Professional Documents
Culture Documents
Uiidp SRS V1.0
Uiidp SRS V1.0
Uiidp SRS V1.0
Submitted To:
Ministry of Urban and
Infrastructure Development
REVISION HISTORY
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
INDEX
1 Introduction ................................................................................................................ 17
1.1 Purpose .................................................................................................................. 17
1.2 Project Scope of Work & features ........................................................................... 17
1.3 Definitions, Acronyms, and Abbreviations ............................................................... 19
1.4 References .............................................................................................................. 20
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
3.11.11Tracking progress of activities under Annual Action Plan [REQ-120] ................ 404
3.11.12Field Visit Request [REQ-121]........................................................................... 408
3.11.13Field Visit Report [REQ-122] ............................................................................. 411
3.11.14Capacity Building Plan [REQ-123]..................................................................... 414
3.12 Procurement Management .............................................................................. 418
3.12.1 Proposal Evaluation [REQ-124]......................................................................... 418
3.12.2 List of Applicable Procurement Documents [REQ-125] ..................................... 419
3.12.3 Procurement Audit Data [REQ-126] ................................................................. 422
3.12.4 Delivered Procured Goods [REQ-127] .............................................................. 424
3.12.5 Procurement Audit Performance Status Report [REQ-128] ............................... 426
3.12.6 Ineligible Firms / Individuals [REQ-129] ............................................................ 429
3.12.7 Supplier and Consultant Details [REQ-130] ...................................................... 431
3.12.8 Annual Action Plan [REQ-131].......................................................................... 433
3.12.9 Procurement Status for EFY [REQ-132] ............................................................. 437
3.12.10Procurement Outcomes for EFY [REQ-133] ...................................................... 445
3.12.11Tracking progress of activities under Annual Action Plan [REQ-134] ................ 452
3.12.12Field Visit Request [REQ-135]........................................................................... 457
3.12.13Field Visit Report [REQ-136] ............................................................................. 459
3.12.14Capacity Building Plan [REQ-137]..................................................................... 462
3.13 Capacity Building ............................................................................................. 466
3.13.1 Self-Assessment [REQ-138] .............................................................................. 466
3.13.2 Training Recordings [REQ-139] ........................................................................ 468
3.13.3 Training Evaluation [REQ-140] ......................................................................... 471
3.13.4 Capacity Building Plan [REQ-141]..................................................................... 474
3.13.5 Capacity Building Plan Implementation Report [REQ-142] ............................... 477
3.13.6 Review and Approval [REQ-143] ...................................................................... 479
3.13.7 Annual Action Plan [REQ-144].......................................................................... 481
3.13.8 Capacity Building Progress Report [REQ-145] .................................................. 484
3.13.9 Tracking progress of activities under Annual Action Plan [REQ-146] ................ 488
3.13.10Field Visit Request [REQ-147]........................................................................... 492
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
1 Introduction
1.1 Purpose
The purpose of the document is to describe the functional and non-functional requirements of
Urban Institutional and Infrastructure Development Program Management Information system
(UIIDP MIS). The functional requirement will be broken down according to the business
requirement, for better understanding and tracking of the project. The non-functional points will
provide the information about dependency of the project with other external and internal entities.
The scope of the assignment will be mainly focused on the 117 cities participating in the UIIDP
as well as the UIIDP Regional and Federal Implementing Agencies. However, the UIIDP MIS is
expected to work for all ULGs which Ministry of Urban and Infrastructure Development (MUID)
may decide in the future to add to the program and/or to benefit from the system.
Functional Scope
The functional scope of the UIIDP MIS comprises of the following thematic area:
i. Project Coordination
v. Financial Management
x. Urban Planning
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
xii. Procurement
vi. Cadastre
viii. AutoCAD
c. CSM / AFRICOM is expected to develop the system that supports English and the
official Amharic language, as well as the following regional languages - Afaan
Oromo, Somali, Tigrinya and Afaraf.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
1 Admin Administration
8 IR Inception Report
12 SA Security Architecture
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
1.4 References
Reference Document
SL#
Scope document - ULGDP II - Detailed design (Volume 1) V3.0, ULGDP II - Detailed design
1
(Volume 2) - Implementation Plan V3.0
16 GIS Manual
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
25 ULGDP II/UIIDP Monitoring, Evaluation and Reporting System and Guidelines for Federal
Level (Volume 1, 2 and 3)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
2 Overall Description
The proposed UIIDP MIS Design (Thematic Area-based) as illustrated in the Concept and
Preliminary design is in this section broken down to the lowest descriptive detail in terms of
module objective, proposed functionality based on each Thematic Area business processes
and Module data interactions/ interdependencies. The detailed description covers the 16 core
MIS modules based on Program Thematic Areas and 4 support modules.
i. Project Coordination
v. Financial Management
x. Urban Planning
xii. Procurement
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
The UIIDP MIS users have been divided into four different types: -
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
3. Database MySQL
b. Hardware Requirement
Sl.
No Category Description
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Server/Application
4
Accessed Through Browser
Interface with other system is dependent on web services still being developed by
other team members.
The application shall use a layered architecture, whereby each layer may only access
the layer directly.
All application software shall be modularized into classes using object-oriented design
principles
All web application components will be written in Java with MySQL database.
User manual must be created to help users of the application to understand the basic flow as
well as each and every details of the application. It will also distribute as the hands out for the
trainee during the training period.
System Installation and Operation Manual would be shared which will facilitate the users in
successfully using the software package.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
2.6 Dependencies
The following conditions are to be consider as “out of scope” for the project:
Integration with any applications unless it is captured in the SRS and System Design
document.
Development of Mobile Application.
System software license procurement & renewal such as operating system,
database licenses, or any license software which is required for internal
consumption at MUID.
Hardware and deployment infrastructure such as server, storage, Data center, DR
site etc.
Any other activities, which is not included or not captured in SRS and System Design
document.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
3 Functional Requirement
Description
This function is used to Capture Annual Work Budget and Plan and generate a report on
Annual Work Budget and Plan
Inputs
Level User will Select the Level from ( Federal , Regional , ULG )
Region User Will Select the region for which Annual Work Budget and Plan is
being captured
ULG User Will Select the ULG for which Annual Work Budget and Plan is being
captured
Category User Will Select the Project Category ( Schedule 1 , Schedule 2 , Schedule
3)
Budget For EFY User will enter the Budget for Financial Year
Output Indicator / Unit User will enter the Output Indicator / Unit of Measure
of Measure
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Expenditure Code User will select the expenditure code from ( BI Code, General Ledger,
Subsidiary ledger )
Button Submit This Button will submit the Data for Annual Work Budget and Plan
Button Reset This Button will reset the entered data for Annual Work Budget and Plan
Button Cancel This Button will terminate the process of capturing data for Annual Work
Budget and Plan
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to captured data for staff Evaluation and generate a report on the staff
evaluation
Inputs
Date of Review User will select the data of review from the calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Performance Indicator
Sub - Category User will select the sub-category for staff evaluation
Maximum-Points User will enter the maximum points awarded for staff who is being
evaluated.
Scoring Method User will enter the scoring method in text field
Points Awarded User will enter the points awarded to staff who is being evaluated
Button Submit This Button will submit the Data for staff performance and evaluation
Button Reset This Button will reset the entered data for staff performance and
evaluation
Button Cancel This Button will terminate the process of capturing data for staff
performance and evaluation
Staff Evaluation
Performance Indicator
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Non-Thematic Areas and generate a report on Non-
Thematic Areas.
Inputs
Approval Status User will select the approval status ( Pending , Approved, Rejected )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the Data for Non-Thematic Areas
Button Reset This Button will reset the entered data for Non-Thematic Areas
Button Cancel This Button will terminate the process of capturing data for Non-
Thematic Areas
Non-Thematic Areas
Figure 2
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture MoUs data between UIIDP and other federal and regional
agencies.
Inputs
Level User will select the Level from ( Federal , Regional , ULG )
Approval Status User will select the approval status ( Pending , Approved, Rejected )
Button Submit This Button will submit the data for MOUs
Button Reset This Button will reset the entered data for MOUs
Button Cancel This Button will terminate the process of capturing data for MOUs
MoUs
Agency Name Level Category
Select Level Select Category
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture annual conducted APA data.
Inputs
Name of APA Firm User will enter the name of the APA Firm
Planned Date User will enter the planned date from calendar
Actual Date ( 61 Cities User will enter the date for conducted APA
in Oromia and
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
SNNPRS)
Actual Date (56 Cities in User will enter the date for Conducted APA
Amhara,Tigray,
Afar,Benishangu,
IGumuz,Gambella,Harar
i,Somali,Dire Dawa)
Button Submit This Button will submit the data for conducted APA
Button Reset This Button will reset the entered data for conducted APA
Button Cancel This Button will terminate the process of capturing data for APA
Conducted APA
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
3.1.6 Consolidated strategy and action plan for addressing weakness identifies in the
APA [REQ-006]
Description
This function is used to Consolidate strategy and action plan for addressing weakness
identifies in the APA.
Inputs
The contents of Consolidated strategy and action plan for addressing weakness identifies in
the APA are:
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Issue to address User will enter the issue to address in text field
Action to address issue User will enter the action to be taken for addressing the issue in text field
Responsible Party User will enter the name of responsible party name
Button Submit This Button will submit the data to Consolidate strategy and action plan
for addressing weakness identifies in the APA
Button Reset This Button will reset the entered data to Consolidate strategy and action
plan for addressing weakness identifies in the APA
Button Cancel This Button will terminate the process of capturing data to Consolidate
strategy and action plan for addressing weakness identifies in the APA
Consolidated strategy and action plan for addressing weakness identifies in the
APA
Financial Year APA Issue to address
Select Year
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used for Preparation of program coordination annual action plans and Review
/ approval of Program Coordination Annual Action plans. The final reviewed annual action plan
will be sent to Monitoring and Evaluation for Final Approval
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used for Value for Money (VfM) audit scheduling and coordination.
Inputs
Start Date of Audit User will enter the date from calendar
End Date of Audit User will enter the data from calendar
by regional
coordinator
Button Submit This Button will submit the data for VfM Audit Scheduling
Button Reset This Button will reset the entered data for VfM Audit Scheduling
Button Cancel This Button will terminate the process of capturing data for Vfm Audit
Scheduling
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Performance Evaluation Criteria for staff Evaluation
Inputs
Sub-Category User will enter the subcategory under category in text field
Description User will enter the description under subcategory which is under
category in text field
Button Submit This Button will submit the data for Performance Evaluation Criteria
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Performance Evaluation
Criteria
Button Cancel This Button will terminate the process of capturing data for Performance
Evaluation Criteria
Performance Criteria
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used for Review and Approval of documents, data and reports coming from
different thematic areas.
Inputs
Button Submit This Button will submit the data for Review and approval
Button Reset This Button will reset the entered data for Review and approval
Button Cancel This Button will terminate the process of capturing data for review and
approval
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Capture Data for VfM Recommendation and generate report Of VfM
Recommendation.
Inputs
Proportion of User will enter the numeric value for the proportion of recommendation
Recommendation of of previous VfM Audit addressed
Previous VfM Audit
Addressed
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of Vfm User will enter the numeric value for number of VfM recommendation of
Number of addressed User will enter the numeric value for the number of addressed
Recommendation recommendation
Percentage of This field will be automatically calculated considering the number of VfM
Button Submit This Button will submit the data for VfM Recommendation
Button Reset This Button will reset the entered data for VfM Recommendation
Button Cancel This Button will terminate the process of capturing data for VfM
Recommendation
VfM Recommendation
Propoortion of Recommendation
of Previous VfM Audit Addressed ULG Name Region Name
Select ULG Select Region
Percentage of Addressed
Recommendation
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to approve the Field Visit request from all other thematic areas.
Inputs
permitted
Button Submit This Button will submit the data for field visit request approval
Button Reset This Button will reset the entered data for field visit request approval
Button Cancel This Button will terminate the process of capturing data for field visit
request approval
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for AWP Budget - (Follow up Activities) and generate
report at ULG and Regional Level user.
Inputs
Annual Budget EFY User will enter the value of annual budget in numeric value
Next Action User will enter the next action in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual User will select the actual date from the calendar
Responsibility for User will enter the responsibility for action and follow up in Bureau /
action and follow Agency in text field.
up in Bureau / Agency
Responsibility for User will enter the responsibility for action and follow up in PPMD in text
action and follow up in field.
PPMD
Button Submit This Button will submit the entered data for action follow up on AWP
Button Reset This Button will reset the entered data for action follow up on AWP
Button Cancel This Button will terminate the process of capturing data for action follow
up on AWP
Deadline Action
Select Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to generate progress monitoring report on implementation of the AWP.
Inputs
Level User will select the Level from ( Federal, Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Output Indicator /Unit User will enter the output indicator / unit of measure in text field
of Measure
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for implementation of AWP
Button Reset This Button will reset the entered data for implementation of AWP
Button Cancel This Button will terminate the process of capturing data for
implementation of AWP
Implementation of AWP
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for result framework data (UIIDP Performance)
Inputs
PDO Level Result User will enter the PDO Level result indicator in text field
Indicator
Baseline Financial Year User will enter the value in numeric field
Actual Financial Year 2 User will enter the value in numeric field
Target Financial Year 2 User will enter the value in numeric field
Actual Financial Year 3 User will enter the value in numeric field
Target Financial Year 3 User will enter the value in numeric field
Actual Financial Year 4 User will enter the value in numeric field
Target Financial Year 4 User will enter the value in numeric field
Actual Financial Year 5 User will enter the value in numeric field
Target Financial Year 5 User will enter the value in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Data User will enter the data source / methodology in text field
Source/Methodology
Responsibility for Data User will enter the responsibility for data collection in text field
Collection
Intermediate Result User will enter the intermediate result area in text field
Area
Button Submit This Button will submit the entered data for UIIDP Performance
Button Reset This Button will reset the entered data for UIIDP Performance
Button Cancel This Button will terminate the process of capturing data for UIIDP
Performance
UIIDP Performance
PDO Level Result Indicator Core DLI
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Monthly Progress report Submission of ULG.
Inputs
Financial Year User will select the financial Year from dropdown
ULG name User will select the ULG Name from dropdown
Submission Deadline User will select the submission deadline date from the calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Date Submitted to User will select the date submitted to region from the calendar
Region
Button Submit This Button will submit the entered data for monthly progress report
submission
Button Reset This Button will reset the entered data for monthly progress report
submission
Button Cancel This Button will terminate the process of capturing data for monthly
progress report submission
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Annual Progress report Submission of ULG.
Inputs
Financial Year User will select the financial Year from dropdown
ULG name User will select the ULG Name from dropdown
Submission Deadline User will select the submission deadline date from the calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Date Submitted to User will select the date submitted to region from the calendar
Region
Button Submit This Button will submit the entered data for annual progress report
submission
Button Reset This Button will reset the entered data for annual progress report
submission
Button Cancel This Button will terminate the process of capturing data for annual
progress report submission
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used for Preparation of program coordination annual action plans and Review
/ approval of Program Coordination Annual Action plans. The final reviewed annual action plan
will be sent to Monitoring and Evaluation for Final Approval
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used for Review and Approval of documents, data and reports coming from
different thematic areas.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the data for Review and approval
Button Reset This Button will reset the entered data for Review and approval
Button Cancel This Button will terminate the process of capturing data for review and
approval
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to support extensive capture of project cost data.
Inputs
ULG name User will select the ULG name from dropdown
Financial year User will select the financial year from dropdown
Project name User will select the project name from dropdown list
Project start Date User will select the project start date from calendar
Unit Cost User will enter the unit cost in numeric field
Total Cost Total cost will be calculated using Unit cost and Quantity
Date of Expenditure User will select the date of expenditure from calendar
Total Project Cost User will enter the total project cost in numeric field
Percentage of spent This will be calculated using total cost and total project cost
Project Budget
Button Submit This Button will submit the entered data for Project Cost
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Project Cost
Button Cancel This Button will terminate the process of capturing data for Project Cost
Project Cost
Cost Details
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used for extensive capture of Field supervision data.
Inputs
ULG Name User will select the ULG name from dropdown list
Project name User will select the project name from dropdown list
Supervision Start Date User will select the supervision start date from the calendar
Supervision End Date User will select the supervision end date from the calendar
Focal persons in charge User will enter the name of focal persons incharge of supervision in text
of supervision field
Findings
Description of Finding User will enter the description of findings in text field
Party Responsible User will enter the party responsible in text field
Button Submit This Button will submit the entered data for Field Supervision
Button Reset This Button will reset the entered data for Field Supervision
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Field
Supervision
Field Supervision
ULG Name Project name Supervision Start Date Supervision End Date
Select name Select date Select date
Findings
Finding Category Description of Finding
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Contract Management data.
Inputs
ULG name User will select the ULG name from the dropdown list
Financial year User will select the financial year from the dropdown list
Contract status User will select the contract status from (Preparation, signed,
Implementation, Closed)
Contractor name User will enter the contractor name in text field
Responsible party User will enter the responsible party in text field
Contract cost User will enter the contract cost in numeric field
Project name User will select the project name from dropdown list
Contract timeline User will select the contract timeline from calendar
Claims details (If any) User will enter the claim details in text field
Contract start date User will select the contract start date from calendar
Contract completion User will select the contract completion date from calendar
date
Project engineers in User will enter the project engineers in charge in text field
charge
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the entered data for Contract Management
Button Reset This Button will reset the entered data for Contract Management
Button Cancel This Button will terminate the process of capturing data for Contract
Management
Contract Management
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for time and cost claims from contractors
Inputs
Request date User will select the request date from the calendar
Approval status User will select the approval status from the dropdown list
Approval date (if User will select the approval date from the calendar
approved)
Approved by (if User will enter the person name who has approved in text field
approved)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Claim category (cost or User will select the claim category from ( Cost, Time )
time)
Button Submit This Button will submit the entered data for time and cost claims
Button Reset This Button will reset the entered data for time and cost claims
Button Cancel This Button will terminate the process of capturing data for time and cost
claims
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture records of all infrastructure projects being implemented at the
city, reginal and federal level.
Inputs
Project Name User will select the project name from dropdown list
Contract Amount User will enter the contract amount in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Contract Start Date User will select the contract start date from calendar
Contract Completion User will select the contract completion date from calendar
Date
Annual Physical Plan User will enter the annual physical plan in numeric field
Annual Financial Plan User will enter the annual financial plan in numeric field
Physical Achievement User will enter the physical achievement this month in numeric field
this Month
Financial Achievement User will enter the financial achievement this month in numeric field
this month
Physical User will enter the physical achievement to date in numeric field
Achievement to date
Financial Achievement User will enter the financial achievement to date in numeric field
to date
Physical Achievement This will be calculated using annual physical plan and physical
Financial achievement This will be calculated using annual financial plan and financial
annual plan
Physical Achievement This will be calculated using contract amount and physical achievement
Contract
Financial achievement This will be calculated using contract amount and financial achievement
contract
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Comments User will enter the comments / contractual problem faced in text field
/Contractual Problem
Faced
Button Submit This Button will submit the entered data for Infrastructure Projects
Button Reset This Button will reset the entered data for Infrastructure Projects
Button Cancel This Button will terminate the process of capturing data for Infrastructure
Projects
Infrastructure Project
Project Name Unit Measurement Contract Amount
Contract Start Date Contract Completion Annual Physical and Financial Plan
Date
Physical and Fiancial Physical and Financial Physical and Financial Physical and Financial
Achievement this Month Achievement to date Achievement in % Achievement in %
to date from annual to date from Contract
Plan
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used for Preparation of project engineering annual action plans and Review /
approval of Project engineering Annual Action plans. The final reviewed annual action plan will
be sent to Monitoring and Evaluation for Final Approval
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Review and Approve Asset Management Plan, Capital Investment Plan,
Procurement Plan and Revenue Enhancement Plan from their respective thematic areas.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Button Submit This Button will submit the data for review and approval
Button Cancel This Button will reset the entered data for review and approval
Button Reset This Button will terminate the process of capturing data for review and
approval
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing checklists against which infrastructure
projects are assessed.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Checking the project User will select the value from ( Yes , No )
plan
assessment
Inspection
Preparation
Button Submit This Button will submit the entered data for Checklists
Button Reset This Button will reset the entered data for Checklists
Button Cancel This Button will terminate the process of capturing data for Checklists
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Checklist
Community Discussion Project Prioritization Checking the Project Environment Impact
for Project Selection against the structural Assessment
Plan
Award Notification
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
3.3.10 Project site/ field supervision and monitoring of all Engineering projects [REQ-
034]
Description
This function is used to capture data of Project site/ field supervision and monitoring of all
Engineering projects
Inputs
Project name User will select the project name from the dropdown list
Focal persons in charge User will enter the focal persons in charge of supervision in text field
of supervision
ULG name User will select the ULG Name from dropdown list
Responsible person User will enter the responsible person name in text field
activity execution
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the entered data for project site / field
supervision
Button Reset This Button will reset the entered data for project site / field supervision
Button Cancel This Button will terminate the process of capturing data for Project site /
field supervision
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
List of User will enter the list of recommendations made to resolve issues in text
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for bills of quantities under project management for
Project engineering.
Inputs
Unit Price User will enter the unit price in numeric field
Total Amount This will be calculated using Quantity and unit price
Button Submit This Button will submit the entered data for bills of quantities
Button Reset This Button will reset the entered data for bills of quantities
Button Cancel This Button will terminate the process of capturing data for bills of
quantities
Bills of Quantities
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data of financial schedules and enable reviewers to incorporate
comments
Inputs
Project Name User will select the project name from dropdown
Contract Amount User will enter the contract amount in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total cost User will enter the total cost in numeric field
Payment
Advance Payment User will enter the advance payment in numeric field
Advance Repayed User will enter the advance repayed in numeric field
Outstanding advance User will enter the outstanding advance in numeric field
Retention
Retention Holded User will enter the Retention Holded value in numeric field
Retention Returned User will enter the Retention Returned value in numeric field
Outstanding Retention User will enter the Outstanding Retention value in numeric field
Financial Gurantee
Advance Gurantee
Start Date User will select the start date from the calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
End Date User will select the end date from the calendar
Extended Date User will select the extended date from the calendar
Performance Gurantee
Start Date User will select the start date from the calendar
End Date User will select the end date from the calendar
Extended Date User will select the extended date from the calendar
Button Submit This Button will submit the entered data for financial schedules
Button Reset This Button will reset the entered data for financial schedules
Button Cancel This Button will terminate the process of capturing data for financial
schedules
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Schedules
Project Name
Payment
Advance Payment ( Birr )
Interim Payments
Retention
Outstanding Payment
Financial Gurantee
Advance Gurantee
Performance Gurantee
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture material test results from the contractors.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Testing Lab User will enter the testing lab name in text field
Testing Number User will enter the testing number modality in text field
Modality
Kind of Material Tested User will enter the kind of material tested in text field
Specfied Quality User will enter the specified quality in text field
or Supervisor
Button Submit This Button will submit the entered data for material test results
Button Reset This Button will reset the entered data for material test results
Button Cancel This Button will terminate the process of capturing data for material test
results
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for monitoring and evaluation of Project Engineering.
Inputs
ULG Name User will select the ULG name from dropdown
Name of Project User will select the project name from dropdown
Unit of Measurement User will select the unit of measurement from dropdown
Planned for Year User will enter the planned for year value in numeric field
From Month User will select the From month from calendar
Percentage achieved This value will be obtained using planned and actual values
Percentage achieved This value will be obtained using planned and actual values
Button Submit This Button will submit the entered data for M & E Report
Button Reset This Button will reset the entered data for M & E Report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for M & E Report
M & E Report
From Month
Up to Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for new projects going to be taken under UIIDP.
Inputs
Project DLIs User will select the DLIs from dropdown list
ULG Name User will select the ULG Name from dropdown list
Thematic Area User will select the thematic area name from dropdown list
Focal Person User will select the focal person name from dropdown list
Project Total Budget User will enter the Project Total Budget in numeric field
Source of Fund User will enter the source of fund in text field
Project Start Date User will select the date from calendar
Project Duration User will enter the number of month in numeric field
Planned Project end User will select the date from calendar
date
Project Status User will select the project status from dropdown list
Actual Project End Date User will select the date from calendar
Button Submit This Button will submit the entered data for Project Setup
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Project Setup
Button Cancel This Button will terminate the process of capturing data for Project Setup
Thematic Area Focal Person Name Project Total Budget Source of Fund
Project Start Date Project Duration Planned Project end Project Status
Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture different types of revenue generated by each city or region.
Inputs
The contents of different types of revenue will be obtained through API from IFMIS / IBEX
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture all State Revenue Progress data.
Inputs
Level User will select the level from ( Federal, Regional, ULG )
ULG Name User will select the ULG name from dropdown
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULGS that achieve an increase of state revenue of at least 10% over the previous
year
Actual Financial Year 1 User will enter the value in numerical field
Year2
Actual Financial Year 2 User will enter the value in numerical field
Actual as % of planned This will be calculated using planned and actual financial for 2nd year
value
% Increase This will be calculated using actual financial year 2 and actual financial
year 1
Planned for the year User will enter the value in numeric field
Percentage achieved This will be calculated using planned and actual value for quarter 1
quarter 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage achieved This will be calculated using planned and actual value for quarter 2
quarter 2
Percentage achieved This will be calculated using planned and actual value for quarter 3
quarter 3
Percentage achieved This will be calculated using planned and actual value for quarter 4
quarter 4
Button Submit This Button will submit the entered data for state revenue progress
Button Reset This Button will reset the entered data for state revenue progress
Button Cancel This Button will terminate the process of capturing data for state revenue
progress
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region name
ULGS that achieve an increase of state revenue of atleast 10% over the previous year
Percentage achieved
quarter 4
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Revenue enhancement plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
ULG Name User will select the ULG name from dropdown list
Total Population User will enter the total population in numeric field
Revenue sources
Revenue Item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Ethiopian Fiscal Year User will select the value from dropdown list
Actual vs Planned This value will be calculated using planned and actual value
Actual Growth Rate This value will be calculated using planned and actual value
Revenue Item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Planned Revenue User will enter the planned revenue in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual Revenues User will enter the actual revenue in numeric field
Actual Vs Planned This will be calculated using Planned and actual revenue value
Percentage of total This will be calculated using Planned and actual revenue value
own revenue
Revenue Item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Planned Revenue User will enter the planned revenue in numeric field
Actual Revenues User will enter the actual revenue in numeric field
total
revenue collected to
the total percentage
Revenue Item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Number of arrear files User will enter the number of arrear files in numeric field
Age of arrears User will enter the age of arrears in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Amount of overdue tax User will enter the amount of overdue tax in birr in numeric field
in birr
Amount of fine in birr User will enter the amount of fine in birr in numeric field
Fine as % of total This value will be calculated using amount of overdue tax and amount
overdue tax of fine value
Possible reasons for User will enter the possible reasons for arrears in text field
arrears
Impact on revenue User will select the Impact from ( Very Low, Low , High , Very High )
Performance
Revenue Item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Planned Revenue 3rd User will enter the value in numeric field.
Year Past
Planned Revenue 2nd User will enter the value in numeric field.
Year Past
Actual Revenue 3rd User will enter the value in numeric field.
Year Past
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual Revenue 2nd User will enter the value in numeric field.
Year Past
Current Year
Actual vs Planned 3rd This value will be calculated using actual and planned for 3rd Year Past.
Year Past
Actual vs Planned 2nd This value will be calculated using actual and planned for 2nd Year Past.
Year Past
Actual vs Planned This value will be calculated using actual and planned for Current Year
Current Year
Three Year Total This value will be calculated using Actual Revenue 3rd Year Past, Actual
Revenue 2nd Year Past , Actual Revenue Current Year
Share of Actual 3rd Year This value will be calculated using Actual 3rd Year Revenue and three year
revenue to three year total value.
actual total
Share of Actual 2nd Year This value will be calculated using Actual 2nd Year Revenue and three
actual total
Share of Actual current This value will be calculated using Actual Current Year Revenue and three
Year revenue to three year total value.
year actual total
Expenditure item User will enter the expenditure item in text field
Account Number User will enter the account number in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total city population User will enter the value in numeric field
Planned for 3rd year
Total city population User will enter the value in numeric field
Total city population User will enter the value in numeric field
Total city population User will enter the value in numeric field
Actual for 3rd Year
Total city population User will enter the value in numeric field
Actual for 2nd Year
Total city population User will enter the value in numeric field
Actual vs Planned 3rd This will be calculated using value of Total city population planned for
Year Past 3rd year and Total city population actual for 3rd Year.
Actual vs Planned 2nd This will be calculated using value of Total city population planned for
Year Past 2nd year and Total city population actual for 2nd Year.
Actual vs Planned This will be calculated using value of Total city population planned for
Current Year Current year and Total city population actual for current Year.
Source of finance User will enter the source of finance in text field
Financial Balance
Actual own source of User will enter the value in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual own source of User will enter the value in numeric field
revenue 2nd year ago
Actual own source of User will enter the value in numeric field
Actual Expenditure for User will enter the value in numeric field
last year
Actual Expenditure for User will enter the value in numeric field
2 years ago
Actual Expenditure for User will enter the value in numeric field
3 years ago
Financial Balance This will be calculated using actual own source revenue last year and
year
Financial Balance This will be calculated using actual own source revenue 2 year ago and
ago
Financial Balance This will be calculated using actual own source revenue 3 year ago and
Revenue vs actual expenditure 3 year ago value.
Expenditure for 3 years
ago
Item description User will enter the item description in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Municipal revenue or User will select from ( Municipal Revenue , Municipal Expenditure )
expenditure
First year value User will enter the value in numeric field
Second year value User will enter the value in numeric field
Third year value User will enter the value in numeric field
Average value This will be calculated using First Year Value, Second Year Value, Third
Year Value
Total revenue per Year This will be calculated using First Year Value, Second Year Value, Third
Year Value
Total expenditure per This will be calculated using First Year Value, Second Year Value, Third
Expenditure item User will enter the expenditure item in text field
Account Number User will enter the account number in text field
Planned expenditure User will enter the planned expenditure in numeric field
Source of finance User will enter the source of finance in text field
Revenue item User will enter the revenue item in text field
Account Number User will enter the account number in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Planned Revenue User will enter the planned revenue in numeric field
Percentage of total User will enter the percentage of total planned revenue in percentage
planned revenue field
Per capita planned User will enter the per capita planned revenue in numeric field
revenue
Total Projected User will enter the total projected revenue in numeric field
revenue
Account Number User will enter the account number in text field
Revenue item User will enter the revenue item in text field
First year value User will enter the value in numeric field
Second Year Value User will enter the value in numeric field
Third year value User will enter the value in numeric field
Total for three year This value will be calculated using First Year Value , Second Year Value,
Third Year Value
Total per category This value will be calculated using category , First Year Value , Second
Year Value, Third Year Value
Revenue Item User will enter the revenue item in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Issues found in past User will enter the issues found in past revenue performance analysis in
revenue performance text field
analysis
Formulated Strategies User will enter the formulated strategies in text field
Timing User will select the value from ( 1st Year, 2nd Year, 3rd Year )
Button Submit This Button will submit the entered data for Revenue Enhancement Plan
Button Reset This Button will reset the entered data for Revenue Enhancement Plan
Button Cancel This Button will terminate the process of capturing data for Revenue
Enhancement Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Revenue sources
Revenue Item Category Account Number
Select Item
Impact on revenue
Performance
Select Impact
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Planned Revenue 2nd Planned Revenue Actual Revenue 3rd Actual Revenue 2nd
Year Past current year Year Past Year Past
Financial Balance
Actual own source Actual own source Actual own source Actual Expenditure
of revenue last year of revenue 2nd year ago of revenue 3rd year ago for last year
Financial Balance
Revenue vs Expenditure
for 3years ago
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Third year value Average value Total revenue per Total expenditure
Year per year
Population
Second year value Third year value Total for three year Total per category
Overall total
Timing Remark
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Analysis of arrears.
Inputs
Recording of Debtors
Date of bill used User will enter the date of bill used from calendar
Name of debtor ( Tax User will enter the name of debtor in text field
Payer )
Amount Due
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Current Billed Amount User will enter the current billed amount in numeric field
Total This will be calculated using Current Billed amount and Penalty Value
Status of Payment User will select the status of payment from dropdown
Summary of Arrears
Tax revenue from User will enter the value of tax revenue from municipal services in
municipal services numeric field
Recurrent Account User will enter the recurrent account number in text field
Number
Number of arrear files User will enter the number of arrear files in numeric field
Age of arrears from User will select the age of arrears from calendar
Age of arrears to User will select the age of arrears to from calendar
Amount of overdue tax User will enter the amount of overdue tax in birr in numeric field
in Birr
Amount of fine in Birr User will enter the amount of fine tax in birr in numeric field
Fine as % of total This will be calculated using amount of overdue tax and amount of fine
overdue tax in birr value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Possible reasons for User will enter the possible reasons for arrears in text field
arrears
Button Submit This Button will submit the entered data for analysis of arrears
Button Reset This Button will reset the entered data for analysis of arrears
Button Cancel This Button will terminate the process of capturing data for analysis of
arrears
Analysis of Arrears
Recording of Debtors
Amount Due
Summary of Arrears
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Municipal Finance and Revenue Progress Report.
Inputs
Level User will select the Level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
From Month User will select the month date from calendar
Percentage Achieved This will be calculated using Planned and actual Value
Percentage Achieved This will be calculated using Planned and actual Value
From Month User will select the month date from calendar
Percentage Achieved This will be calculated using Planned and actual Value
Percentage Achieved This will be calculated using Planned and actual Value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the entered data for Municipal finance and
revenue progress report
Button Reset This Button will reset the entered data for Municipal finance and revenue
progress report
Button Cancel This Button will terminate the process of capturing data for Municipal
finance and revenue progress report
ULGs that achieve an increase of own source municipal revenue (excluding landlease
income) of at least 10 percent over the previous year under UIIDP
From Month
Up to Month
ULGs that achieve an increase of own source municipal revenue (including landlease
income) of at least 10 percent over the previous year under UIIDP
From Month
Up to Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
collection and collation
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for M & E Reporting data are:
Inputs
Level User will select the level from ( Federal , Regional , ULG )
ULG Name User will select the ULG Name from the dropdown list
Region Name User will select the region from the dropdown list
Financial Year User will the Financial Year from the dropdown list
Quarter User will select the Quarter from the dropdown list
ULG Name User will select the ULG Name from the dropdown list
Region Name User will select the region from the dropdown list
Financial Year User will the Financial Year from the dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name User will select the ULG Name from the dropdown list
Region Name User will select the region from the dropdown list
Financial Year User will the Financial Year from the dropdown list
Quarter User will select the Quarter from the dropdown list
ULG Name User will select the ULG Name from the dropdown list
Region Name User will select the region from the dropdown list
Financial Year User will the Financial Year from the dropdown list
Button Submit This Button will submit the data for Financial Management M&E
Button Reset This Button will reset the entered data for Financial Management M&E
Button Cancel This Button will terminate the process of capturing data for Financial
Management M&E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Count and reconcillation of fixed assets and stock inventory (only annual reports)
ULG Region Financial Year Date of Count
Select ULG Select Region
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for count and reconciliation of fixed assets.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Year User will select the financial year from dropdown list
ULG Name User will select the ULG Name from the dropdown list
Date of Count User will select the date of count from calendar
Asset name and type User will the select the asset name and type from dropdown list
Asset Condition User will select the Asset condition from the dropdown list
Asset Value User will enter the asset value in numeric field
Asset Purchase Date User will select the date from calendar
Asset Description User will enter the asset description modality in text field
Modality
Quality of stock count User will enter the quality of stock count in text field
Obsolete quantity User will the enter the obsolete quantity in numeric field
Damaged Quantity User will the enter the damaged quantity in numeric field
Asset Location User will enter the asset location in text field
Button Submit This Button will submit the data for Count and reconciliation of asset
data
Button Reset This Button will reset the entered data for Count and reconciliation of
asset data
Button Cancel This Button will terminate the process of capturing data for Count and
reconciliation of asset data
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset name and type Asset condition Asset Value Asset Purchase Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for timely preparation audit progress report.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
ULG User will select the ULG name from dropdown list
Region User will select the Region Name from the dropdown list
Financial Year User will select the financial year from the dropdown list
Date offinancial User will the select the date from calendar
account submitted to
ORAG
Date of Audit Report User will the select the date from calendar
( EC & GC )
Date submitted for User will the select the date from calendar
Deadline
State of Audit User will select the value from (Adverse, Disclaimer, Opinion, qualifies or
unqualified)
Audit Compliance User will select the follow up from previous year audit value
Button Submit This Button will submit the data for Audit Progress Report
Button Reset This Button will reset the entered data for Audit Progress Report
Button Cancel This Button will terminate the process of capturing data for Audit
Progress Report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Audit Progress
Level ULG Region Financial Year
Select Level Select ULG Select Region Select Thematic Area
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Financial Year User will select the year from dropdown list
ULG Name User will select the ULG Name from the dropdown list
Audit Start Date User will select the date from calendar
Audit Completion Date User will select the date from calendar
Date of Audit Report User will select the date from calendar
Submission
Button Submit This Button will submit the data for Financial Audit
Button Reset This Button will reset the entered data for Financial Audit
Button Cancel This Button will terminate the process of capturing data forFinancial
Audit
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Audit
Financial Year Quarter ULG Name Audit Type
Select Year Select Quarter Select ULG Select Audit Type
Figure 1
Figure 2
Description
This function is used to capture Annual Action Plan data for Financial Management.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Financial Management area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Environment Project screening data.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Name User will select the project name from dropdown list
ULG Name User will select the ULG Name from dropdown list
Estimated Cost User will enter the estimated cost in numeric field
Proposed Date of Works User will select the date from calendar
Commencement
Technical drawing and User will select the value from ( Yes , No )
specifications reviewed
Site Selection
Physical Data User will enter the physical data in text field
Any existing property to User will select the value from ( Yes , No )
transfer to Project
(Yes/No)
Any Plans new User will select the value from ( Yes , No )
for
Construction (Yes/No)
Site sensitivity with User will select the value from ( Low , Medium , High )
explanation ( Low,
Medium ,High)
Checklist of impacts
Type of projects User will enter the type of projects in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
List of the checklist User will enter the list of checklist items in text field
items
Potential for adverse User will enter the potential for adverse impact in text field
impact
General questions that apply for all types of projects and subprojects
Question category User will enter the question category in text field
List of questions User will enter the list of questions in text field
List of answers (Yes / User will select the list of answers from ( Yes , No )
No)
Category of the project User will select the category of project from ( Schedule 1, Schedule 2,
Schedule 1,2,or 3 Schedule 3 )
Submit Button This Button will submit the entered data for project screening
Reset Button This Button will reset the entered data for project screening
Cancel Button This Button will terminate the process of capturing data for project
screening
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Screening
Project name ULG name Location Estimated Cost
Site selection
Physical data Extensions of or Any existing property Any Plans for new
changes to existing to transfer to Project Construction
alignment (Yes / No) Yes / No (Yes / No )
Rating
Checklist of impacts
General questions that apply for all types of projects and subprojects
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture ESMS & RS (Environmental and social management system
and resettlement system)
Inputs
ULG User will select the ULG Name from dropdown list
Total number of CIP User will enter the value in numeric field
Projects
Total Number of User will select the month from dropdown list
Projects Screened as
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
under schedule 1
(Requires EIA)
under schedule 2
(Requires
Environmental review
report)
under schedule 3 ( No
Potential Impacts)
no further action to be
taken)
REPA Decision
ULG to REPA
Revision
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
completed
completed
Button Submit This Button will submit the entered data for ESMS & RS
Button Reset This Button will reset the entered data for ESMS & RS
Button Cancel This Button will terminate the process of capturing data for ESMS & RS
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ESMS & RS
REPA Decision
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Environment Performance audit by authorized users having
Add rights or Manage rights.
