● The exam comprises 2 parts, part 1 as quiz and part 2 as theory. Part 1 has 1
questions 1 mark each. Part 2 has 2 questions 15 marks each
● Marks are indicated against each question.
● Answer of each subjective question is to be written on a separate sheet.
● Mention your name and roll number on the top of each page.
● State assumptions where ever necessary, Answer to the point.
● Every of the answer will be thoroughly evaluated, write your own answer.

1. John is leading a project for establishing a production line for Build Tech corp, which is
contract manufacturing facility for packaging material. The line laying is started and is hal
done. One day while inspecting the line John meets, Altris who is the manufacturing head
Altris advises John to change some workstations as he believes that change in sequence wil
increase the operator ef ciency

Is this a general request from Altris?. What has gone wrong in your opinion? What should Joh
do next? (15 Marks

2. You have joined as the project manager at God Grace Pvt. Limited, alliance making start up.
The promoters have been very active on the market research and recent report from a
consulting organisation reveals that people visit Godgrace’s website, take and like references
but do not return on site back for a nal closure. One of the prominent reason is more time
taken up by the God Grace’s team for following up discussion closures, which needs to be
revamped. You have been designated as a project manager to manage this as a project. Plan
your project and build your WBS to address this planning. (15 Marks)