Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Consent to Operate under the Air (Prevention and Control of Pollution) Act, 1981

1 Name of Approval / Consent to Operate under the Air (Prevention and Control of Pollution) Act, 1981
NOC/ License/
Registration
2 Competent Authority Regional Officer
3 Stage Pre -Operation

SLA/ Number of Days 120 days


4
5 1 A covering requisition letter stating the status of the industry and
Documents Required
activities clearly.
2 Details of production capacity, actual products manufactured in
month wise during the last two financial years.
3 Details of changes if any in the quantity of sewage/trade effluent
generated and mode of disposal of the same indicated against in the
original consent order (If applicable).
4 Details of changes if any in the quantity of emission and number and
height of chimney/stacks indicated against in the original consent order
(If applicable).
5 Details of changes if any in the name or in the management/ Board
of Directors of the company (If applicable).
6 Latest Analysis report of the treated sewage/ trade effluent samples
(If Applicable).
7 Latest Analysis report of the Stack Monitoring, AAQ and Noise
Level (As applicable).
8 Compliance report on the conditions of latest Hazardous waste
Authorization /Biomedical Waste Authorization issued to the unit (If
applicable).
9 Compliance report on the latest consent/renewal of consent order
conditions stipulated under Water & Air Acts issued to the unit.
10 The latest Audited Balance Sheet/Auditor’s certificate showing the
Fixed Assets, Current Assets and Current Liabilities.
11 Details and mode of payment of Consent fee under Water and Air Act.
12 Status of Water Cess payment along with the details of last bill (If
applicable).
13 Details of Online monitoring system installed for effluent and or
Emissions as applicable.
14 Complete details of systems adopted for ZLD and details of land in case
of on land disposal along with the photographs (If applicable)

1
7 Step- 1:
a) The applicant shall open the Online Single Window Portal using the address
b) Register in Online portal using their personal Details and Contact Details.
c) A password is generated and sent thru SMS/Email. Using the User id and
Password to log into the online Web portal.
Step – 2:
After logging into the web portal, the Applicant shall fill the Common Application
Procedure for getting Form and create Unit.
license Step – 3:
Select Apply for Certificate/NOC/Permission, choose unit, select Department “UP
Pollution Control Board” and service “Consent to Operate under Air Act” then
click on proceed. The applicant will go ahead and submit the application form.
Step – 4:
Now, go to “Pay Your consolidated Fee” and then pay the required fee.
Step – 5:
After successful fee payment, application shall reflect to concerned regional
office (RO)
Step – 6:
Application shall be processed by RO. Necessary inspection is done by
department. In case of any query/objection, Dept shall raise query within 7 days
of submitting application and applicant has to reply on query through Nivesh
Mitra portal.
Step – 7:
RO process the application and finally approve/reject consent
Step – 10:
Applicant Downloads the Final certificate through Nivesh Mitra portal
8 Fee & Variable Fee, Online mode
Mode of Payment ( Please Note - Fee Calculator is given at UPPCB Portal
https://upocmms.nic.in/UPOCMMS/ )

You might also like