Inputs
Region Name User will select the Region name from dropdown list
Audit Started User will select the audit started date from calendar
Audit Completed User will select the audit completed date from calendar
Audit Report User will select the audit report submitted to MUDCo date from calendar
Submitted to MUDCo
Financial Year User will select the financial year from dropdown list
Button Submit This Button will submit the entered data for Audit Environmental
Performance Audit.
Button Reset This Button will reset the entered data for Audit Environmental
Performance Audit
Button Cancel This Button will terminate the process of capturing data for Audit
Environmental Performance Audit
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Year
Figure 1
Figure 2
Description
This function is used to capture Environment Management Plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
ULG name User will select the ULG Name from dropdown list
Region name User will select the Region Name from dropdown list
Project name User will select the Project Name from dropdown list
Potential Environment User will enter the potential environment impacts in text field
Impacts
Proposed Mitigation User will enter the proposed mitigation measures in text field
Measures
Responsibility for User will enter the responsibility for implementing the mitigation
implementing the measures in text field
mitigation measures
Responsibility for User will enter the responsibility for monitoring in text field
monitoring
Time horizon
Cost Estimates
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the entered data for Environment Management
Plan
Button Reset This Button will reset the entered data for Environment Management
Plan
Button Cancel This Button will terminate the process of capturing data for Environment
Management Plan
Time horizon
Mitigation Monitoring
Cost Estimates
Mitigation Monitoring
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Environment audit data.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name User will select the ULG Name from dropdown list
Region Name User will select the Region name from dropdown list
Start Date of Audit User will select the date from calendar
End Date of Audit User will select the date from calendar
Audit Report
Findings Description User will enter the findings description in text field
Project Name User will select the project name from dropdown list
Action to be taken User will enter the action to be taken in text field
Responsible Party User will enter the responsible party in text field
Timeline for Action User will select the timeline for action in quarter
Action Implementation User will select the action implementation status from dropdown list
Status
Button Submit This Button will submit the entered data for Environment Audit
Button Reset This Button will reset the entered data for Environment Audit
Button Cancel This Button will terminate the process of capturing data for Environment
Audit
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Environment Audit
ULG Name Region Name Start Date of Audit End Date of Audit
Select ULG Select Region Select Date Select Date
Submission Date
of Audit Report
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 3
Description
This function is used to capture ESIA data.
Inputs
Executive Summary User will enter the executive summary in text field
Policy , Legal and User will enter the policy , legal and administrative framework in text
administrative field
framework
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Description User will enter the project description in text field
Baseline Data User will enter the baseline data in text field
Environment and Social User will enter the environment social impacts in text field
Impacts
Analysis of Alternatives User will enter the analysis of alternatives in text field
Environment This will come from the data captured for environment management
Management Plan plan
Appendixes
List of ESIA Report User will enter the list of ESIA report preparers in text field
Preparers
Record of interagency User will Upload the record of interagency and consultation meeting
and consultation
meeting
Table Presenting the User will upload the table presenting the relevant data
relevant data
List of associated User will enter the list of associates reports in text field
reports
Button Submit This Button will submit the entered data for ESIA
Button Reset This Button will reset the entered data for ESIA
Button Cancel This Button will terminate the process of capturing data for ESIA
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Appendixes :-
Record of interagency and consultation meeting Table Presenting the relevant data
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
List of User will enter the list of recommendations made to resolve issues in text
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Environment Project screening data.
Inputs
Project Name User will select the project name from dropdown list
ULG Name User will select the ULG Name from dropdown list
Estimated Cost User will enter the estimated cost in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Proposed Date of Works User will select the date from calendar
Commencement
Technical drawing and User will select the value from ( Yes , No )
specifications reviewed
Site Selection
Physical Data User will enter the physical data in text field
to existing alignment
(Yes/No)
Any existing property to User will select the value from ( Yes , No )
transfer to Project
(Yes/No)
Any Plans for new User will select the value from ( Yes , No )
Construction (Yes/No)
Site sensitivity with User will select the value from ( Low , Medium , High )
explanation ( Low,
Medium ,High)
Checklist of impacts
Type of projects User will enter the type of projects in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
List of the checklist User will enter the list of checklist items in text field
items
Potential for adverse User will enter the potential for adverse impact in text field
impact
General questions that apply for all types of projects and subprojects
Question category User will enter the question category in text field
List of questions User will enter the list of questions in text field
List of answers (Yes / User will select the list of answers from ( Yes , No )
No)
Category of the project User will select the category of project from ( Schedule 1, Schedule 2,
Submit Button This Button will submit the entered data for project screening
Reset Button This Button will reset the entered data for project screening
Cancel Button This Button will terminate the process of capturing data for project
screening
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Project Screening
Project name ULG name Location Estimated Cost
Site selection
Physical data Extensions of or Any existing property Any Plans for new
changes to existing to transfer to Project Construction
alignment (Yes / No) Yes / No (Yes / No )
Rating
Checklist of impacts
General questions that apply for all types of projects and subprojects
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to ESMS & RS data for social development thematic area
Inputs
ULG name User will select the ULG Name from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number Screened User will enter the value in numeric field
as per RSG Screening
Form
no further action to be
taken)
Number RAP not User will enter the value in numeric field
completed
Button Submit This Button will submit the entered data for ESMS & RS
Button Reset This Button will reset the entered data for ESMS & RS
Button Cancel This Button will terminate the process of capturing data for ESMS & RS
ESMS & RS
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to resettlement action plan data under social development thematic area
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG name User will select the ULG Name from dropdown list
Region name User will select the Region Name from dropdown list
Project name User will select the Project Name from dropdown list
Project Social Impact User will enter the potential environment impacts in text field
Proposed Mitigation User will enter the proposed mitigation measures in text field
Measures
Responsibility for User will enter the responsibility for implementing the mitigation
Responsible for User will enter the responsibility for monitoring in text field
monitoring
Time horizon
Cost Estimates
Button Submit This Button will submit the entered data for Resettlement Action Plan
Button Reset This Button will reset the entered data for Resettlement Action Plan
Button Cancel This Button will terminate the process of capturing data for Resettlement
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Time horizon
Mitigation Monitoring
Cost Estimates
Mitigation Monitoring
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Social Audit Review Data.
Inputs
ULG Name User will select the ULG Name from dropdown list
Region Name User will select the Region name from dropdown list
Start Date of Audit User will select the date from calendar
End Date of Audit User will select the date from calendar
Audit Report
Findings Description User will enter the findings description in text field
Project Name User will select the project name from dropdown list
Action to be taken User will enter the action to be taken in text field
Responsible Party User will enter the responsible party in text field
Timeline for Action User will select the timeline for action in quarter
Action Implementation User will select the action implementation status from dropdown list
Status
Button Submit This Button will submit the entered data for Environment Audit
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Environment Audit
Button Cancel This Button will terminate the process of capturing data for Environment
Audit
ULG Name Region Name Start Date of Audit End Date of Audit
Select ULG Select Region Select Date Select Date
Submission Date
of Audit Report
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
collection and collation
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture asset condition assessment indicator which will be used to
assess the assets
Inputs
Level User will select the Level from ( Federal , Regional , ULG )
General Description User will enter the general description in text field
Button Submit This Button will submit the data for Asset Condition Assessment
Indicator
Button Reset This Button will reset the entered data for Asset Condition Assessment
Indicator
Button Cancel This Button will terminate the process of capturing data for Asset
Condition Assessment Indicator
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data of Infrastructure Asset Inventory.
Inputs
Movement Network
Movement Network User will select the movement network asset category from dropdown list
Asset category
Movement Network User will select the movement network asset category unit of
measurement
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Roads
Road Type User will select the road type from dropdown list
Primary Road (KM) User will enter the value of primary road in Kilometer ( Numeric field )
Secondary Road (KM) User will enter the value of secondary road in Kilometer ( Numeric field)
Collectors and Local User will enter the value of collectors and local road in Kilometer ( Numeric
Road (KM) field )
Total (KM) This will be calculated using Primary Road , Secondary Road, Collectors
and Local Road
Pedestrian Walkways
Pedestrian walkway User will select the pedestrian type from dropdown list.
type (KM)
Pedestrian walkway on User will enter the value of pedestrian walkway on primary road in
Primary Road (KM) Kilometer ( Numeric field )
Pedestrian walkway on User will enter the value of pedestrian walkway on secondary road in
Pedestrian walkways User will enter the value of pedestrian walkway on collectors and local
Total (KM) This will be calculated using Pedestrian walkway on Primary Road,
Secondary Road, Collectors and Local Road
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Road Structure
Road Structure type User will select the road structure type from dropdown list
(KM)
Road structure on User will enter the road structure on primary road in numeric field
Road structure on User will enter the road structure on secondary road in numeric field
Road Structure on User will enter the road structure on collectors and local road in numeric
Total (NO) This will be calculated using Road structure on Primary Road , Secondary
Road , Collectors and Local Road
Street Lights
Street Light type (KM) User will select the street light type from dropdown list
Street Light on Primary User will enter the street lights on primary road in numeric field
Road (NO)
Street Light on User will enter the street lights on secondary road in numeric field
Street Light on User will enter the street lights on collectors and local road in numeric
collectors and Local field
Road (NO)
Total (NO) This will be calculated using Street Lights on Primary Road , Secondary
Road, Collectors and Local Road
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Machinery User will select the machinery type from dropdown list
Drainage Network
Drainage Network User will select the drainage network asset category from dropdown list
Asset category
Drainage Network User will select the drainage network asset category unit of measurement
measurement
Drain Type User will select the drain type from dropdown list
Drain on Primary Road User will enter the drains on primary road in kilometer ( Numeric field)
(KM)
Drain on Secondary User will enter the drains on secondary road in kilometer ( Numeric field)
Road (KM)
Drain on Collectors and User will enter the drains on collectors and local road in kilometer
Local Road (KM) ( Numeric field)
Total Drain (KM) This will calculates using the drain on primary road, secondary road,
collectors and local road.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Water Supply
Water Supply Asset User will select the water supply asset category from dropdown list
category
Water Supply asset User will select the water supply asset category unit of measurement from
measurement
Water Supply Sub User will select water supply sub category from dropdown list
category
Total (NO) User will enter the Total ( Number ) in numeric field
Sanitation
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Sanitation Asset User will select the sanitation asset category from dropdown list
category
Sanitation asset User will select the sanitation asset category unit of measurement from
measurement
Sanitation Asset User will select the sanitation asset category classification from dropdown
Category Classification list
Sanitation Facilities User will enter the sanitation facilities and description in text field
Description
Solid waste User will select the solid waste management asset category from
Solid waste User will select the solid waste management asset category unit of
measurement
Solid waste User will select the solid waste management asset category classification
management asset from dropdown list
category classification
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Solid waste User will enter the solid waste management description in text field
management
Description
Greenery and parks User will select the greenery and park asset category from dropdown list.
asset category
Greenery and parks User will select the greenery and parks asset category unit of
measurement
Greenery and parks User will select the greenery and parks asset category classification from
classification
Greenery and parking User will select the greenery and parks sub-category from dropdown list
sub-category
Greenery and parking User will enter the greenery and parking details in text field
details
Social and Economic User will select the social and economic development facility asset
asset category
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Social and Economic User will select the social and economic development facility asset
Development Facility category unit of measurement from dropdown list
Social and economic User will select the social and economic development facility asset
classification
Kind of facility User will enter the kind of facility in text field
Button Submit This Button will submit the data for Asset inventory
Button Reset This Button will reset the entered data for Asset inventory
Button Cancel This Button will terminate the process of capturing data for Asset
inventory
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Movement Network
Movement Network Movement Network
Asset category asset category unit
of measurement
Road Type Primary Road (KM) Secondary Road (KM) Collectors and
Local Road (KM)
Total (KM)
Pedestrian Walkways
Total (KM)
Road Strcuture
Total (NO)
Street Lights
Total (NO)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Drainage Network
Drainage Network Drainage Network
Asset category asset category unit
of measurement
Water Supply
Water Supply Water Supply
Asset category asset category unit
of measurement
Sanitation
Sanitation Sanitation
Asset category asset category unit
of measurement
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Functionality Remark
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for asset condition assessment.
Inputs
Movement Network User will select the Movement Network asset category from dropdown
Asset category list ( Roads, Pedestrian walkways, Road Structures, Street Lights,
Construction Machinery and Vehicles )
(m2)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Area (m2) User will enter the value in numeric field
Percentage This will be calculated using Deterioration area and total area
Deteriorated
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Road Drainage Type User will select the road drainage type from dropdown list
Total Length (Km) User will enter the value in numeric field
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Water supply User will select the water supply sub-category from dropdown list
subcategory
Total Length (Km) User will enter the value in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Sanitation asset User will select the sanitation asset category from dropdown list
category
Asset type User will select the asset type from dropdown list
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Solid waste manage- User will select the solid waste management asset category from
Asset type User will select the asset type from dropdown list
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Greenery and parks User will select the Greenery and parks asset category from dropdown
asset category list
Asset type User will select the asset type from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Social and economic User will select the social and economic development facilities asset
development facilities category from dropdown list
asset category
Asset type User will select the asset type from dropdown list
Condition User will select the condition from ( Very Good, Good , Moderate, Poor ,
Very Poor )
Button Submit This Button will submit the data for Asset Condition
Button Reset This Button will reset the entered data for Asset Condition
Button Cancel This Button will terminate the process of capturing data for Asset
Condition
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Detoriation Area (m2) Total Area (m2) Total Number Percentage Detoriated
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Infrastructure asset management data.
Inputs
ULG User will select the ULG name from dropdown list
Name of Project User will select the name of project from dropdown list
Infrastructure asset User will select the infrastructure asset category from dropdown list
category
Unit of measurement User will select the unit of measurement from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Planned for Financial User will enter the value in numeric field
Year
O & M Budgets
ULG Name User will select the ULG name from dropdown list
Project Name User will select the name of project from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Physical This will be calculated using planned and actual physical value
Percentage Financial This will be calculated using planned and actual financial value
Percentage Physical This will be calculated using planned and actual physical value
Percentage Financial This will be calculated using planned and actual financial value
Button Submit This Button will submit the data for infrastructure asset management
Button Reset This Button will reset the entered data for infrastructure asset
management
Button Cancel This Button will terminate the process of capturing data for infrastructure
asset management
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
From Month
To Month
From Month
To Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Asset Management Plan which will be sent to other thematic
areas for review and approval
Inputs
Contact Details User will enter the contact details in text field
Strategic Activity Area User will select the strategic activity area from ( Movement Network,
Water supply network, Environmental services, social and economic
services )
Physical Asset Category User will select the physical asset category from dropdown list
Asset category User will select the asset category from dropdown list
Responsible Body User will enter the responsible body name in text field
Responsible Person/ User will enter the responsible person / Group in text field
Group
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset Inventory
Upload Asset Inventory User will upload the asset inventory report
Report
Upload Asset condition User will upload the asset condition assessment report
assessment Report
Feature Class User will enter the feature class in text field
Normal Maintenance User will enter the normal maintenance activity in text field
Activity
Unit Cost User will enter the unit cost in numeric field
Budget for the activity User will enter the budget for activity in numeric field
Strategic Activity area User will select the strategic activity area from ( Movement Network,
Water supply network, Environmental services, social and economic
services )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Cost (EB) Operation User will enter the cost ( EB ) operation in numeric field
Total Cost User will enter the total cost in numeric field
Asset Category User will select the asset category from dropdown list
Asset category type User will select the asset category type from dropdown list
Unit of measure User will select the unit of measure from dropdown list
Unit Rate ( EB ) User will enter the Unit rate ( EB ) in numeric field
Total Cost User will enter the total cost ( EB ) in numeric field
Replacement cost and residual value of all assets by strategic and supportive activity.
Strategic and User will select the strategic and supportive activity area from
supportive activity area ( Movement Network, Water supply network, Environmental services,
Replacement Cost User will enter the replacement cost in numeric field
Residual Value User will enter the residual value in numeric field
Total Budget for User will enter the total budget for normal maintenance in numeric field
Normal maintenance
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Strategic and User will select the strategic and supportive activity area from
supportive activity area ( Movement Network, Water supply network, Environmental services,
Cost of new works User will enter the cost of new works project in numeric field
projects
Total Budgets User will enter the total budgets in numeric field
Normal maintenance User will enter the total budget for normal maintenance in numeric field
or new works project
Approval User will select the approval status from ( Accepted , Rejected )
Date of tender closure User will select the date from calendar
Contract
Date of start of activity User will select the date from calendar
Completion
the city
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Date when the new User will select the date from calendar
project is entered into
New work projects started against project approved for AMP Year-2
Strategic and User will select the strategic and supportive activity area from
supportive activity ( Movement Network, Water supply network, Environmental services,
areas
social and economic services )
approved
No. of projects started User will enter the value in numeric field
Cost of Projects started User will enter the value in numeric field
Total This will be calculated using cost of projects approved and started
Approval User will select the approval status from ( Accepted , Rejected )
Contract
Date of start of activity User will select the date from calendar
activity
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Date when the User will select the date from calendar
condition of the asset is
updated
Strategic and User will select the strategic and supportive activity area from
approved
completed
completed
Total This will be calculates using cost of activities approved and completed
Button Submit This Button will submit the data for Asset management plan
Button Reset This Button will reset the entered data for Asset management plan
Button Cancel This Button will terminate the process of capturing data for Asset
Management Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset Inventory
Replacement cost and residual value of all assets by strategic and supportive activity.
Strategic and supp- Replacement Cost Residual Value Total Budget for Normal
ortive activity area maintenance
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Strategic and supp- Cost of new works Total Budgets Normal maintenance
ortive activity area projects or new works project
Date of start of Date of Project Date of handover to Date when the new
activity Completion the city project is entered into
the database for existing
assets
New work projects started against project approved for AMP Year-2
Strategic and suppo- No. of Projects Cost of projects No. of projects started
rtive activity areas approved approved
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture asset maintenance plan.
Inputs
Strategic and User will select the strategic and supportive activity area from
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Budget for routine and User will enter the value in numeric field
periodic maintenance
(EB/ Year)
Total Budget for User will enter the value in numeric field
normal maintenance
Budget Source User will enter the budget source in text field
Budget Amount User will enter the budget amount in numeric field
Strategic and User will select the strategic and supportive activity area from
supportive activity ( Movement Network, Water supply network, Environmental services,
areas
social and economic services )
Budget for reducing User will enter the value in numeric field
Button Submit This Button will submit the data for Asset maintenance plan
Button Reset This Button will reset the entered data for Asset maintenance plan
Button Cancel This Button will terminate the process of capturing data for asset
maintenance plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture new work projects and the maintenance activities budgets to
a 3-year rolling program.
Inputs
New work projects and the maintenance activities budgets to a 3-year rolling
program.
