1 CIVIL WORK SUMMERY


Total
S.No Description of Item No Amount
Amount
C-1 Ground Reservior of 1000m3 1 4,869,082.2 4,869,082.2
C-2 Ground Reservior of 500m3 1 3,019,106.7 3,019,106.7
Construction of 200m3 underground at cooling
C-3 1 2,657,289.6 2,657,289.6
basin
C-4 Ground reservior 50m3 @ source 1 623,881.7 623,881.7
C-5 Water Point (6f) 13 75,077.8 976,011.3
C-6 Cattle Trought 8 72,281.5 578,252.3
C-7 Generator and Guard house at BH and 500m3 2 852,332.0 1,704,664.0
C-8 construction of guard house at 1000m3 1 322,598.3 322,598.3
construction of toilet at 1000m3, 500m^3 booster
C-9 354,398.6 1,063,195.7
station and borehole 3
Artificail well At Boster Station 500m3 and at
C-10 536,647.5 1,073,294.9
200m3 Underground RCC 2
C-11 Utility Admin. & Auxiliary Buildings 1 11,960,939.2 11,960,939.2
C-12 Solid Waste Disposal pit 1 1,193,350.0 1,193,350.0
C-13 Construction Of public Toilet and Soak Away Pit 2 396,023.6 792,047.1
C-14 Maintenance of old massonary reservoir 1 268,783.8 268,783.8
C-15 Rectangular water cooling tank 1 1,339,280.3 1,339,280.3
C-16 Clorination room at 200m3 reservoir 1 376,188.6 376,188.6
TOTAL 32,817,965.7
Bill No. C- 06 Construction of Rectangular Cooling Structures
UNIT
UNI
ITEM NO DESCRIPTION QNTY PRICE TOTAL Birr
T
Birr
C-06.1.0 EARTH WORK
D-0.6.2 Site Clearing of Top Soil up to 20cm Depth m2 285.0 26.5 7,552.5
Bulk excavation in normal soil to a depth not exceeding
C-06.1.1 m3 115.2 177.0 20,390.4
1.5m
D-0.6.3 Ditto but in soft rock formation m3 76.8 331.0 25,420.8
C-06.1.2 Ditto but in hard rock formation m3 38.4 468.0 17,971.2
Cart away all excavated material, deposit to appropriate
D-0.6.4 m3 230.4 52.0 11,980.8
distance not exceeding 1 km
Provide and fill with suitable selected granular material not
C-06.1.3 m3 100.0 707.0 70,700.0
exceeding 50cm
D-0.6.5 MASSONARY WORK
construct stone massonary trapezoidal foundation wall of
C-06.1.4 m3 124.8 523.0 65,270.4
the birka with 700mm at base and 600mm at the top
construct stone massonary trapezoidal wall of the birka
D-0.6.6 m3 230.2 1,701.0 391,570.2
with 600mm at base and 500mm at the top
50 cm thick basaltic or equivalent stone Hard core well
C-06.1.5 m3 126.0 189.0 23,814.0
rolled, consolidated & blinded with crushed stone
D-0.6.7 CONCRETE WORK
C-06.1.6 50mm thick lean concrete C-10 above the hard core m2 100.0 140.0 14,000.0
Reinforced concrete type C-30 of the base floor filled into
D-0.6.8 m3 27.4 4,750.0 130,150.0
form work and vibrated around reinforced bar
Provide, cut, bend and fix in position reinforced steel
C-06.1.7 bar. All according to structural drawing. Price should
include tying wires
D-0.6.9 Diameter 8 mm plain bar kg 100.0 64.4 6,440.0
C-06.1.8 Diameter 10 mm deformed bar kg 2,500.0 66.8 167,000.0
D-0.6.10 ACCESSORIES AND FINISHING
Provided and install access ladder internal and external
C-06.1.9 constructed out of 1 1/2" dia GS pipe and hooked to the LS 2.0 4,500.0 9,000.0
wall as per the drawing; including safety cages
D-0.6.11 three coats of plastering for the wall internal and external m2 720.0 114.0 82,080.0
C-06.1.10 floor cement screeding m2 200.0 109.0 21,800.0
D-0.6.12 rendering external wall m2 360.0 74.0 26,640.0
C-06.1.11 PIPES, VALVES AND FITTINGS
D-0.6.13 inlet fittings all PN16
C-06.1.12 Pipe and Fittings Supply for cooling basin at borhole
D-0.6.14 DN 250 DCI double flanged bell mouth PN16 No 1.0 7,500.0 7,500.0
C-06.1.13 DN 250 DCI 90 deg double flanged bend No 6.0 7,500.0 45,000.0
D-0.6.15 DN 250 DCI double flanged pipe, L = 6.0 meters No 6.0 7,500.0 45,000.0
C-06.1.14 Tee DN 250 DCI double flanged PN16 No 1.0 7,500.0 7,500.0
D-0.6.16 DN 250 duoble flanged gate valve No 1.0 7,500.0 7,500.0
C-06.1.15 DN 250 dismantling joint No 3.0 7,500.0 22,500.0
D-0.6.17 WATER METER DN 250 PN 16 No 1.0 7,500.0 7,500.0
C-06.1.16 DN 250Non Swing Check Valve No 1.0 7,500.0 7,500.0
D-0.6.18 outlet fitting all PN16
C-06.1.17 DN 250DCI flanged bell mouth No 1.0 7,500.0 7,500.0
D-0.6.19 DN 250 DCI 90 deg double flanged bend No 6.0 7,500.0 45,000.0
C-06.1.18 DN 250 DCI double flanged pipe, L = 6.0 meters No 3.0 7,500.0 22,500.0
D-0.6.20 DN 250 DCI double flanged Tee No 1.0 7,500.0 7,500.0
C-06.1.19 DN 250 flanged gate valve No 1.0 7,500.0 7,500.0
D-0.6.21 DN 250 dismantling joint No 1.0 7,500.0 7,500.0
Total of Bill . Construction of rectangular cooling 1,339,280.3
Bill No. C- 03 Construction of Underground 200m3 RCC Reservoir @ Borehole

Unit Total
Uni
Item DESCRIPTION
t
Qty Rate Contract
(Birr) Amount(Birr)

C-03.1 EARTH WORK


C-03.1.1 Site Clearing to remove top soil m2 105.62 26.50 2,798.93
C-03.1.2 Bulk excavation in ordinary soil upto depth of 1.5m m3 161.28 177 28,546.36
C-03.1.3 Ditto but in soft rock formation m3 129.50 331 42,865.14
C-03.1.4 Ditto but in hard rock formation m3 104.32 468 48,822.23
Cart away all excavated material, deposit to appropriate
C-03.1.5
distance not exceeding 1 km
m3 233.82 52 12,158.79
C-03.1.6 Provide and fill with suitable selected granular material m3 87.50 707 61,861.38
Provide, fill and compact impermeable clay soil to a
C-03.1.7
finished thickness of 30 cm
m3 65.62 246 16,143.46

Provide and fill hard core with hard basaltic or


equivalent stone, well compacted and blinded with
C-03.1.8
crushed stone to a finished thickness of 25 cm under the
m3 98.52 189 18,620.39
reservoir and valve chamber
C-03.1.9 CONCRETE WORK
50mm thick lean concrete with mix ratio (1:3:6) under
C-03.1.10
the reservoir base slab and valve chamber
m2 173.52 1,465 254,207.64
Reinforced concrete type C-30 filled into form work
C-03.1.11& vibrated around reinforced bar mix ratio should be
1:2:3
C-03.1.12Base slab m3 44.46 3,899 173,335.89
C-03.1.13Concrete wall m3 45.64 3,899 177,938.66
C-03.1.14Concrete column m3 1.66 3,899 6,484.82
C-03.1.15Top slab m3 23.30 3,899 90,860.35
C-03.1.16Parapet m3 2.99 3,899 11,658.01
C-03.1.17Provide and fix formwork to
C-03.1.18Base slab m2 47.39 500 23,696.85
C-03.1.19Wall m2 275.34 500 137,671.00
C-03.1.20Column m2 8.70 500 4,348.90
C-03.1.21Top slab m2 88.26 500 44,129.39
C-03.1.22Parapet m2 16.18 500 8,088.75
Provide, cut, bend and fix in position reinforced steel
C-03.1.23bar. All according to structural drawing. Price
should include tying wires
C-03.1.24Diameter 8 mm plain bar kg 31.2 64 2,009.28
C-03.1.25Diameter 10 mm deformed bar kg 3,436.6 67 229,564.88
C-03.1.26Diameter 12 mm deformed bar kg 3,630.0 69 251,196.00
C-03.1.27Diameter 14 mm deformed bar kg 2,811.0 71 199,581.00
C-03.1.28Diameter 16 mm deformed bar kg 772.7 71 54,862.51
Reinforced concrete type C-25 filled into form work and
C-03.1.29vibrated around reinforced bar mix ratio should be 1:2:3 m3 9.80 3,592 35,201.60
for valve chamber
C-03.1.30Block work
Provide and erect 20cm HCB wall for one side of the
C-03.1.31valve chamber, having internal plastering and external m2 15.00 306 4,590.00
rendering finish
C-03.1.32 Stone masonry foundation wall m3 20.00 1,701 34,020.00
C-03.1.33ACCESSORIES AND FINISHING 0.00
Provide and apply 50mm cement screed to the reservoir
C-03.1.34
floor and roof slab
m2 157.10 109 17,123.90
Provide and apply 3 coats of plaster to internal walls,
C-03.1.35
columns and to embedded part of external wall surface
m2 281.06 114 32,040.77
C-03.1.36Rendering external wall m2 153.18 74 11,335.32
Provided and install access internal and external ladder
C-03.1.37constructed out of 25 mm dia GS pipe and hooked to the LS 1.00 9,200 9,200.00
wall as per the drawing; including safety cages
Provide and install water stops made of natural or
C-03.1.38synthetic rubber or elastometric plastic compound with m 69.12 750 51,843.00
basic risen polyvinyl chloride (PVC)
C-03.1.39Plaster with water proof of internal wall surfaces m2 105.20 185 19,462.00
provide and insert plastic sheet for the base slab of the
C-03.1.40
embeded part
m2 50.24 135 6,782.40
Provide and fix 6 mm sheet metal access cover with
C-03.1.41
latch and lock for valve chamber and reservoir
No 2 3,500 7,000

mesh wires fencing consists of 2.5 mm barbed wire


horizontal and diagonal member fixed to 2500 mm
C-03.1.42 m2 480 250 120,000
long concrete post spaced every 2000mm, including
all necessary material as per the drawing
Gate, 6mm angle iron with metal sheet C/C 40 mm
fixed to 60*60*3 mm RHS frame, as shown in the
C-03.1.43 no 1 1,500 1,500
drawing; price includes lock & latches & earth work
(width 4.0m*height 2.60m)
C-03.1.44PIPES, VALVES AND FITTINGS
C-03.1.45Install inlet pipe
C-03.1.46DN 250, L=330cm double flanged pipe No 1 11,500 11,500
C-03.1.47DN 250, 90 degree Duck foot bend No 1 16,800 16,800
DN 250, double flanged L=1m with centrally welded
C-03.1.48
puddle flange
No 1 13,600 13,600
C-03.1.49DN 250 dismantling piece No 1 7,920 7,920
C-03.1.50DN 250 flanged gate valve No 1 18,400 18,400
C-03.1.51DN 250 double flanged pipe L=1.25 m No 1 7,600 7,600
C-03.1.52DN 250, 90 degree double flanged elbow No 1 9,600 9,600
C-03.1.53DN 250, double flanged pipe L=4m No 1 14,200 14,200
C-03.1.54DN 250, double flanged pipe L=1.00m No 1 5,600 5,600
C-03.1.55DN 250 flanged spigot No 1 7,600 7,600
C-03.1.56DN 250 express collar No 1 7,200 7,200
C-03.1.57DN 250 flanged float valve No 1 12,800 12,800
C-03.1.58Install outlet pipe
C-03.1.59DN 250 suction strainer No 1 13,600 13,600
DN 250 double flanged pipe L=1m with centrally welded
C-03.1.60
puddle flange
No 1 4,400 4,400
C-03.1.61DN 250 dismantling piece No 1 7,920 7,920
C-03.1.62DN 250 flanged gate valve No 1 18,400 18,400
C-03.1.63DN 250, 900 double flanged bend No 1 9,600 9,600
C-03.1.64DN 250*150 double flanged reducer No 1 17,600 17,600
C-03.1.65DN 250 double flanged pipe L=1m No 1 4,400 4,400
C-03.1.66DN 250 flanged spigot No 1 4,400 4,400
C-03.1.67DN 250 express collar No 1 7,200 7,200
C-03.1.68DN 250 water meter No 1 25,000 25,000
C-03.1.69Install Overflow and Drain pipes
C-03.1.70DN 250 Flanged bell mouth No 1 9,600 9,600
DN 250 double flanged pipe L=180cm with puddle
C-03.1.71
flange
No 1 4,400 4,400
C-03.1.72DN 250, 90 degree double flanged elbow No 2 9,600 19,200
DN 250, double flanged pipe L=1.0m with centrally
C-03.1.73
welded puddle flange
No 1 4,400 4,400
C-03.1.74DN 250x250 all flanged Tee No 1 17,600 17,600
C-03.1.75DN 250 flanged gate valve No 1 18,400 18,400
C-03.1.76DN 250 flanged spigot No 2 4,400 8,800
C-03.1.77Install level indicator Ls 1 65,000 65,000
Provide and install DN 50 ventillation pipe with dome, L
C-03.1.78
=1.0 meters
pcs 2 6,500 13,000

