Create Read Update Read Update Read Update

Gender Performance Report Upload in DMS Upload in DMS Upload in DMS


Review,Update,Upload Manuals
Create Read Update
and Guidelines
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:689 of


696
Software Requirement Specification

5.16 System Admin

System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
User Management Create Read Update
Thematic Areas Management Create Read Update
Creation and update of project Create Read Update
IPF Management Create Read Update
Legal Entity Management Create Read Update Delete
Responsibilities Management Create Read Update Delete
Menus Management Create Read Update Delete
Reports Management Create Read Update Delete
Suppliers Management Create Read Update
Contractors Management Create Read Update
Auditors Management Create Read Update
Programm File Management Create Read Update
Customisation Create Read Update

6 External Interfaces

6.1 Hardware/Network Interfaces

The user can access the application through PC/Laptop/Tablet having any Make/Model of
H/W. For network, internet connection is required (minimum 512 kbps).

6.2 Software Interfaces

This section provides details of the external interfaces and/or integrations between the UIIDP
MIS and the existing government systems as well as the standalone systems in use for various
functionalities that must be put into consideration in order to achieve a fully functional end-
to-end integrated UIIDP MIS.

Like any integrated information system, the UIIDP MIS will exhibit intra-modular, inter-modular
and external interface and/or integration handshakes.

Owing to the various formats of data exchanges and the number of systems in place that need
to be interfaced and/or integrated, it is recommended that an Enterprise Service Bus – ESB be
considered for that purpose. The use of an ESB is worth considering when three or more
applications or services need to be interfaced and/or integrated which is the case of the UIIDP
MIS.

The Interfaces below describes the existing systems that the UIIDP MIS is expected to interface
and/or integrate with through an ESB:-

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:690 of


696
Software Requirement Specification

 Exchange considerations between IBEX/IFMIS and UIIDP MIS


 Exchange considerations between GIS and UIIDP MIS
 Exchange considerations between Cadastre and UIIDP MIS
 Exchange considerations between STEP and UIIDP MIS
 Exchange considerations between AutoCAD and UIIDP MIS

6.3 Communication Interfaces

Different users of UIIDP MIS will need to access the system through a variety of devices. Users
and clients will access the UIIDP MIS through Web browsers. These will require a secure HTTPS
internet connection, user name and password of the user which will be verified before
accessing the UIIDP MIS application. The minimum browser requirements are:

i. The browser must allow HTTPS browsing;


ii. The browser must be JavaScript enabled;
iii. The browser must be able to translate responsive layouts; and
iv. The browser must support cookies and sessions.

7 Non Functional Requirement

a. Integration Requirement

The key objective of integration between different systems is for the systems to share data to
make transactions seamless. The systems should be integrated using Service Oriented
Architecture supported by the Enterprise Service Bus through which Application integration,
both internal and external, is expected to go through

 The system must be able to interface with the IBEX/IFMIS through the ESB to:
o Prepare the revenue enhancement plans
o Prepare M&E progress reports
o Facilitate fund disbursements to federal, regions and ULGs
o Allow checking of budgets at funds replenishment requests
o Synchronise procurement plans to payment processing

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:691 of


696
Software Requirement Specification

o Asset Management plans


o Determine economic value of assets
o Determine O&M costs of assets
o Determine replacement values of assets
 The system must be able to interface with the IBEX/IFMIS through the ESB to share
data such as:
o Revenue sources
o Financial Reports
o Funds utilization
o Budgets
o Funds checker
o Payable/payment data
o Asset values
o Asset Maintenance costs
o Replacement costs
 The system must be able to interface with the GIS through the ESB to:
o Allow for tracking of developments on/of assets
o Allow keep a value on/of the assets
o Link the spatial asset data to UIIDP plans
o Enable preparation of AMP which feeds into the CIP
o Enable preparation of M&E reports
o Plan for land lease/allotment management
o Allow for tracking of developments on land
o To allow keep a value of the land
 The system must be able to interface with the GIS through the ESB to share data such
as:
o Land identification
o Unit of measure
o Dimension
o Location/address

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:692 of


696
Software Requirement Specification

o Land Value
o Developments planned for the land
o Services on the land
o Ownership of the land
o Developments planned for the land
o Services on the land
o Ownership of the land
 The system must be able to interface with the Cadastre through the ESB to:
o Keep a record of land maps
o Allow for tracking of developments on land
o Allow keep a value of the land
o Link the spatial land data to GIS and UIIDP plans
o Plan for land lease/allotment management
 The system must be able to interface with the Cadastre through the ESB to share data
such as:
o Land identification
o Unit of measure
o Dimension
o Location/address
o Land Value
o Developments planned for the land
o Services on the land
o Ownership of the land
o Land parcels
 The system must be able to interface with the STEP through the ESB to:
o Enable development of ToRs as per the World Bank guidelines and standards
o Link procurement plans to the UIIDP MIS
o Enable preparation of M&E reports
o Keep track of contract execution
o Keep track of contract claims