Strategic activity areas User will select the strategic and supportive activity area from
Total Budget This will be calculated using Budget Year 1 , Budget Year 2 , Budget Year
3
Category User will select the category from ( Maintenance , New Work )
Button Submit This Button will submit the data for 3-year rolling program
Button Reset This Button will reset the entered data for 3-year rolling program
Button Cancel This Button will terminate the process of capturing data for 3-year rolling
program
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
New Works projects and the maintenance activities budgets to a 3-Year rolling Program
Category
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Capture Data for Urban Land Management M & E Data for generating
M & E Report
Inputs
Region name User will select the Region Name from dropdown list
ULG name User will select the ULG Name from dropdown list
Financial Year User will select the financial year from dropdown list
Unit of Measurement User will select the unit of measurement from dropdown list
Residential
Commercial
Other
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Residential
Commercial
Other
Residential
Commercial
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Other
Residential
Commercial
Other
Number of organized files of parcels of landholdings which are made ready for adjucation and
registration as per the annual plan cascaded from the region to the city
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
year
adjucation and
registration during the
month
Actual number of files User will enter the value in numeric field
to be ready for
adjucation and
month
% Achieved This will be calculated using planned and actual value during the month
Adjucated parcels of landholdings which are made ready for registration as per the approvals of
adjucation and registration commission and as per the annual plan cascaded from the region to the
city
year
adjucated parcels to be
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
adjucated parcels to be
month
% Achieved This will be calculated using planned and actual value during the month
Registered parcels of landholdings as per the annual plan cascaded from the region to the
city
the year
registered parcels
% Achieved This will be calculated using planned and actual value during the month
Button Submit This Button will submit the data for Urban Land Management M & E data
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Urban Land Management M
& E data
Button Cancel This Button will terminate the process of capturing data for Urban Land
Management M & E data
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
From Month
Residential
Number Hectares
Commercial
Number Hectares
Number Hectares
To Month
Residential
Number Hectares
Commercial
Number Hectares
Number Hectares
From Month
Residential
Number Hectares
Commercial
Number Hectares
Number Hectares
To Month
Residential
Number Hectares
Commercial
Number Hectares
Number Hectares
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of Organized Files of Parcels of landholdings which are made ready for adjudication and
registration as per the Annual Plan cascaded from the Region to the city.
For Month
Adjudicated parcels of landholdings which are made ready for registration as per the approvals of adjudication
and registration commission and as per the Annual Plan cascaded from the Region to the city
For Month
Registered Parcels of landholdings as per the Annual Plan cascaded from the Region to the city
For Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Land Registration, inventory, Release, Development, Banking
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region name User will select the Region Name from dropdown list
ULG name User will select the ULG Name from dropdown list
Sub – city name User will select the sub-city name from dropdown list
Woreda User will select the Woreda name from dropdown list
Kebela User will select the kebela name from dropdown list
Land registration serial User will enter the UPIN in numeric field
number(UPIN)
Allotment or Auction User will select the value from ( Allotment , Auction )
Plot number User will enter the plot number in text field
Land description User will enter the land description in text field
Land dimension User will enter the land dimension in numeric field
Land category User will enter the land category in text field
Button Submit This Button will submit the data for Land Registration.
Button Reset This Button will reset the entered data for Land Registration
Button Cancel This Button will terminate the process of capturing data for Land
Registration
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
collection and collation
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture extensive recording of all Proposal Feasibility Assessment
Inputs
ULG Name User will select the ULG name from dropdown list
Region Name User will select the Region name from dropdown list
Project Type User will select the value of project type from dropdown list
Financial Year User will select the value of financial year from dropdown list
Total Area in Hectare User will enter the total area in numeric field
Assessment criteria User will select the assessment criteria from dropdown list
Assessment remarks / User will enter the assessment remarks / recommendation in text field
recommendation
Approval Status User will select the approval status from ( Accepted , Rejected )
Button Submit This Button will submit the data for proposal feasibility assessment data
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for proposal feasibility assessment
data
Button Cancel This Button will terminate the process of capturing data for proposal
feasibility assessment data
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Urban Plan Supervision data.
Inputs
ULG name User will select the ULG Name from dropdown list
Region name User will select the region name from dropdown list
Project name User will select the project name from dropdown list
Financial year User will select the financial year from dropdown list
Supervision start date User will select the date from calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Supervision end date User will select the date from calendar
Site name User will select the site name from dropdown list
Infrastructure type User will select the infrastructure type from dropdown list
Supervisory remark User will enter the supervisory remark in text field
Button Submit This Button will submit the data for urban plan supervision
Button Reset This Button will reset the entered data for urban plan supervision
Button Cancel This Button will terminate the process of capturing data for urban plan
supervision
Supervisory Remarks
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture proposal assessment criteria which will be used to assess
Proposal feasibility.
Inputs
Assessment criteria User will enter the assessment criteria in text field
Button Submit This Button will submit the data for assessment criteria
Button Reset This Button will reset the entered data for assessment criteria
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for assessment
criteria
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for reviewing EIA report coming from environment
Management
Inputs
ULG Name User will select the ULG name from dropdown list
Region Name User will select the region name from dropdown list
EIA Report Serial User will enter the EIA Report serial number in text field
Number
Review Remarks User will enter the review remarks in text field
Button Submit This Button will submit the data for EIA Report Review
Button Reset This Button will reset the entered data for EIA Report Review
Button Cancel This Button will terminate the process of capturing data for EIA Report
Review
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
EIA Review
ULG Name Region Name EIA Report serial Period
Number
Review Remarks
Figure 1
Figure 2
Description
This function is used to capture data for reviewing structural plan coming from AUTOCAD
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the data for structural plan review
Button Reset This Button will reset the entered data for structural plan review
Button Cancel This Button will terminate the process of capturing data for structural
plan review
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Urban Planning M & E Report
Inputs
ULG User will select the ULG name from dropdown list
Type of Urban Plan User will select the type or urban plan from dropdown list
Technical endorsement User will select the year from dropdown list
Approval Date
Council of Ministers User will select the year from dropdown list
Approval Year
Planning in period User will select the year from dropdown list
Remaining time in User will select the year from dropdown list
Number of CIP Projects User will enter the number of CIP Projects in numeric field
( Works )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of CIP Projects User will enter the number of CIP Projects for which site plan issued in
for which site plan numeric field
issued
Number of CIP Projects User will enter the number of CIP Projects for which right of way
standards issued
Button Submit This Button will submit the data for Urban Planning M & E
Button Reset This Button will reset the entered data for Urban Planning M & E
Button Cancel This Button will terminate the process of capturing data for Urban
Planning M & E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Urban Plan Type Urban Plan Technical Urban Plan Technical Urban Plan Council
Endorsement Date Endorsement Year Minutes of Approval
of BUDCo of BUDCo Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data of screening data on potential projects.
Inputs
Name of Project User will select the name of project from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Kebele User will select the name of Kebele from dropdown list
Community Group City User will enter the community group city office from proposed in text
office from proposed field
Button Submit This Button will submit the data for screening data on potential projects
Button Reset This Button will reset the entered data for screening data on potential
projects
Button Cancel This Button will terminate the process of capturing data for screening
data on potential projects
Potential Projects
Name of Project Name of Kebele Community Group
City office from
from proposed
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Citizen Participation in Planning Progress.
Inputs
ULG name User will select the ULG name from dropdown list
Type of Meeting User will enter the type of meeting in text field
Community Group / User will enter the community group / city of official participated in text
No. of Participants
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage %
Group total as % of This will be calculated using value of male , female , transgender
Total
Female share % This will be calculates using female and total of male , female , transgender
Button Submit This Button will submit the data for citizen participation in planning
process
Button Reset This Button will reset the entered data for citizen participation in planning
process
Button Cancel This Button will terminate the process of capturing data for citizen
participation in planning process
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Participants
Percentage %
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Capital Investment Plan which will be sent to other thematic areas
for review and approval.
Inputs
ULG Name User will select the ULG Name from dropdown list
Region name User will select the Region Name from dropdown list
Population size User will enter the population size in numeric field
Growth rate User will enter the growth rate of population in percentage
Name of Mayor User will enter the name of mayor in text field
Name of City Manager User will enter the name of city manager in text field
Party responsible for User will enter the party responsible for CIP in text field
the CIP
Period of CIP (Financial User will select the period of CIP from dropdown list
years)
Financial Data
Capital budget item User will enter the capital budget item in text field
Projected budget 1st User will enter the value in numeric field
Financial year
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Projected budget 2nd User will enter the value in numeric field
Financial year
Projected budget 3rd User will enter the value in numeric field
Financial year
Total budget per item This will be calculated using capital budget item , Projected budget 1st
financial year , Projected budget 2nd Financial year, Projected budget 3rd
Financial year
Total budget per This will be calculated using capital budget item , Projected budget 1st
financial year financial year , Projected budget 2nd Financial year, Projected budget 3rd
Financial year
Revenue item User will enter the revenue item in text field
Forecast for 1st User will enter the value in numeric field
Financial year
Forecast for 2nd User will enter the value in numeric field
Financial year
Forecast for 3rd User will enter the value in numeric field
Financial year
Total budget per item This will be calculated using revenue item , Forecasted Revenue 1st
financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total budget per This will be calculated using revenue item , Forecasted Revenue 1st
financial year financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year
Expenditure item User will enter the expenditure item in text field
Forecast for 1st User will enter the value in numeric field
Financial year
Forecast for 2nd User will enter the value in numeric field
Financial year
Forecast for 3rd User will enter the value in numeric field
Financial year
Total budget per item This will be calculated using expenditure item , Forecasted 1st financial
year , Forecasted 2nd Financial year, Forecasted 3rd Financial year
Total budget per This will be calculated using expenditure item , Forecasted 1st financial
financial year year , Forecasted 2nd Financial year, Forecasted 3rd Financial year
Operation surplus for User will enter the operation surplus for each year in numeric field
each year
Capital revenue
Revenue item User will enter the revenue item in text field
Forecast for 1st User will enter the value in numeric field
Financial year
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Forecast for 2nd User will enter the value in numeric field
Financial year
Forecast for 3rd User will enter the value in numeric field
Financial year
Total budget per item This will be calculated using revenue item , Forecasted Revenue 1st
financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year
Total budget per This will be calculated using revenue item , Forecasted Revenue 1st
financial year financial year , Forecasted Revenue 2nd Financial year, Forecasted
Revenue 3rd Financial year
Capital expenditure User will enter the capital expenditure item in text field
item
Amount for 1st financial User will enter the value in numeric field
year
Amount for 2nd User will enter the value in numeric field
financial year
Amount for 3rd User will enter the value in numeric field
financial year
Item description User will enter the item description in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Part (Municipal User will select the value from ( Municipal function , State function )
function or state
function)
Unit of measure User will enter the unit of measure in text field
Unit cost User will enter the unit cost in numeric field
Priority User will select the priority from ( Low , Medium , High )
Budget for 1st year User will enter the value in numeric field
Budget for 2nd year User will enter the value in numeric field
Budget for 3rd year User will enter the value in numeric field
Total budget per item This value will be calculated using item description , Budget for 1st Year,
Budget for 2nd Year, Budget for 3rd Year
Total budget per This value will be calculated using category , Budget for 1st Year, Budget
category for every year for 2nd Year, Budget for 3rd Year
Total budget per year This value will be calculated using item description, category, Budget for
1st Year, Budget for 2nd Year, Budget for 3rd Year
Overall total budget This value will be calculated using item description, category, Budget for
per year 1st Year, Budget for 2nd Year, Budget for 3rd Year
Item description User will enter the item description in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Part (Municipal User will select the value from ( Municipal function , State function )
function or state
function)
Unit of measure User will enter the unit of measure in text field
Unit cost User will enter the unit cost in numeric field
Total cost This will be calculated using Unit of measure , Quantity, Unit Cost
Funding sources User will enter the funding sources in text field
Funding amount for User will enter the funding amount for each source in numeric field
each source
Total cost for each item This will be calculated using item description , unit of measure , quantity,
unit of cost
Total cost for each This will be calculated using item description , unit of measure , quantity,
category per funding unit of cost, funding amount for each source
source
Overall total costs This will be calculated using item description , category, unit of measure ,
quantity, unit of cost
Maintenance budgets
Item description User will enter the item description in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset item description User will enter the asset item description in text field
1st Year budget User will enter the value in numeric field
2nd Year budget User will enter the value in numeric field
3rd Year budget User will enter the value in numeric field
Total budget per year This will be calculated using item description , 1st year budget, 2nd year
budget, 3rd year budget
Total budget per item This will be calculated using item description , 1st year budget, 2nd year
budget, 3rd year budget
Staffing plan
Infrastructure category User will enter the infrastructure category in text field
Number of required User will enter the number of required staff in numeric field
staff
Number of available User will enter the number of available staff in numeric field
staff
Job Creation Plan Data from LED and Job Creation Module
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Item Number User will enter the item number in text field
Participatory group
Citizen group User will enter the citizen group in text field
Number of male User will enter the number of male in numeric field
Number of female User will enter the number of female in numeric field
Total This will be calculated using number of male , number of female value
Project Name User will select the project name from dropdown list
Conventional approach User will enter the conventional approach / design in text field
/ design
Low carbon and User will enter the low carbon and resilient alternative designs
designs considered
Select approach / User will select the approach / design from dropdown list
design
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Output indicator/ Unit User will enter the output indicator / unit of measure in text field
of measure
Quarter 1 User will enter the Quarter 1 implementation financial in numeric field
implementation
Financial
Quarter 1 User will enter the Quarter 1 implementation physical in numeric field
implementation
Physical
Quarter 2 User will enter the Quarter 2 implementation financial in numeric field
implementation
Financial
Quarter 2 User will enter the Quarter 2 implementation physical in numeric field
implementation
Physical
Quarter 3 User will enter the Quarter 3 implementation financial in numeric field
implementation
Financial
Quarter 3 User will enter the Quarter 3 implementation physical in numeric field
implementation
Physical
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Quarter 4 User will enter the Quarter 4 implementation financial in numeric field
implementation
Financial
Quarter 4 User will enter the Quarter 4 implementation physical in numeric field
implementation
Physical
Annual Total This will be calculates using Quarter 1 , 2, 3 , 4 physical and financial
Button Submit This Button will submit the data for Capital Investment Plan
Button Reset This Button will reset the entered data for Capital Investment Plan
Button Cancel This Button will terminate the process of capturing data for Capital
Investment Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Data
Revenue item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year
Expenditure item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year
Capital revenues
Revenue item Forecast for 1st Forecast for 2nd Forecast for 3rd
Financial year Financial year Financial year
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Capital expenditure Amount for 1st Amount for 2nd Amount for 3rd
item financial year financial year financial year
Budget for 2nd year Budget for 3rd year Total budget per item Total budget per
category for every
year
Funding amount Total cost for Total cost for each Overall total costs
for each source each item category per funding
source
Maintenance budgets
2nd Year budget 3rd Year budget Total budget per year Total budget per item
Staffing plan
Job Creation Plan Data from LED and Job Creation Module
Procurement
Copyrightplan data from
© 2021-22. CSMprocurement module
Technologies (A CMMI ML5 Company). All rights reserved.
Participatory group
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Matching funds data for capital investment plan
Inputs
indicative or approved
allocation
in CIP
Percentage of actual This will be calculated using the Budgeted in CIP and actual deposited
value
Date deposited User will select the date from the calendar
Financial year User will select the financial year from calendar
Button Submit This Button will submit the data for Matching Funds
Button Reset This Button will reset the entered data for Matching Funds
Button Cancel This Button will terminate the process of capturing data for Matching
Funds
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Matching funds
Expected minimum Budgeted in CIP Percentage Actual deposited
(Birr) as per MUDCo budgeted in CIP
notification of
indicative or
approved allocation
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data of Checklist for Review of Capital Investment Plan.
Inputs
ULG name User will select the ULG name from dropdown list
Region name User will select the Region name from dropdown list
Population size User will enter the population size in numeric field
Assumed rate of User will enter the assumed rate of growth in percentage in numeric field
Growth
Contact details User will enter the contact details in numeric field
Review items
Description of item User will enter the description of item in text field
Other general User will enter the other general comments in text field
comments
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the data for Checklists for review of CIP.
Button Reset This Button will reset the entered data for Checklists for review of CIP.
Button Cancel This Button will terminate the process of capturing data for Checklists
for review of CIP.
Contact details
Review items
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to develop budget forecasts using base-year budgets.
Inputs
Acc / No. User will enter the Account Number in text field
Revenue Item User will enter the revenue item in text field
Sub-Category of User will enter the subcategory of revenue item in text field
Revenue Item
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total This will be calculated using Year 1 , Year 2 , Year 3, Revenue item , sub-
category of revenue item
Button Submit This Button will submit the data for Developing Budget Forecast
Button Reset This Button will reset the entered data for Developing Budget Forecast
Button Cancel This Button will terminate the process of capturing data for Developing
Budget Forecast
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Review and Approve Revenue Enhancement Plan coming from
Municipal Finance and Revenue and Asset Management Plan coming from Infrastructure asset
management
Inputs
Button Submit This Button will submit the data for Review and approval
Button Reset This Button will reset the entered data for Review and approval
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Review and
approval
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Planning and Budgeting Monitoring and Evaluation
Data.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Date (s) of Meeting User will select the date from calendar
Number Attended User will enter the number attended in numeric field
Date (s) of Meeting User will select the date from calendar
Number Attended User will enter the number attended in numeric field
Initial Public Consultants - Combined Meeting for Women and Men at Kebele Level
Date (s) of Meeting User will select the date from calendar
Number of Men User will enter the number attended in numeric field
Number of Women User will enter the number attended in numeric field
Total Participants This will be calculated using number of men and number of women value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage (%)Women This will be calculated using number of women and total participants
Date (s) of Meeting User will select the date from calendar
Number of Men User will enter the number attended in numeric field
Number of Women User will enter the number attended in numeric field
Total Participants This will be calculated using number of men and number of women value
Percentage (%)Women This will be calculated using number of women and total participants
Total No. of Participant for the three meeting ( CIP of Prior Year )
Total This will be calculated using number of men and number of women value
Percentage (%)Women This will be calculated using number of women and total participants
Total No. of Participant for the three meeting ( CIP of Current Year )
Total This will be calculated using number of men and number of women value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage (%)Women This will be calculated using number of women and total participants
Percentage Achieved This will be calculated using Planned and actual value
Percentage Achieved This will be calculated using Planned and actual value
Percentage Achieved This will be calculated using Planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be calculated using Planned and actual value
Button Submit This Button will submit the data for Planning and Budgeting M & E
Button Reset This Button will reset the entered data for Planning and Budgeting M&E
Button Cancel This Button will terminate the process of capturing data for Planning and
Budgeting M & E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Participation of Citizens in the planning process. No. of public consultations (lower level and
city level)
Initial Public Consultants - Combined Meeting for Women and Men at Kebele Level
Percentage (%)
Women
Percentage (%)
Women
Participation of citizens in the planning process: Increase in no. of people involved from
prior year to the current year
Total No. of Participant for the three meeting ( CIP of Prior Year )
Total No. of Participant for the three meeting ( CIP of Current Year )
Budget Reliability for City Administration Total Budget (Annual) (Capital + Recurrent) for EFY
From Month
To Month
From Month
To Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture CIPs Progress Report
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Level User will select the level from ( Regional , Federal , ULG )
Region name User will select the region name from dropdown list
ULG name User will select the ULG name from dropdown list
Financial year User will select the financial year from dropdown list
Date approved by city User will select the date from the calendar
council (EC and GC)
Date approved by User will select the date from the calendar
Region name User will select the region name from dropdown list
ULG name User will select the ULG name from dropdown list
Financial year User will select the financial year from dropdown list
CIP for the Year User will enter the value in numeric field
From Month User will select the date from the calendar
Utilization Rate This will be calculated using Planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Utilization Rate This will be calculated using Planned and actual value
Button Submit This Button will submit the entered data for CIP Progress Report
Button Reset This Button will reset the entered data for CIP Progress Report
Button Cancel This Button will terminate the process of capturing data for CIP Progress
Report
Date approved by
region (EC and GC)
ULG Name Name of Project Financial year CIP Total for Year
From Month
To Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Proposal Evaluation Data
Inputs
Minutes of Technical User will enter the minutes of technical proposal opening in text field
Proposal opening
Minutes of Financial User will enter the minutes of financial proposal opening in text field
Proposal opening
Evaluation report User will Upload the evaluation report in pdf format
Prior review of Bid User will enter the prior review of bid document in text field
Document
Button Submit This Button will submit the data for Proposal Evaluation
Button Reset This Button will reset the entered data for Proposal Evaluation
Button Cancel This Button will terminate the process of capturing data for Proposal
Evaluation
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Proposal Evaluation
Minutes of Technical Minutes of Financial Evaluation report Prior review of Bid
Proposal opening Proposal opening Document
Negotiation
Figure 1
Figure 2
Description
This function is used to capture list and content of applicable procurement proclamations,
regulations, directives, manuals, circulars, standard bidding documents and templates.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Objective/ Purpose/ User will enter the objective/purpose/scope of application in text field
Scope of Application
Amendments / User will enter the amendments / changes in financial year in text field
Changes in Financial
Year
change
Date of amendment User will select the date from the calendar
change
Impact of change in User will enter the impact of change in VfM and fairness compared to
Compared to Baseline
Button Submit This Button will submit the data for List of Applicable Procurement
Documents
Button Reset This Button will reset the entered data for List of Applicable Procurement
Documents
Button Cancel This Button will terminate the process of capturing data for
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture procurement audit data.