Total Carried for BILL NO. D-02 Summary 2,657,289.6


Bill No. C- 07 Construction of Artificial Well @ 200m3 underground Booster and at 500m3 rcc ground
Booster I
UNIT
ITEM DESCRIPTION UNIT QNTY TOTAL
PRICE
C-07.1 EARTH WORK
C-0.7.2 Site Clearing to remove Top Soil up to 20cm Depth m2 14.4 26.5 381.6
C-07.2 Bulk excavation in normal soil to a depth not exceeding 3m m3 20.0 303 6,060.0
C-0.7.3 Ditto but in soft rock formation not exceeding 2.5m m3 26.5 331 8,771.5
C-07.3 Ditto but in hard rock formation 2m m3 20.0 468 9,360.0
Cart away all excavated material, deposit to appropriate distance
C-0.7.4 m3 66.5 52 3,458.0
not exceeding 1 km
Provide and fill with suitable selected granular material not
C-07.4 m3 3.0 707 2,121.0
exceeding 50cm
Provide and fill hard core with hard basaltic or equivalent stone,
C-0.7.5 well compacted and blinded with crushed stone to a finished m3 7.9 189 1,493.1
thickness of 25 cm under the artificial and valve chamber
C-07.5 CONCRETE WORK
30cm thick lean concrete C-10 under the artificial base slab and
C-0.7.6 m2 3.6 180 648.0 8
valve chamber
Reinforced concrete type C-30 filled into form work and
C-07.6
vibrated around reinforced bar
C-0.7.7 Base slab m3 3.2 3,899 12,632.8 2
C-07.7 Concrete wall m3 9.9 3,899 38,600.1 20
C-0.7.8 Top slab m3 3.6 3,899 14,036.4
C-07.8 Valve Box m3 5 3,899 19,495
C-0.7.9 Provide and fix formwork to:
C-07.9 Base slab m2 6.6 500 3,300 4
C-0.7.10 Wall m2 39.6 500 19,800 132
C-07.10 Top slab m2 5.6 500 2,800
Provide, cut, bend & fix in position reinforced steel bar. All
C-0.7.11 according to structural drawing. Price should include tying
wires
C-07.11 Diameter 8 mm plain bar kg 80 64.4 5,152 284.4
C-0.7.12 Diameter 12 mm deformed bar kg 515 69.2 35,638 1,023.0
C-07.12 ACCESSORIES AND FINISHING
Provided and install access ladder constructed out of 1 1/2" dia GS
C-0.7.13 pipe and hooked to the casing as per the drawing; including safety LS 1 18,400 18,400
cages
C-0.7.14 supply and install of steel casing DN600mm m 60 240 14,400
provide top acces consisting of GI pipe wellded and fixed in
C-0.7.15 m2 48 2,450 117,600
position as per the drwimg
C-0.7.16 PIPES, VALVES AND FITTINGS ALL ARE PN16
Inlet Pipe & Fittings Supply for artificial well @ BS 500M3
C-0.7.17
and at BH
C-0.7.18 DN 250DCI double cross Tee No 1 7,500 7,500
C-0.7.19 DN 250 DCI 90 deg double flanged bend No 5 7,500 37,500
C-0.7.20 DN 250 DCI double flanged pipe, L = 6 meters No 1 7,500 7,500
C-0.7.21 DN 250 DCI double flanged short pipe,L = 1.5 mm No 3 7,500 22,500
C-0.7.22 DN 250 duoble flanged gate valve No 1 7,500 7,500
C-0.7.23 DN 250 dismantling joint No 3 7,500 22,500
C-0.7.24 250 OD HDPE PE100 stub flange with backing ring No 2 7,500 15,000
C-0.7.25 DN 250 Non Swing Check Valve No 1 7,500 7,500
C-0.7.26 outlet Pipe and Fittings Supply for BS PN 16 DN 250
C-0.7.27 DN 250 DCI 90 deg double flanged bend No 3 7,500 22,500
C-0.7.28 DN 250 DCI double flanged pipe, L = 6.0 meters No 1 7,500 7,500
C-0.7.29 DN 250 DCI double flanged pipe, L = 500 mm No 1 7,500 7,500
C-0.7.30 DN 250 DCI duckfoot 90 deg double flanged bend No 1 7,500 7,500
C-0.7.31 DN 250 dismantling joint No 1 7,500 7,500
C-0.7.32 DN 250 Non Swing Check Valve No 3 7,500 22,500
Total of Bill . Construction of Artificial Wet Well 536,647.5
Bill No. C- 015.0Toilet At 1000m3, 500m^3 booster station and @ borehole
C-015: CONSTRUCTION OF SOAK AWAY PIT
Item
Earth Work Unit Qty Unit price Amount
No
C15.3 Clearing of site to remove top soil to a depth of 200 mm m2 12.0 26.5 318.0
C.15.3 Bulk excavation in ordinary soil to depth of 1.5m m3 15.0 177.0 2,655.0
C15.4 Bulk excavation in soft rock m3 15.0 331.0 4,965.0
C.15.4 Bulk excavation in hard rock m3 12.0 468.0 5,616.0
C15.5 Curt away excavated material m3 42.0 52.0 2,184.0
C.15.5 Masonry Work
C15.6 masonar wall with 50cm at the base and 40cm at top m3 35.0 1,701.0 59,535.0
C.15.6 concerete work
Reinforced concrete septic cover C30 (Cement 1440
C15.7 kg/m3) filled into form work and vibrated around
reinforced bars, mix ratio should be 1 :2:3 in
C.15.7 Soak pit top slab m3 2.3 3,899.0 8,772.8
C15.8 Reinforcement
Provide, cut, bend and fix in position reinforced steel bar. All
C.15.8 according to structural drawing. Price shall include tying
wires
C15.9 diameter 12 kg 650.0 69.2 44,980.0
C.15.9 diameter 10 kg 90.0 66.8 6,012.0
C15.10 diameter 8 kg 80.0 64.4 5,152.0
C.15.10Miscellaneous
Supply and lay 100 mm dia. PVC pipe as shown on the
C15.11 drawing, price including excavation of earth and back filling m 100.0 78.0 7,800.0
drianage conection
C.15.11Supply and fix 100x100 mm tee Pcs 4.0 3,500.0 14,000.0
Supply and fix 100 mm dia. PVC ventilation pipe hood
C15.12 Pcs 2.0 2,800.0 5,600.0
shaped covering (cowl)
Supply and fix 40*40cm manhole cover concrete with
C.15.12 pcs 2.0 1,200.0 2,400.0
handling frame
Sub Total for Soak Away Pit 169,989.8
CONSTRUCTION OF TOILET
C.15.13Earth Work
C15.14 Clearing of site to remove top soil to a depth of 200 mm m2 9.0 26.5 238.5
Excavation for stone masonry foundation; 0.5 m width and m3
C.15.14 3.0 88.0 264.0
0.5 m depth
Cart away and deposit excavated surplus material to a m3
C15.15 6.0 52.0 312.0
distance not exceeding I km
C.15.15fill for the selected material m2 3.0 50.0 150.0
C15.16 Masonry Work
Supply and place 250 mm thick hard core compacted to m2
C.15.16 10.0 189.0 1,890.0
receive reinforced floor slab
C15.17 Supply and place 500 mm thick hard core for founation wall m2 7.0 189.0 1,323.0
C.15.17Sub-Total
C15.18 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement
C.15.18 content 1440 kg/m3 cast into formwork and vibrated around
reinforcement bars in
C15.19 RC floor tie beam m3 3.0 3,592.0 10,776.0
C.15.19RC column m3 1.3 3,592.0 4,525.9
C15.20 Mass concrete fill on floor slab (100 mm) m3 1.3 3,592.0 4,490.0
C.15.20Lintel m3 0.1 3,592.0 179.6
C15.21 RC roof tie beams m3 2.5 3,592.0 8,980.0
Provide, fix in position, cut and bend reinforced steel bar.
C.15.21 All according to structural drawing. Price should include
tying wires
C15.22 Diameter 8 mm deformed bar kg 120.0 64.4 7,728.0
C.15.22Diameter 10 mm deformed bar kg 98.8 66.8 6,599.2
C15.23 Provide, cut, and fix formwork beam column m2 19.2 500.0 9,600.0
C.15.23Block work
C15.24 20cm HCB block for wall No 250.0 306.0 76,500.0
C.15.24Carpentry and Roofing
Supply, assemble and fix in position roof truss price shall ml
C15.25 include the application of three coats and external anti-termite 25.0 28.9 723.7
treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed ml
C.15.25 into eucalyptus truss including three coats of anti - termite 30.0 37.1 1,111.5
external treatment
m2
Supply and fix roof cover in G-28 mm corrugated galvanized
C15.26 iron sheet fixed into zigba wood purl in with dome headed 24.0 354.0 8,496.0
galvanized nails (purlin and ridge cover measured separately)

m
Supply and fix edge gutter formed in G- 28 flat galvanized
metal sheet including support brackets 1 mm thick shaped
C.15.26 steel plate spaced at a maximum spacing of 1000 mm c/c and 5.0 321.0 1,605.0
fixed to purl in - price includes metal primer and two coats of
synthetic enamel paint

Supply & fix diameter 100mm down pipe in G-28 including I m


C15.27 mm thick metal support brackets fixed at a maximum interval 15.0 397.0 5,955.0
of 1000 mm fixed to walls or columns
C.15.27Supply and fix 25x 250 mm fascia board to purl in m 9.8 167.1 1,637.2
Supply and fix metal windows size 1x1.8m price includes m2
C15.28 1.8 5,040.0 9,072.0
lock hachs
Supply and fix metal doors size 2.1 Ox1 with figured glass in Pcs
C.15.28 2.1 5,880.0 12,348.0
upper half portion
Finishing; finishing work shall include all surface pre-
C15.29
cleaning, polishing and cleaning at the end of finishing
C.15.29Floor screed in cement mortar 20 mm thick m2 1.8 109.0 196.2
Apply cement mortar pointing to all external cement concrete m2
C15.30 34.0 74.0 2,516.0
block wall
Apply 3 coats of plastic paint to internal ,externalwalls and m2
C.15.30 36.0 47.0 1,692.0
synthetic paint to metal doors and windows
C15.31 Electrical Installation
C.15.31Supply and install the required electrical works LS 1.0 5,500.0 5,500.0
Sub Total for Toilet 184,408.8
Total for 1 Toilet including Soak Awey Pit 354,398.6
Bill No. C- 05 Generator and Guard House(9.32x7) At Borehole and At Booster I
Unit
S/n Description Unit Qty Total cost
cost
C-05.1 Earth Work
site clearing up to a depth of 20cm to remove top
C-05.2 m2 77 27 2,035
vegetative soil
Excavation of trench in foundation, minimum of
C-05.3 m3 8 88 718
0.5meter depth
C-05.4 Back filling of excavated trench m3 5 133 612
Excavation work up to a depth of 50 cm to reduce level
C-05.5 for placing hard core & carting away of exacted soil to m3 15 52 782
a distance not exceeding 500meter
C-05.6 Masonary 0
25 cm thick basaltic or equivalent stone Hard core well
C-05.7 m3 33 189 6,165
rolled, consolidated & blinded with crushed stone
Stone masonry work in cemement Sand mortar 1:3in
C-05.8 m3 16 1,701 26,366
ratio in foundation
250mm thick cemented stone pavement around the
C-05.9 building 1m wide, price includes excavation & all m3 16 523 8,535
materials, including selected material bedding
C-
Concrete 0
05.10
C-
10cm thick Lean concrete work above hard core m2 9 140 1,214
05.11
C- RCC work 1:2:4 vibrated in to form work around
m3 7 3,592 23,664
05.12 reinforcement in floor slab
C-
Grade beam m3 12 3,592 43,104
05.13
C-
top tei beam m3 6 3,592 21,552
05.14
C-
in Lintels m3 2 3,592 5,388
05.15
in Columns m3 1 3,592 3,017
in footing m3 2 3,592 7,759
C-
generator seat m3 4 3,592 12,931
05.16
C-
Block work
05.17
C-
20cm thick hallow concrete block for wall m2 1,663 306 508,725
05.18
C-
Roof work 0
05.19
C- Upper & lower truss member of 10cm dia eucalyptus
ml 480 29 13,896
05.20 wood with 50cm c/c,well seasoned & free of defects
C- Vertical & Diagonal truss member of 8cm dia
ml 350 33 11,628
05.21 eucalyptus wood ,well seasoned & free of defects
C- Zigba wood purling 5cm X 7cm fixed to the truss at
ml 350 37 12,968
05.22 90cm C/C
C-
Roofing with G-28 corrugated iron sheet m2 65 354 23,010
05.23
C- Galvanized sheet gutter G-30 ,150 X150mm, price
m 11 321 3,595
05.24 includes brackets and two coats of metal paint
C-
Ditto but down pipes,120 X60mm m 10 78 796
05.25
C-
supply & fix 25 X 200mm facial board m 11 167 1,871
05.26
C-
Door and window 0
05.27
Supply & fix locally made metal window , with all
C- necessary iron monger locks ,mesh for protection & one
m2 3 4,704 11,760
05.28 coat of anti rust & two coats of metal paint as per the
drawing 1400mm X1200mm
Supply & fix locally made metal door , with all
C- necessary iron monger locks & one coat of anti rust &
no 3 8,400 25,200
05.29 two coats of metal paint as per the drawing 1500mm
X2000mm
C-
Renforcement 0
05.30
Steel reinforcement work according to the structural
C-
drawing price includes cutting, bending, tying, & 0
05.31
placing in a position
C-
8mm kg 200 64 12,880
05.32
C-
10mm kg 120 67 8,016
05.33
C-
12mm kg 100 69 6,920
05.34
C-
Finishing 0
05.35
C-
Plastering in cement sand mortar for internal walls m2 166 114 18,924
05.36
C-
plastering & tyrolyn render to the external surface m2 99 74 7,326
05.37
C-
Cement screeding in floor m2 27 109 2,926
05.38

C-
Electricity 0
05.39
Lights to fed through PVC sheated cable of 2 X 2.5
C- mm2 in thermoplastic conduit of 13.3mm in /under
m 4 350 1,400
05.40 surface including junction boxes ,screw type connectors
& flash mounted switches
Flush mounted socket outlet of 16Amp fed through PVC
C- sheathed cable of 3 X2.5mm2 in thermoplastic conduit
no 3 250 750
05.41 of 13.5mm in /under surface including junction
boxes ,screw type insulating caps & cover
C- Flouresent lamp laminar type Philips or
no 3 500 1,500
05.42 equivalent ,TMS02/240 with 1X40Watt
C-
Supply and fix anchor bolt in the R.C. generator seat No 8 1,800 14,400
05.43
Total for BILL NO C-05 Generator and Guard House(9.32x7.6) At Borehole and
852,332.0
At Booster I
Construction of clorine dosing room
Uni Unit Total Price
Item No Description Qty
t Price (ETB)
C- 013.1.0 Construction of clorination room
C- 013.1.1 Earth Work
Clearing of site to remove top soil to a depth of 200
C- 013.1.2 m2 12.0 26.5 318.0
mm
Excavation for stone masonry foundation 0.5 m
C- 013.1.3 m3 2.9 88.0 250.8
width and 0.5 m depth
Cart away and deposit excavated surplus material to
C- 013.1.4 m3 14.9 52.0 772.2
a distance not exceeding I km
C- 013.1.5 fill for the selected material m2 12.0 133.0 1,596.0
C- 013.1.6 Masonry Work
Supply and place 250 mm thick hard core
C- 013.1.7 m2 24.0 189.0 4,536.0
compacted to receive reinforced floor slab
Supply and place 500 mm thick hard core for
C- 013.1.8 m2 12.0 189.0 2,268.0
founation wall
C- 013.1.9 Concrete and Block Work
Reinforced concrete grade C-25 with minimum
C- 013.1.10 cement content 1440 kg/m3 cast into formwork and
vibrated around reinforcement bars in
C- 013.1.11 RC floor tie beam m3 4.0 3,592.0 14,368.0 1.128
C- 013.1.12 RC column m3 2.25 3,592.0 8,082.0 1.08
C- 013.1.13 Mass concrete fill on floor slab (100 mm) m2 12.0 3,592.0 43,104.0 13.53
C- 013.1.14 Lintel m3 0.05 3,592.0 179.6 0.052
C- 013.1.15 RC roof tie beams m3 7.2 3,592.0 25,862.4 0.423

Provide, fix in position, cut and bend reinforced


C- 013.1.16 steel bar. All according to structural drawing.
Price should include tying wires
C- 013.1.17 Diameter 8 mm deformed bar kg 120.0 64.4 7,728.0
C- 013.1.18 Diameter 10 mm deformed bar kg 110.0 66.8 7,348.0
C- 013.1.19 Provide, cut, and fix formwork beam column m2 19.2 500.0 9,600.0
C- 013.1.20 Block work
C- 013.1.21 HCB block for wall m2 650.0 306.0 198,900.0
C- 013.1.22 Carpentry and Roofing
Supply, assemble and fix in position roof truss price
C- 013.1.23 shall include the application of three coats and m2 25.0 28.9 723.7
external anti-termite treatment
Supply and fix purl in in zigba wood size 50 x 70
C- 013.1.25 mm nailed into eucalyptus truss including three ml 30.0 37.1 1,111.5
coats of anti - termite external treatment
Supply and fix roof cover in G-28 mm corrugated
galvanized iron sheet fixed into zigba wood purl in
C- 013.1.26 m2 24.0 354.0 8,496.0
with dome headed galvanized nails (purlin and ridge
cover measured separately)

Supply and fix edge gutter formed in G- 28 flat


galvanized metal sheet including support brackets 1
mm thick shaped steel plate spaced at a maximum
C- 013.1.27 m 5.0 321.0 1,605.0
spacing of 1000 mm clc and fixed to purl in - price
includes metal primer and two coats of synthetic
enamel paint

