Professional Documents
Culture Documents
B-Civil Works BOQ
B-Civil Works BOQ
Unit Total
Uni
Item DESCRIPTION
t
Qty Rate Contract
(Birr) Amount(Birr)
m
Supply and fix edge gutter formed in G- 28 flat galvanized
metal sheet including support brackets 1 mm thick shaped
C.15.26 steel plate spaced at a maximum spacing of 1000 mm c/c and 5.0 321.0 1,605.0
fixed to purl in - price includes metal primer and two coats of
synthetic enamel paint
C-
Electricity 0
05.39
Lights to fed through PVC sheated cable of 2 X 2.5
C- mm2 in thermoplastic conduit of 13.3mm in /under
m 4 350 1,400
05.40 surface including junction boxes ,screw type connectors
& flash mounted switches
Flush mounted socket outlet of 16Amp fed through PVC
C- sheathed cable of 3 X2.5mm2 in thermoplastic conduit
no 3 250 750
05.41 of 13.5mm in /under surface including junction
boxes ,screw type insulating caps & cover
C- Flouresent lamp laminar type Philips or
no 3 500 1,500
05.42 equivalent ,TMS02/240 with 1X40Watt
C-
Supply and fix anchor bolt in the R.C. generator seat No 8 1,800 14,400
05.43
Total for BILL NO C-05 Generator and Guard House(9.32x7.6) At Borehole and
852,332.0
At Booster I
Construction of clorine dosing room
Uni Unit Total Price
Item No Description Qty
t Price (ETB)
C- 013.1.0 Construction of clorination room
C- 013.1.1 Earth Work
Clearing of site to remove top soil to a depth of 200
C- 013.1.2 m2 12.0 26.5 318.0
mm
Excavation for stone masonry foundation 0.5 m
C- 013.1.3 m3 2.9 88.0 250.8
width and 0.5 m depth
Cart away and deposit excavated surplus material to
C- 013.1.4 m3 14.9 52.0 772.2
a distance not exceeding I km
C- 013.1.5 fill for the selected material m2 12.0 133.0 1,596.0
C- 013.1.6 Masonry Work
Supply and place 250 mm thick hard core
C- 013.1.7 m2 24.0 189.0 4,536.0
compacted to receive reinforced floor slab
Supply and place 500 mm thick hard core for
C- 013.1.8 m2 12.0 189.0 2,268.0
founation wall
C- 013.1.9 Concrete and Block Work
Reinforced concrete grade C-25 with minimum
C- 013.1.10 cement content 1440 kg/m3 cast into formwork and
vibrated around reinforcement bars in
C- 013.1.11 RC floor tie beam m3 4.0 3,592.0 14,368.0 1.128
C- 013.1.12 RC column m3 2.25 3,592.0 8,082.0 1.08
C- 013.1.13 Mass concrete fill on floor slab (100 mm) m2 12.0 3,592.0 43,104.0 13.53
C- 013.1.14 Lintel m3 0.05 3,592.0 179.6 0.052
C- 013.1.15 RC roof tie beams m3 7.2 3,592.0 25,862.4 0.423
6,739.0
10,560.0
11,461.3
7,020.0
7,494.6
11,518.0
21,262.5
25,176.7
18,649.4
45,606.6
-
194,950.0
223,412.7
10,839.2
114,944.0
83,672.5
10,055.0
192,500.0
13,105.0
59,100.0
8,015.0
8,417.1
310,633.4
453,301.5
117,150.0
25,560.0
21,307.1
4,500.0
26,138.2
35,910.0
11,618.0
65,000.0
18,400.0
90,000.0
166,200.0
16,825.1
14,000.0
9,600.0
11,500.0
16,800.0
13,600.0
7,920.0
18,400.0
7,600.0
9,600.0
28,400.0
5,600.0
7,600.0
7,200.0
12,800.0
7,500.0
13,600.0
4,400.0
7,920.0
18,400.0
9,600.0
17,600.0
4,400.0
4,400.0
7,200.0
25,000.0
7,500.0
9,600.0
4,400.0
19,200.0
4,400.0
17,600.0