Inputs
Financial year User will select the financial year from dropdown list
Responsible agency User will enter the responsible agency name in text field
(RPPPA)
Audit Start date User will select the date from calendar
Audit completion date User will select the date from calendar
submission date
Submitted to User will enter the name to whom audit report has been submitted in
text field
Button Submit This Button will submit the data for Procurement Audit Data
Button Reset This Button will reset the entered data for Procurement Audit Data
Button Cancel This Button will terminate the process of capturing data for Procurement
Audit Data
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Delivered Procured Goods.
Inputs
Item name User will enter the name of item in text field
Unit price User will enter the Unit Price in numeric field
Total price This will be calculated using values of Quantity, Unit Price
Specifications of the User will enter the specifications of the item in text field
item
Purchase order code User will enter the purchase order code in text field
Button Submit This Button will submit the data for Delivered Procured Goods
Button Reset This Button will reset the entered data for Delivered Procured Goods
Button Cancel This Button will terminate the process of capturing data for Delivered
Procured Good
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture procurement Audit performance status report data.
Inputs
ULG name User will select the ULG name from dropdown list
Procurement audit User will select the procurement audit timeline from calendar
timeline
Audit completion User will upload the audit completion report in pdf
report
Findings
Finding description User will enter the findings description in text field
Rectification plan User will enter the rectification plan in text field
Party responsible User will enter the party responsible in text field
Button Submit This Button will submit the data for Procurement Audit Performance
Status
Button Reset This Button will reset the entered data for Procurement Audit
Performance Status
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Procurement
Audit Performance Status
Findings
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the list of Ineligible Firms / Individuals
Inputs
Name of Entity / Firm / User will enter the name of entity / firm / individual in text field
Individual
Reasons or Ground for User will enter the reasons or ground for ineligibility in text field
ineligibility
Start date of User will select the start date of ineligibility from calendar
ineligibility
End date of ineligibility User will select the End date of ineligibility from calendar
Button Submit This Button will submit the data for List of ineligible firms / individuals
Button Reset This Button will reset the entered data for List of ineligible firms /
individuals
Button Cancel This Button will terminate the process of capturing data for List of
ineligible firms / individuals
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Supplier and Consultant Details.
Inputs
Name of Supplier User will enter the name of supplier in text field
Supplier / Vendor ID User will enter the supplier / vendor id in text field
Supplier / Vendor Type User will select the supplier / vendor type from dropdown list
The Product / Service User will enter the product / service name supplier can provide
Contact Person User will enter the name of contact person in text field
Button Submit This Button will submit the data for Supplier / Vendor Details
Button Reset This Button will reset the entered data for Supplier / Vendor Details
Button Cancel This Button will terminate the process of capturing data for Supplier /
Vendor Details
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Procurement Status for EFY and generate report
accordingly
Inputs
Region Name User will select the region name from dropdown list
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Procurement Category User will select the procurement category from dropdown list
in process
Signed (completed)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number of This will be calculates using the value of number of contracts signed
Contracts Signed ( completed and not completed )
Completed
Percent of Contracts This will be calculated using the value of Number of contracts not
not tendered out tendered out and no of contracts planned
Percentage of This will be calculated using the value of Number of contracts in process
Percentage of This will be calculated using the value of number of contracts signed
completed)
Percentage of This will be calculated using the value of Number of signed ( completed
Contracts Signed and not completed ) and no of contracts planned
completed)
Percent of contracts This will be calculated using the value of Number of signed ( completed
Region Name User will select the region name from dropdown list
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Procurement Category User will select the procurement category from dropdown list
Signed (completed)
Total Number of This will be calculates using the value of number of contracts signed
Percent of Contracts This will be calculated using the value of Number of contracts not
Percentage of This will be calculated using the value of Number of contracts in process
Contracts in process and no of contracts planned
Percentage of This will be calculated using the value of number of contracts signed
completed)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage of This will be calculated using the value of Number of signed ( completed
Contracts Signed and not completed ) and no of contracts planned
Percent of contracts This will be calculated using the value of Number of signed ( completed
Region Name User will select the region name from dropdown list
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Procurement Category User will select the procurement category from dropdown list
Planned
Total Number of This will be calculates using the value of number of contracts signed
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Completed
Percent of Contracts This will be calculated using the value of Number of contracts not
Percentage of This will be calculated using the value of Number of contracts in process
Percentage of This will be calculated using the value of number of contracts signed
Contracts Signed (not ( not completed ) and no of contracts planned
completed)
Percentage of This will be calculated using the value of Number of signed ( completed
Percent of contracts This will be calculated using the value of Number of signed ( completed
Button Submit This Button will submit the data for Procurement status
Button Reset This Button will reset the entered data for Procurement status
Button Cancel This Button will terminate the process of capturing data for procurement
status
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data of Procurement Outcomes for EFY and generate report
accordingly.
Inputs
Financial Year User will select the financial year from dropdown list
ULG Name User will select the ULG name from dropdown list
Name of Procurement User will enter the name of procurement in text field
Basic Data
Procurement reference User will enter the procurement reference number in text field
Number
Identification
Lot Number User will enter the Lot Number in numeric field
Source of Finance User will enter the source of finance in text field
Procurement Planning
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Was the procurement User will select the value from ( Yes, No )
included in the original
procurement plan?
Competitiveness
Procurement Method User will select the procurement method from dropdown list
Cost Management
Original price in the User will enter the value in numeric field
procurement plan
( ETB)
ETB
Deviation in % b/n This will be calculated using original price in the procurement plan ( ETB )
contract amount
Deviation in % b / n This will be calculated using Contract Amount in ( ETB ) and completion
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Original planned date User will select the date from calendar
of procurement
initiation
Original Planned date User will select the date from calendar
of procurement
completion
Total Planned This will be calculated using original planned date of procurement
Procurement cycle time initiation and original planned date of procurement completion
( days )
procurement initiation
procurement
completion
Actual Procurement This will be calculated using actual date of procurement initiation and
Deviation in % between This will be calculates using Total planned procurement cycle and actual
Was ( were ) there User will select the value from ( Yes , No )
complaints
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Final date of complaint User will select the date from calendar
resolved
Number of days took User will enter the number of days in numeric field
to respond to
complaints
Was ( were ) the User will select the value from ( Yes, No )
complaints responded
statutory time(s)
Was ( were ) the User will select the value from ( Yes, No )
complaints resolved
Button Submit This Button will submit the data for Procurement Outcomes
Button Reset This Button will reset the entered data for Procurement Outcomes
Button Cancel This Button will terminate the process of capturing data for Procurement
Outcomes
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Basic Data
Procurement Category of
reference no. Procurement
Identification
Source of Finance
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Prcourement Planning
Competitiveness
Procurement Method
Cost Management
Was ( were ) there Date(s) of complaint(s) Final Date of Number of days took
complaints submitted complaint resolved to respond complaints
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to self-assessment form to be used by the UIIDP and ULGDP II staff to
carry out a self-assessment for the employees under all the thematic areas.
Inputs
Job title User will enter the job title in text field
Name of institution(or User will select the thematic area from dropdown list
thematic area)
Name of department User will enter the department / unit name in text field
/Unit
Years in organization User will enter the years in organization in numeric field
Highest level of User will select the highest level of education from dropdown list
education
Training received User will enter the training received in text field
List of gaps in the skills User will enter the list of gaps in the skills in text field
List of gaps in the User will enter the list of gaps in the attitude in text field
attitude
Button Submit This Button will submit the entered data for self-assessment
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for self-assessment
Button Cancel This Button will terminate the process of capturing data for self-
assessment
Self-Assesment
Names Age Job title Name of institution
(or thematic area)
`
Submit Reset Cancel
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 3
Description
This function is used to capture training recording for thematic trainees undertaken
periodically at ULGs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Select Level User will select the level from ( Federal , Regional , ULG )
ULG name User will select the ULG name from dropdown list
Region Name User will select the Region name from dropdown list
ECSPG Pillar & User will enter the ECSPG Pillar & Capacity Building activities/
Capacity Building investments in text field
activities/ investments
Thematic areas User will select the thematic areas from dropdown list
Gaps identified User will enter the gaps identified in text field
Capacity building User will enter the capacity building modality in text field
modality
Lead person User will enter the lead person responsible in text field
responsible
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Resources User will enter the resources required ( budget ) in numeric field
required(budget)
Packaging User will select the value from ( Goods, Works, Services or training )
Button Submit This Button will submit the entered data for Training Recordings
Button Reset This Button will reset the entered data for Training Recordings
Button Cancel This Button will terminate the process of capturing data for Training
Recordings
Training Recordings
Select Level
Resources Packaging
required(budget)
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture post evaluation of trainings by trainees and other involved
parties
Inputs
Training Date User will select the training date from calendar
Education Level User will select the Education Level from dropdown list
Year of service in area User will enter the year of service in area in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Current Position User will enter the current position in text field
Rating User will select the rating from ( Poor, Satisfactory, Good , Very Good,
Excellent )
What type of support User will enter the answer in text field
you need to apply the
newly acquired
What are your User will enter the answer in text field
recommendations for
the overall
improvement of
training?
Button Submit This Button will submit the entered data for Training Evaluations
Button Reset This Button will reset the entered data for Training Evaluations
Button Cancel This Button will terminate the process of capturing data for Training
Evaluations
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Training Evaluation
Training Date
Introduction
Description Rating
What type of support you need to apply the newly acquired knowledge and skill ?
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Capacity Building Plan data.
Inputs
ULG name User will select the ULG name from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region Name User will select the Region name from dropdown list
Thematic area User will select the thematic areas from dropdown list
Gaps identified User will enter the gaps identified in text field
CB modality User will enter the capacity building modality in text field
Performance indicators User will enter the performance indicators in text field
Lead person User will enter the lead person responsible in text field
responsible
Resources required User will enter the resources required ( budget ) in numeric field
Packaging (goods , User will select the value from ( Goods, Works, Services or training )
works, services or
training)
Button Submit This Button will submit the entered data for Capacity Building Plan
Button Reset This Button will reset the entered data for Capacity Building Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Capacity
Building Plan
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Capacity Building Plan Implementation Report data.
Inputs
ULG name User will select the ULG name from dropdown list
Region Name User will select the Region name from dropdown list
Packaging (goods , User will select the packaging from ( Goods , Works, Services , Training )
works, services or
training)
Thematic area User will select the thematic areas from dropdown list
Performance indicators User will enter the performance indicators in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual expenditure in User will enter the actual expenditure in numeric field
birr
Button Submit This Button will submit the entered data for capacity Building
implementation
Button Reset This Button will reset the entered data for capacity building
implementation
Button Cancel This Button will terminate the process of capturing data for capacity
building implementation
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to Review and Approval of capacity building plan coming from all other
thematic areas.
Inputs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the data for Review and Approval
Button Reset This Button will reset the entered data for Review and Approval
Button Cancel This Button will terminate the process of capturing data for Review and
Approval
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture annual action plan data for Capacity Building Thematic Areas
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
through technical text field
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Capacity Building Progress Report data which is monitoring and
evaluation progress report of the Capacity Building Thematic Area.
Inputs
ULG Name User will select the ULG Name from dropdown list
Financial Year User will select the financial year from dropdown list
Annual CBP Budget User will enter the annual CBP Budget in numeric field
Number of Activities in User will enter the number of activities in CBP in numeric field
CBP
Financial
Financial Percent Spent This value will be calculated using Planned and Actual Value
Planned Number of User will enter the planned number of activities in numeric field
Activities
Actual Number of User will enter the actual number of activities completed in numeric field
Activities Completed
Percent activities This value will be calculated using Planned number of activities and
Completed actual number of activities completed value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial
Financial Percent This value will be calculated using Planned and Actual Value
Planned Number of User will enter the planned number of activities in numeric field
Activities
Actual Number of User will enter the actual number of activities completed in numeric field
Activities Completed
Percent activities This value will be calculated using Planned number of activities and
Completed actual number of activities completed value
Detail of Activities
Name of Activity User will enter the name of activity in text field
Financial Percent This value will be calculated using Planned and Actual Value
Button Submit This Button will submit the data for Capacity Building M & E
Button Reset This Button will reset the entered data for Capacity Building M & E
Button Cancel This Button will terminate the process of capturing data for Capacity
Building M & E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of Activities
in CBP
From Month
Financial
Up To Month
Financial
Detailed Activities
Financial Percent
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Capacity Building area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Business Idea Competition Data.
Inputs
ULG Name User will select the ULG name from dropdown list
Plan submission
Name of People / MSEs User will enter the name of people or name of MSEs who submitted
business plans
Rating of business plan User will select the rating from dropdown list
Selected business Plan User will Enter the selected business plan in text field
Support Provided for User will enter the support provided for implementation of business plan
the implementation of in text field
business plan
Business Plan User will select the Business Plan Implementation Status from dropdown
Button Submit This Button will submit the entered data for Business Idea Competition
Button Reset This Button will reset the entered data for Business Idea Competition
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Business Idea
Competition
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for the preparation of the LED and job creation plan.
Inputs
Category of project User will select the category of project from ( Schedule 1 , Schedule 2,
Schedule 3 )
Unit of Measure User will select the unit of measure from dropdown list
Total Cost User will enter the total cost in numeric field
Implementation Year User will select the implementation year from dropdown list
Permanent Jobs
Number of Males User will enter the number of males in numeric field
Number of females User will enter the number of females in numeric field
Total for permanent This will be calculated using number of males and number of females
jobs value
Temporary Jobs
Number of Males User will enter the number of males in numeric field
Number of females User will enter the number of females in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total for Temporary This will be calculated using number of males and number of females
jobs value
Total for males This will be calculates using Number of males for Permanent Jobs and
Temporary Job.
Total for females This will be calculates using Number of females for Permanent Jobs and
Temporary Job.
Button Submit This Button will submit the entered data for LED and Job Creation Plan
Button Reset This Button will reset the entered data for LED and Job Creation Plan
Button Cancel This Button will terminate the process of capturing data for LED and Job
Creation Plan
Permanent Jobs
Temporary Jobs
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to M & E Report.
Inputs
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
1st Meeting
Date of 1st Meeting User will select the date from calendar
Number of agreed User will enter the number of agreed actions in numeric field
actions
Number of agreed User will enter the number of agreed action implemented in numeric
2nd Meeting
Date of 2nd Meeting User will select the date from calendar
Number of agreed User will enter the number of agreed actions in numeric field
actions
Number of agreed User will enter the number of agreed action implemented in numeric
action implemented field
3rd Meeting
Date of 3rd Meeting User will select the date from calendar
Number of agreed User will enter the number of agreed actions in numeric field
actions
Number of agreed User will enter the number of agreed action implemented in numeric
action implemented field
No. of MSEs supported through open business plan competition against annual target
ULG Name User will select the ULG Name from dropdown list
Financial Year User will select the financial year from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Annual Target User will enter the annual target in numeric field
For Month User will select the date from the calendar
Percentage Achieved This will be calculated using the Planned and actual value
No. of MSEs one stop centers (OSC) Supported to be fully functional againts annual taregt
ULG Name User will select the ULG Name from dropdown list
Financial Year User will select the financial year from dropdown list
Annual Target User will enter the annual target in numeric field
For Month User will select the date from the calendar
Percentage Achieved This will be calculated using the Planned and actual value
No. of gradudated MSE provided with support from the medium manufacturing enterprises
development unit in the CA Against annual target
ULG Name User will select the ULG Name from dropdown list
Financial Year User will select the financial year from dropdown list
Annual Target User will enter the annual target in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
For Month User will select the date from the calendar
Percentage Achieved This will be calculated using the Planned and actual value
Name of One Stop User will enter the name of One Stop Centers ( OSC ) in text field
Centers ( OSC )
For how many people User will enter the number of people in numeric field
(individuals not
households) live
around this OSC?
For how many MSEs User will enter the number of MSEs in numeric field
Does the OSC cater for User will select the value form ( Yes , No )
15,000 people or
maximum of 500
MSEs?
Is the OSC Coordinator User will select the value form ( Yes , No )
Position Filled?
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Secretary / Information
Desk
Registration, Trade
Registration, Trace
Preparation Expert
Saving and Loan User will select the value form ( Yes , No )
Facilitation officer
Accounts and audition User will select the value form ( Yes , No )
officer
Production and sells User will select the value form ( Yes , No )
site facilitation ,
training industry
Facilitation expert
How many positions User will enter the value in numeric field
are filled?
Is the OSC equipped User will select the value form ( Yes , No )
furniture?
Did the OSC Provides User will select the value form ( Yes , No )
fundamental trainings
to staffs, atleast 2 areas
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
provision standard
2017
Does the ULG Maintain User will select the value form ( Yes , No )
documents
consultation notes as
an evidence of
Operationality?
Over all is the OSC User will select the value form ( Yes , No )
Functional
Button Submit This Button will submit the entered data for LED and Job Creation M&E
Button Reset This Button will reset the entered data for LED and Job Creation M&E
Button Cancel This Button will terminate the process of capturing data for LED and Job
Creation M&E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
M & E Report
1st Meeting
2nd Meeting
3rd Meeting
No. of MSEs supported through open business plan competition against annual target
For Month
No. of MSEs one stop centres(OSC) Supported to be fully functional againts annual taregt
For Month
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of gradudated MSE provided with support from the medium manufacturing enterprises
development unit in the CA Against annual target
For Month
For How many For how many Does the OSC Cater
people ( individuals MSEs does the OSC for 15,000 people or
not housheolds ) cater? maximum of 500 MSEs ?
live around this OSC?
Is the OSC Coordinator Officer administrator Job seekers registration Saving and loan
position filled ? / Secretary / Infor- Trade registration, Trade facilitation officer
not housheolds ) mation desk license, and TIN
live around this OSC? Preparation Expert
Accounts and Production and sells Graduation / Transfer How Many Positions
audition officer site facilitation , facilitation Expert are filled ?
