Cutter Suction Dredger

No.3 SUEZ

Builder IHI Japan

Year of Built March 1991 (Rebuilt)

Classification NK, JG

Gross Tonnage 6,250 GT

Length Overall 131.0 m

Length (b.p.) 91.75 m

Breadth (mld.) 19.4 m

Depth (mld.) 6.1 m

Maximum Draught 4.53 m

Suction Pipe Diameter 915.0 mm

Delivery Pipe Diameter 860.0 mm

Maximum Dredging Depth 32.0 m

Minimum Dredging Depth 5.7 m

Total Installed Power 12,400 kW

Cutter Output 1,500 kW

Ladder Pump Output 1,300 kW

Delivery Pump Output 6,000 kW