18,400.0
8,800.0
65,000.0
13,000.0
1,500.0
6,500.0
51,250.0
38,425.0
15,000.0
850.0
3,019,106.7
BILL NO.C.14.0 Guard House at 1000m3 service Reservoir
Item Description Unit Quantity Rate Amount (Birr)
C.14.1 Sub Structure
C14.2 Excavation & Earth Work
C.14.2 Clearing the top soil and unwanted material to depth of m² 25.0 26.5 662.5
200mm
C14.3 Bulk excavation in ordinary soil to depth not greater m³ 3.6 88.0 316.8
50cm
C.14.3 Bulk excavation in rock to depth not greater 30cm m³ 4.5 88.0 396.0
C14.4 Cart away all excavated material, deposit to m³ 8.1 52.0 421.2
appropriate distance not exceeding 1km
C.14.4 Masonary 0.0
Supply and fill hard core for founadation and hard
basaltic or equivalent stone, well compacted and
C14.5 blinded with crushed stone to a finished thickness of m² 5.0 189.0 935.6
25cm
C.14.5 Concrete
5cm thick Work
class C-10 lean Concrete under masonry 0.0
C14.6 foundation walls m² 3.2 180.0 576.0
C14.15 Supply and fix down drain pipe in sheet metal, size m 9.6 397.0 3,811.2
80x60mm including strainer at inlet
Supply and fix G-28 ribbed sheet to the external roof
C.14.15soffit & eve fixed to 50x40 mm zigba battens at m² 5.2 516.0 2,683.2
600x600mm spacing rate including one coat of anti
rust paint.
C14.16 Carpentry and Joinery 0.0
Supply and fix in position well seasoned eucalyptus
C.14.16roof truss according to drawing, rate shall include 0.0
the application of two coats of external anti-termite
treatment
C14.17 Lower chord dia 100mm ml 120.0 28.9 3,473.9
C.14.17Upper chord
Diagonal anddia 100mm
vertical member dia 80mm ml 120.0 33.2 3,986.7
C14.18 ml 100.0 33.2 3,322.3
Supply and fix purlin in zigba wood size 50x70 mm
C.14.18nailed into eucalyptus truss including two coats of anti ml 18.0 37.1 666.9
- termite external treatment
Supply and fix 8mm thick chip wood ceiling fixed to
C14.19 50x40mm zigba battens spacing 600x600mm, rate m² 4.4 390.3 1,721.1
includes battens and corner list
C.14.19Supply and fix well seasoned Keraro facia board m 12.2 167.1 2,038.1
200x30mm
C14.20 Metal work
530.00
360.80
213.20
1,330.00
-
2,079.00
3,661.00
-
5,204.47
1,710.00
2,812.50
11,362.50
3,764.00
8,150.64
-
970.10
14,590.00
15,543.33
72,281.54
BILL NO.C.11.0 Water Point Six Faucets
BILL NO.H.11.0Description Unit Qty Unit price Total price
NO.C.11.1 1.Earth Work
Clearing and removal of top soil to average
C.11.2 depth of 20mm m2 30.0 26.5 795.00
bulk Excavation for foundation depth not
C.11.3 exceeding 50cm m3 7.5 88.0 658.24
Cart away the excavated material not exceeding
C.11.4 than 1000m m3 7.5 52.0 388.96
25cm Selected material filling (if necessary as
C.11.5 directed by the Engineer) m3 3.1 246.0 753.38
Supply and place 250mm thick(Equivalent to
hard basaltic stone) hard core filling blinded
C.11.6 with crushed agregate m3 6.0 189.0 1,134.00
C.11.8 3.Concrete Work -
10cm thick C-20 mass concrete in water point
base and on the hard core ,valve chamberand
C.11.9 cuping m3 1.4 3,424.0 4,687.46