Supply & fix diameter 100mm down pipe in G-28


including I mm thick metal support brackets fixed at
C- 013.1.28 m 15.0 397.0 5,955.0
a maximum interval of 1000 mm fixed to walls or
columns
C- 013.1.29 Supply and fix 25x 250 mm fascia board to purlin
C- 013.1.30 m 9.8 167.1 1,637.2
Supply and fix metal windows size 1x1.8m price
C- 013.1.31 m2 1.8 5,040.0 9,072.0
includes lock hachs
Supply and fix metal doors size 2.1 Ox1 with
C- 013.1.32 Pcs 2.1 5,880.0 12,348.0
figured glass in upper half portion
Finishing; finishing work shall include all surface
C- 013.1.33 pre-cleaning, polishing and cleaning at the end of
finishing
C- 013.1.34 Floor screed in cement mortar 20 mm thick m2 1.8 109.0 196.2
Apply cement mortar pointing to all external cement
C- 013.1.35 m2 34.0 74.0 2,516.0
concrete block wall
Apply 3 coats of plastic paint to
C- 013.1.36 internal ,externalwalls and synthetic paint to metal m2 45.0 47.0 2,115.0
doors and windows
C- 013.1.37 Electrical Installation
C- 013.1.38 Supply and install the required electrical works LS 1.0 5,500.0 5,500.0
Sub-Total 376,188.6
Bill No. D- 01 BOQ of 1000m3 Service
Item NO Descriptions Unit Quantity Unit rate Amount
C-01.1 EARTHWORKS
Site Clearing to remove top soil to depth not exceeding
C-01.1.1 m2 314.00 26.50 8,321.00
200mm
C-0.1.2 Excavation
Excavation shall includs from strutting ,
shuttering ,stabilising excavated surfaces and keeping
C-01.1.2 excavations free of water by bailing out,pumping or
other means. ( Excluding disposal of excavated
material )
C-0.1.1.3 Excavation for foundations
Bulk excavation in ordinary soil to depth not greater than
C-01.1.3 M3 51.20 132.50 6,784.00
1m
Hard Rock : commencing surface 0.8m above final
C-0.1.1.4 M3 10.00 177.00 1,770.00
surface
C-01.1.4 Soft Rock : commencing surface 0.8m above final surface M3 10.00 331.00 3,310.00
C-0.1.1.5 General Excavation
Maximum depth shall be depth of excavation from thr
C-01.1.5
orginal surface to 0.8m above the final surface
C-0.1.1.6 Topsoil: maximum depth n.e. 0.25m M3 200.00 26.50 5,300.00
C-01.1.6 Common material; maximum depth 1.0m - 2.0m M3 400.00 184.00 73,600.00
C-0.1.1.7 Common material; maximum depth 2.0 -5m M3 440.00 303.00 133,320.00
C-01.1.7 Hard Rock ; maximum depth 2.0m - 5.0m M3 20.00 468.00 9,360.00
C-0.1.1.8 Ditto soft Rock M3 10.00 331.00 3,310.00
C-01.1.8 Disposal of Excavated Material
Approved material shall be retained for filling/
C-0.1.1.9 backfilling and unsuitabel material shall be disposed
to tip as directed by the Engineer.
C-01.1.9 Topsoil; maximum distance of haul n.e. 1 km M3 180.00 52.00 9,360.00
C-0.1.1.10Ditto but haulage exceeding 1 km M3 20.00 52.00 1,040.00
C-01.1.10 Common material ; maximum distace to haul n.e. 1 km M3 640.00 52.00 33,280.00
C-0.1.1.11Ditto but haulage exceeding 1 km M3 200.00 52.00 10,400.00
C-01.1.11 Hard Rock ; maximum distance of haul n.e. 1 km M3 20.00 52.00 1,040.00
C-0.1.1.12Soft Rock ; maximum distance of haul n.e 1 km M3 10.00 52.00 520.00
C-01.1.12 Back Filling
Include for compaction as specified and Filling to
C-0.1.1.13
Completed Structures
C-01.1.13 Filling of Excavated topsoil M3 200.00 133.00 26,600.00
C-0.1.1.14Non- selected excavated common material M3 300.00 246.00 73,800.00
C-01.1.14 Non-selected excavated common material ( General ) M3 375.00 246.00 92,250.00
C-0.1.1.15To stated depth or thickness
C-01.1.15 250mm approved hardcore below blinding concrete level M3 100.00 189.00 18,900.00
C-0.1.1.16Drain
C-01.1.16 Earth drain with slopes at 45 degrees , depth n.e. 1.5m M3 310.00 35.00 10,850.00
SUB-TOTAL For C-01.1.0 523,115.00
C-01.1.17 CONCRETE WORK
300mm thick lean concrete with mix ratio (1:3:6) under
C-01.1.18 M2 393.65 140.00 55,111.00
the reservoir base slab and valve chamber
Reinforced concrete type c-30 filled into from work
C-01.1.19 and vibrated around reniforced bar mix ratio should
1:2:3
C-01.1.20 Base slab (C-30) M3 100.42 3,899.00 391,537.58
C-01.1.21 Concrete wall (C-30) M3 82.92 3,899.00 323,305.08
C-01.1.22 Concrete column (C-30) M3 6.63 3,899.00 25,850.37
C-01.1.23 Top slab(C-25) M3 45.93 3,592.00 164,980.56
C-01.1.24 Parapet (C-25) M3 22.00 3,592.00 79,024.00
C-01.1.25 Provide and fix formwork to
C-01.1.26 Base slab M2 16.49 500.00 8,245.00
C-01.1.27 Wall M2 547.80 500.00 273,900.00
C-01.1.28 Column M2 10.05 500.00 5,025.00
C-01.1.29 Top slab M2 240.40 500.00 120,200.00
C-01.1.30 Parapet M2 150.00 500.00 75,000.00
Provide cut,bend and fix in position renifoced steel
C-01.1.31 bar.All according to structural drawing . Price should
include tying wires.
C-01.1.32 Diameter 8mm plain bar kg 650.00 64.40 41,860.00
C-01.1.33 Diameter 12mm deformed bar kg 7,705.00 69.20 533,186.00
C-01.1.34 Diameter 14mm deformed bar kg 10,849.00 71.00 770,279.00
C-01.1.35 Diameter 16mm deformed bar kg 700.00 71.00 49,700.00
C-01.1.36 Diameter 20mm deformed bar kg 450.00 71.00 31,950.00
SUB-TOTAL FOR (C-01.1.17)
C-01.1.37 valve chambere
C-01.1.38 Concrete
Reniforced concrete type C-25 filled into from work and
C-01.1.39 vibrated around reniforced bar mix ratio should be 1:2:3: M3 16.20 3,592.00 58,190.40
for valve chambere
C-01.1.40 Provide and fix formwork for valve chamber to
C-01.1.41 Base slab M2 9.85 500.00 4,925.00
C-01.1.42 wall M2 112.20 500.00 56,100.00
C-01.1.43 Column M2 6.13 500.00 3,065.00
C-01.1.44 Top slab M2 13.79 500.00 6,895.00
Provide cut,bend and fix in position renifoced steel
C-01.1.45 bar.All according to structural drawing . Price should
include tying wires.
C-01.1.46 Diameter 8mm plain bar kg 797.00 64.40 51,326.80
C-01.1.47 Diameter 10mm deformed bar kg 190.00 66.80 12,692.00
C-01.1.48 Block work
Provide and construct 400mm thick pointed stone
C-01.1.49 masonary valve chamber for inlet ,outlet,overflow and Lps 1.00 4,500.00 4,500.00
drain valves as per the drawing (top slab C-25)
C-01.1.50 ACCESSEORIES AND FINISHING
Provide and apply 50cm cement screed to the reservoir
C-01.1.51 M2 256.90 109.00 28,002.10
floor and roof slab
Provide and apply 3 coats of plaster to internal walls
C-01.1.52 M2 281.45 114.00 32,085.30
columns and to embedded part of external wall
C-01.1.53 Rendering external wall M2 276.40 74.00 20,453.60
Supply and fix external galvanised steel (6m) and internal
C-01.1.54 stainless steel (5.5m) ladder complete with saftly cage as NO 1.00 15,000.00 15,000.00
per design to satisfaction of the Engineer
Supply and install external water level indicator complete
C-01.1.55 NO 1.00 65,000.00 65,000.00
with necessary accessories
Provide and install water stops made of natural or
C-01.1.56 synthetic rubber or elastometric plastic compound with M 156.37 750.00 117,277.50
basic risen polyvinyl chloride ( PVC)
provide and fix 6mm sheet metal access cover with latch
C-01.1.57 NO 3.00 3,500.00 10,500.00
and lock for valve chamber and reservoir
C-01.1.59 paint with water proof for the wall and floorbase M2 302.00 185.00 55,870.00
Provide and place single brick layer cover to protect the
C-01.1.60 M2 52.15 570.00 29,725.50
asphalt coat from the backfill material
SUB-TOTAL FOR (C-01.1.31) 3,520,761.79
PIPES, VALVES AND FITTINGS
C-01.1.61 Install inlet pipe
C-01.1.62 DN 250mm flanged bell mouth No 1.00 9,600.00 9,600.00
C-01.1.63 DN 250, L=330cm double flanged pipe No 1.00 11,500.00 11,500.00
C-01.1.64 DN 250, 900 Duck foot bend No 1.00 16,800.00 16,800.00
DN 250, double flanged L=1m with centrally welded puddle
C-01.1.65 flange No 1.00 13,600.00 13,600.00
C-01.1.66 DN 250 dismantling piece No 1.00 7,920.00 7,920.00
C-01.1.67 DN 250 flanged gate valve No 1.00 18,400.00 18,400.00
C-01.1.68 DN 250 double flanged pipe L=1.25 m No 1.00 7,600.00 7,600.00
C-01.1.69 DN250, 90 degree double flanged elbow No 1.00 9,600.00 9,600.00
C-01.1.70 DN 250, double flanged pipe L=4.5m No 3.00 14,200.00 42,600.00
C-01.1.71 DN 250, double flanged pipe L=1.00m No 1.00 5,600.00 5,600.00
C-01.1.72 DN 250 flanged spigot No 1.00 7,600.00 7,600.00
C-01.1.73 DN 250 express collar No 1.00 7,200.00 7,200.00
C-01.1.74 DN 250 flanged float valve No 1.00 12,800.00 12,800.00
Pipe support with pipe clamp, wall bracket, foot plate and
C-01.1.75 anchor bolts LS 1.00 7,500.00 7,500.00
C-01.1.76 Install outlet pipe
C-01.1.77 DN 250 suction strainer No 1.00 13,600.00 13,600.00
DN 250 double flanged pipe L=1m with centrally welded
C-01.1.78 puddle flange No 1.00 4,400.00 4,400.00
C-01.1.79 DN 250 dismantling piece No 1.00 7,920.00 7,920.00
C-01.1.80 DN 250 flanged gate valve No 1.00 18,400.00 18,400.00
C-01.1.81 DN 250, 90 degree double flanged bend No 1.00 9,600.00 9,600.00
C-01.1.82 DN 250 double flanged pipe L=1m No 1.00 4,400.00 4,400.00
C-01.1.83 DN 250 flanged spigot No 1.00 4,400.00 4,400.00
C-01.1.84 DN 250 express collar No 1.00 7,200.00 7,200.00
C-01.1.85 DN 250 water meter No 1.00 25,000.00 25,000.00
Pipe support with pipe clamp, wall bracket, foot plate and
C-01.1.86 anchor bolts LS 1.00 7,500.00 7,500.00
C-01.1.87 Install Overflow and Drain pipes
C-01.1.88 DN 250 Flanged bell mouth No 1.00 9,600.00 9,600.00
C-01.1.89 DN 250 double flanged pipe L=180cm with puddle flange No 1.00 4,400.00 4,400.00
C-01.1.90 DN 250, 90 degree double flanged bend No 2.00 96,000.00 192,000.00
DN 250, double flanged pipe L=1.0m with centrally welded
C-01.1.91 puddle flange No 1.00 4,400.00 4,400.00
C-01.1.92 DN 250x250 all flanged Tee No 1.00 17,600.00 17,600.00
C-01.1.93 DN 250 flanged gate valve No 1.00 18,400.00 18,400.00
C-01.1.94 DN 250 flanged spigot No 2.00 4,400.00 8,800.00
C-01.1.95 Install level indicator pcs 1.00 65,000.00 65,000.00
Provide and install DN 100 ventillation pipe with dome, L
C-01.1.96 No 2.00 6,500.00 13,000.00
=6meters
C-01.1.97 SUB-TOTAL FOR C-01.1.6 613,940.00
C-01.1.98 Compound Work
Filling and compacting of selected material excavated
C-01.1.99 M3 175.00 246.00 43,050.00
from site in layers not exceeding 20cm thickness
Construction of 200mm*300m wide and 20cm thick C-20
reinforced concrete drian around the reservoir wall
C-01.1.101including the drinage ditch as shown in the drawing. The M3 68.00 523.00 35,564.00
work including excavation, cart away and selected
backfill material.

