ARCHITECTURAL, CIVIL & PLUMBING CONSTRUCTION CONTRACT

PROJECT : PILING WORKS


LOCATION : PANIQUI, TARLAC
OWNER : WILCON DEPOT INC.
SUBJECT : LABOR & CONSUMABLES CONSTRUCTION CONTRACT
CONSTRUCTOR : (COMPANY NAME)
PRE-BID CONFERENCE :
SUBMISSION OF BID :
AWARDING OF BID :
DATE START :
DATE FINISH :

COST OF LABOR COST OF CONSUMABLES


SCOPE OF WORKS UNIT COST AMOUNT UNIT COST AMOUNT TOTAL
QTY. UOM QTY. UOM
(PHP) (PHP) (PHP) (PHP)

DIVISION 1. GENERAL REQUIREMENTS


A MOBILIZATION & DEMOBILIZATION LOT Php - Php - - - - - Php -
BUILDING PERMIT & OCCUPANCY PERMIT (Leg Work and Assistance to our Properties and Permits
B WILCON Php - Php - 0.00 WILCON Php - Php - Php -
Department) To Be Assisted by Contractor. Note DOLE Certificate from Contractor
C TEMPORARY FACILITIES (Constructor shall Bid for Labor & Materials) - - - - - - - -
1 Worker's Barracks LOT Php - Php - - - Php -
- -
TEMPORARY WATER CONNECTION (Constructor shall provide Temporary Waterline for Comfort Rooms
& Construction Use, Bid Labor & Materials, Leg Work and Assistance in processing temporary water
2 LOT Php - Php - - - Php -
connection) (WILCON will apply & pay for all necessary payment for temporary water connection and
monthly billing)
- -

TEMPORARY ELECTRICAL CONNECTION (Constructor shall provide Temporary Electrical Supply, Project
Site Lighting including Temporary Panelboard with breakers to accomodate Temporary Power Connections
3 LOT Php - Php - - - Php -
for all Construction Facilities & Construction use; Bid Labor & Materials)
(WILCON will apply & pay for all necessary payment for temporary electrical connection and monthly billing)
- -
4 OTHERS (Please specify) - - - - - - - -
A. LAY-OUT & STAKE OUT (RELOCATION, TOTAL STATION, WILCON SHALL REQUIRE
CONTRACTOR TO HAVE ITS OWN GEODETIC ENGR.) (Critical for validation of lot boundary and proper LOT Php - Php - - - - Php -
alignment of steel structure anchor bolts) -
B. MATERIAL TESTING WILCON Php - Php - 0.00 WILCON Php - Php - Php -
C. CLEANING & DISPOSAL OF CONSTRUCTION DEBRIS, EXISTING DAMPS AND UNSUITABLE ITEMS
LOT Php - Php - - - - Php -
INCLUDING CUTTED TREES. -
D. SUPPORT EQUIPMENTS & MAINTENANCE (INCLUDE COST FOR EXCAVATOR, LOADER, TRUCKS
LOT Php - Php - - - - Php -
AND OTHER NECESSARY HEAVY EQPT.) -
E. PROJECT SITE MANAGEMENT (SUPERVISION & STAFFS) LOT Php - Php - - - - - Php -
F. SANITARY FACILITIES LOT Php - Php - - - - - Php -
H. MATERIALS HANDLING AND PROTECTION LOT Php - Php - - - - Php -
I. REGULAR MEETINGS & CONFERENCES LOT Php - Php - - - - - Php -
D BOND AND INSURANCE
1 CONTRACTOR ALL RISK INSURANCE (CARI) LOT Php - Php - Php -
2 PERFORMANCE BOND LOT Php - Php - Php -
3 GUARANTEE BOND FOR 1 YEAR LOT Php - Php - Php -
4 SURETY BOND LOT Php - Php - Php -
E Covid-19 Requirements For Safety & Health (As per DPWH Guideline) LOT Php - Php - Php -
Rapid or Swab Test for Site Personnel and Workers (As necessary)
DIVISION 1 GENERAL REQUIREMENTS COST SUB-TOTAL : Php - Php - Php -

