For example, for a long tunnel of 3.000 m with 30.000 vehicles/day, the probability of a huge fire is around 1:500 per year.
• considering a human life cost of EUR 1.000.000 and 30 fatalities, the total cost would be 60.000 EUR per year
• considering the damage repair of 1000 m of tunnel with a cost of 25.000 EUR/m, the cost would be 50.000 EUR/m per year.
• considering 10 EUR per vehicle of losses and an interruption of one year, the total cost would be 220.000 EUR per year.
The overall cost would be around 330.000 EUR per year, 6.6 MEUR for 20 years and 16.5 MEUR for 50 years.
The FFFS cost varies from 6 MEUR to 10 MEUR therefore it is well justified, referring to the Risk-Benefit analysis.
Smoke
stratification
Wall
Nozzles
Sidewalk
Nozzles
A good system starts from a good engineering analysis and design that shall be tailored on the specific tunnel features and risks.
The performance of the extinguishing and mitigation systems is determined by:
• positioning along the tunnel (length of the intervention area, installation height)
• delivery features of the nozzles (discharge coefficient, jet profile, operating pressure, droplet size)
• design flow rate and discharge density
• chemical-physical properties of the extinguishing agent (specific weight, freezing point, foam solution, degree of expansion,
drainage time, environmental compatibility).
The FFFS must be tested in real conditions in a test facility before the installation and the installed system must verified in operating
conditions together with the ventilation system performances.
Specific management procedures shell be developed according to local standards and best practices.
The Fire detection system performances are crucial for the effectiveness of the whole system in terms of: