Industrial Training Report: ON AT Rev Electro Control Pvt. LTD

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 15

INDUSTRIAL TRAINING REPORT

ON
Electrical control panels
AT
REV ELECTRO CONTROL PVT. LTD.
Submitted in partial fulfillment of the requirements For the award of
diploma of
Polytechnic diploma
In
Electrical Engineering

Submitted To: - Submitted By: -


Mrs. Pragti gupta Pankaj kumar

SURESH DEEP POLYTECHNIC


NH-24,DELHI- HAPUR ROAD, DASNA, GHAZIABAD, (U.P)
AFFILIATED TO- UPBTE, LUCKNOW.

1
DECLARATION

I, PANKAJ KUMAR , Student of


Polytechnic (ELECTRICAL) declare that
the training report titled “ Electrical control
panels ” which is submitted by me to
Department of Polytechnic Electrical
Engineering of SURESH DEEP
POLYTECHNIC.

Date: 23 SEPT 2021


Pankaj kumar

2
ACKNOWLEDGEMENT

The successful completion of this project mark the beginning of an ever - going
learning experience of converting ideas and concepts into real life, practical system. This
project was a quite a learning experience for me at each and every step. At the same
time it has given me confidence to work in professional setup. I feel the experience
gained during the project will lead me to gain the bright prospect in the future. First of
all I would like to give thanks to Mr. Vabhav garg for giving me the opportunity to
work in this esteemed organization, which not only has increased our awareness about
latest fields but also taught me the importance of team building. I will also like to the
other working staff teachers at for taking keen interest in my project and giving
valuable suggestions and helping me directly or indirectly to complete this project report
and Training

Pankaj kumar
E19162132800038
Polytechnic (ELECTRICAL)

3
CERTIFICATE

4
5
☆. Electrical Panel Selection.....

System for HT/ LT connection

• HVPN Supply

• GO Switch

• HT Metering

• VCB

• Transformer

• LT Panel ( Power control centre, Power factor panel,AMF)

• Distribution Panel

• Sub Distribution panel

6
☆.Selection Of GO Switch.....

Gang Operated Switch

Comprises of :- Lightning

Arresters, GO (gang

Operated) switch, Drop off

Fuse(DO), Plate Earthings

Two Nos.

For LA (lightening arrestor)

& GO switch.

Selected at 11KV Only.

7
☆.Selection of CT & PT....

• CT (Current Transformer /5A) Selected as per the full load Current of


Transformer.

• PT ( Potential Transformer) As per The system Voltage.(11Kv/220v/110v/24V)AC

• Calculation of HT Current for CT KVA/11KV/1.732

• Example:- Transformer rating ( HT Current for CT/PT

selection) 500Kva/11KV/1.732 = 26.24

• Tri vector Meter selected as per HT Current.

8
☆.VCB Panel....

• Vacuum Circuit Breaker

• For Switching carrying Normal Current and Breaking abnormal current At High Voltage.

• 630A ( Short circuit current) And Above.

• Over Load, Short Circuit & E/F protections.

• Measurement of current, Voltage etc.

9
☆.Transformer....

• 11KV( input)/433V ( Output)

• Selection of Transformer as Per Total load.

• Buckle relay and winding Temperature for safety of Transfer. These help to trip VCB.

• Silica gel to check moisture Content. If blue- Ok, If white Or light pink- replace it.

10
☆.LT Panels....

● PCC--- Power Control Center.

● MCC- Motor Control Center.

● AMF- Auto Mains Failure Panel

● APFC- Automatic Power Factor Correction

● Distribution Panels.

11
☆.STARTER FOR THREE PHASE
INDUCTION MOTOR....

☆.Starting is a process in which a motor’s rotor is Brought from zero speed to rated
speed.

☆.The force to rotate in angular movement is Called Torque.

☆.Direct On Line Starters used upto 10 HP

☆.Star Delta Starters.

 Manual Star Delta Starters ( not used)

 Automatic Start Delta Starters

 Soft Starters

 VFD

12
☆.Starter Panel for Induction Motors....

1. Contactors + Over Load + MCCB / MPCB

2. Motor Protection Relay Starter Panel for Induction Motors

3. On delay Timer + Capacitor Duty Contactor + Capacitors

4. Under Voltage & Over Voltage Relay

5. Hour Meter

6. Time Switch

13
☆.Components To Be used In Starters....

☆. DOL– MPCB-1No,Contactor- 1No, Push Button 2Nos. On

Indication 1 No., single phase preventer 1 No Up to 10HP,

☆. Star Delta Starter– MCCB 1no, Contactors 3nos,MPR-

1no, star-delta Timer 1No, Ammeter with CT 1 No, Push

Button 2no, on Indication 1no., single phase preventer 1 No.

☆. Soft Starter- MCCB 1 No, Semiconductor fuses 3 Nos.,

Line Contactor 1 No, Soft Starter 1 No. ( with built in

Bye-pass contactor & soft starter selected as per duty or

Application), Push Button 2 Nos.

☆. VFD- MCCB 1 No, Semiconductor fuses 3 Nos, VFD1 No.

Push Button 2 Nos. Input/ Out put Chokes.

14
15