C.11.10 10cm thick class C-20 mass concrete in manhole m3 0.2 3,424.0 671.10
Supply,cut and fix mild steel reinforcement
bars for manhole cover, as shown in the
C.11.11 drawing -
C.11.12 Dia 8cm kg 3.6 64.4 229.26
C.11.14 3. FORMWORK -
C.11.15 Water point base, pot seat and cape(cover) m2 1.4 500.0 700.00
C.11.16 4. Masonry
Hard Work
trachytic or equivalent stone masonry -
water point wall grouted and filled with 1:3
C.11.17 mortar m3 5.0 523.0 2,615.00
1.4mx1.4m masonry Valve Chambers
C.11.18 Construction as shown in the drawing m3 1.1 4,500.0 4,752.00
C.11.20 5.Finishing Work -
three coats of plastering to internal walls of
C.11.21 manhole, using 1:3 mortar m2 2.2 114.0 255.36
pointing of the masonry wall of water point with
C.11.22 rich mortar m2 6.2 95.0 592.80
C.11.23 3cm thick sand and cement floor screed m2 6.5 109.0 703.05
C.11.25 6.Supply and Installation of Pipes and Fittings -
C.11.26 G.S pipe 2''class 'B' Type m 6.0 1,800.0 10,800.00
C.11.27 G.S pipe 3/4"class 'B' Type m 1.2 1,300.0 1,560.00
C.11.28 Elbow 90 deg. dia. 2'' No 1.0 187.0 187.00
C.11.29 Reducer dia. 2''x3/4" No 6.0 187.0 1,122.00
C.11.30 Tee dia. 2'' No 3.0 187.0 561.00
C.11.31 Faucet dia.3/4” No 6.0 190.0 1,140.00
C.11.32 Water Meter dia. 2'' No 1.0 1,900.0 1,900.00
C.11.33 Gate Valve dia. 2'' No 1.0 1,800.0 1,800.00
C.11.34 Nipples dia 2'' No 6.0 237.5 1,425.00
C.11.35 Union dia 2'' No 2.0 356.3 712.50
C.11.36 HDPE OD40mm adaptor to GI 2'' No 1.0 750.0 750.00
Supply and fix including 50cmx50cm metal
sheet for manhole cover with thickness 4mm
C.11.37 with lnch and lock for the water meter chamber No 1.0 1,377.0 1,377.00
C.11.39 7.Fence Work -
Supply and erect 2m height above OGL fence of
7 lines of Mesh wire 200mm and 400mm
spacing the bottom 5 and upper 2 lines
respectively, with cross diagonal on 11/2" GS
pipe pole and bracers at the corners, embedded
by 40*40cm concrete around the pole to depth of
60cm below the OGL and including painting the
pole as interst of the Engineer
C.11.40 m2 100.0 280.0 28,000.00
Supply and erect 2000x1000mm size gate with
metal frame and rectangular hollow tube
RHS4mm including 2.5mm ripped sheet metal
having three coats of antirust piainting, complete
with hinges and lock
C.11.41 No 2.0 2,403.8 4,807.68
Total for One Water Point 75,077.79
1
BILL NO.C.12.1: BILL NO.C.12.0 Solid Waste Disposal Site
UNIT
ITEM NO DESCRIPTION UNIT QNTY TOTAL
PRICE
C-12.2 EARTH WORK
C-12.3 Site Clearing of Top Soil up to 20cm Depth m2 900.0 26.5 23,850.0
Bulk excavation in normal soil to a depth not exceeding
C-12.4 m3 1,350.0 177.0 238,950.0
1.5m
C-12.5 Ditto but in soft rock formation below 1.5m up to 2.5m m3 450.0 331.0 148,950.0
C-12.6 Ditto but in hard rock formation 1.5m m3 900.0 468.0 421,200.0
Cart away all excavated material, and deposit to
C-12.7 circumference of the pit asprotection embank 2m m3 2,700.0 52.0 140,400.0
distance from the pit
C-12.8 Provide in and out entrance for the solid waste pit m 100.0 1,200.0 120,000.0
C-12.9 fencing and protection
Mesh wire fencing consists of 2m heigth barbed wire
with horizontal and diagonal member fixed to 2.5m c/c
C-12.10 m2 400.0 250.0 100,000.0
angl iron pole , including all necessary material as per
the drawing
TOTAL 1,193,350.0
C-16.0 CONSTRUCTION OF PUBLIC TOILET
CONSTRUCTION OF SOAK AWAY PIT
S/NO Earth Work Unit Qty Unit price Amount
C-16.1 Clearing of site to remove top soil to a depth of 200 mm m2 12.00 26.50 318.00
C-16.2 Bulk excavation in ordinary soil to depth of 1.5m m3 15.60 177.00 2,761.20
C-16.3 Bulk excavation in soft rock depth not greater than 1.5m m3 15.00 331.00 4,965.00
C-16.4 Bulk excavation in hard rock m3 12.00 468.00 5,616.00
C-16.5 Curt away excavated material m3 42.60 52.00 2,215.20
C-16.6 Masonry Work
C-16.7 masonar wall with 50cm at the base and 40cm at top m3 35.00 1,701.00 59,535.00
C-16.8 concerete work
Reinforced concrete septic cover C30 (Cement 1440 kg/m3)
C-16.9 filled into form work and vibrated around reinforced bars,
mix ratio should be 1 :2:3 in
C-16.10 Soak pit top slab m3 2.25 3,592.00 8,082.00
C-16.11 Reinforcement
Provide, cut, bend and fix in position reinforced steel bar. All
C-16.12
according to structural drawing. Price shall include tying wires
C-16.13 diameter 12 kg 555.50 69.20 38,440.60
C-16.14 diameter 10 kg 90.00 66.80 6,012.00
C-16.15 diameter 8 kg 80.00 64.40 5,152.00
C-16.16 Miscellaneous
Supply and lay 100 mm dia. PVC pipe as shown on the drawing,
C-16.17 price including excavation of earth and back filling drianage m 100.00 167.06 16,705.95
conection
C-16.18 Supply and fix 100x100 mm tee No 4.00 7,500.00 30,000.00
Supply and fix 100 mm dia. PVC ventilation pipe hood shaped
C-16.19 No 2.00 7,500.00 15,000.00
covering (cowl)
Supply and fix 40*40cm manhole cover concrete with handling
C-16.20 No 2.00 7,500.00 15,000.00
frame
Sub total for SOAK AWAY PIT 209,802.95
Construction of Toilet
S/no Description Unit Qty Rate Amount
Earth Work ETB ETB
C-16.21 Clearing of site to remove top soil to a depth of 200 mm m2 20.00 26.50 530.00
C-16.22 Excavation for foundation 0.5 m width and 0.5 m depth m3 5.40 88.00 475.20
Cart away and deposit excavated surplus material to a distance not
C-16.23 m3 5.40 52.00 280.80
exceeding I km
C-16.24 fill for the selected material m2 3.60 133.00 478.80
C-16.25 Masonry Work
Supply and place 250 mm thick hard core compacted to receive
C-16.26 m2 15.00 189.00 2,835.00
reinforced floor slab
C-16.27 Supply and place 500 mm thick hard core for founation wall m2 10.00 189.00 1,890.00
C-16.29 Concrete and Block Work
Reinforced concrete grade C-25 with minimum cement
C-16.30 content 1440 kg/m3 cast into formwork and vibrated around
reinforcement bars in
C-16.31 RC floor tie beam m3 3.00 3,592.00 10,776.00
C-16.32 RC column m3 1.26 3,592.00 4,525.92
C-16.33 Mass concrete fill on floor slab (100 mm) m3 1.25 3,592.00 4,490.00
C-16.34 Lintel m3 0.05 3,592.00 179.60
C-16.35 RC roof tie beams m3 2.50 3,592.00 8,980.00
Provide, fix in position, cut and bend reinforced steel bar. All