Mesh wires fencing consists of 2.5 mm wire horizontal


and diagonal member fixed to 2.5m long concret post
C-01.1.103 M2 250.00 250.00 62,500.00
spaced C/C 2000mm, including all necessary material as
per the drawing.
C-01.1.104Supply and construct gate type III as per the drawing NO 1.00 15,000.00 15,000.00
C-01.1.105Compound Lighiting as per the drawing Ls 1.00 8,500.00 8,500.00
C-01.1.106Testing, Disinfection and Commissioning Ls 1.00 7,500.00 7,500.00
C-01.1.10 Electrical Installation
Supply and install within guard house; distribution
C-01.1.10 board for flush mounting with lockl abel door
consisting of
C-01.1.1091PC of ACD of 10A, 1-ph NO 1.00 7,334.80 7,334.80
C-01.1.1102pc of ACB of 16A , 1-ph NO 1.00 1,504.80 1,504.80
Light points with switches, fed through Pvc insulated wire
C-01.1.111 NO 2.00 81.68 163.35
2x2.5 mm 2 cable
Flush mounted socket outlets of 16a, 220V ,50HZ , fed
C-01.1.112through PVC 3x2.5mm 2 cable , laid on the roof and in NO 2.00 147.40 294.80
16mm conduit in the wall
Light fittings type philips TMS 012/136 or equvalent with
C-01.1.113 NO 2.00 501.82 1,003.64
1x36 W lamps
Power line of PVC conductor of 2x 4mm2 from EEPCO
C-01.1.114 NO 20.00 1,400.00 28,000.00
meter.
Supply & install sign boards as specified by the Engineer
C-01.1.118 NO 1.00 850.00 850.00
( at gate entrance & main road)(1-3)m2
C-01.1.11 SUB-TOTAL FOR C-01.1.98 211,265.39
Total For BILL NO. C-01 (1000 m3) Balancing
4,869,082.18
Reservoir
Bill No. C- 02 Construction of 500m3 @ BOOSTER I
Contract
Item Description Unit Qty Unit Price
C-02.1 EARTH WORK
Clearing the top soil and unwanted material to a depth
C-02.1.1 of 200mm m2 254.3 26.5
Bulk excavation in ordinary soil to depth not greater
C-02.2 than 0.6m m3 120.0 88.0
C-02.1.2 Ditto but to a depth not greater than 1m m3 86.5 132.5
C-02.3 Extra over for bulk excavation in hard rock m3 15.0 468.0
Back fill around reservoir walls with selected material
C-02.1.3 from off site and well ram in layers every 25cm interval. m3 56.4 133.0
Cart away all excavated material, deposit to
C-02.1.4 appropriate distance not exceeding 1 km m3 221.5 52.0
50cm thick basaltic or equivalent stone base for
C-02.5 foundation m2 25.0 850.5
C-02.1.5 50cm thick hard trachyte stone hard core filling m2 133.2 189.0
C-02.6 CONCRETE AND MASONRY WORK
200mm thick lean concrete with mix ratio (1:3:6) under
C-02.1.6 the reservoir base slab m2 133.2 140.0
Masonary pavment around the reservoir wih mass
C-02.7 concrete m3 52.7 865.4
Reinforced concrete type C-30 filled into form
work and vibrated around reinforced bar.with mix
C-02.1.7 ratio (1:2:3)
C-02.8 In base slab( C-30) m3 50.0 3899.00
C-02.1.8 In 25cm thick concrete wall(C-30) m3 57.3 3899.00
C-02.9 in concrete column(C-30) m3 2.8 3899.00
C-02.1.9 In top slab(C-25) m3 32.0 3592.00
C-02.10 in ring and fillet(C-30) m3 21.5 3899.00
C-02.1.10 Provide and fix formwork
C-02.11 In base slab m2 20.1 500.0
C-02.1.11 To wall m2 385.0 500.0
C-02.12 To column m2 26.2 500.0
C-02.1.12 To top slab m2 118.2 500.0
C-02.13 To ring and fillet m2 16.0 500.0
Provide, cut, bend and fix in position reinforced
steel bar. All according to structural drawing. Price
C-02.1.13 should include tying wires.
C-02.1.14 Diameter 8 mm deformed bar kg 130.7 64.40
C-02.15 Diameter 10 mm deformed bar kg 4,650.2 66.80
C-02.1.15 Diameter 12 mm deformed bar kg 6,550.6 69.20
C-02.16 Diameter 14 mm deformed bar kg 1,650.0 71.00
C-02.1.16 Diameter 16 mm deformed bar kg 360.0 71.00
C-02.17 Diameter 20 mm deformed bar kg 300.1 71.00
Provide and construct 400 mm thick pointed stone
masonry valve chamber for inlet, outlet, overflow and
C-02.1.17 drain valves as per the drawing( top slab c-25) Lps 1.0 4,500.0
C-02.18 ACCESSORIES & FINISHING
Provide and apply 50mm cement screed to the reservoir
C-02.1.18 floor and roof slab and to valve chamber m2 239.8 109.0
Provide and apply 3 coats of plaster to internal walls,
C-02.19 columns and to embeded part of external wall surface m2 315.0 114.0
C-02.1.19 Rendering external wall m2 157.0 74.0
Supply and install external water level indicator
C-02.20 complete with necessary accessories No 1.0 65,000.0
Supply and fix external galvanised steel (6m) and
internal stainless steel (5.5m) ladder complete with
safety cage as per the design to the satisfaction of the
C-02.1.20 engineer. No 2.0 9,200.0
Provide and install water stops made of natural or
synthetic rubber or elastometric plastic compound with
C-02.21 basic risen polyvinyl chloride (PVC) m 120.0 750.0
C-02.1.21 water proofing of internal walls m2 221.6 750.0
provide and insert plastic sheet for the base slab of the 124.63
m2
C-02.22 embeded part 135
Provide and fix 6 mm sheet metal access cover with
C-02.1.22 latch and lock for valve chamber and reservoir No 4.0 3,500.0
Installation of Pipes ,Valves & Fittings Supplied by
C-02.24 the client
C-02.1.24 PIPES, VALVES AND FITTINGS
C-02.25 Install inlet pipe
C-02.1.25 DN 250mm flanged bell mouth No 1 9,600.00
C-02.26 DN 250, L=330cm double flanged pipe No 1 11,500.00
C-02.1.26 DN 250, 900 Duck foot bend No 1 16,800.00
DN 250, double flanged L=1m with centrally welded puddle
No 1 13,600.00
C-02.27 flange
C-02.1.27 DN 250 dismantling piece No 1 7,920.00
C-02.28 DN 250 flanged gate valve No 1 18,400.00
C-02.1.28 DN 250 double flanged pipe L=1.25 m No 1 7,600.00
C-02.29 DN250, 900 double flanged bend No 1 9,600.00
C-02.1.29 DN 250, double flanged pipe L=3.50m No 2 14,200.00
C-02.30 DN 250, double flanged pipe L=1.00m No 1 5,600.00
C-02.1.30 DN 250 flanged spigot No 1 7,600.00
C-02.31 DN 250 express collar No 1 7,200.00
C-02.1.31 DN 250 flanged float valve No 1 12,800.00
Pipe support with pipe clamp, wall bracket, foot plate and
LS 1 7,500.00
C-02.32 anchor bolts
C-02.1.32 Install outlet pipe
C-02.33 DN 250 suction strainer No 1 13,600.00
DN 250 double flanged pipe L=1m with centrally welded
No 1 4,400.00
C-02.1.33 puddle flange
C-02.34 DN 250 dismantling piece No 1 7,920.00
C-02.1.34 DN 250 flanged gate valve No 1 18,400.00
C-02.35 DN 250, 900 double flanged bend No 1 9,600.00
C-02.1.35 DN 250*150 double flanged reducer No 1 17,600.00
C-02.36 DN 250 double flanged pipe L=1m No 1 4,400.00
C-02.1.36 DN 250 flanged spigot No 1 4,400.00
C-02.37 DN 250 express collar No 1 7,200.00
C-02.1.37 DN 250 water meter No 1 25,000.00
Pipe support with pipe clamp, wall bracket, foot plate and
LS 1.00 7,500.00
C-02.38 anchor bolts
C-02.1.38 Install Overflow and Drain pipes
C-02.39 DN 250 Flanged bell mouth No 1 9,600.00
C-02.1.39 DN 250 double flanged pipe L=180cm with puddle flange No 1 4,400.00
C-02.40 DN 250, 900 double flanged bend No 2 9,600.00
DN 250, double flanged pipe L=1.0m with centrally welded
No 1 4,400.00
C-02.1.40 puddle flange
C-02.41 DN 250x250 all flanged Tee No 1 17,600.00
C-02.1.41 DN 250 flanged gate valve No 1 18,400.00
C-02.42 DN 250 flanged spigot No 2 4,400.00
C-02.1.42 Install level indicator pcs 1 65,000.00
Provide and install DN100 ventillation pipe with dome, L
pcs 2 6,500.00
C-02.43 =1.0 meters
C-02.1.43 Supply and istall hooper ( Staineless steel) No 1.0 1,500.0
Supply and Install level indicator with all its
C-02.44 accessories ls 1.0 6,500.0
C-02.1.44 Compound Work
mesh wires fencing consists of 2.5 mm barbed wire
horizontal and diagonal member fixed to 2500 mm long
concrete post spaced every 2000mm, including all
C-02.45 necessary material as per the drawing m2 205.0 250.0
Stripping top soil from whole area surrounded by
fence, including running to spoil and sterilization to
C-02.1.45 prevent vegetation growth m2 1,450.0 26.5
Gate, 6mm angle iron with metal sheet C/C 40 mm
fixed to 60*60*3 mm RHS frame, as shown in the
drawing; price includes lock & latches & earth work
C-02.49 (width 4.0m*height 2.60m) No 1.0 15,000.0
Supply & install sign boards as specified by the
C-02.1.50 Engineer ( at gate entrance & main road)(1-3)m2 No 1.0 850.0
Total For C-02 Carried to Summary
Contract Amount

6,739.0

10,560.0
11,461.3
7,020.0

7,494.6

11,518.0

21,262.5
25,176.7

18,649.4

45,606.6

-
194,950.0
223,412.7
10,839.2
114,944.0
83,672.5

10,055.0
192,500.0
13,105.0
59,100.0
8,015.0

8,417.1
310,633.4
453,301.5
117,150.0
25,560.0
21,307.1

4,500.0

26,138.2

35,910.0
11,618.0

65,000.0
18,400.0

90,000.0
166,200.0

16,825.1

14,000.0

9,600.0
11,500.0
16,800.0

13,600.0
7,920.0
18,400.0
7,600.0
9,600.0
28,400.0
5,600.0
7,600.0
7,200.0
12,800.0

7,500.0

13,600.0

4,400.0
7,920.0
18,400.0
9,600.0
17,600.0
4,400.0
4,400.0
7,200.0
25,000.0

7,500.0

9,600.0
4,400.0
19,200.0

4,400.0
17,600.0
18,400.0
8,800.0
65,000.0

13,000.0
1,500.0
6,500.0

51,250.0

38,425.0

15,000.0

850.0
3,019,106.7
BILL NO.C.14.0 Guard House at 1000m3 service Reservoir
Item Description Unit Quantity Rate Amount (Birr)
C.14.1 Sub Structure
C14.2 Excavation & Earth Work
C.14.2 Clearing the top soil and unwanted material to depth of m² 25.0 26.5 662.5
200mm
C14.3 Bulk excavation in ordinary soil to depth not greater m³ 3.6 88.0 316.8
50cm
C.14.3 Bulk excavation in rock to depth not greater 30cm m³ 4.5 88.0 396.0
C14.4 Cart away all excavated material, deposit to m³ 8.1 52.0 421.2
appropriate distance not exceeding 1km
C.14.4 Masonary 0.0
Supply and fill hard core for founadation and hard
basaltic or equivalent stone, well compacted and
C14.5 blinded with crushed stone to a finished thickness of m² 5.0 189.0 935.6
25cm
C.14.5 Concrete
5cm thick Work
class C-10 lean Concrete under masonry 0.0
C14.6 foundation walls m² 3.2 180.0 576.0

Reinforced concrete grade C-25 with minimum


C.14.6 cement content 360 kg/m³ cast into formwork and 0.0
vibrated around reinforcement bars in
C14.7 For column m³ 2.5 3,592.0 8,980.0
C.14.7 Grade beams m³ 5.5 3,592.0 19,756.0
C14.8 Top tie beams m³ 2.5 3,592.0 8,980.0
C.14.8 Supply and fix sawn form work to 0.0
C14.9 For column m² 6.1 500.0 3,060.0
C.14.9 Grade beams m² 6.5 500.0 3,250.0
supply, cut, bend and fix in position steel
reinforcement bars, strength S300. All according to
C14.10 structural drawings. rate shall include tying wires and 0.0
spacing bars
C.14.10Dia 8mm kg 150.0 64.4 9,660.0
C14.11 Dia 10mm kg 250.0 66.8 16,700.0
Supply and raise class-B hollow concrete block
C.14.11(H.C.B) walls laid in cement mortar of mix ratio 0.0
1:3, according to drawing
C14.12 a) 200mm thick no 525.0 306.0 160,650.0
C.14.12Concrete Work 0.0
C14.13 Mass concrete C-20 floor m³ 2.2 3,357.7 7,521.3
C.14.13Roofing 0.0
Supply and fix roof cover in G-28 corrugated
C14.14 galvanized iron sheet fixed into zigba wood purlin m² 34.0 354.0 12,036.0
with dome headed galvanized nails including ridge
cover and one coat of anti rust paint
Supply and fix edge gutter made of G-28 flat
galvanized metal sheet including support brackets
1mm thick shaped steel plate spaced at a maximum
C.14.14spacing of 1000mm c/c and fixed to purlin, rate m 8.5 321.0 2,728.5
includes one coat of anti rust and two coats of
synthetic enamel paint. Development length 500mm.

C14.15 Supply and fix down drain pipe in sheet metal, size m 9.6 397.0 3,811.2
80x60mm including strainer at inlet
Supply and fix G-28 ribbed sheet to the external roof
C.14.15soffit & eve fixed to 50x40 mm zigba battens at m² 5.2 516.0 2,683.2
600x600mm spacing rate including one coat of anti
rust paint.
C14.16 Carpentry and Joinery 0.0
Supply and fix in position well seasoned eucalyptus
C.14.16roof truss according to drawing, rate shall include 0.0
the application of two coats of external anti-termite
treatment
C14.17 Lower chord dia 100mm ml 120.0 28.9 3,473.9
C.14.17Upper chord
Diagonal anddia 100mm
vertical member dia 80mm ml 120.0 33.2 3,986.7
C14.18 ml 100.0 33.2 3,322.3
Supply and fix purlin in zigba wood size 50x70 mm
C.14.18nailed into eucalyptus truss including two coats of anti ml 18.0 37.1 666.9
- termite external treatment
Supply and fix 8mm thick chip wood ceiling fixed to
C14.19 50x40mm zigba battens spacing 600x600mm, rate m² 4.4 390.3 1,721.1
includes battens and corner list
C.14.19Supply and fix well seasoned Keraro facia board m 12.2 167.1 2,038.1
200x30mm
C14.20 Metal work

Supply and fix 38/1.5mm LTZ metal frame doors


and windows covered with 1mm thick sheet metal
C.14.20where specified or indicated; rate shall include one
coat of anti-rust and three coats of synthetic paint;
complete with all accessories
C14.21 Door D1 0.9x2.1m m2 1.9 5,292.0 10,001.9
C.14.21Window W1 0.9x1.6m m2 1.5 4,032.0 6,048.0
C14.22 Finishing
C.14.22Apply 3 coats of plastering to internal walls m² 19.6 114.0 2,234.4
C14.23 Apply 2 coats of plastering and 1 coat of Tyrolean m² 19.6 74.0 1,450.4
rendering to external walls
C.14.23Place 50mm thick cement screed to floor slab m² 9.3 109.0 1,011.5
C14.24 Supply and place terrazzo window sills 250mm width m 1.6 1,300.0 2,080.0
C.14.24Apply 3 coats of plastic paint to internal walls m² 19.6 47.0 921.2
C14.25 ditto but to chip wood ceiling m² 9.6 63.0 604.8
C.14.25apply 3 coats of varnish painting to fascia board m² 3.3 47.0 152.8
C14.26 Electrical installation 0.0

Rates include supply and installation of all items


including the necessary civil works.
C.14.26All materials shall be approved by the Supervisor. 0.0
All distribution boards shall be wired and tested as per
the relevant IEC standards
C14.27 Distribution Board 0.0
C.14.27Flush mounted sub distribution board as shown on the LS 1.0 7,600.0 7,600.0
drawings
C14.28 Light points 0.0
C.14.28Light points in medium duty rigid conduit of 16mm nr 4.0 550.0 2,200.0
fed by PVC copper conductor of 2x2.5mm²
C14.29 Switches IP54 0.0
C.14.2910A/1ph flush mounted with appropriate cover plate, 0.0
frame and box.
C14.30 Single Switch nr 2.0 350.0 700.0
C.14.30Double Switch nr 1.0 250.0 250.0
C14.31 Socket Outlet Power Points and Floor Box 0.0
Flush mounted with appropriate cover plate, frame and
C.14.31box 0.0

Socket outlet 16A, 3pin or approved equivalent flush


C14.32 mounted 16A, 1ph fed by PVC insulated copper cable nr 2.0 550.0 1,100.0
of 3x2.5mm² in medium duty rigid thermoplastic
conduit of diameter 20mm.
C.14.32Light Fittings with Lamps 0.0