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:693 of


696
Software Requirement Specification

o Plan for IPFs


o To link procurement plans and contracts to payment processing
o To link the procurement plans and processes to the UIIDP budgets and budget
allocations
 The system must be able to interface with the STEP through the ESB to share datas
such as:
o Contractor, Supplier, consultant data
o IPF data
o Contract claims
o Payment claims
o Payment status
o ToRs
o Contractor, Supplier, consultant data
o Payment processing
o Project information
o Execution time frames
o Budget allocations
 The system must be able to interface with the AutoCAD through the ESB to:
o To be able to reference structural plans of ULGs to project implementations
 The system must be able to interface with the AutoCAD through the ESB to share data
such as:
o Project details
o Structural plans
 The ESB interfaces must be scalable to accommodate changes in scale including
changes in user population, transaction volume and throughput
 The ESB must provide the capability to perform source to destination file integrity
checks for exchange of data and alert appropriate parties with issues
 The systems must be able to use standards-based communication protocols, such as
TCP/IP, HTTP, HTTP/S and SMTP.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:694 of


696
Software Requirement Specification

 The communication between core systems should be secured, even if secured network
is used for the connection. SSL and/or WS-Security will be applied as appropriate
 The ESB should support Web Services framework for integration including the
following protocols:
o eXtensibleMarkup Language (XML);
o Simple Object Access Protocol (SOAP);
o Web Service Description Language (WSDL); and
o Universal Description, Discovery, and Integration (UDDI).
 The ESB should support the following integration standards:
o Messaging based integration
o Bulk upload of flat files
o Application Programming Interface (API) based integration
 The ESB should provide a detailed error report on any failures to upload data during
Bulk uploads.
 The ESB should support use of XML based messages as part of Message based
integration
o The ESB would support near-real-time messaging with guaranteed once-only
delivery.
o The ESB would support guaranteed sequential delivery within a message family.

b. Availability Requirement

 The system would be 99.95% available for any given month of the year (an average of
less than one hour per week or 1.83 days per year).
 The system would be able to handle at least 10 back office users that are dealing with
the processing of end user requests.
 The system would also be able to handle at least 500 simultaneous requests for both
uploads and downloads.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:695 of


696
Software Requirement Specification

c. Reliability Requirement

 The system would be able to handle at least 50 Transactions Per Second (TPS) at peak
times
 The maximum response time for search and lookup performance would be 3 seconds
for 95% percent of the time.
 The maximum response time for a dashboard report would be 5 seconds, 95% of the
time.
 The maximum response time for static standard reports would be 5 seconds, 95% of
the time.
 The maximum response time for a parameter-based report would be 20 seconds.

d. Security Requirement

 The System would be password protected.


 The System Would support SSL certificates and encryption on all web forms.
 The System Would support authentication methods such as public key infrastructure.
 The System should Would password policy and trigger alerts whenever the following
conditions are not met:
o Minimum length of 6 characters
o Password change must be done every 90 days
o Passwords containing usernames shall not be used
o Previous passwords, shall not be used
o Every password must have at least a small letter, capital letter, numeral and
special character.
 The System would provide a single sign-on authentication and allow integration with
password policies in directories such as LDAP, Active Directory.
 The directory service would have support for open standards e.g. LDAP, XML.
 The System would support encryption of fields that store sensitive data such as
passwords.

Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0

CSM Technologies CSM/QT/01/04 Page #:696 of


696
Software Requirement Specification

 The System would support customizable role-based access that is easy to manage to
ensure that data is only accessed by people with the privileges to access it
 The System would support administrative restrictions such as
o Configurations of systems
o Deletion of users
o New users’ registration
o This would be done by only the systems administrators
 The System would enable logging and have the capability to generate audit trails that
can be customized to different fields in the system.
 The System would have the capability to avoid creation of duplicate records as a
concern about the integrity of the data stored
 The System would support deactivation of a user account for a certain period and it
shouldn’t be possible for the deactivated account to be used to access the system or
data
 The system would have the capability to close an inactive session after a defined period
of time (Session timeout)
 The system would display the last date and time the user logged onto the system at
the time of logon.
 The System would have the capability to validate data input before storing to ensure
that it is correct and appropriate
 Access to each database would be restricted to connections from the respective
application servers.
 The system would allow an administrator to suspend a user ID from further use.
 The system would record and maintain past security profiles (history of security access
for staff) when changes are made to staff's security profile.
 The system would record in the system who changes security profiles and when
changes are made (user name, date and time stamp).
 The system would assign application access rights across entire suite of applications at
a single point of entry.