DIVISION 2. PILING WORKS (CONSTRUCTOR SHALL BID LABOR ONLY) (OWNER SUPPLY MATERIALS :PILING MACHINE AND MATERIALS.)
1 INSTALLATION OF PILES (considering 20meter depth)
- includes Pile Shoe ,leveling, cutting and etc
2 INSTALLATION OF REBAR
3 CEMENT GROUT
4 2.5TON COLUMN BOX FOR TESTING
DIVISION 2 PILING WORKS COST SUB-TOTAL :

TOTAL LABOR AND CONSUMABLES


+12% VAT Php0.12 Php -
GRAND TOTAL Php -

FINAL CONTRACT
i
( PLEASE FILL-UP THIS FORM AS COMPLETE AS POSSIBLE, EXCEPT OTHERS AND “ – “ AREAS, INCOMPLETE INPUT WILL NOT BE ACCEPTED )
( OTHER SCOPES OF WORKS FOUND ON BID PLANS, BUT NOT REFLECTED IN THIS FORM SHALL BE INCLUDED IN THE FINAL CONTRACT)

GENERAL CONDITIONS
A INCLUSIVES CONSUMABLES INLUDED IN THIS CONTRACT / BIDFORM
1 VAT inclusive REBAR WORKS
2 Wilcon Depot Inc. strictly impose a Construction Period of SIX (6) MONTHS only a. G.I. Tie Wire #16

Downpayment will be released upon signing of construction contract & submission of required documents
3 STRUCTURAL STEEL
(10% for Labor + Consumbales Contract and 30% for Materials + Labor and Consumables Contract)

4 Welding test will be conducted by Wilcon (assistance on access & clearing for the test area c/o Contractor) a. Welding rod (WIPWELD 6011 OR NIHON WELD 6011)

5 Cutting of slab shall proceed 24hrs after completion of concreting (concrete cutter c/o Contractor) b. Oxygen & LPG
6 95% FDT on structure fill is required. c. Tig-welding coil & shielding gas (ELECTRODE WIRE SS304)
Civil Constructor is responsible to assist the unloading/loading of construction materials, debris, backload
7 ROOFING WORKS
materials etc.
8 Constructor is responsible for the cleanliness and good housekeeping of the project site. a. Tekscrew
9 Constructor to sort-out construction materials in proper order. b. UV Resistant Silicon Sealant (ABC construction sealant or equivalent)
10 Concrete vibrator is required on concreting works c. Duct Tape
11 Curing tank for concrete sample should be provided PAINTING WORKS
Constructor shall provide their own wires for their electrical tools and equipment. Wilcon to provide only the
12 a. Roller & Brush
panelboard for the Contractor to tap their tools and equipment
B FULL CONTRACT WITH A GUARANTEED MAXIMUM COST b. Sandpaper & Masking Tape
All NECESSARY ITEMS not defined in the plans, but is required for the completion the project will be
1 c. Basahan & Newspaper
included. No additional cost will be charge to the Project
The project will build a guaranteed maximum price (GMP) thus if the actual cost of the works is higher than
2 the guaranteed maximum price, then the contractor must bear the additional cost in exemption for all major PLUMBING WORKS
additional scope of works, not included in the item above.
a. PVC solvent cement & teflon tape (NELTEX)

000000Page 1
ALL FORMWORKS; SHORINGS & SCAFFOLDINGS ARE CONSIDERED
C EXCLUSIONS :
CONSUMABLES
a. Nails (CWN and Concrete Nails)
BUILDING, OCCUPANCY & OTHER PERMITS by the owner
WILCON CORPORATION
TECHNICAL QUERIES:(Architectural, Plumbing & Structural Plans) 634-8387 local 1625

AR. JESUS B. IRINGAN 0917-841-5979

ADDRESS BID TO :
CONFORME: PURCHASING MANAGER : MS. VERONICA PINILI
VP PRODUCT DEVELOPMENT : MS. EDEN GODINO
PROJECT MANAGER : ENGR. ISAGANI V. ROBLES
WILLIAM T. BELO AVP : MR. NICHOLAS AGBING
CHAIRMAN ENGINEERING DEPT. 5TH FLOOR WILCON BUILDING #90 E.RODRIGUEZ JR. AVE., UGON NORTE LIBIS Q.C.
( THIS DOCUMENT SHALL SERVE AS AN OFFICIAL CONTRACT UPON APPROVAL OF OWNER )

000000Page 2

You might also like