Training industry
extension and market
linkage expert
Were at least 5 key Is the OSC equipped Did the OSC Provides Does the ULG maintain
staff positions filled ? with equipment and fundamental trainings document consultation
furniture ? to staffs, atleast 2 areas notes as an evidence
in the OSC service of operationality ?
provision standard 2017
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Temporary Jobs and generate progress report for
temporary jobs.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Level User will select the level from ( Federal , Regional , ULG )
ULG Name User will select the ULG Name from dropdown list
Region Name User will select the Region name from dropdown list
Project Name User will select the project name from dropdown list
Financial Year User will select the financial year from dropdown list
Number of males (over User will enter the value in numeric field
30 Years)
Total Number( 30 Years User will enter the value in numeric field
and under)
Number of males (over User will enter the value in numeric field
30 Years)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number( 30 Years User will enter the value in numeric field
and under)
Percentage of achievement
Number of males ( 30 This will be calculates using planned and actual value of number of males
Years and under) ( 30 years and under )
Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )
Number of females ( 30 This will be calculates using planned and actual value of number of
Years and under) females ( 30 years and under )
Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )
Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )
Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )
Number of males (over User will enter the value in numeric field
30 Years)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number( 30 Years User will enter the value in numeric field
and under)
Number of males (over User will enter the value in numeric field
30 Years)
Total Number( 30 Years User will enter the value in numeric field
and under)
Percentage of achievement
Number of males ( 30 This will be calculates using planned and actual value of number of males
Years and under) ( 30 years and under )
Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )
Number of females ( 30 This will be calculates using planned and actual value of number of
Years and under) females ( 30 years and under )
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )
Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )
Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )
Button Submit This Button will submit the entered data for Temporary Jobs
Button Reset This Button will reset the entered data for Temporary Jobs
Button Cancel This Button will terminate the process of capturing data for Temporary
Jobs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Temporary Jobs
Level ULG Name Region Name Project Name
From Month
Percentage of achievement
From Month
Percentage of achievement
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Firm Jobs and generate progress report on Firm Jobs.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
ULG Name User will select the ULG Name from dropdown list
Region Name User will select the Region name from dropdown list
Project Name User will select the project name from dropdown list
Financial Year User will select the financial year from dropdown list
Planned number of people employed in firms provided with serviced land and/or MSE Sheds under
CIP
Number of males (over User will enter the value in numeric field
30 Years)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number( 30 Years User will enter the value in numeric field
and under)
Years)
Actual number of people employed in firms provided with serviced land and/or MSE Sheds under
CIP
Number of males (over User will enter the value in numeric field
30 Years)
(over 30 Years)
Total Number( 30 Years User will enter the value in numeric field
and under)
Years)
Percentage of achievement
Number of males ( 30 This will be calculates using planned and actual value of number of males
Number of males (over This will be calculates using planned and actual value of number of males
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of females ( 30 This will be calculates using planned and actual value of number of
Number of females This will be calculates using planned and actual value of number of
(over 30 Years) females ( Over 30 years )
Total Number( 30 Years This will be calculates using planned and actual value of Total number
and under) (30 Years and Under )
Total Number(over 30 This will be calculates using planned and actual value of Total number
Planned number of people employed in firms provided with serviced land and/or MSE Sheds under
CIP
Number of males (over User will enter the value in numeric field
30 Years)
(over 30 Years)
Total Number( 30 Years User will enter the value in numeric field
and under)
Years)
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Actual number of people employed in firms provided with serviced land and/or MSE Sheds under
CIP
Number of males (over User will enter the value in numeric field
30 Years)
Total Number( 30 Years User will enter the value in numeric field
and under)
Years)
Percentage of achievement
Number of males ( 30 This will be calculates using planned and actual value of number of males
Number of males (over This will be calculates using planned and actual value of number of males
30 Years) ( Over 30 years )
Number of females ( 30 This will be calculates using planned and actual value of number of
Number of females This will be calculates using planned and actual value of number of
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total Number( 30 Years This will be calculates using planned and actual value of Total number
Total Number(over 30 This will be calculates using planned and actual value of Total number
Years) (30 Years and Under )
Button Submit This Button will submit the entered data for Firm Jobs
Button Reset This Button will reset the entered data for Firm Jobs
Button Cancel This Button will terminate the process of capturing data for Firm Jobs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Firm Jobs
Level ULG Name Region Name Project Name
From Month
Planned number of people employed in firms provided with serviced land and/or MSE
sheds under CIP
Actual number of people employed in firms provided with serviced land and/or MSE sheds
under CIP
Percentage of achievement
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
To Month
Planned number of people employed in firms provided with serviced land and/or MSE
sheds under CIP
Actual number of people employed in firms provided with serviced land and/or MSE sheds
under CIP
Percentage of achievement
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for handling complaints by capturing challenges that
MSEs in different regions are facing and allow categorization of the challenges.
Inputs
Region Name User will select the level from ( Federal , Regional , ULG )
ULG Name User will select the ULG Name from dropdown list
Type of MSEs User will select the type of MSEs from dropdown list
Challenges Faced User will enter the challenges faced in text field
Category of challenge User will select the type of challenges from dropdown list
Remedial Measures User will enter the remedial measures planned in text field
Planned
Remedial Measures User will enter the remedial measures planned in text field
Taken
Resolved
Button Submit This Button will submit the entered data for Challenges faced by MSEs
Button Reset This Button will reset the entered data for Challenges faced by MSEs
Button Cancel This Button will terminate the process of capturing data for Challenges
faced by MSEs
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Risk Priority data for Identification and preparation of risk matrix.
Inputs
Impact Severity User will select the impact severity from ( 0 to 5 Value )
Risk Score This will calculated using value of likelihood and Impact Severity
Button Submit This Button will submit the data for Risk Priority
Button Reset This Button will reset the entered data for Risk Priority
Button Cancel This Button will terminate the process of capturing data for Risk Priority
Risk Priority
Hazards Likelihood Impact Severity Risk Score
Priority
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Institution participating in risk analysis data.
Inputs
ULG Name User will select the name from dropdown list
Institution Name User will enter the institution name in text field
Resources that can be User will enter the resources that can be provided in text field
provided
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Major Strength User will enter the major strength in text field
Major Weakness User will enter the major weakness in text field
Button Submit This Button will submit the data for Institution Participating in risk
analysis
Button Reset This Button will reset the entered data for Institution Participating in risk
analysis
Button Cancel This Button will terminate the process of capturing data for Institution
Participating in risk analysis
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Urban Resilience performance scoring matrix data.
Inputs
ULG Name User will select the value of ULG Name from dropdown list
Year assessed User will enter the Year assessed in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Maximum Points User will enter the maximum points in numeric field
Waivers / Exceptions/ User will enter the Waivers / Exceptions / Clarification in text field
Clarification
Button Submit This Button will submit the data for Urban Resilience performance
scoring matrix
Button Reset This Button will reset the entered data for Urban Resilience performance
scoring matrix
Button Cancel This Button will terminate the process of capturing data Urban Resilience
performance scoring matrix
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
Inputs
ULG Name User will select the ULG name from dropdown list
Major Identified User will enter the major identified risk / disaster in text field
risk/disaster
Occurrence
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Exposed entity User will enter the exposed entity in text field
Severity Level User will enter the severity level in text field
Causes and effects User will enter the cause and effects in text field
Risk Priority
Impact Severity User will select the impact severity from ( 0 to 5 Value )
Risk Score This will calculated using value of likelihood and Impact Severity
Percentage to be affected
Button Submit This Button will submit the data for Risk Analysis
Button Reset This Button will reset the entered data for Risk Analysis
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Risk Analysis
Risk Priority
Priority
Percentage to be affected
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture DRM and emergency response plan with the following forms
(Urban Resilience performance scoring matrix, Institutions participating in risk analysis, Risk
Analysis Summary)
Inputs
The contents of DRM and Emergency plan are including the contents of Urban Resilience
performance scoring matrix, Institutions participating in risk analysis, Risk Analysis Summary.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Description
This function is used to capture Urban Resilience and DRM M&E Report data and generate
report accordingly.
Inputs
ULG Name User will select the ULG name from Dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Risk Map Developed User will select the value from ( Yes , No )
Name of DRM officer User will enter the name of DRM officer in text field
Name of rapid User will enter the name of rapid assessment officer in text field
assessment officer
Name of emergency User will enter the name of emergency response officer in text field
response officer
Button Submit This Button will submit the data for Urban Resilience and DRM M&E
Button Reset This Button will reset the entered data for Urban Resilience and DRM
M&E
Button Cancel This Button will terminate the process of capturing data for Urban
Resilience and DRM M&E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Gender Audit by authorized users having Add rights or Manage
rights.
Inputs
Region Name User will select the region name from dropdown list
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Audit report submission User will select the date from calendar
Date
Auditor's Name User will enter the auditor’s name in text field
List of Findings User will enter the list of findings in text field
List of Audit User will enter the list of audit recommendation in text field
Recommendation
Action planned for each User will enter the action plan for each recommendation in text field
recommendation
Focal Person in Charge User will enter the focal person in charge in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Progress for each action User will mark progress against each action on each recommendation
Button Submit This Button will submit the entered data for Gender Audit
Button Reset This Button will reset the entered data for Gender Audit
Button Cancel This Button will terminate the process of capturing data for Gender
Audit
Gender Audit
Region Name ULG Name Financial Year Audit report submission
Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Gender Main Streaming process.
Inputs
Date of 1st User will select the date from the calendar
Quarter(July - October)
Meeting
Date of 2nd User will select the date from the calendar
Quarter(October-
January) Meeting
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Date of 3rd User will select the date from the calendar
Quarter(January-April)
Meeting
Date of 4th User will select the date from the calendar
Quarter(April - July)
Meeting
Financial Year User will select the year from dropdown list
attended( Male )
officers
attended( Female )
officers attended
( Others )
Evaluation
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the entered data for Gender Mainstreaming
Button Reset This Button will reset the entered data for Gender Mainstreaming
Button Cancel This Button will terminate the process of capturing data for Gender
Mainstreaming
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gender Mainstreaming
Date of 1st Quarter Date of 2nd Quarter Date of 3rd Quarter Date of 4th Quarter
(July - October) (October-January) (January-April) (April - July)
Meeting Meeting Meeting Meeting
Evaluation
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Employment Mainstreaming.
Inputs
Category of User will select the category of employment from (Temporary Job,
Number of Women User will enter the number of women in numeric field
Number of Men User will enter the number of men in numeric field
Total Professional This will be calculated using value of number of women and number of
men.
Percentage Women This will be calculates using Number of women and total professional
value.
Financial Year User will select the financial year from dropdown list
Gender Focal Person in User will enter the gender focal person in place in text field
place
Educational Back User will enter the educational back ground in text field
Ground
Year of Experience User will enter the year of experience in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Annual Gender User will enter the annual gender development plan / budget in numeric
Development field
Plan/Budget
Consistent with ULG User will select the value from ( Yes, No )
annual plan / Budget
CBP and Gender
guideline
Meeting with gender User will enter the meeting with gender focal persons from each sector
Date of Meeting User will select the date of meeting from calendar
Meeting Number User will entering the meeting number in numeric field
Implementation of User will enter the implementation of gender activities in plan in text
gender activities in field
plan
Number of activities User will enter the number of activities in numeric field
Number Implemented User will enter the number of activities implemented in numeric field
Percentage This will be calculated using the value of Number of activities and
implemented number of activities implemented
Gender Plan Budget User will enter the gender plan budget in numeric field
Actual Spent User will enter the actual spent in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Spent This will be calculated using value of Gender Plan Budget and Actual
Spent
Button Submit This Button will submit the entered data for Employment Mainstreaming
Button Reset This Button will reset the entered data for Employment Mainstreaming
Button Cancel This Button will terminate the process of capturing data for Employment
Mainstreaming
Employment Mainstreaming
Category of Number of Women Number of Men Total Professional
Employment
Consistent with ULG Meeting with gender Date of Meeting Meeting Number
annual plan / Budget focal persons from
CBP and Gender each sector office
guideline
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture extensive date for Employment Empowerment.
Inputs
Category of User will select the Category of Employment from dropdown list
Employment
Sub-Category of User will select the sub-category of employment from dropdown list
Employment
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of Women User will enter the number of women employed in numeric field
Employed
Number of men User will enter the number of men employed in numeric field
Employed
Total This will be calculated using the value of number of men and women
Percentage of Women This will be calculated using number of female and total value
Button Submit This Button will submit the entered data for Economic Empowerment
Button Reset This Button will reset the entered data for Economic Empowerment
Button Cancel This Button will terminate the process of capturing data for Economic
Empowerment
Employment Empowerment
Category of Sub-Category of Number of Women Number of men
Employment Employment Employed Employed
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Women Participation and community dialogue.
Inputs
ULG Name User will select the name of ULG from dropdown list
Kebele Name User will select the kebele name from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Select Meeting User will select the meeting number from (Meeting Number 1, Meeting
Number Number 2, Meeting Number 3)
Meeting Number 1
Select Male or Women User will select the value from ( Male , Women )
Meeting Number 2
Number of Women User will enter the number of women in numeric field
Number of Men User will enter the number of men in numeric field
Total Participant This will be calculated using values of number of women and number of
men
Total % of Women This will be calculated using values of number of women and total
participant
Meeting Number 3
Number of Women User will enter the number of women in numeric field
Number of Men User will enter the number of men in numeric field
Number of Others User will enter the number of others in numeric field
Total Participants This will be calculated using values of number of women , number of
men and total participants
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Total % of Women This will be calculated using values of number of women and total
participants
Issue noted / Raised by User will enter the issue noted / raised by the public in text field
the Public
training on women's
right in workplace
Gender Based Violence User will enter the action plan for gender based violence in text field
Sexual Harassment User will enter the action plan for sexual harassment in text field
Equal Pay and Gender User will enter the action plan for equal pay and gender awareness in
Awareness text field
Other contextual issues User will enter the other contextual issues related to gender at ULGs in
ULGs
Button Submit This Button will submit the entered data for Women Participation and
community dialogue
Button Reset This Button will reset the entered data for Women Participation and
community dialogue
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Women
Participation and community dialogue
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Select Meeting
Number
Meeting Number 1
Meeting Number 2
Meeting Number 3
Total % of Women
Number of awareness Gender Based Sexual Harrasment Equal Pay and Gender
raising workshop / Violence Awareness
training on women's
right in workplace
againts annual target
Other contextual
issues related to gender
at ULGs
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture Gender Development Plan.
Inputs
Region Name User will select the region name from dropdown list
ULG Name User will select the ULG name from dropdown list
Financial Year User will select the financial year from dropdown list
Gender Issue and/or User will select the value from ( Gender Issue , GAD Mandate , Both )
GAD Mandate
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Cause of the Gender User will enter the cause of the gender issue in text field
Issue
GAD Result Satement/ User will enter the GAD Result statement / GAD Objective in text field
GAD Objective
Relevant Agency MFO/ User will enter the Relevant agency MFO / PAP in text field
PAP
GAD Activity User will enter the GAD Activity in text field
Output Performance User will enter the output indicators and targets in text field
GAD Budget User will enter the GAD Budget in numeric field
Source of Budget User will enter the Source of Budget in Text field
Responsible Unit/ User will enter the responsible unit / office in text field
Office
Total Budget User will enter the Total Budget in numeric field
Prepared by (User) User will enter the user information who has prepared the Plan in text
field
Approved by (User) User will enter the user information who has approved the Plan in text
field
Button Submit This Button will submit the entered data for Gender Development Plan
Button Reset This Button will reset the entered data for Gender Development Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Gender
Development Plan
Cause of the Gender GAD Result Satement/ Relevant Agency MFO/ GAD Activity
Issue GAD Objective PAP
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture extensive date for Gender Development M&E Data and
generate report accordingly.
Inputs
Category of User will select the Category of Employment from dropdown list
Employment
Sub-Category of User will select the sub-category of employment from dropdown list
Employment
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name User will select the ULG Name from Dropdown list
Name of Project User will select the name of project from dropdown list
From Month User will select the date from the calendar
Planned
Number of Women User will enter the number of women employed in numeric field
Employed
Number of men User will enter the number of men employed in numeric field
Employed
Total This will be calculated using the value of number of men and women
Percentage of Women This will be calculated using number of female and total value
Actual
Number of Women User will enter the number of women employed in numeric field
Employed
Number of men User will enter the number of men employed in numeric field
Employed
Total This will be calculated using the value of number of men and women
Percentage of Women This will be calculated using number of female and total value
Planned
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Number of Women User will enter the number of women employed in numeric field
Employed
Number of men User will enter the number of men employed in numeric field
Employed
Total This will be calculated using the value of number of men and women
Percentage of Women This will be calculated using number of female and total value
Actual
Number of Women User will enter the number of women employed in numeric field
Employed
Number of men User will enter the number of men employed in numeric field
Employed
Total This will be calculated using the value of number of men and women
Percentage of Women This will be calculated using number of female and total value
Detailed activities in Annual Gender Development Plan Budget Utilization per each activity
Name of ULG User will select the ULG name from dropdown list
Name of activity User will enter the name of activity in text field
Financial Year User will select the financial year from dropdown list
Annual Gender User will enter the Annual Gender Development Budget in numeric field
Development Budget
Financial
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be calculated using the value of planned and actual
Percentage Achieved This will be calculated using the value of planned and actual
Physical
Percentage Achieved This will be calculated using the value of planned and actual
Percentage Achieved This will be calculated using the value of planned and actual
Button Submit This Button will submit the entered data for Gender Development M&E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for Gender Development M&E
Button Cancel This Button will terminate the process of capturing data for Gender
Development M&E
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Employment Empowerment
Category of Sub-Category of ULG Name Name of Project
Employment Employment
From Month
Planned
Actual
To Month
Planned
Actual
Detailed Activities in Annual Gender Development Plan Budget Utilization per each activity
Financial
For Month
To Month
Physical
For Month
To Month
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to add Annual Action Plan by authorized users having Add rights or
Manage rights.
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Activities Planned
Office User will select the office from ( Federal , Regional , ULG )
Responsible Person User will enter the name of responsible person in text field
Major Activity User will enter the major activity name in text field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gaps to be addressed User will enter the gaps to be addressed through technical support in
support
Button Submit This Button will submit the data for Annual Action Plan
Button Reset This Button will reset the entered data for Annual Action Plan
Button Cancel This Button will terminate the process of capturing data for Annual
Action Plan
Activities Planned
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for capturing progress of both financial and physical
activities under annual action plan.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Inputs
Name of Activities User will select the name of activities captured under annual action plan.
Annual Plan for EFY- User will enter the values of annual plan ( Physical ) in numeric field
Physical
Annual Plan for EFY- User will enter the values of annual plan ( Financial ) in numeric field
Financial
Quarter 1
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 3
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Quarter 4
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Percentage Achieved This will be automatically calculated using both the planned and actual
value
Button Submit This Button will submit the entered data for tracking progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Reset This Button will reset the entered data for tracking progress of activities
Button Cancel This Button will terminate the process of capturing data for tracking
progress of activities
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Name of Activity Annual Plan for Annual Plan for
Financial Year- Financial Year-
Physical Financial
Select Level
Quarter 1
Physical
Financial
Quarter 2
Physical
Financial
Quarter 3
Physical
Financial
Quarter 4
Physical
Financial
Physical
Financial
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
Inputs
Requesting Person User will enter the name of the person requesting for field visit
Level of Field / Site User will select the level from ( Federal, Regional, ULG )
work requested
Name of Project sites in User will select the name of project sites from the dropdown
ULGs
Name of Project ULGs User will select the name of project from dropdown
Start Date of Field User will select the date from calendar
Work
End Date of Field Work User will select the date from calendar
Date of field work User will select the date from calendar
requested
Button Submit This Button will submit the data for field visit request
Button Reset This Button will reset the entered data for field visit request
Button Cancel This Button will terminate the process of capturing data for field visit
request
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project sits in ULGs Name of Project ULGs Start Date of Field Work
Select Region Select ULG Select Date
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture the data of Field Visit and generate report accordingly.
Inputs
Project Status
Progress % This will be automatically calculated using planned and actual value
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
No. of Trainee User will enter the number of trainees in numeric value
No. of Male User will enter the number of male in numeric value
No. of Female User will enter the number of female in numeric value
Progress Data User will enter the progress data collection and collation in text field
Reporting
Issues identified by User will enter the issues identified by ULGs in text field
ULGs
List of User will enter the list of recommendations made to resolve issues in text
recommendation made field
to resolve issues
uploaded
progress report
uploaded
Button Submit This Button will submit the entered data for field visit report
Button Reset This Button will reset the entered data for field visit report
Button Cancel This Button will terminate the process of capturing data for field visit
report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of Project
Project Status
Reporting
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to add Capacity Building Plan for Project Engineering Thematic area
Inputs
Level User will select the level from ( Federal , Regional , ULG )
Thematic Areas User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ECSPG Pillar & Capacity User will enter the ECSPG Pillar & Capacity Building activities/
Building activities/ investments in text field
investments
Gaps Identified User will enter the gaps identified in text field
Capacity Building User will enter the capacity building modality in text field
Modality
Performance Indicator User will enter the performance indicator in text field
Lead Person User will enter the lead person responsible name in text field
Responsible
Start Date User will select the start date from calendar
End Date User will select the end date from calendar
Resources Required User will enter the resources required in text field
Button Submit This Button will submit the entered data for capacity building plan
Button Reset This Button will reset the entered data for capacity building plan
Button Cancel This Button will terminate the process of capturing data for capacity
building plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Packaging
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Procurement Complain data.