All light fittings should have appropriate electric


gear, lamps, mounting and other necessary
C14.33 accessories; types as per general electrical 0.0
specifications; rate shall include supply, installation
and all works
C.14.33Type 5 - 23W - ceiling nr 1.0 1,460.0 1,460.0
C14.34 Type 6 - 23W- wall nr 3.0 1,320.0 3,960.0
C.14.34Cabling 0.0
Supply, installation and all works related with cabling
C14.35 of the building for all electrical, telephone and data LS 1.0 1,500.0 1,500.0
lines in PVC conduits as specified
C.14.35PVC sheathed cable for house connection rating of m 18.0 55.0 990.0
0.6/1KV, 3x4mm², incl. PVC conduit
Total for Guard House at 1000m3 service 322,598.3
Reservoir
C-04.0Standard Service Reservoir 50 m3 (#1) at BH For onspot
Description Unit Qty Rate Amount
C-04.1 Earth Work
Site clearing & grubbing up to a average depth of 20
C-04.2 cm to remove top vegetated soil m2 35 26.50 927.50
Foundation excavetion to a depth of not exceedin 1m
C-04.3 below
Placingground level basalic stone or equivalent hard m3
25cm thick 30.5 184.00 5,612.00
core well-rolled consolidated and blinded with
C-04.5 gravel m3 45 189.00 8,505.00
Back filling around a foundation with approved
selected materials from site well rammed in layer of
C-04.6 20 cm m3 29.14 133.00 3,875.62
Cartaway surplus excavated materials from the site
C-04.7 to a distance of 100 m m3 35.5 52.00 1,846.00
C-04.8 concrete work -
Casting 70 mm thick Lean concrete over hard-core
with Grade C-15 concrete with minimum cement
C-04.9 150kg/m3 m2 29.2 180.00 5,256.00
Casting 25 cm thick Base slab in Grade C-30
reinforced concrete with minimum cement
C-04.10 360kg/m3
Casting 20mix 1:2:4 Roof cover slab with Grade C- m3
cm thick 9 3592.00 32,328.00
30 reinforced concrete of minimum cement
C-04.11 360kg/m3 m3 7.99 3592.00 28,700.08
Construction of friction key with Grade C-30
C-04.12 reinforced concrete simultaneously with base slab m3 6.27 3592.00 22,521.84
Construction of 10 cm thick reinforced concrete
Grade C-30 filled between masonry wall reinforced
C-04.13 with Hexagonal Mesh-Wire of size 3/4 m3 5.2 3592.00 18,678.40
Casting 20cm thick concrete Ring beam of Grade C-
C-04.14 30 with minimum cement 360kg/m3 m3 1.7 3592.00 6,106.40
supply, cut, bend and fix in position
C-04.15 reinforcement bars -
C-04.16 dia ø10mm kg 1,820 66.80 121,576.00
C-04.17 dia ø 12mm kg 756 69.20 52,315.20
C-04.18 dia ø 14mm kg 50 71.00 3,550.00
Fixing of good quality wooden or metal form work
firmly with strong struting & tight to avoid Bleeding
C-04.19 & Bulgingout m2 54 500.00 27,000.00
C-04.20 Massonry work -
Construction of 2 x 20 cm thick Masonry Wall on
both side of the Concrete - Core embeded with
C-04.21 cement Sand mortar of mix 1 : 3 m3 35 523.00 18,305.00
Floor finish 30 mm thick trawl and smooth finish
C-04.22 with 1:3 cement Sand mortar screed m2 30.144 109.00 3,285.70
Semi Dressed Stone Pavement around the Reservoir
C-04.23 1.0 m wide cemented with in 1:3 mix cement mortar m3 36 523.00 18,828.00
Construction of Semi-Circular 30 cm diameter
C-04.24 Drainage Ditch as per drawing m3 38 450.00 17,100.00
Construction of 100 x 100 x 100 cm Valve chamber
C-04.25 with Hollow Concrete Block as per Design Drawing LS 1 4500.00 4,500.00
C-04.26 Mislaneous & Finishing -
Install & Fix all necessary pipes & fittings with all
necessary accessories, gate valves, Float Valves
asper the Design Drawings for In-let, Out-let, Vent
C-04.27 pipe Drain,& Over-flow system of the reservoir LS 1 7500.00 7,500.00
C-04.28 Install inlet and outlet pipe -
C-04.29 DN 200, L=340cm double flanged pipe No 1 7920.00 7,920.00
C-04.30 DN 200, 90 degree elbow bend No 2 9600.00 19,200.00
DN 200, double flanged L=1m with centrally welded
No 2 4400.00
C-04.31 puddle flange 8,800.00
C-04.32 DN 200 dismantling piece No 1 7920.00 7,920.00
C-04.33 DN 250*200 reducer No 2 8600.00 17,200.00
C-04.34 DN 200 flanged gate valve
Supply & No 1 18400.00 18,400.00
andInstall
installlockable Steel Man-Hole
both External & Internalcover
Ladder
with all
made of fixing hings
Class B, G S&Pipe
Accessories
of DN 25with
mmlock gate3.0
Length
(Design)
C-04.35 m having extra 1.0 m high handle at the top for No 1 7500.00 7,500.00
C-04.36 External Ladder No 2 9200.00 18,400.00
Provide and install water stops made of natural or
C-04.37 synthetic rubber (pvc) m 45 750.00 33,750.00
Install and fix quality water meter DN 200 mm at the
outlet of the reservoir with approperiate fittngs and
C-04.38 Gate Valve No 1 25000.00 25,000.00
Plastering the whole inner wall face and exposed
faces of concrete works with three coates of cement
C-04.39 sand mortar of mix 1 : 2 m2 50 114.00 5,700.00
mesh wires fencing consists of 2.5 mm barbed wire
horizontal and diagonal member fixed to 2500 mm
long concrete post spaced every 2000mm, including
C-04.40 all necessary material as per the drawing m2 160 250.00 40,000.00
Gate, 6mm angle iron with metal sheet C/C 40 mm
fixed to 60*60*3 mm RHS frame, as shown in the
drawing; price includes lock & latches & earth work
C-04.41 (width 4.0m*height 2.60m) no 1 1500 1,500.00
Pointing the whole External face of the masonry
C-04.42 wall with cement mortar mix 1 : 2 m2 45 95.00 4,275.00
BILL NO Total for one reservoir 623,881.74
BILL NO. C-08 maintenance of old reservoirs
Construction maintenance of Existing 100m3 Masonary service reservoir BIKE
Item DESCRIPTION Unit Revised Unit Rate Contract
QTY (Birr) Amount
C-08.1 EARTH WORK
Site Clearing to remove top soil and proper leveling
C-08.1 of the reservoir circumfrence m2 22.29 26.50 590.79
C-08.1 reservoir foundation hard coring m3 20.00 189.00 3,780.00
C-08.1 mass concrete around the corcumfrence m3 6.00 3,357.72 20,146.34
proper plastering and leakage protection for the wall
C-08.1 (interal and external m3 89.18 138.00 12,306.29
C-08.1 ladders and drainage pipes ls 2.00 9,200.00 18,400.00
C-08.1 water proofing of internal surface m2 126.00 135.00 17,010.00
Provide, fill and compact impermeable clay soil to a
C-08.1 finished thickness of 30 cm m3 36.79 246.00 9,050.34
Mesh wire fencing consists of 2.5 mm barbed wire
horizontal and diagonal member fixed to 2500 mm
long concrete psts spaced every 2000mm, including
C-08.1 all necessary material as per the drawing m2 250.00 250.00 62,500.00
Cost for connecting to the new pipe HDPE PE100
OD 280 PN10 this include All trench works, Welding
laying ,fitting works and all others necessaries
C-08.1 materials m 500.00 250.00 125,000.00
Total FOR BILL NO.E 268,783.76
BILL NO.C-09 UTILITY ADMIN. AUXILAR BUILDINGS
BILL NO.C-09 Utility office construction
Item no_ Description Unit Qty Unit price Amount
C-0.9.1 Earth work
Site clearing up to a depth of 20cm to remove top soil
C-09.2 m2 375.0 26.5 9,937.5
including trench of compound fence
Normal soil excavation for foundation up to a depth of
C-0.9.2 m3 82.5 88.0 7,260.0
0.5meters
C-09.3 Soft rock excavation for foundation up to a depth of 0.3 meters m3 45.8 331.0 15,163.1
C-0.9.3 cart away excavated material m3 128.3 52.0 6,672.1
C-09.4 Backfill and compaction with excavated material m3 127.0 133.0 16,891.0
C-0.9.4 Masonry and block work 0.0
C-09.5 50cm thick stone masonry for foundation m3 106.8 1,465.0 156,462.0
C-0.9.5 25cm hard core for floor m3 79.6 189.0 15,035.0
C-09.6 HBC block for the walls including fence no. 13,987.0 306.0 4,280,022.0
C-0.9.6 concrete work 0.0
C-09.7 C-20 concrete (50cm thick) for base slab mass concrete m3 127.2 3,357.7 427,102.3
C-0.9.7 concrete columns including fence columns m3 25.2 3,592.0 90,518.4
Grade beam and top tie beams the cost includes grade beams of
C-09.8 m3 106.9 3,592.0 383,984.8
fencing
C-0.9.8 Provide and fix formwork to 0.0 0.0
C-09.9 Column including the fence columns m2 283.2 500.0 141,600.0
C-0.9.9 Grade beam and top tie beams cost includes grade beams of fencing m2 315.0 500.0 157,500.0
C-09.10 Parapet m2 54.0 500.0 27,000.0
Provide, cut, bend and fix in position reinforced steel bar. All
C-0.9.10 according to structural drawing. Price should include tying wires 0.0
C-09.11 Diameter 8 mm plain bar kg 1,172.3 64.4 75,496.1
C-0.9.11 Diameter 10 mm deformed bar kg 1,003.0 66.8 67,000.4
C-09.12 Diameter 12 mm deformed bar kg 1,194.0 69.2 82,624.8
C-0.9.12 Roofing 0.0
C-09.13 Fabrication and installation of Eucalyptus truss ml 2,105.0 28.9 60,938.8
Fabrication and installation of standing Eucalyptus pole of
C-0.9.13 ml 2,105.0 33.2 69,933.7
diameter 100mm.
C-09.14 70*50 purlin ml 2,105.0 37.1 77,990.6
C-0.9.14 CIS G-28 roof m2 440.0 354.0 155,760.0
C-09.15 chip wood for corners m2 69.9 390.3 27,280.0
C-0.9.15 chip wood for wall m2 190.5 390.3 74,338.9
Supply and fix edge gutter formed in G-28 flat galvanized
metal sheet including support brackets 1mm thick shaped steel
C-09.16 plate spaced at a max. spacing 1000mm c/c and fixed to m 325.0 321.0 104,325.0
purlin .price includes metal primer and two coats of synthetic
enamel paint.
Supply & fix dia.100mm down pipe in G-28 including 1mm
C-0.9.16 m 30.0 167.1 5,011.8
thick metal support brackets fixed to walls or columns.
C-09.17 Fascia board by 20cm m 53.4 167.1 8,921.0
C-0.9.17 Finishing
C-09.18 5cm cement screed floor m2 318.0 109.0 34,662.0
C-0.9.18 three coats of plastering cost includes fence plastering m2 1,080.0 114.0 123,120.0
C-09.19 painting works m2 355.0 47.0 16,685.0
C-0.9.19 Metal works
C-09.20 Door and windows
1.2m*1.8m L- Z metal double opening windows (1.5mm
C-0.9.20 thick) with suitable mirror , hinges and lock and key system m2 20.4 6,048.0 123,379.2
approved by the Engineer.
1.2*2.1 Single open L-Z metal doors(1.5mm thick) with
C-09.21 suitable mirrors, hinges and lock and key system approved by m2 28.6 7,056.0 201,801.6
the Engineer.
C-0.9.21 entrance gate 4m*3m with all locks and hinges m2 15.0 1,000.0 15,000.0
Electrical works including ampols ,power meter ,wires(2.5mm)
C-09.22 LS 1.0 5,500.0 5,500.0
all accessories approved by the engineer.
C-0.9.22 Compound Fencing and decoration M 350.0 50.0 17,500.0
C-09.23 Office facilities 0.0
C-0.9.23 Table No. 2.0 7,500.0 15,000.0
C-09.24 Chair manager No. 3.0 11,696.7 35,090.0
C-0.9.24 Chair normal No. 20.0 2,500.0 50,000.0
Printer with accessories continuous supply till project period to
C-09.25 No. 5.0 14,036.0 70,180.0
be used by both firms.
C-0.9.25 Computer (Desk Top) with ups and cpu No. 14.0 12,000.0 168,000.0
C-09.26 Shelf of four window No. 8.0 2,500.0 20,000.0
C-0.9.26 Bajaj force Four Stroke three wheeler No 1.0 20,000.0 20,000.0
C-09.27 Motorcycle bike two wheeler Ls 2.0 45,000.0 90,000.0
C-0.9.27 Utility spare parts and Necessary tools Ls 1.0 35,000.0 35,000.0
C-09.28 training and work shop for utility staff ls 1.0 3,500.0 3,500.0
Total For BILL NO.C-09 carried to summary 7,589,187.2
BILL NO.C-09.29 heavy material store
Item no_ Description Unit Qty Unit price Amount
C-0.9.30 Earth work
C-09.31 Site clearing up to a depth of 20cm m2 120.0 26.5 3,180.0
Normal soil excavation for foundation up to a depth of
C-0.9.31 m3 12.0 88.0 1,056.0
0.5meters
C-09.32 cart away excavated material m3 12.0 52.0 624.0
C-0.9.32 Hard core including foundation and floor m3 37.5 189.0 7,087.5
C-09.33 Backfill and compaction with selected material m3 30.0 246.0 7,380.0
C-0.9.33 concrete work 0.0
C-09.34 concrete columns m3 4.0 3,592.0 14,224.3
C-0.9.34 Grade beam and top tie beams m3 7.0 3,592.0 25,072.2
C-09.35 Provide and fix formwork to 0.0 0.0
C-0.9.35 Column m2 33.6 500.0 16,800.0
C-09.36 Grade beam and top tie beams m2 57.6 500.0 28,800.0
C-0.9.36 Parapet m2 20.0 500.0 10,000.0
Provide, cut, bend and fix in position reinforced steel bar. All
C-09.37 according to structural drawing. Price should include tying wires
0.0
C-0.9.37 Diameter 8 mm plain bar kg 465.0 64.4 29,946.0
C-09.38 Diameter 10 mm deformed bar kg 90.0 66.8 6,012.0
C-0.9.38 Diameter 12 mm deformed bar kg 109.1 69.2 7,549.7
C-09.39 C-20 concrete (50cm thick) for floor slab mass concrete m3 16.3 3,592.0 58,370.0
C-0.9.39 Roofing 0.0
Fabrication and installation of Eucalyptus truss horizontally of
C-09.40 ml 260.0 28.9 7,526.9
diameter 80mm
Fabrication and installation of standing Eucalyptus pole
C-0.9.40 ml 260.0 33.2 8,637.9
transversally of diameter 80mm.
C-09.41 70*50 purlin ml 210.0 37.1 7,780.5
C-0.9.41 CIS G-28 roof m2 110.0 354.0 38,940.0
C-09.42 chip wood for corners m2 32.0 390.3 12,488.7
C-0.9.42 HBC block for the wall m2 2,000.0 306.0 612,000.0
Supply and fix edge gutter formed in G-28 flat galvanized
metal sheet including support brackets 1mm thick shaped steel
C-09.43 plate spaced at a max. spacing 1000mm c/c and fixed to m 16.0 321.0 5,136.0
purlin .price includes metal primer and two coats of synthetic
enamel paint.
Supply & fix dia.100mm down pipe in G-28 including 1mm
C-0.9.43 m 15.8 397.0 6,252.8
thick metal support brackets fixed to walls or columns.
C-09.44 Fascia board by 20cm m 35.0 167.1 5,847.1
C-0.9.44 Finishing 0.0
C-09.45 25mm cement screed floor m2 28.0 109.0 3,052.0
C-0.9.45 Door and windows 0.0
1.2m*2m and metal sheet double opening windows(1.5mm
C-09.46 thick) with suitable hinges , lock and key including upper part m2 7.4 6,720.0 49,728.0
mesh system approved by the Engineer.
2.4m*2.5m horizontal sliding and (1*2 ) entrance door of
C-0.9.46 metal sheet (4mm thick) with suitable hinges and lock and key m2 8.0 16,800.0 134,400.0
system approved by the Engineer.
Electrical works including all accessories approved by the
C-09.47 LS 1.0 55,000.0 55,000.0
engineer.
Total carried FOR BILL NO. C-0.9.29 1,162,891.5
CONSTRUCTION OF SOAK AWAY PIT
Item No Earth Work Unit Qty Unit price Amount
C-09.49 Clearing of site to remove top soil to a depth of 200 mm m2 12.0 26.5 318.0
C-0.9.49 Bulk excavation in ordinary soil to depth of 1.5m m3 15.6 177.0 2,761.2
C-09.50 Bulk excavation in soft rock depth not greater than 1.5m m3 15.0 331.0 4,965.0
C-0.9.50 Bulk excavation in hard rock m3 12.0 468.0 5,616.0
C-09.51 Curt away excavated material m3 42.6 52.0 2,215.2
C-0.9.51 Masonry Work 0.0
C-09.52 masonry wall with 50cm at the base and 40cm at top m3 35.0 1,701.0 59,535.0
C-0.9.52 concrete work 0.0
Reinforced concrete septic cover C30 (Cement 1440 kg/m3)
C-09.53 filled into form work and vibrated around reinforced bars, mix 0.0
ratio should be 1 :2:3 in
C-0.9.53 Soak pit top slab m3 2.3 3,592.0 8,082.0
C-09.54 Reinforcement 0.0
Provide, cut, bend and fix in position reinforced steel bar. All
C-0.9.54 0.0
according to structural drawing. Price shall include tying wires
C-09.55 diameter 12 kg 555.5 69.2 38,440.6
C-0.9.55 diameter 10 kg 90.0 66.8 6,012.0
C-09.56 diameter 8 kg 80.0 64.4 5,152.0
C-0.9.56 Miscellaneous 0.0
Supply and lay 100 mm dia. PVC pipe as shown on the
C-09.57 drawing, price including excavation of earth and back filling m 100.0 167.1 16,706.0
drainage connection
C-0.9.57 Supply and fix 100x100 mm tee No 4.0 7,500.0 30,000.0
Supply and fix 100 mm dia. PVC ventilation pipe hood shaped
C-09.58 No 2.0 7,500.0 15,000.0
covering (cowl)
Supply and fix 40*40cm manhole cover concrete with
C-0.9.60 No 2.0 7,500.0 15,000.0
handling frame
Sub total for SOAK AWAY PIT 209,803.0
Construction of Toilet
Item No Description Unit Qty Unit Rate Amount
Earth Work
C-09.58 Clearing of site to remove top soil to a depth of 200 mm m2 20.0 26.5 530.0
C-0.9.60 Excavation for foundation 0.5 m width and 0.5 m depth m3 5.4 88.0 475.2
Cart away and deposit excavated surplus material to a distance
C-09.59 m3 5.4 52.0 280.8
not exceeding I km
C-0.9.61 fill for the selected material m2 3.6 133.0 478.8
C-09.60 Masonry Work
Supply and place 250 mm thick hard core compacted to
C-0.9.62 m2 15.0 189.0 2,835.0
receive reinforced floor slab
C-09.61 Supply and place 500 mm thick hard core for foundation wall m2 10.0 189.0 1,890.0
C-09.62 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement content
C-0.9.64 1440 kg/m3 cast into formwork and vibrated around
reinforcement bars in
C-09.63 RC floor tie beam m3 3.0 3,592.0 10,776.0
C-0.9.65 RC column m3 1.3 3,592.0 4,525.9
C-09.64 Mass concrete fill on floor slab (100 mm) m3 1.3 3,592.0 4,490.0
C-0.9.66 Lintel m3 0.1 3,592.0 179.6
C-09.65 RC roof tie beams m3 2.5 3,592.0 8,980.0
Provide, fix in position, cut and bend reinforced steel bar. All
C-0.9.67 according to structural drawing. Price should include tying
wires
C-09.66 Diameter 8 mm deformed bar kg 98.0 64.4 6,311.2
C-0.9.68 Diameter 10 mm deformed bar kg 110.0 66.8 7,348.0
C-09.67 Provide, cut, and fix formwork beam column m2 19.2 500.0 9,600.0
C-0.9.69 Block work
C-09.68 20cm HCB block for wall No 250.0 306.0 76,500.0
C-09.69 Carpentry and Roofing
Supply, assemble and fix in position roof truss of 80mm
eucalyptus pole horizontal and transversal price shall include
C-0.9.71 m2 36.0 28.9 1,042.2
the application of three coats and external anti-termite
treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed
C-09.70 into eucalyptus truss including three coats of anti - termite m2 100.0 37.1 3,705.0
external treatment
Supply and fix roof cover in G-28 mm corrugated galvanized
C-0.9.72 iron sheet fixed into zigba wood purl in with dome headed m2 12.0 354.0 4,248.0
galvanized nails (purlin and ridge cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized
metal sheet including support brackets 1 mm thick shaped steel
C-09.71 plate spaced at a maximum spacing of 1000 mm clc and fixed m 3.5 321.0 1,123.5
to purl in - price includes metal primer and two coats of
synthetic enamel paint
Supply & fix diameter 100mm down pipe in G-28 including I
C-0.9.73 mm thick metal support brackets fixed at a maximum interval m 20.0 397.0 7,940.0
of 1000 mm fixed to walls or columns
C-09.72 Supply and fix 25x 250 mm fascia board to purl in m 9.8 167.1 1,637.2
Supply and fix metal windows size 1x1.8m price includes lock
C-0.9.74 m2 1.8 5,040.0 9,072.0
hachs
Supply and fix metal doors size 2.1 Ox1 with figured glass in
C-09.73 Pcs 2.1 5,880.0 12,348.0
upper half portion
finishing work shall include all surface pre-cleaning, polishing
C-0.9.75
and cleaning at the end of finishing
C-09.74 Floor screed in cement mortar 20 mm thick m2 1.8 109.0 196.2
Apply cement mortar pointing to all external cement concrete
C-0.9.76 m2 34.0 74.0 2,516.0
block wall
Apply 3 coats of plastic paint to internal ,external walls and
C-09.75 m2 36.0 47.0 1,692.0
synthetic paint to metal doors and windows
C-0.9.77 Sub-Total
C-09.76 Electrical Installation
C-0.9.78 Supply and install the required electrical works LS 1.0 5,500.0 5,500.0
Sub-total for toilet 186,220.6
Total for 1 toilet including soak away pit 396,023.6
BILL NO.C-09.108 meeting hall
Item No Description Unit Qty Unit Rate Amount
C-0.9.108 Earth work
C-0.9.109 Site clearing up to a depth of 20cm m2 120.0 26.5 3,180.0
Normal soil excavation for foundation up to a depth of
C-0.9.110 m3 13.2 88.0 1,161.6
0.5meters
C-0.9.111 cart away excavated material m3 13.2 52.0 686.4
C-0.9.112 Hard core including foundation m3 48.7 189.0 9,204.3
C-0.9.113 Backfill and compaction with excavated material m3 36.0 133.0 4,788.0
C-0.9.114 concrete work 0.0
C-0.9.115 concrete columns m3 3.1 3,592.0 11,027.4
C-0.9.116 Grade beam and top tie beams m3 17.2 3,592.0 61,638.7
C-0.9.117 Provide and fix formwork to 0.0 0.0
C-0.9.118 Column m2 30.7 500.0 15,360.0
C-0.9.119 Grade beam and top tie beams m2 70.4 500.0 35,200.0
C-0.9.120 Parapet m2 32.0 500.0 16,000.0
Provide, cut, bend and fix in position reinforced steel bar. All
C-0.9.121 according to structural drawing. Price should include tying wires 0.0
C-0.9.122 Diameter 8 mm plain bar kg 535.7 64.4 34,497.1
C-0.9.123 Diameter 10 mm deformed bar kg 100.0 66.8 6,680.0
C-0.9.124 Diameter 12 mm deformed bar kg 213.3 69.2 14,762.4
C-0.9.125 C-20 concrete (50cm thick) for base slab mass concrete m3 24.0 3,424.0 82,176.0
C-0.9.126 Roofing 0.0
C-0.9.127 Fabrication and installation of Eucalyptus truss ml 440.0 28.9 12,737.8
Fabrication and installation of standing Eucalyptus pole of
C-0.9.128 ml 400.0 33.2 13,289.1
diameter 100mm.
C-0.9.129 70*50 purlin ml 250.0 37.1 9,262.5
C-0.9.130 CIS G-28 roof m2 98.0 354.0 34,692.0
C-0.9.131 chip wood for corners m2 32.0 390.3 12,488.7
C-0.9.132 HBC block for the wall m2 1,750.0 306.0 535,500.0
Supply and fix roof formed in G-28 caps iron sheet including
support brackets 1mm thick shaped steel plate spaced at a max.
C-0.9.133 m2 126.0 45.0 5,670.0
spacing 1000mm c/c and fixed to purlin .price includes metal
primer and two coats of synthetic enamel paint.
Supply & fix dia.100mm down pipe in G-28 including 1mm
C-0.9.134 m 15.8 397.0 6,252.8
thick metal support brackets fixed to walls or columns.
C-0.9.135 Fascia board by 20cm m 45.0 167.1 7,517.7
C-0.9.136 Finishing 0.0
C-0.9.137 25mm cement screed floor m2 120.0 109.0 13,080.0
Apply three coats of plaster in cement mortar to internal
C-0.9.138 m2 132.0 114.0 15,048.0
cement concrete block wall
Apply cement mortar pointing to all external cement concrete
C-0.9.139 m2 132.0 74.0 9,768.0
block wall
Apply 3 coats of plastic paint to internal walls and synthetic
C-0.9.140 m2 132.0 47.0 6,204.0
paint to metal doors and windows
C-0.9.141 celling to roof m2 144.0 63.0 9,072.0
C-0.9.142 Door and windows 0.0
1.2m*1.8m and metal sheet double opening windows(1.5mm
C-0.9.143 thick)with suitable mirror, hinges and lock and key system no. 3.0 3,500.0 10,500.0
approved by the Engineer.
*2.m*2.5m double open metal sheet doors(1.5mm thick)
C-0.9.144 with suitable hinges and lock and key system approved by the m2 5.8 3,500.0 20,160.0
Engineer.
Electrical works including all accessories approved by the
C-0.9.145 LS 1.0 5,500.0 5,500.0
engineer.
chairs of the meeting hall no. 40.0 5,000.0 200,000.0
Total carried FOR BILL NO.C -09.108 1,223,104.6
BILL NO.C-09.146 MOSQUE
Item No Description Unit Qty Unit Rate Amount
C-0.9.146 Earth work
C-0.9.147 Site clearing up to a depth of 20cm m2 113.2 26.5 2,999.8
Normal soil excavation for foundation up to a depth of
C-0.9.148 m3 12.8 88.0 1,124.6
0.5meters
C-0.9.149 cart away excavated material m3 12.8 52.0 664.6
C-0.9.150 Hard core including foundation m3 55.2 189.0 10,432.8
C-0.9.151 Backfill and compaction with excavated material m3 36.0 133.0 4,788.0
C-0.9.152 concrete work 0.0
C-0.9.153 concrete columns m3 3.8 3,592.0 13,685.5
C-0.9.154 Grade beam and top tie beams m3 16.6 3,592.0 59,677.5
C-0.9.155 Provide and fix formwork to 0.0 0.0
C-0.9.156 Column m2 30.7 500.0 15,360.0
C-0.9.157 Grade beam and top tie beams m2 70.4 500.0 35,200.0
C-0.9.158 Parapet m2 32.0 500.0 16,000.0
Provide, cut, bend and fix in position reinforced steel bar. All
C-0.9.159 according to structural drawing. Price should include tying wires 0.0
C-0.9.160 Diameter 8 mm plain bar kg 535.7 64.4 34,497.1
C-0.9.161 Diameter 10 mm deformed bar kg 100.0 66.8 6,680.0
C-0.9.162 Diameter 12 mm deformed bar kg 213.3 69.2 14,762.4
C-0.9.163 C-20 concrete (50cm thick) for base slab mass concrete m3 24.0 3,424.0 82,176.0
C-0.9.164 Roofing 0.0
C-0.9.165 Fabrication and installation of Eucalyptus truss ml 440.0 28.9 12,737.8
Fabrication and installation of standing Eucalyptus pole of
C-0.9.166 ml 400.0 33.2 13,289.1
diameter 100mm.
C-0.9.167 70*50 purlin ml 250.0 37.1 9,262.5
C-0.9.168 CIS G-28 roof m2 98.0 354.0 34,692.0
C-0.9.169 chip wood for corners m2 32.0 390.3 12,488.7
C-0.9.170 HBC block for the wall m2 1,700.0 306.0 520,200.0
Supply and fix edge gutter formed in G-28 flat galvanized
metal sheet including support brackets 1mm thick shaped steel
C-0.9.171 plate spaced at a max. spacing 1000mm c/c and fixed to m 25.0 321.0 8,025.0
purlin .price includes metal primer and two coats of synthetic
enamel paint.
Supply & fix dia.100mm down pipe in G-28 including 1mm
C-0.9.172 m 15.8 397.0 6,252.8
thick metal support brackets fixed to walls or columns.
C-0.9.173 Fascia board by 20cm m 45.0 167.1 7,517.7
C-0.9.174 Finishing 0.0
C-0.9.175 25mm cement screed floor m2 120.0 109.0 13,080.0
Apply three coats of plaster in cement mortar to internal
C-0.9.176 m2 132.0 114.0 15,048.0
cement concrete block wall
Apply cement mortar pointing to all external cement concrete
C-0.9.177 m2 132.0 74.0 9,768.0
block wall
Apply 3 coats of plastic paint to internal walls and synthetic
C-0.9.178 m2 132.0 47.0 6,204.0
paint to metal doors and windows
C-0.9.179 Door and windows 0.0
1.2m*1.8m and metal sheet double opening windows(1.5mm
C-0.9.180 thick)with suitable mirror, hinges and lock and key system no. 3.0 6,048.0 18,144.0
approved by the Engineer.
*2.m*2.5m double open metal sheet doors(1.5mm thick)
C-0.9.181 with suitable hinges and lock and key system approved by the m2 5.8 14,000.0 80,640.0
Engineer.
Electrical works including all accessories approved by the
C-0.9.182 LS 1.0 5,500.0 5,500.0
engineer.
Total carried FOR BILL NO. C-09.146 1,070,897.9
BILL NO. C-09.183 Construction of light spare parts
Item No Description Unit Qty Unit Rate Amount
C-0.9.183 Construction of light spare parts
C-0.9.184 Earth Work
C-0.9.185 Clearing of site to remove top soil to a depth of 200 mm m2 29.0 26.5 768.5
Excavation for stone masonry foundation; 0.5 m width and 0.5
C-0.9.186 m3 6.5 88.0 575.5
m depth
Cart away and deposit excavated surplus material to a distance
C-0.9.187 m3 35.5 52.0 1,848.1
not exceeding I km
C-0.9.189 fill in selected material m3 24.0 246.0 5,904.0
Supply and place 250 mm thick hard core compacted to
C-0.9.190 m2 27.7 189.0 5,239.1
receive reinforced floor slab
C-0.9.191 Concrete and Block Work 0.0
Reinforced concrete grade C-25 with minimum cement
C-0.9.192 content 1440 kg/m3 cast into formwork and vibrated 0.0
around reinforcement bars in
RC floor tie beam and grade beam m3 8.5 3,592.0 30,532.0
C-0.9.193
RC column m3 1.3 3,592.0 4,561.8
Mass concrete fill on floor slab (100 mm) m2 2.4 3,592.0 8,620.8
C-0.9.194
C-0.9.194
Lintel m3 0.1 3,592.0 359.2
Provide, fix in position, cut and bend reinforced steel bar.
All according to structural drawing. Price should include 0.0
C-0.9.195 tying wires
Diameter 8 mm deformed bar kg 120.0 64.4 7,728.0
Diameter 10 mm deformed bar kg 110.0 66.8 7,348.0
C-0.9.196
Provide, cut, and fix formwork beam column m2 21.8 500.0 10,900.0
Block work 0.0
C-0.9.197
HCB block for wall m2 1,200.0 306.0 367,200.0
Carpentry and Roofing 0.0
C-0.9.198
Supply, assemble and fix in position roof truss price shall
include the application of three coats and external anti-termite ml 70.0 28.9 2,026.5
C-0.9.199 treatment

