Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

2/28/22, 10:14 AM Gmail - MEP EXTERNAL COORDINATION DRAWING; PAYYANUR TALUK HOSPITAL, PROJECT

SYAM KRISHNAN <syam.mep.ccpl@gmail.com>

MEP EXTERNAL COORDINATION DRAWING; PAYYANUR TALUK HOSPITAL, PROJECT

Praveennarayan . <praveennarayan@hllhites.com> Sat, Feb 26, 2022 at 3:11 PM


To: Crescent Contractors Taluk Hospital Payyannur <ccplthp@gmail.com>, SYAM KRISHNAN <syam.mep.ccpl@gmail.com>, samsuccplth@gmail.com,
Anaswara M K <tranaswaramkccplth@gmail.com>
Cc: "Anantha Padmanabha. Bhat" <ananthap@hllhites.com>, "Arun.M" <arunm@hllhites.com>, Govind Rj <govindrj@hllhites.com>, AKHIL S B
<sbakhil007@gmail.com>

Sir,

The drawing is mostly correct.However few changes have been suggested

Above drawing

1.The cables from substation to op building shall initially go through a 45 degree bend of the structural tray.This is due to plumbing duct
and also due to the fact that the foundation of two DG exhaust pipes on the OP building may be made on the ground without any hindrance.

2.The fire pipes shall follow the pedestal route upto mid of ramp portion of the labour block after which it will be placed on a common
structural ladder support.

3.The cable tray for the labour block initial part may also be routed inside the building through the ramp portion.ELV tray also shall be
above the electrical cable tray in ramp portion and shall run parallel to the electrical tray.Drop shall be made upon entrance to the lobby to
rack.

Below drawing

Manholes shall not be used for ELV.Direct in pipes to destination with draw wires tied at both ends.This is done as ELV is mostly fragile and
manholes may attract rodents.Bends shall be made using quarter bends available for DWC pipes

1.Substation to Fire pump room

2 nos of 63 mm HDPE pipe for ELV(1 for FA,PA and 2nd for data,tel,CCTV)
2 nos of Hume pipe for electrical -300mm hume pipe (if quantity not available 150)+1 no 150 mm hume pipe spare

2.Fire pump room to isolation block

1 no of 150mm hume pipe for electrical.The length of pipe shall be decided after confirming position of elec room in the isolation block.If
quantity of pipe not available direct in ground laying shall be done for this portion.

https://mail.google.com/mail/u/0/?ik=46d95cc12d&view=pt&search=all&permmsgid=msg-f%3A1725818189000826662&simpl=msg-f%3A1725818189… 1/2
2/28/22, 10:14 AM Gmail - MEP EXTERNAL COORDINATION DRAWING; PAYYANUR TALUK HOSPITAL, PROJECT
3.Dental block to office block
2 nos of 63 mm HDPE pipe for ELV(1 for FA,PA and 2nd for data,tel,CCTV)
2 nos of Hume pipe for electrical -150mm hume pipe +1 no 150 mm hume pipe spare

4.Main Block to Dental block


Two number DWC HDPE pipe shall exit the building at 9.3m from the corner i.e. registration room through tray and pipe outside.

The soil and waste water pipe and related manholes are not as per latest layout.Please superimpose the latest layout issued on Feb 9 by
Arun ,M(C),HITES.
[Quoted text hidden]
[Quoted text hidden]
--

सादर / With regards

प्रवीन नारायणन् / PRAVEEN NARAYANAN

प्रबंधक (विद्युत) / MANAGER (ELCT.)

एचएलएल इंफ्रा टेक सर्विसेज़ लिमिटड / HLL INFRA TECH SERVICES LIMITED

Ph:8527067756

2 attachments
EXTERNAL BLW COPY.dwg

7291K
EXTERNAL ABV COPY.dwg

7906K

https://mail.google.com/mail/u/0/?ik=46d95cc12d&view=pt&search=all&permmsgid=msg-f%3A1725818189000826662&simpl=msg-f%3A1725818189… 2/2

You might also like