C-16.36 according to structural drawing. Price should include tying
wires
C-16.37 Diameter 8 mm deformed bar kg 98.00 64.40 6,311.20
C-16.38 Diameter 10 mm deformed bar kg 110.00 66.80 7,348.00
C-16.39 Provide, cut, and fix formwork beam column m2 19.20 500.00 9,600.00
C-16.40 Block work
C-16.41 20cm HCB block for wall No 250.00 306.00 76,500.00
C-16.43 Carpentry and Roofing
Supply, assemble and fix in position roof truss of 80mm
C-16.44 equaliptus pole horizontala and tranversal price shall include the m2 36.00 28.95 1,042.18
application of three coats and external anti-termite treatment
Supply and fix purl in in zigba wood size 50 x 70 mm nailed into
C-16.45 eucalyptus truss including three coats of anti - termite external m2 100.00 37.05 3,705.02
treatment
Supply and fix roof cover in G-28 mm corrugated galvanized iron
C-16.46 sheet fixed into zigba wood purl in with dome headed galvanized m2 12.00 354.00 4,248.00
nails (purlin and ridge cover measured separately)
Supply and fix edge gutter formed in G- 28 flat galvanized metal
sheet including support brackets 1 mm thick shaped steel plate
C-16.47 spaced at a maximum spacing of 1000 mm clc and fixed to purl in m 3.50 321.00 1,123.50
- price includes metal primer and two coats of synthetic enamel
paint
Supply & fix diameter 100mm down pipe in G-28 including I mm
C-16.48 thick metal support brackets fixed at a maximum interval of 1000 m 20.00 397.00 7,940.00
mm fixed to walls or columns
C-16.49 Supply and fix 25x 250 mm fascia board to purl in m 9.80 167.06 1,637.18
Supply and fix metal windows size 1x1.8m price includes lock
C-16.50 m2 1.80 5,040.00 9,072.00
hachs
Supply and fix metal doors size 2.1 Ox1 with figured glass in
C-16.51 Pcs 2.10 5,880.00 12,348.00
upper half portion
finishing work shall include all surface pre-cleaning, polishing
C-16.52
and cleaning at the end of finishing
C-16.53 Floor screed in cement mortar 20 mm thick m2 1.80 109.00 196.20
Apply cement mortar pointing to all external cement concrete
C-16.54 m2 34.00 74.00 2,516.00
block wall
Apply 3 coats of plastic paint to internal ,externalwalls and
C-16.55 m2 36.00 47.00 1,692.00
synthetic paint to metal doors and windows
C-16.57 Electrical Installation
C-16.58 Supply and install the required electrical works LS 1.00 5,500.00 5,500.00
Sub-total for toilet 186,220.60
Total for 1 toilet including soak away pit 396,023.56
C-01.1.98 Compound Work
Fence for 200m3 Reservior with Area
C-01.1.99 Ls 1 56,250 56,250.00
of 2500m2
Supply and construct gate type III as
C-01.1.104 NO 1 15000.00 15,000.00
per the drawing
71,250.00
-1-
- 15 -
-5-
-7-
- 14 -
- 10 -
- 12 -
- 13 -
9. METAL WORKS
9.1 Fully metal doors of 28LTZ without grill Pcs. Br./m2
9.2 Fully metal doors of 38LTZ without grill " Br./m2
9.3 Halfglazed metal doors of 38LTZ withoutgrill " Br./m2
9.4 Halfglazed metal doors of 28LTZ withoutgrill " Br./m2
9.5 Guard rails & Balustrade of RHS m2 Br./m2
9.6 90 cm high verndah grill & RHS post . " Br./m2
- 17 -