Supply and fix purl in in zigba wood size 50 x 70 mm nailed


C-0.9.200 into eucalyptus truss including three coats of anti - termite ml 86.0 37.1 3,186.3
external treatment
Supply and fix roof cover in G-28 mm corrugated galvanized
iron sheet fixed into zigba wood purl in with dome headed m2 36.0 354.0 12,744.0
galvanized nails (purlin and ridge cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized
metal sheet including support brackets 1 mm thick shaped steel
C-0.9.21 plate spaced at a maximum spacing of 1000 mm clc and fixed m 15.0 321.0 4,815.0
to purl in - price includes metal primer and two coats of
synthetic enamel paint
Supply & fix diameter 100mm down pipe in G-28 including I
C-0.9.158 mm thick metal support brackets fixed at a maximum interval m 15.0 397.0 5,955.0
of 1000 mm fixed to walls or columns
C-0.9.200 Supply and fix 25x 250 mm fascia board to purl in m 20.0 167.1 3,341.2
Supply and fix metal windows size 600mm*500mm price
m2 2.0 500.0 1,000.0
includes 4mm thick glass
Supply and fix metal doors size 2.1m x1m with figured glass in
C-0.9.21 Pcs 7.4 500.0 3,675.0
upper half portion
finishing work shall include all surface pre-cleaning,
C-0.9.158 0.0
polishing and cleaning at the end of finishing
C-0.9.200 Floor screed in cement mortar 20 mm thick m2 25.2 109.0 2,746.8
Apply three coats of plaster in cement mortar to internal
C-0.9.242 m2 61.8 114.0 7,045.2
cement concrete block wall
Apply cement mortar pointing to all external cement concrete
C-0.9.284 m2 61.8 74.0 4,573.2
block wall
Apply 3 coats of plastic paint to internal walls and synthetic
C-0.9.326 m2 123.6 59.8 7,391.3
paint to metal doors and windows
C-0.9.368 Sanitary Work 0.0
Supply and fix hand wash basin made of white vitreous china
equipped with concealed brackets made of gray malleable cast
C-0.9.410 iron white painted complete with plug, claim & traps. Price Pcs 1.0 850.0 850.0
includes installation of galvanized steel pipe, all the necessary
concrete
C-0.9.452 Supply and fix Turkish type WC. with high flush cistern Pcs 2.0 1,200.0 2,400.0
C-0.9.494 Electrical Installation 0.0
C-0.9.536 Supply and install the required electrical works LS 1.0 5,500.0 5,500.0
Total carried FOR BILL NO. C-09.183 518,834.5
Total bill for All utility compound 11,960,939.2
BILL NO.C-10.0 CATLE TROUGHS
BILL NO.G.10.0 Item Description Unit Qty Unit Rate
.C.10.1 Earth Work
Site clearing up to a depth of 20cm to remove top vegetated 26.5
.C.10.2 soil m2 20.0
.C.10.3 Excavation for foundation up to 25cm depth m3 4.1 88.0
.C.10.4 Cart away excavated material to 100m distance m3 4.1 52.0
Back Fill excavated area above the concrete cover over 133.0
.C.10.5 filter media with clay m3 10.0
.C.10.6 Masonry work
.C.10.7 Basaltic or equivalent hard core filling 25cm thick m3 11.0 189.0
Semi dressed stone pavement pointed with cement mortar 523.0
.C.10.8 1:3 all round the cattle trough m2 7.0
.C.10.9 Concrete work
Pouring 10cm thick lean concrete over hard core in with 15.5 335.8
.C.10.10 class C-15 Minimum cement content of 150kg/m3, m2
External and internal plastering of the body of the cattle 114.0
.C.10.11 trough m2 15.0
.C.10.12 Construction of 50*50cm HCB chamber with cover m2 0.6 4,500.0
.C.10.13 Form work wooden or Steel m2 22.7 500.0
Provide cut, and fix in position reinforced steel bar all
according to structural drawing, Price shall include
.C.10.14 tying wires
.C.10.15 Diametr 6 mm Kg 40.0 94.1
.C.10.16 Diametr 10 mm Kg 122.0 66.8
.C.10.17 Finishing work
.C.10.18 3cm thick finish cement screed in 1:3 mix m2 8.9 109.0
.C.10.19 Install water meter DN 63 mm No 1.0 14,590.0
.C.10.20 Install other fittings as per Design Drawing LS 1.0 15,543.3
Total for One Cattle Trough
Total Amount

530.00

360.80
213.20
1,330.00

-
2,079.00
3,661.00

-
5,204.47
1,710.00

2,812.50
11,362.50

3,764.00
8,150.64
-
970.10
14,590.00
15,543.33
72,281.54
BILL NO.C.11.0 Water Point Six Faucets
BILL NO.H.11.0Description Unit Qty Unit price Total price
NO.C.11.1 1.Earth Work
Clearing and removal of top soil to average
C.11.2 depth of 20mm m2 30.0 26.5 795.00
bulk Excavation for foundation depth not
C.11.3 exceeding 50cm m3 7.5 88.0 658.24
Cart away the excavated material not exceeding
C.11.4 than 1000m m3 7.5 52.0 388.96
25cm Selected material filling (if necessary as
C.11.5 directed by the Engineer) m3 3.1 246.0 753.38
Supply and place 250mm thick(Equivalent to
hard basaltic stone) hard core filling blinded
C.11.6 with crushed agregate m3 6.0 189.0 1,134.00
C.11.8 3.Concrete Work -
10cm thick C-20 mass concrete in water point
base and on the hard core ,valve chamberand
C.11.9 cuping m3 1.4 3,424.0 4,687.46
C.11.10 10cm thick class C-20 mass concrete in manhole m3 0.2 3,424.0 671.10
Supply,cut and fix mild steel reinforcement
bars for manhole cover, as shown in the
C.11.11 drawing -
C.11.12 Dia 8cm kg 3.6 64.4 229.26
C.11.14 3. FORMWORK -
C.11.15 Water point base, pot seat and cape(cover) m2 1.4 500.0 700.00
C.11.16 4. Masonry
Hard Work
trachytic or equivalent stone masonry -
water point wall grouted and filled with 1:3
C.11.17 mortar m3 5.0 523.0 2,615.00
1.4mx1.4m masonry Valve Chambers
C.11.18 Construction as shown in the drawing m3 1.1 4,500.0 4,752.00
C.11.20 5.Finishing Work -
three coats of plastering to internal walls of
C.11.21 manhole, using 1:3 mortar m2 2.2 114.0 255.36
pointing of the masonry wall of water point with
C.11.22 rich mortar m2 6.2 95.0 592.80
C.11.23 3cm thick sand and cement floor screed m2 6.5 109.0 703.05
C.11.25 6.Supply and Installation of Pipes and Fittings -
C.11.26 G.S pipe 2''class 'B' Type m 6.0 1,800.0 10,800.00
C.11.27 G.S pipe 3/4"class 'B' Type m 1.2 1,300.0 1,560.00
C.11.28 Elbow 90 deg. dia. 2'' No 1.0 187.0 187.00
C.11.29 Reducer dia. 2''x3/4" No 6.0 187.0 1,122.00
C.11.30 Tee dia. 2'' No 3.0 187.0 561.00
C.11.31 Faucet dia.3/4” No 6.0 190.0 1,140.00
C.11.32 Water Meter dia. 2'' No 1.0 1,900.0 1,900.00
C.11.33 Gate Valve dia. 2'' No 1.0 1,800.0 1,800.00
C.11.34 Nipples dia 2'' No 6.0 237.5 1,425.00
C.11.35 Union dia 2'' No 2.0 356.3 712.50
C.11.36 HDPE OD40mm adaptor to GI 2'' No 1.0 750.0 750.00
Supply and fix including 50cmx50cm metal
sheet for manhole cover with thickness 4mm
C.11.37 with lnch and lock for the water meter chamber No 1.0 1,377.0 1,377.00
C.11.39 7.Fence Work -
Supply and erect 2m height above OGL fence of
7 lines of Mesh wire 200mm and 400mm
spacing the bottom 5 and upper 2 lines
respectively, with cross diagonal on 11/2" GS
pipe pole and bracers at the corners, embedded
by 40*40cm concrete around the pole to depth of
60cm below the OGL and including painting the
pole as interst of the Engineer
C.11.40 m2 100.0 280.0 28,000.00
Supply and erect 2000x1000mm size gate with
metal frame and rectangular hollow tube
RHS4mm including 2.5mm ripped sheet metal
having three coats of antirust piainting, complete
with hinges and lock
C.11.41 No 2.0 2,403.8 4,807.68
Total for One Water Point 75,077.79
1
BILL NO.C.12.1: BILL NO.C.12.0 Solid Waste Disposal Site
UNIT
ITEM NO DESCRIPTION UNIT QNTY TOTAL
PRICE
C-12.2 EARTH WORK
C-12.3 Site Clearing of Top Soil up to 20cm Depth m2 900.0 26.5 23,850.0
Bulk excavation in normal soil to a depth not exceeding
C-12.4 m3 1,350.0 177.0 238,950.0
1.5m
C-12.5 Ditto but in soft rock formation below 1.5m up to 2.5m m3 450.0 331.0 148,950.0
C-12.6 Ditto but in hard rock formation 1.5m m3 900.0 468.0 421,200.0
Cart away all excavated material, and deposit to
C-12.7 circumference of the pit asprotection embank 2m m3 2,700.0 52.0 140,400.0
distance from the pit
C-12.8 Provide in and out entrance for the solid waste pit m 100.0 1,200.0 120,000.0
C-12.9 fencing and protection
Mesh wire fencing consists of 2m heigth barbed wire
with horizontal and diagonal member fixed to 2.5m c/c
C-12.10 m2 400.0 250.0 100,000.0
angl iron pole , including all necessary material as per
the drawing
TOTAL 1,193,350.0
C-16.0 CONSTRUCTION OF PUBLIC TOILET
CONSTRUCTION OF SOAK AWAY PIT
S/NO Earth Work Unit Qty Unit price Amount
C-16.1 Clearing of site to remove top soil to a depth of 200 mm m2 12.00 26.50 318.00
C-16.2 Bulk excavation in ordinary soil to depth of 1.5m m3 15.60 177.00 2,761.20
C-16.3 Bulk excavation in soft rock depth not greater than 1.5m m3 15.00 331.00 4,965.00
C-16.4 Bulk excavation in hard rock m3 12.00 468.00 5,616.00
C-16.5 Curt away excavated material m3 42.60 52.00 2,215.20
C-16.6 Masonry Work
C-16.7 masonar wall with 50cm at the base and 40cm at top m3 35.00 1,701.00 59,535.00
C-16.8 concerete work
Reinforced concrete septic cover C30 (Cement 1440 kg/m3)
C-16.9 filled into form work and vibrated around reinforced bars,
mix ratio should be 1 :2:3 in
C-16.10 Soak pit top slab m3 2.25 3,592.00 8,082.00
C-16.11 Reinforcement
Provide, cut, bend and fix in position reinforced steel bar. All
C-16.12
according to structural drawing. Price shall include tying wires
C-16.13 diameter 12 kg 555.50 69.20 38,440.60
C-16.14 diameter 10 kg 90.00 66.80 6,012.00
C-16.15 diameter 8 kg 80.00 64.40 5,152.00
C-16.16 Miscellaneous
Supply and lay 100 mm dia. PVC pipe as shown on the drawing,
C-16.17 price including excavation of earth and back filling drianage m 100.00 167.06 16,705.95
conection
C-16.18 Supply and fix 100x100 mm tee No 4.00 7,500.00 30,000.00
Supply and fix 100 mm dia. PVC ventilation pipe hood shaped
C-16.19 No 2.00 7,500.00 15,000.00
covering (cowl)
Supply and fix 40*40cm manhole cover concrete with handling
C-16.20 No 2.00 7,500.00 15,000.00
frame
Sub total for SOAK AWAY PIT 209,802.95
Construction of Toilet
S/no Description Unit Qty Rate Amount
Earth Work ETB ETB
C-16.21 Clearing of site to remove top soil to a depth of 200 mm m2 20.00 26.50 530.00
C-16.22 Excavation for foundation 0.5 m width and 0.5 m depth m3 5.40 88.00 475.20
Cart away and deposit excavated surplus material to a distance not
C-16.23 m3 5.40 52.00 280.80
exceeding I km
C-16.24 fill for the selected material m2 3.60 133.00 478.80
C-16.25 Masonry Work
Supply and place 250 mm thick hard core compacted to receive
C-16.26 m2 15.00 189.00 2,835.00
reinforced floor slab
C-16.27 Supply and place 500 mm thick hard core for founation wall m2 10.00 189.00 1,890.00
C-16.29 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement
C-16.30 content 1440 kg/m3 cast into formwork and vibrated around
reinforcement bars in
C-16.31 RC floor tie beam m3 3.00 3,592.00 10,776.00
C-16.32 RC column m3 1.26 3,592.00 4,525.92
C-16.33 Mass concrete fill on floor slab (100 mm) m3 1.25 3,592.00 4,490.00
C-16.34 Lintel m3 0.05 3,592.00 179.60
C-16.35 RC roof tie beams m3 2.50 3,592.00 8,980.00
Provide, fix in position, cut and bend reinforced steel bar. All
C-16.36 according to structural drawing. Price should include tying
wires
C-16.37 Diameter 8 mm deformed bar kg 98.00 64.40 6,311.20
C-16.38 Diameter 10 mm deformed bar kg 110.00 66.80 7,348.00
C-16.39 Provide, cut, and fix formwork beam column m2 19.20 500.00 9,600.00
C-16.40 Block work
C-16.41 20cm HCB block for wall No 250.00 306.00 76,500.00
C-16.43 Carpentry and Roofing
Supply, assemble and fix in position roof truss of 80mm
C-16.44 equaliptus pole horizontala and tranversal price shall include the m2 36.00 28.95 1,042.18
application of three coats and external anti-termite treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed into
C-16.45 eucalyptus truss including three coats of anti - termite external m2 100.00 37.05 3,705.02
treatment
Supply and fix roof cover in G-28 mm corrugated galvanized iron
C-16.46 sheet fixed into zigba wood purl in with dome headed galvanized m2 12.00 354.00 4,248.00
nails (purlin and ridge cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized metal
sheet including support brackets 1 mm thick shaped steel plate
C-16.47 spaced at a maximum spacing of 1000 mm clc and fixed to purl in m 3.50 321.00 1,123.50
- price includes metal primer and two coats of synthetic enamel
paint
Supply & fix diameter 100mm down pipe in G-28 including I mm
C-16.48 thick metal support brackets fixed at a maximum interval of 1000 m 20.00 397.00 7,940.00
mm fixed to walls or columns
C-16.49 Supply and fix 25x 250 mm fascia board to purl in m 9.80 167.06 1,637.18
Supply and fix metal windows size 1x1.8m price includes lock
C-16.50 m2 1.80 5,040.00 9,072.00
hachs
Supply and fix metal doors size 2.1 Ox1 with figured glass in
C-16.51 Pcs 2.10 5,880.00 12,348.00
upper half portion
finishing work shall include all surface pre-cleaning, polishing
C-16.52
and cleaning at the end of finishing
C-16.53 Floor screed in cement mortar 20 mm thick m2 1.80 109.00 196.20
Apply cement mortar pointing to all external cement concrete
C-16.54 m2 34.00 74.00 2,516.00
block wall
Apply 3 coats of plastic paint to internal ,externalwalls and
C-16.55 m2 36.00 47.00 1,692.00
synthetic paint to metal doors and windows
C-16.57 Electrical Installation
C-16.58 Supply and install the required electrical works LS 1.00 5,500.00 5,500.00
Sub-total for toilet 186,220.60
Total for 1 toilet including soak away pit 396,023.56
C-01.1.98 Compound Work
Fence for 200m3 Reservior with Area
C-01.1.99 Ls 1 56,250 56,250.00
of 2500m2
Supply and construct gate type III as
C-01.1.104 NO 1 15000.00 15,000.00
per the drawing
71,250.00
-1-