Inputs
Type of Service User will select the type of service from ( Request for Information,
Request for Service )
Contact Number User will enter the contact number in numeric field
Financial Year User will select the financial year from dropdown list
ULG Name User will select the ULG name from dropdown list
Name of Contract User will select the name of contract from dropdown list
Contract Number User will enter the contract number in text field
Complain Description User will enter the Complain description in text field
Nature of Complaint User will select the nature of complaint from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Submit This Button will submit the data for Procurement Complaints
Button Reset This Button will reset the entered data for Procurement Complaints
Button Cancel This Button will terminate the process of capturing data for Procurement
Complaints
Procurement Complain
Name of Contract Contract Number Complain Description
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to ULG APA Complain data.
Inputs
Type of Service User will select the type of service from ( Request for Information,
Request for Service )
Contact Number User will enter the contact number in numeric field
ULG Name User will select the ULG Name from the dropdown list
Specific complaint
Category User will select the Value from ( Minimum Conditions , DLI )
Specific disagreements User will enter the specific disagreements and justification in text field
and justification
Response from the User will enter the response from the committee in text field
committee
Button Submit This Button will submit the data for ULG APA Complain
Button Reset This Button will reset the entered data for ULG APA Complain
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for ULG APA
Complain
Specific complaint
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture Regional level RIAs APA Complain data.
Inputs
Type of Service User will select the type of service from ( Request for Information,
Request for Service )
Contact Number User will enter the contact number in numeric field
Region Name User will select the region name from dropdown list
Specific complaint
Category User will select the category from ( Minimum Conditions , DLI )
Specific disagreements User will enter the specific disagreements and justification in text field
and justification
Response from the User will enter the response from the committee in text field
committee
Button Submit This Button will submit the data for Regional APA Complain
Button Reset This Button will reset the entered data for Regional APA Complain
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Button Cancel This Button will terminate the process of capturing data for Regional APA
Complain
Specific complaint
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to Registering Grievances data.
Inputs
Type of Service User will select the service from ( Request for Information, Request for
Service)
Type of User User will select the type of user from ( Public, Internal )
If Public User
Contact Number User will enter the contact number in numeric field
If Internal User
ULG Name User will select the ULG name from dropdown list
Complaint Number User will enter the complaint number in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Name of recorder User will enter the name of recorder in text field
Complaint
Button Submit This Button will submit the data for Grievances
Button Reset This Button will reset the entered data for Grievances
Button Cancel This Button will terminate the process of capturing data for Grievances
Registering Grievances
ULG Name Complaint Number Name of recorder Address
Date Resolved
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for complain assigning to concerned thematic area users.
Inputs
Complain Name User will select the Complaint name from dropdown list
Assigned to
Thematic Area User will select the thematic area from dropdown list
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
User to be assigned User will select the user of the concerned thematic area from dropdown
list
Button Submit This Button will submit the data for Complain Assigned
Button Reset This Button will reset the entered data for Complain Assigned
Button Cancel This Button will terminate the process of capturing data for Complain
Assigned
Complain Assign
Complaint Name Complaint Number
Assigned To
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Users who will be operating on the MIS.
Inputs
Full names User will enter the full name in text field
Category User will select the value from ( focal person , non-thematic area user )
Email address User will enter the email address in text field
Phone number User will enter the phone number in numeric field
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Thematic area User will select the thematic area from dropdown list
Level User will select the level from ( Federal , Regional , ULG )
Region name User will select the ULG from dropdown list
Next of Kin Details User will enter the next of kin details in text field
Button Submit This Button will submit the data for User Information
Button Reset This Button will reset the entered data for User Information
Button Cancel This Button will terminate the process of capturing data for User
Information
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
User Information
Full Names Category Email Address Phone Number
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for Region Detail
Inputs
Region name User will enter the name of region in text field
RIA address User will enter the RIA Address in text field
Number of Regional User will enter the number of regional mobile teams in numeric field
mobile teams
Number of ULGs User will enter the number of ULGs in numeric field
Name of ULGs User will enter the name of ULG in numeric field
Address of the city User will enter the address of the city administration for each office in
office
Button Submit This Button will submit the data for Regional Detail
Button Reset This Button will reset the entered data for Regional Details
Button Cancel This Button will terminate the process of capturing data for Regional
Detail
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region Detail
Region Name RIA Address Number of Regional Number of ULGs
mobile teams
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to ULG Detail
Inputs
ULG name User will enter the name of ULG in text field
Region name User will select the name of Region from dropdown list
Number of Kebele User will enter the number of Kebele in numeric field
Kebele Names User will enter the names of kebele in text field
Total Population User will enter the total population in numeric field
Total Population below User will enter the total population below 15 years in numeric field
15 Years
Total Population User will enter the total population between 15 and 50 years in numeric
Total Population above User will enter the total population above 50 years in numeric field
50 Years
Button Submit This Button will submit the data for ULG Detail
Button Reset This Button will reset the entered data for ULG Detail
Button Cancel This Button will terminate the process of capturing data for ULG Detail
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Detail
ULG Name Region Name Number of Kebele Kebele Names
Total Population
above 50 Years
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to capture data for User Permission.
Inputs
Responsibilities User will select the responsibilities from ( Creator , Reviewer , Approver ,
Viewer )
Modules accessibility User will select the modules accessibility from dropdown list
Button Submit This Button will submit the data for User Permission
Button Reset This Button will reset the entered data for User Permission
Button Cancel This Button will terminate the process of capturing data for User
permisson
User Permission
User group ID User group name Responsibilities Modules accessibility
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data for Focal Persons
Inputs
Focal Persons name User will enter the name in text field
Focal persons date of User will select the date from the calendar
birth
Commencement date User will select the date from the calendar
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
End date User will select the date from the calendar
Thematic Area User will select the thematic area from dropdown list
Level User will select the level from ( Federal , Regional , ULG )
ULG name User will select the ULG name from dropdown list
Region name User will select the region name from dropdown list
Button Submit This Button will submit the data for Focal Persons
Button Reset This Button will reset the entered data for Focal Persons
Button Cancel This Button will terminate the process of capturing data for Focal Persons
Focal Persons
Focal Person Name Focal Person Date Commencement End Date
of Birth Date
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Figure 2
Description
This function is used to capture data before uploading documents.
Inputs
Category User will select the document category from dropdown list
Sub-Category
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Thematic Area User will select the thematic area from dropdown field
Level User will select the level from ( Federal , Regional , ULG )
ULG Name User will select the ULG from dropdown list
Region Name User will select the region name from dropdown list
Button Submit This Button will submit the data for Document Upload
Button Cancel This Button will reset the entered data for Document Upload
Button Reset This Button will terminate the process of capturing data for Document
Upload
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Document Upload
Title Description Category
Sub-Category
Figure 1
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Description
This function is used to provide an alternative link to the MIS. The website will avail all the
information that the program may want to convey to the general public
Inputs
Home Page User will view the following sections through Home Page :
Upcoming program events in different ULGs
News regarding the program
Jobs available under the UIIDP projects
About UIIDP User will view the information of the program’s background such as cities
and objective through About UIIDP section.
Projects User will view the different public projects in each ULG or Region under
the UIIDP program through Project Section
Public Notices User will view the following public notices through Public Notices :
Local tender notices
Open Business idea competition plan schedules and details
Women participation meetings schedules
Planning participation meeting schedule
Public Private Dialogue
Land lease information
ULG performance reports
Contact Us User will view the “contact us” page for public contact UIIDP offices by
sending an enquiry or a comment by prompting the user to input the
following details:
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Email address
Phone number
Message
ULG Or Regional office User after selecting ULG or regional office, will view the following
Contact person
Phone number
Email
Address
Working hours
4 Report Screen
VfM Recommendation
Region Select Region ULG Select ULG Financial Year Select Year
Search
Figure 1
Name of Staff ULG Name Select ULG From Date of Select Date To Date of Select Date
Evaluation Evaluation
Level Select Level Region Select Region Thematic Area Select Thematic Area Year Select Year
Search
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Financial Year Select Year ULG Name Select ULG Thematic Area Select Thematic Area
Search
SI# Finacial Year Level ULG Region Thematic Area Output Indiactor Period Planned Actual Percentage Achieved
Figure 3
Financial Year Select Year Activity Select Activity Deadline Select Date
Search
Figure 4
Financial Year Select Year Activity Select Activity Deadline Select Date
Search
Figure 5
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 6
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 7
Search
Figure 8
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 1
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 2
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 3
Search
PDO level Result Baseline Actual (Financial Target(Financial Actual (Financial Target(Financial Actual (Financial Target(Financial Actual (Financial Target(Financial Reponsibility for Intermediate Results
Core DLI Unit of Measure Frequency Data Source
SI# Indicators (Financial Year 1) Year 2) Year 2) Year 3) Year 3) Year 4) Year 4) Year 5) Year 5) Data Collection Area
Figure 4
Search
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name Select ULG Financial Year Select Year Project Name Select Project
Search
Cost Details
SI# ULG Name Financial Year Project Name Project Start Date Percentage of spent
Item Category Unit cost Quantity Total Cost Date of Expenditure Total Project Cost
project budget
Figure 2
ULG Name Select ULG Financial Year Select year Project Name Select Project
Search
Figure 3
Search
Figure 4
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 5
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 6
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Infrastructure Project
Search
Contract Completion Annual Physical and Physical and Fiancial Physical and Financial Physical and Financial Achievement Physical and Financial Achievement Time elapsed in %
SI# Project Name Unit Measurement Contract Amount Contract Start Date Comments /Contractual Problem Faced
Date Financial Plan Achievement this Month Achievement to date in % to date from annual Plan in % to date from Contract
Figure 7
Period Select Period Level Select Level Region Name Select Region
Search
ULGS that achieve an increase of state revenue of atleast 10% over the previous year State Revenue Performance
SI# Period Level Region ULG From Month To Month
Actual FY 1 Planned FY 2 Actual FY2 Actual % of Planned % Increase At least 10% Financial Year Planned for the Year
Planned Actual % Achieved Planned Actual % Achieved
Figure 1
Search
ULGs that achieve an increase of own source municipal revenue ( Excluding Land Lease Income) of at least 10 percent over the previous year under UIIDP
ULGs that achieve an increase of own source municipal revenue ( Including Land Lease Income) of at least 10 percent over the previous year under UIIDP
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Revenue Sources
SI# Ethiopian fiscal Year Planned Actual Actual vs planned Actual growth rate
Percentage of total
SI# Revenue Item Account Number Planned Revenue Actual Revenue Actual vs planned
own revenue
Amount of overdue Amount of fine in Fine as % of total Possible reason for Impact on revenue
SI# Revenue Item Account Number Number of arrear files Age of arrears
tax in birr Birr overdue tax arrears performance
Planned Revenue Actual Revenue Share of each revenue to three years actual total
SI# Revenue Item Account Number Category Three Year Total
3rd Year Past 2nd Year Past Current Year 3rd Year Past 2nd Year Past Current Year 3rd Year Share 2nd Year Share Current Year Share
Total
Financial Balance
SI# Actual Own source of revenue Actual Expenditure Financial balance , revenue vs eexpenditure
3 years ago 2 Years ago Last Year 3 years ago 2 Years ago Last Year 3 years ago 2 Years ago Last Year
SI# Expenditure item Account Number Planned expenditure Source of finance Population
SI# Account Number Revenue item Category First Year value Second Year value Third Year Value
Total
Responsible
Revenue Item Issues found in past revenue performance analysis Formulated strategies Timing Remark
SI# Organization
Figure 3
Search
Figure 4
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 5
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 6
Search
Timely Financial Reporting Monthly cash and bank reconcillation reports submitted to BOFED Internal Audit, quaterly reports submitted to BOFED / ZoFED Count and Reconcillation of fixed assets
SI# ULG Region Financial Year
Quarter Deadline Date Date Submitted Month Deadline Date Date Submitted Quarter Deadline Date Date Submitted Date of Count
Figure 1
Search
Figure 2
Audit Progress
Search
Figure 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 4
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 5
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 6
Search
Month Cummulative
Categorization and recommendation from ESMF Screening form REPA Decision Implemenation of REFCC Decision Categorization and recommendation from ESMF Screening form REPA Decision Implemenation of REFCC Decision
Total Number of CIP
Total Number of Total Number Number categorized Number categorized Number categorized Number of Projects Number submitted Number Accepted Number subject to Number of EIAs Number of environ- Total Number of Number categorized Number categorized Number categorized Number of Projects Number submitted Number Accepted Number subject to Number of EIAs Number of environ-
SI# ULG Name Projects planned to % Achieved
CIP Projects Projetc Screened under schedule 1 under schedule 2 under schedule 3 (Under the category by ULG to REPA Revision completed for mental review Projects screened under schedule 1 under schedule 2 under schedule 3 (Under the category by ULG to REPA Revision completed for mental review
be screened
during Month (Requires EIA) (Requires Environmental( No Potential of no further action schedule 1 Project report completed for (Requires EIA) (Requires Environmental
( No Potential of no further action schedule 1 Project report completed for
review report) Impacts) to be taken) schedule 2 Project review report) Impacts) to be taken) schedule 2 Project
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region Name Select Region ULG Name Select ULG Start Date of Audit Select Date End Date of Audit Select Date
Search
Figure 2
Search
Site Selection Impact Identification and Classification Chechklists of Impacts General Questions that apply for all types of projects and sub projects Categorisation and recommendations
Proposed Date of Work Technical Drawing Extension of changes Any Existing property Any Plans for Site sensitivity Type of Projects List of Checklist Potential for Question Category List of Questions List of Answers Category of the Recommendation
SI# Project Name ULG Name Location Estimated Cost Physical Data
Commencement and specifications to existing alignment to transfer to New construction Issues (With Explaination) Rating Items adverse impact ( Yes / No) Project
reviewed ( Y/N) (Y/N) Project (Y/N) (Y/N)
Figure 3
ESIA Report
Figure 4
Region Name Select Region ULG Name Select ULG Project Name Select Project
Search
Potential Environment Proposed Mitigation Responsibility for Respomsible for Time Horizon Cost Estimates
SI# Region Name ULG Name Project Name Impacts Measures Implementing the Monitoring
Mitigation Monitoring Mitigation Monitoring
mitigation measures
Figure 5
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
SI# ULG Name Date Audit Started Date Audit completed Date Audit Report
By Region By Region Received by ULG
from Region
Figure 6
Search
Figure 7
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 8
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 9
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
SI# ULG Name Total Number Total Number Number Requiring Number RAP Number RAP not Percentage of Percentage of
of CIP Projects screened as per RSG RAP Completed Completed Project screened RAP completed
Screening form
Figure 1
Region Name Select Region ULG Name Select ULG Start Date of Audit Select Date End Date of Audit Select Date
Search
Figure 2
Search
Site Selection Impact Identification and Classification Chechklists of Impacts General Questions that apply for all types of projects and sub projects
Categorisation and recommendations
Proposed Date of Technical Drawing Extension of changes Any Existing property Any Plans for Site sensitivity Type of Projects List of Checklist Potential for Question Category List of Questions List of Answers Category of the Recommendation
SI# Project Name ULG Name Location Estimated Cost Physical Data
Work Commencement and specifications to existing alignment to transfer to New construction Issues (With Explaination) Rating Items adverse impact ( Yes / No) Project
reviewed ( Y/N) (Y/N) Project (Y/N) (Y/N)
Figure 3
Project Name Select Project Region Name Select Region ULG Name Select ULG
Search
Potential Social Proposed Mitigation Responsibility for Responsible for Time Horizon Cost Horizon
SI# Project Name Region Name ULG Name Impact Measures implementing the Monitoring Mitigation Monitoring Mitigation Monitoring
Mitigation measures
Figure 4
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ESIA Report
Figure 5
Search
Figure 6
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 7
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 8
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset Condition
Search
Collectors and
SI# Road Type Primary Road (KM) Secondary Road (KM) Total (KM)
Local Road (KM)
Drain on
SI# Drain Type Drain on Drain on Collectors and Total Drain (KM)
Primary Road (KM) Secondary Road (KM) Local Road (KM)
Greenery and
parking sub-
SI# category Greenery and Park Details
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Asset Condition
Search
Movement Network
SI# Total Area (m2) Total Number Percentage Detoriated No. of Potholes Total Length Condition
Asset category
Sanitation asset
SI# Asset type Total No. Condition
category
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Responsible Person/
SI# Asset category Responsible Body Remarks
Group
Asset Inventory
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
SI# Asset Category Asset category type Unit of measure Qunatity Unit Rate ( EB ) Cost ( EB ) Total Cost
Replacement cost and residual value of all assets by strategic and supportive activity.
New work projects started against project approved for AMP Year-2
Strategic and suppo- No. of Projects Cost of projects No. of projects started Cost of Projects Total
SI#
rtive activity areas approved approved started
Strategic and suppo- No. of activities Cost of activities No. of activities Cost of activities Total
SI#
rtive activity areas approved approved completed completed
Figure 3
Search
Figure 4
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 5
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 6
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 7
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name
Search
MONTH
Annual Plan
Total Number JULY-AUGUST (HAMLE)
ULG
of Files for EFY Planned Number of Actual Number of Files
2013 Files made ready for made ready for
Percentage
adjudication and adjudication and
Achieved
registration during the registration during the
Month Month
Figure 1
Region Name ULG Name Sub-city Select Sub-City Woreda Select Woreda Kebele Select Kebele
Search
SI# Region Name ULG Name Sub-City Name Woreda Kebele Land Registration serial
Allotment Auctionowner
Numberor(UPIN) Lease Plot Number Land Description Land Dimension Land Category
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 3
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 4
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 5
Region Select Region ULG Select ULG Proposal Name Select Proposal Period Select Period
Search
Assessment
Total Area in
SL# Region Name ULG Name Proposal Name Period Date Received Project Type Financial Year Assessment Criteria Remark/ Approval Status
Hectare
Recommendation
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 2
Search
Figure 3
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 4
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 5
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Particpation of Citizens in the planning process. No. of Public consultations ( lower level and city level )
Particpation of citizen in the planning process , Increase in number of people involved from prior year to the current year
Financial Category Meeting Date Number of attendes % of Women Increase in male Increase in female Increase in total
SI# Region ULG
Men Women attendes attendes attendes
Budget Reliability for city administration for capital budget (per quarter )
Budget Category Annual Budget Actual for Quarter Percent of execution Variance less than
SI# Region ULG Quarter
10%
Figure 1
Search
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
SI# Expected minimum Budgeted in CIP Percentage budgeted in CIP Actual deposited Percentage of actual Date deposited Financial year
(Birr) ass per MUDCo
notification of
indicative or
approved allocation
Figure 3
Search
Figure 4
ULG Name
Search
Findings
Audit
Procurement audit
SL# ULG name completion Finding
timeline Rectification plan Deadline Party responsible Deadline status
report description
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Procurment Category
Search
Number of Number of Number of Number of Total Number of Contracts Number of Percent of Percentage of Percentage of Percentage of Contracts Percent of
S. N Procurement Category Number of
Contracts not Contracts in Contracts Signed Contracts Signed Signed (completed and not Contracts Contracts not Contracts in Contracts Signed Signed (completed and not contracts
Contracts Planned
tendered out process (not completed) (completed) completed) Completed tendered out process (not completed) completed) completed
1
2
3
4
S.No. Name of Procurement Basic Data Procurement Planning Competitiveness Cost Management Procurement cycle time Management(Procurement Initiation-Contract Procurement Compliant handling
Procurement Category of Identification Source of Finance Was the Procurement included Procurement Original Price in Contract Completion Price Diviation in % b/n Price in Diviation in % Original Planned Procurement Actual Procurement Cycle Time Was (Were) there Date(s) of Final date(s) of Number of Was(Were) the Was(Were) the
Reference No. Procurement Package Lot in the original Procurement Method the Amount in ETB (Turnout Cost)(ETB) the Procurement Plan and b/n contract Cycle Time complaint(s) complaint(s) comlaint(s) Days took to complaint(s) complaint(s)
Number Number Plan? Procurement contract amount amount Original Original Total Actual Actual Actual Deviation
Figure 2
Self-Assesment
Name Age Job Title Thematic Area
Search
SI# Names Age Job title Name of institution Name of department /Unit
Years in organisation Highest level Training received List of gaps in the List of gaps in the
(or thematic area) of education skills attitude
Figure 1
Training Evaluation
Training Date
Search
Figure 2
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
SI# ULG name Region Name Pillar Activity Packaging Thematic area CB modality Performance indicators Target Actual Start date End date Budget in birr Actual expenditure in birr
Figure 3
Search
SI# Region Name ULG Name Financial Year Annual CBP Budget Number of Activities From Month To Month
in CBP Planned Actual %Financial Spent Planned Actual %Physical Spent Planned Actual %Financial Spent Planned Actual %Physical Spent
Figure 4
Search
Figure 4
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 5
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 6
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Name of People / MSEs Rating of business Selected business Support Provided for Business Plan
SI# ULG Name Deadline of business who submitted plan Plan the implementation implementation Status
Plan submission business plans of business plan
Figure 1
Search
SI# Project Category of project Unit of Measure Quantity Total Cost Implementation Year Category of Jobs Male Female Total
Figure 2
M & E Report
Month
Search
Number of agreed
SI# Region Name ULG Name Financial Year Category of Meeting Date of Meeting Number of agreed actions
action Implemented
No. of MSEs supported through open business plan competition against annual target
SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved
No. of MSEs one stop centres(OSC) Supported to be fully functional againts annual taregt
SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved
No. of gradudated MSE provided with support from the medium manufacturing enterprises development unit in the CA Against
annual target
SI# Region Name ULG Name Financial Year For Month Planned Actual % Achieved
Functionality indicators
OSC catchment area Staff positions that are filled Did the OSC Does the ULG
Name of For how many Does the OSC Production and provides maintain
Office Job Seekers is the OSC equipped
One Stop people For how cater for 15,000 Is the OSC Sells Site Graduation/ Were at least fundamental documents Overall, is the
S.No Administrator/ Registration, Trade How many with equipment and
Centers (individuals not many MSEs people or coordinator Accounts and Facilitation, Transfer 5 key staffs trainings to consultation OSC functional?