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

1. EXCAVATION AND EARTH WORKS


1.1 20 cm. Clearing on loose & dry soil. m2 26.50 Birr/m2
1.2 Bulk Excavaion up to depth of 0.5m m3 88.00 Birr/m2
Bulk Excavaion up to depth of 1m m3 132.50 Birr/m2
Bulk Excavaion up to depth of 1.5m m3 177.00 Birr/m2
1.3 Trench Excavation up to a Depth of 1.5m of Ordina m3 184.00 Birr/m3
Pit Excavation up to4- 3m From NGL m3 303.00 Birr/m3
1.4 Excavation for Softy Rock up to a depth not m3 331.00 Birr/m3
1.5 Ditto But Hard Rock m3 468.00 Birr/m3
1.13 Back fill excavated materials from the site. m3 133.00 Birr/m3
1.14 Back fill selected excavated mats. from out side m3 246.00 Birr/m3
Back fill selected Natural Gravel . from out sid m3 707.00 Birr/m3
1.15 Cart away surplus excavated mats. 1km. from th m3 52.00 Birr/m3
1.16 25cm. thick basaltic hard core. m2 189.00 Birr/m2

- 15 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS


2 . MASONRY WORKS "
2.2 50cm. thick masonry foundation (BGL ). m3 1465.00 Birr/m3
2.3 50cm Thick Stone Masonry A Bove NGL m3 1701.00 Birr/m3
2.4 40cm. thick elevation wall (One side dressed). m3 1990.00 Birr/m3
Payment Stone Around Building m2 523.00 Birr/m2
Stone masonry for Champer LS LS 4500.00 Birr/Ls
3. CONCRETE WORKS Birr/m3
3.1 C-5 Lean Concrete (Mech mix) 1:3.5:8 m2 140.00 Birr/m3
3.2 C-7 Lean Concrete (Mech mix) 1:2:7 m2 180.00 Birr/m3
3.3 C-15 Concrete (Mech mix) 1:2:4 m3 3357.72 Birr/m3
3.4 C-20 Concrete (Mechanical Mix) 1:2:3 " 3424.00 Birr/m2
3.5 C-20 Concrete (Mechanical Mix) 1:2:3 (10c m2 342.40 Birr/m3
3.6 C-25 Concrete (Mech Mix) 1:1.5:3 " 3592.00 Birr/m3
3.7 C-25 Concrete (Mechanical Mix) 1:1.5:3 10c " 359.20 Birr/m
For Reverviors only used For Opc Cement
4.1 C-25 Concrete (Mechanical Mix) 1:1. m3 4929.00 Birr/m3 5596.00
4.2 C-30 Concrete (Mechanical Mix) 1:1.5:2 m3 4966.00 Birr/m3 5678.00
4.4 C-25 Concrete (Mechanical Mix) 1:2:3 > 3-6 m3 Birr/m3
4.5 C-25 Concrete (Mechanical Mix) 1:2:3 > 6m m3 Birr/m3
4.6 C-30 Concrete (Mechanical Mix) 1:2:3 > 3 m3 Birr/m3
4.7 C-30 Concrete (Mechanical Mix) 1:2:3 > 3-6 m3 Birr/m3
4.8 C-30Concrete (Mechanical Mix) 1:2:3 > 6m m3 Birr/m3
" Birr/m3
" Birr/m3
" Birr/m3
3899 Birr/m3
ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS
5. REINFORCEMENTS
5.1 Dia 6mm Plain Bar kg. 94.10 Birr/kg
5.2 dia. 8 mm. Deformed Steel Bar kg. 64.40 Birr/kg
5.3 dia. 10mm. Deformed Steel Bar kg. 66.80 Birr/kg
5.4 dia. 12 mm. Deformed Steel Bar kg. 69.20 Birr/kg
5.5 dia. 14mm. Deformed Steel Bar kg. 71.00 Birr/kg
5.6 dia. 16 mm. Deformed Steel Bar kg. 71.00 Birr/kg
5.7 dia. 18mm. Deformed Steel Bar kg.
5.8 dia. 20mm. Deformed Steel Bar kg. 71.00 Birr/kg
5.Hallow Concrete Blocks
6.1 20 cm.thick HCB Wall m2 306.00 Birr/m2
6.2 15 cm.thick HCB Wall m2 253.00 Birr/m2
6.3 10 cm.thick HCB Wall m2 243.93 Birr/m2
6. ROOFING WORKS "
6.1 G-28 Corrugated Iron Sheet Roofing Cover m2 354.00
6.2 G-30 Corrugated Iron Sheet Roofing Cover m2 313.00
6.3 G-28 Flat Metal Sheet for Dev't Size 40 cm Riml 397.00
6.4 G-28 Flat Metal Sheet for Dev't Size 40 cm Forml 321.00
6.5 G-28 Flat Metal Sheet Down Pipe Dev't Size ml 322.00
6.6 ϴ110mm PVC Down pipe Including All Ancess
m 78.00
6.7 G-30 Ribbed Sheet m2 516.00

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS


7 . CARPENTRY & JOINERY
7.1 8mm. thick chipwood Ceiling. m2 390.272 Birr/m2
7.2 Dia 12cm Eculaptus for Upper & Lower Chordml 28.95 Birr/ml
7.3 Dia 8-10cm Eculaptus for Vertical & Diagonaml 33.22 Birr/ml
7.4 7x5 cm Zigba Wooden Purlin ml 37.05 Birr/ml
7.5 Timber Fascia Board of 2.5x25x400cm ml 167.06 Birr/ml
12. PAINTING WORKS
12.1 Three coats of plastic paint to wall. m2 47.00
12.2 Three coats of plastic paint to Rendering m2 59.80
12.3 Three coats of plastic paint to ceilling. m2 63.00
12.4 Three coats of synthetic paint to metal sur m2
Wire Fence m 250.00 Birr/Ml
Earth Drainage m 350.00 Brr/ml
Gate For Fence pc 15000.00 Birr/pc
Compound Ligthing ls 8500.00
Sign Board ls 850.00
Testing And Comminssion ls 7500.00
Ladder pc 9200.00
Plastice Sheet m2 135.00
6mm Thick Metal Chamber Cover Pc 3500.00
ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS
4 FORM WORKS
4.1 Timber Form Work For Footing Columns m2 500.000 Birr/m2
4.2 Timber Form Work For Grade Beam. m2 500.00 Birr/m2
4.3 Timber Form Work For Elevation Column. < m2 500.00 Birr/m2
4.4 Timber Form Work For Columns 3-6m m2 500.00 Birr/m2
4.5 Timber Form Work for Columns > 6m m2 500.00 Birr/m2
4.6 Timber Form Work For Bracing Beams 3-6M m2 500.00 Birr/m2
4.7 Timber Form Work Bracing Beams > 6m m2 500.00 Birr/m2
Timber Form Work Top Tie Beams & Lintels m2 500.00 Birr/m2
4.8 Timber Form Work For Suspended slab & shea m2 500.00 Birr/m2

-5-
-7-

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS


8.1 11. FINISHING WORKS
8.2 3 Coats of cement plastering ( 1:2 ) m2 114.00 Birr/m2
8.3 3 Coats of cement plastering ( 1:3) m2 114.00 Birr/m2
8.4 3 Coats of cement plastering ( 1:4) m2 104.00 Birr/m2
8.5 1 coat (final coat) cement rendering. m2 74.00 Birr/m2
8.7 Cement pointing to H.C.B.wall surface (1:3). m2 74.00 Birr/m2
8.8 Recessed pointing to dressed masonry wall sur m2 95.00 Birr/m2
8.9 3cm. Thick cement screed flooring (1:3). m2 109.00 Birr/m2
Water Stopper ml 750.00 Birr/ml
Half Dictch ml 450.00 Birr/ml
Metal Work per M2 m2 2800 Birr/m2
apply two coats of bituminous asphalt over the m2 185.00 Birr/m2
Single Brick Layer m2 570.00 Birr/m2
Sign Board PC 850.00 Birr/pc
Birr/m.
" Birr/m.
" Birr/m.
" Birr/m.
" Birr/m.
" Birr/m.
" Birr/m.
" Birr/m.
" 5.00
" Birr/m.
" Birr/m.
" Birr/m.

- 14 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

12. PAINTING WORKS


12.1 Three coats of plastic paint to wall. m2 Birr/m2
12.2 Two coats of plastic paint to wall. " Birr/m2
12.3 Three coats of plastic paint to ceilling. " Birr/m2
12.4 Three coats of synthetic paint to metal surface. " Birr/m2
12.5 Two coats of varnish paint to wooden surface. " Birr/m2
12.6 Two coats of anti-rust paint. " Birr/m2
12.7 One coat of white washing paint. " Birr/m2

- 10 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

10. GLAZING WORKS


10.1 Fixing 3mm clear glass . m2 Birr/m2
10.2 Fixing 4mm clear glass. " Birr/m2
10.3 Fixing 5mm. figured glass. " Birr/m2
10.4 Fixing 4 mm. Frosted glass. " Birr/m2
10.5 Fixing 4mm. Tinted glass. " Birr/m2
10.6 Fixing 5mm. security glass. " Birr/m2
- 11 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

11. FINISHING WORKS


11.1 3 Coats of cement plastering ( 1:3 ) m2 Birr/m2
11.2 2 Coats of cement plastering to soffit celling. " Birr/m2
11.3 2 Coats of cement plastering to exposed beams and " Birr/m2
11.4 1 coat (final coat) cement rendering. " Birr/m2
11.5 Cement pointing to brick wall surface (1:3). " Birr/m2
11.6 Cement pointing to H.C.B.wall surface (1:3). " Birr/m2
11.7 Recessed pointing to dressed masonry wall sur " Birr/m2
11.8 3cm. Thick cement screed flooring (1:3). " Birr/m2
11.9 5cm. Thick cement screed flooring (1:3). " Birr/m2
11.10 20 x 20cm. cement tile flooring(1:3). " Birr/m2
11.11 20 x 20cm. terrazzo tile flooring(1:3). " Birr/m2
11.12 2cm. thick granolythic tile flooring (1:3). " Birr/m2
11.13 2cm thick Harar marble flooring (1:3). " Birr/m2
11.14 2cm thick white marble flooring (1:3). " Birr/m2
11.15 Marbel Chips Flooring. " Birr/m2
11.16 Ceramic tile flooring (1:3). " Birr/m2
11.17 2mm. thick PVC flooring. (Ethiopia) " Birr/m2
11.18 2mm. thick PVC flooring. ( Italy) " Birr/m2
11.19 2mm. thick PVC flooring. ( England) " Birr/m2
11.20 2mm. thick PVC flooring. (China.) " Birr/m2
11.21 Parque flooring with all accessories . " Birr/m2
11.22 10cm. High cement tile skirting (1:3). ml. Birr/ml
11.23 10cm. High terrazzo tile skirting (1:3). " Birr/ml
11.24 10cm. High Granolythic tile skirting (1:3). " Birr/ml
11.25 15 x 75mm. Marble skirting ( 1: 3 ). " Birr/ml
11.26 15 x 100 mm. Marble skirting ( 1: 3 ). " Birr/ml

- 12 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS


11.27 ceramic tile skirting (1:3). ml. Birr/ml
11.28 8cm.high PVC tile skirting.( ETHIOPIA) " Birr/ml
11.29 8cm. high PVC tile skirting.( ITALY) " Birr/ml
11.30 8cm. high PVC tile skirting.( ENGLAND) " Birr/ml
11.31 8cm. high PVC tile skirting.(CHINA) " Birr/ml
11.32 10cm. high wooden skirting. " Birr/ml
11.33 30mm. thick terrazo window cill (1:3) on HCB " Birr/ml
11.34 30mm. thick terrazo window cill (1:3) on brick " Birr/ml
11.35 30mm. thick terrazo window cill (1:3) on stone " Birr/ml
11.36 30mm. thick Granite window cill (1:3) on HC " Birr/ml
11.37 30mm. thick Granite window cill (1:3) on bric " Birr/ml
11.38 30mm. thick Granite window cill (1:3) on ston " Birr/ml
11.39 30mm. thick white marble window cill (1:3)o " Birr/ml
11.40 30mm.thick white marble window cill (1:3) on " Birr/ml
11.41 30mm. thick white marble window cill (1:3) on " Birr/ml
11.42 30mm. thick HARAR marble window cill (1:3 " Birr/ml
11.43 30mm. thick HARAR marble window cill (1:3) " Birr/ml
11.44 30mm. thick HARAR marble window cill (1:3) " Birr/ml
11.45 30mm.thick granolythic window cill (1:3) on " Birr/ml
11.46 30mm.thick granolythic window cill (1:3) on B " Birr/ml
11.47 30mm. thick granite marble threads.(1:3) " Birr/ml
11.48 30mm. thick white marble threads.(1:3) " Birr/ml
11.49 30mm. thick harar marble threads.(1:3) " Birr/ml
11.50 30mm. thick Granolythic marble threads.(1:3) " Birr/ml
11.51 20mm. thick Granite marble riser. (1:3). " Birr/ml
11.52 20mm. thick white marble riser. (1:3). " Birr/ml

- 13 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS


11.53 20mm. thick Harar marble riser. (1:3). ml. Birr/ml
11.54 20mm. thick Granolythic marble riser. (1:3). " Birr/ml
11.55 20mm. thick Granite marble trechholds. (1:3). " Birr/ml
11.56 20mm. thick white marble trechholds. (1:3). " Birr/ml
11.57 15x15 cm. Ceramic wall tile.(1:3). m2 Birr/m2
11.58 20x20 cm. Ceramic wall tile.(1:3). " Birr/m2
11.59 Supply and fix mosaic tile. " Birr/m2
11.60 Addis decore wall finishing. " Birr/m2
11.61 Addis decore plastic wall paper. " Birr/m2
11.62 2cm. thick Granite wall marble (1:2) . " Birr/m2
11.63 2cm. thick Harar wall marble (1:2). " Birr/m2
11.64 2cm. thick white Gojam wall marble (1:2). " Birr/m2
11.65 Semi dressed stone pavement on 20cm. thick granul " Birr/m2
11.66 C-15 8cm thick mass concrete pavement under hard " Birr/m2
-9-

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

9. METAL WORKS
9.1 Fully metal doors of 28LTZ without grill Pcs. Br./m2
9.2 Fully metal doors of 38LTZ without grill " Br./m2
9.3 Halfglazed metal doors of 38LTZ withoutgrill " Br./m2
9.4 Halfglazed metal doors of 28LTZ withoutgrill " Br./m2
9.5 Guard rails & Balustrade of RHS m2 Br./m2
9.6 90 cm high verndah grill & RHS post . " Br./m2

- 17 -

ITEM NO. DESCRIPTION UNIT UNIT PRICE REMARKS

14. ELECTRICAL INSTALLATIONS


14.1 MDB including bus bars of 160Amp.rating Pcs 7334.80 Birr/Pcs
14.2 SDB including bus bars of 63 Amp.rating Pcs 1504.80 Birr/Pcs
14.3 light point including two way switch Pt 81.68 Birr/Pt
14.4 light point including one way switch Pt 75.08 Birr/Pt
14.5 light point Pt 66.83 Birr/Pt
14.6 Sockect point 16Amp. Pt 147.40 Birr/Pt
14.7 Sockect point 10Amp. Pt 144.65 Birr/Pt
14.8 Bell call point Pt 72.14 Birr/Pt
14.9 Telephone point Pt 73.59 Birr/Pt
14.10 TV point Pt 92.07 Birr/Pt
14.11 Bell call indicator/system/ 1-8 No. 1036.06 Birr/No.
14.12 Bell call indicator/system/ 1-12 No. 1206.56 Birr/No.
14.13 Bell call indicator/system/ 1-16 No. 1668.56 Birr/No.
14.14 Flourecent fitting type philips TMS 012/136 with No. 160.82 Birr/No.
14.15 Flourecent fitting type philipsTMW 065/136 with No. 281.82 Birr/No.
14.16 Flourecent fitting type philipsTMW 065/236 with No. 501.82 Birr/No.
14.17 Fitting type Simense 5NL-510 with 60 wattglo No. 50.82 Birr/No.
14.18 Fitting type Simense 5NL-302/140watt No. 204.82 Birr/No.
14.19 Incandecent with 60 watt lamp No. 6.71 Birr/No.