Secretary/ Registration, Trade positions are furniture? Yes/
(OSC) households) live does the OSC maximum of 500 position Audit Officer Training Industry facilitation positions staffs, at least notes as an Yes/ No
Information License, and TIN filled? Yes/No No/Yes
around this cater? MSEs? filled? Extension and expert filled? Yes/No 2 areas in the evidence of
Desk preparation Expert
OSC? Yes/No Market Linkage OSC Service operationality? Yes
Figure 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Temporary Jobs
ULG Name
Search
For Month
Temporary Jobs Planned in CIP by Age Group Actual Temporary Jobs Created by CIP by Age Group Percent Achievement
NAME OF
Males Females Total Males Females Total Males Females Total
ULGs
S/N 30 years and Over 30 Total Males 30 years and Over 30 years Total Females Over 30 years Total Percent Female 30 years and Over 30 Total Males 30 years and Over 30 years Total Females 30 years Over 30 Total Percent 30 years Over 30 Total 30 years Over 30 Total 30 years Over 30 Total
To Month
Temporary Jobs Planned in CIP by Age Group Actual Temporary Jobs Created by CIP by Age Group Percent Achievement
Males Females Total Males Females Total Males Females Total
NAME OF
30 years 30 years 30 years 30 years
ULGs 30 years and Over 30 30 years and 30 years and Over 30 30 years and Over 30 Percent Over 30 Over 30 Over 30
Total Males Over 30 years Total Females Over 30 years Total Percent Female Total Males Over 30 years Total Females and Total and Total and Total and Total
under years under under years under years Female years years years
S/N under under under under
Figure 4
Firm Jobs
ULG Name
Search
For Month
Planned Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Actual Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Percent Achievement
Name of
Males Females Total Males Females Total Males Females Total
ULGs
S/N 30 years and Over 30 Total Males 30 years and Over 30 years Total Females Over 30 years Total Percent Female 30 years and Over 30 Total Males 30 years and Over 30 years Total Females 30 years Over 30 Total Percent 30 years Over 30 Total 30 years Over 30 Total 30 years Over 30 Total
To Month
Planned Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Actual Number of People Employed in firms provided with serviced land and/or MSE sheds under CIP Percent Achievement
Males Females Total Males Females Total Males Females Total
Name of
30 years 30 years 30 years 30 years
ULGs 30 years and Over 30 30 years and 30 years and Over 30 30 years and Over 30 Percent Over 30 Over 30 Over 30
Total Males Over 30 years Total Females Over 30 years Total Percent Female Total Males Over 30 years Total Females and Total and Total and Total and Total
under years under under years under years Female years years years
S/N under under under under
Figure 5
Search
Figure 6
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 7
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 8
Search
Figure 1
Search
Waivers /
Performance Evidence to be
SL# ULG Name Category Year assessed Maximum Points Objective Exceptions/Clarifica
Measurement Produced
tion
Figure 2
Search
Impact Likelihood Impact Severity Risk Score Priority Worst Case Most Likely Worst Case Most Likely
Figure 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
ULG Name
Search
Figure 4
Search
Figure 5
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 6
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 7
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Gender Audit
Region Name ULG Name Financial Year Audit Report Submission Date
Search
Figure 1
Gender Mainstreaming
Meeting Date of
Financial Year
Number Meeting
Search
Number of Gender
Focal person , sector Focal person , sector Focal person , sector Agenda of the Meetings
SI# Meeting Number Date of Meeting Financial Year
officers attended officers attended officers attended
( Male) ( Fenale ) ( Others ) Planning Implementation Monitoring Achievement Challenge Recommendation Progress
Figure 2
Employment Mainstreaming
Category of Employment
Search
Annual Gender annual plan / Budget Meeting with gender Implementation of Number of Number
SI# Category of Number of Women Number of Men Total Professional Percentage Women Financial Year Month Gender Focal Person Educational Year of Experience Development Plan/ Approved by city CBP and Gender focal persons from Date of Meeting Meeting Number
gender activities in activities Implemented % Implemented Gender Plan Budget Actual Spent % Spent
Employment in place Back Ground Budget Council ( Yes / No) guideline each sector office Plan
Figure 3
Employment Empowerment
Search
Detailed Activities in Annual Gender Development Plan Budget Utilization per each activity
Figure 4
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Number of awareness
raising workshop / Other contextual
Equal Pay and Gender
SI# ULG Name Kebele Name Date of Meeting Time of Meeting Meeting Number Number of Male Number of Female Total Particpant % of Women training on women's Gender Based Violence
Sexual Harrasment issues related to gender
awareness
right in workplace at ULGs
againts annual target
Figure 5
Search
SI# Region Name ULG Name Financial Year Gender Issue and/or Cause of the Gender GAD Result Satement/ Relevant Agency MFO/ GAD Activity GAD Budget Source of Budget Responsible Unit/ Total Budget Prepared by (User) Approved by (User) Date
GAD Mandate Issue GAD Objective PAP Office
Figure 6
Search
Figure 7
Region Select Region ULG Select ULG Kebele Select Kebele Name of Project
Search
Name of field / site visited Progress on the Project Implementation Technical Support Provided During Monitoring Time
Name of Project Project Status On-the Job Training Reporting
Issues Identified Feedback Letter Detail Monitoring List of recommendations
SL# Kebele ULG Region
Planned Actual Progress % Remark No. of trainees No. of male No. of Female By ULGs Uploaded Progress report made to resolve issue
Uploaded
Figure 8
Region Select Region ULG Select ULG Thematic Area Select Thematic Area Start Date Select Date End Date Select Date
Search
SI# ULG name Region Name Pillar Activity Thematic areas Gaps identified CB modality Performance indicators Target Lead person responsible Year Start date End date Resources required Packaging
Figure 9
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Procurement Complain
Date Resolved
Search
SI# Name of Contract Contract Number Complain Description Nature of Complaint Date Received Date Resolved Resolution
Figure 1
Search
Specific Complaint
SI# ULG Name Date of assessment Specific disagreements Response from
Category
and justifications the comiittee
Figure 2
Search
Specific Complaint
SI# Region Name Date of assessment Specific disagreements Response from
Category
and justifications the comiittee
Figure 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Complain Assigned
Search
Assigned to
SI# Complain Name Complain Number
Thematic Area Assigned Date User Assigned
Figure 4
Search
SL# Full Names Category Email Address Phone Number Thematic Area Organization Date of Birth Address Level ULG Region Name Next of Kin Details
Figure 1
ULG
Search
Figure 2
Region
Search
Figure 3
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Search
Figure 4
Search
Figure 5
Document Upload
Submit
Sub-Category
SI# Title Description Category Tags Level ULG Name Region Name Upload Document
Thematic Area Version Index
Figure 1
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare, Review and Approve
Create Read Update Create Read Update Create Read Update
MoUs
Review and Approve Training
Read Update Read Update Read Update
Programs
Review and Approve Training ToRs Read Update Read Update Read Update
Consolidate APA Complaints Create Read Update Read Update Read Update
Vfm Audit Create Read Update Read Update
Develop/Update Manuals Create Read Update Delete Read Update Create Read Update
Review and Approve/Reject Field
Create Read Update Read Update Read Update
Visit Requests
Prepare and Review Field Visit
Create Read Update Create Read Update
Report
Review and Approve/Reject Annual
Read Update Read Update Read Update
Action Plans
Track Progress of activities in
Read Read Create Read Update
annual action plan
Prepare and Review Progress
Create Read Update Read Update
Reports
View APA Reports Read
Comment on APA Report Create Update
Prepare IPF ToRs Create Read Update
View Procurement Audit Reports Read
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare, Review and consolidate
Read Update Create Read Update Create Read Update
action plan
Track Progress of activities in
Read Read Create Read Update
annual action plan
Set Performance Indicators Create Read Update
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate M&E
Create Read Update
Report
Prepare Filed Visit Request Create Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update
Report
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Result Framework Create Read Update
Progress Report Create Read Update Read Read
Urban Development Program Read Read Create Read Update
M&E Actual Plan Management The System is consolidating , reviewing , approving different thematic area action plan
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Bid Documents Create Read Update Read Update
Prepare and Review Contracts Create Read Update Read Update Read Update
Infrastructure Projects Create Read Update Create Read Update Create Read Update
Review Infrastructure Design Read Update
Prepare Filed Visit Request Create Read Update Create Read Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review REP Create Read Update Read Update Read Update
Prepare and Review M&E Report Create Read Update Create Read Update
Review and consolidate progress
Read Update
report
Prepare field visit request Create Read Update Create Read Update
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Prepare Annual Action Plan Create Read Update
Track Progress of activities in
Read Read Create Read Update
annual action plan
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Revenue Data Will be coming from IBEX / IFMIS Team
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Review AMP, REP, CIP Read Update Read Update Read Update
Review,Update,Upload Manuals
Read Update
and Guidelines
Prepare and Review M&E Report Create Read Update
Review and consolidate progress
Create Read Update
report
Preparation of annual action plan Create Read Update
Track Progress of activities in
Read Read Create Read Update
annual action plan
Budget The system is preparing Program Budgets and also developing Budget Forecasts using base-year budgets
Payable Management
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter Project Screening Create Update
Prepare and Review Project
Create Read Update
Screening Report
Review,Update,Upload Manuals
Read Update
and Guidelines
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Project Screening Create Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter Asset Condition Create Update
Prepare and Review Asset
Create Read Update
Condition Status Report
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Structural
Create Read Update Read Update
Plans
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Set, Review,Approve/Reject
Create Read Update
Standards and Indicators
Review,Update,Upload Manuals
Create Read Update
and Guidelines
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Procurement
Create Read Update
Strategies
Review Procurement Strategies Read Update
View WB Procurement Guidelines Read
Prepare and Review Procurement
Create Read Update
Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Prepare and Review Capacity
Create Read Update Create Read Update Read Update
Assessment Report
Prepare and Review Capacity Needs
Create Read Update Create Read Update Create Read Update
and Gaps Analysis
Prepare and Review Capacity
Create Read Update Create Read Update Create Read Update
Building Plan
Capacity Building Report Create Read Update
Prepare and Review ToRs (Provide
Create Read Update Create Read Update Create Read Update
Support to Other FPs)
Prepare and Review Training
Create Read Update Create Read Update Create Read Update
Evaluation Plan
Prepare and Review Training
Create Read Update Create Read Update Create Read Update
Evaluation Report
Training Thematic trainees Create Read Update Read Read
Evaluation by trainees Create Read Update Create Read Update Create Read Update
Prepare and Review M&E Report Create Read Update Create Read Update Create Read Update
Prepare and review field visit
Create Read Update Create Read Update
requests
Prepare and review field visit
Create Read Update Create Read Update
reports
Prepare Annual Action Plan Create Read Update
Review,Update,Upload Manuals
Create Read Update
and Guidelines
View APA Reports Read Read Read
Comment on APA Report Create Update Create Update
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Complaints Create Read Update Read Read
Capture Business Idea Competition Create Read Update Read Read
View Prior Year LED and Job
Read
Creation Plan
Prepare and Review LED and Job
Create Read Update Read Update Read Update
Creation Plan
Prepare and Review Dialogue
Create Read Update Read Update Create Read Update
Report and Action Plan
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
Enter and Prioritise Identified Risks Create Read Update
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
View Prior Year Gender
Read
Development Plan
Prepare and Review Annual Gender
Create Read Update Read Update Read Update
Development Plan
Prepare and Review Dialogue
Create Read Update Read Update
Report and Action Plan
Prepare and review community
Create Read Update
dialogue tools
Prepare and Review M&E Report Create Read Update Create Read Update
Review Progress Reports Create Read Update
Review and consolidate progress
Create Read Update
reports
Prepare and approve field visit
Create Read Update Create Read Update
requests
Prepare and Review Field Visit
Create Read Update Create Read Update Create Read Update
Report
Preparation of annual action plan Create Read Update
Program Performance Report Create Read Update Read Update Read Update
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
System Responsibility ULG Focal Person Regional Mobile Team Federal Mobile Team
User Management Create Read Update
Thematic Areas Management Create Read Update
Creation and update of project Create Read Update
IPF Management Create Read Update
Legal Entity Management Create Read Update Delete
Responsibilities Management Create Read Update Delete
Menus Management Create Read Update Delete
Reports Management Create Read Update Delete
Suppliers Management Create Read Update
Contractors Management Create Read Update
Auditors Management Create Read Update
Programm File Management Create Read Update
Customisation Create Read Update
6 External Interfaces
The user can access the application through PC/Laptop/Tablet having any Make/Model of
H/W. For network, internet connection is required (minimum 512 kbps).
This section provides details of the external interfaces and/or integrations between the UIIDP
MIS and the existing government systems as well as the standalone systems in use for various
functionalities that must be put into consideration in order to achieve a fully functional end-
to-end integrated UIIDP MIS.
Like any integrated information system, the UIIDP MIS will exhibit intra-modular, inter-modular
and external interface and/or integration handshakes.
Owing to the various formats of data exchanges and the number of systems in place that need
to be interfaced and/or integrated, it is recommended that an Enterprise Service Bus – ESB be
considered for that purpose. The use of an ESB is worth considering when three or more
applications or services need to be interfaced and/or integrated which is the case of the UIIDP
MIS.
The Interfaces below describes the existing systems that the UIIDP MIS is expected to interface
and/or integrate with through an ESB:-
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Different users of UIIDP MIS will need to access the system through a variety of devices. Users
and clients will access the UIIDP MIS through Web browsers. These will require a secure HTTPS
internet connection, user name and password of the user which will be verified before
accessing the UIIDP MIS application. The minimum browser requirements are:
a. Integration Requirement
The key objective of integration between different systems is for the systems to share data to
make transactions seamless. The systems should be integrated using Service Oriented
Architecture supported by the Enterprise Service Bus through which Application integration,
both internal and external, is expected to go through
The system must be able to interface with the IBEX/IFMIS through the ESB to:
o Prepare the revenue enhancement plans
o Prepare M&E progress reports
o Facilitate fund disbursements to federal, regions and ULGs
o Allow checking of budgets at funds replenishment requests
o Synchronise procurement plans to payment processing
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
o Land Value
o Developments planned for the land
o Services on the land
o Ownership of the land
o Developments planned for the land
o Services on the land
o Ownership of the land
The system must be able to interface with the Cadastre through the ESB to:
o Keep a record of land maps
o Allow for tracking of developments on land
o Allow keep a value of the land
o Link the spatial land data to GIS and UIIDP plans
o Plan for land lease/allotment management
The system must be able to interface with the Cadastre through the ESB to share data
such as:
o Land identification
o Unit of measure
o Dimension
o Location/address
o Land Value
o Developments planned for the land
o Services on the land
o Ownership of the land
o Land parcels
The system must be able to interface with the STEP through the ESB to:
o Enable development of ToRs as per the World Bank guidelines and standards
o Link procurement plans to the UIIDP MIS
o Enable preparation of M&E reports
o Keep track of contract execution
o Keep track of contract claims
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
The communication between core systems should be secured, even if secured network
is used for the connection. SSL and/or WS-Security will be applied as appropriate
The ESB should support Web Services framework for integration including the
following protocols:
o eXtensibleMarkup Language (XML);
o Simple Object Access Protocol (SOAP);
o Web Service Description Language (WSDL); and
o Universal Description, Discovery, and Integration (UDDI).
The ESB should support the following integration standards:
o Messaging based integration
o Bulk upload of flat files
o Application Programming Interface (API) based integration
The ESB should provide a detailed error report on any failures to upload data during
Bulk uploads.
The ESB should support use of XML based messages as part of Message based
integration
o The ESB would support near-real-time messaging with guaranteed once-only
delivery.
o The ESB would support guaranteed sequential delivery within a message family.
b. Availability Requirement
The system would be 99.95% available for any given month of the year (an average of
less than one hour per week or 1.83 days per year).
The system would be able to handle at least 10 back office users that are dealing with
the processing of end user requests.
The system would also be able to handle at least 500 simultaneous requests for both
uploads and downloads.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
c. Reliability Requirement
The system would be able to handle at least 50 Transactions Per Second (TPS) at peak
times
The maximum response time for search and lookup performance would be 3 seconds
for 95% percent of the time.
The maximum response time for a dashboard report would be 5 seconds, 95% of the
time.
The maximum response time for static standard reports would be 5 seconds, 95% of
the time.
The maximum response time for a parameter-based report would be 20 seconds.
d. Security Requirement
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.
Quality System Template Document #:
Rev.: 3.0
The System would support customizable role-based access that is easy to manage to
ensure that data is only accessed by people with the privileges to access it
The System would support administrative restrictions such as
o Configurations of systems
o Deletion of users
o New users’ registration
o This would be done by only the systems administrators
The System would enable logging and have the capability to generate audit trails that
can be customized to different fields in the system.
The System would have the capability to avoid creation of duplicate records as a
concern about the integrity of the data stored
The System would support deactivation of a user account for a certain period and it
shouldn’t be possible for the deactivated account to be used to access the system or
data
The system would have the capability to close an inactive session after a defined period
of time (Session timeout)
The system would display the last date and time the user logged onto the system at
the time of logon.
The System would have the capability to validate data input before storing to ensure
that it is correct and appropriate
Access to each database would be restricted to connections from the respective
application servers.
The system would allow an administrator to suspend a user ID from further use.
The system would record and maintain past security profiles (history of security access
for staff) when changes are made to staff's security profile.
The system would record in the system who changes security profiles and when
changes are made (user name, date and time stamp).
The system would assign application access rights across entire suite of applications at
a single point of entry.
Copyright © 2021-22. CSM Technologies (A CMMI ML5 Company). All rights reserved.