Availability Daily Report Friday, February 4, 2022

Shovels and Diggers


Shovels RH170E Availability % 100% MTD Ava 98.37% Number of Equip 4 Suspended

Excavators RH120E Availability % 98.44% MTD Ava 86.33% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown LH Eng. No Start 04-Feb-22 4:15 PM 04-Feb-22 5:00 PM
EX001 0.75 96.88% 1
No of Equipment 1 Total Down (Hours) 0.75
Excavators RH90 Availability % 100.00% MTD Ava 99.22% Number of Equip 1 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Undercarriage Night Opportune Track Link 3x Bolts Missing 04-Feb-22 9:00 PM 04-Feb-22 9:30 PM
EX007 0.00 100.00%
No of Equipment 1 Total Down (Hours) 0.00
Excavators 6040 BH Availability % 92.71% MTD Ava 86.46% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service,Backlog Jobs 03-Feb-22 8:45 AM 04-Feb-22 8:30 AM
EX008 3.50 85.42% 1
No of Equipment 1 Total Down (Hours) 3.50
Availability Daily Report Friday, February 4, 2022
Dump Trucks
Dump Trucks 785C Availability % 92.45% MTD Ava 93.90% Number of Equip 48 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Air Cond Night Opportune C/O Timer 04-Feb-22 6:15 PM 04-Feb-22 6:45 PM
DT015 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Night Breakdown Coolant Hose Leak 05-Feb-22 3:00 AM 05-Feb-22 4:00 AM
DT017 1.00 95.83% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 2000H Service,Backlog Jobs 08-Jan-22 1:15 AM
DT019 24.00 0.00% 1 Down
Rebuild Night Planned Full Life 08-Jan-22 1:15 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Day Breakdown Noise at RH Hoist Cyl. (Mantrac) 03-Feb-22 7:30 AM 04-Feb-22 5:00 PM
DT025 12.00 50.00% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service 04-Feb-22 12:30 PM 05-Feb-22 12:00 AM
DT031 11.50 52.08% 1
Tires Day Planned C/O Front Tyres 04-Feb-22 12:30 PM 05-Feb-22 12:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
FSS Day Opportune FSS Alarm(C/O Panel Plug) 04-Feb-22 1:15 PM 04-Feb-22 1:30 PM
DT036 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Day Breakdown Hyd. Oil Control Leak 04-Feb-22 4:00 PM 04-Feb-22 8:00 PM
DT037 4.00 83.33% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Night Opportune Hyd Oil Leak 04-Feb-22 5:15 PM 04-Feb-22 6:15 PM
DT040 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 2000 H Service 04-Feb-22 5:30 PM 05-Feb-22 4:00 AM
DT041 10.50 56.25% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Day Planned Full Life 04-Feb-22 5:00 AM
DT042 24.00 0.00% 1 Down
No of Equipment 10 Total Down (Hours) 87.00
Dump Trucks 775G Availability % 100% MTD Ava 99.90% Number of Equip 5 Suspended
Availability Daily Report Friday, February 4, 2022
Ancillary
Project Excavators Availability % 100% MTD Ava 100.00% Number of Equip 2 Suspended

Wheel Loaders Availability % 66.67% MTD Ava 66.67% Number of Equip 3 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Full Life 21-Dec-21 5:00 PM
WL001 24.00 0.00% 1 Down
No of Equipment 1 Total Down (Hours) 24.00
Dozer Availability % 77.38% MTD Ava 72.58% Number of Equip 7 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service,Backlog Jobs 03-Feb-22 11:00 AM 04-Feb-22 7:00 PM
DZ003 14.00 41.67% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Full Life 17-Jun-21 3:00 AM
DZ006 24.00 0.00% 1 Down
No of Equipment 2 Total Down (Hours) 38.00
Wheel Dozers 844H Availability % 75.00% MTD Ava 74.41% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Final Drive & Diff Day Breakdown R.H front final drive oil leak 22-Jan-22 12:30 PM
WD003 24.00 0.00% 1 Down
PM Day Breakdown 500H Service,Backlog Jobs 22-Jan-22 12:30 PM

No of Equipment 1 Total Down (Hours) 24.00


Graders Availability % 69.97% MTD Ava 74.74% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Night Breakdown Check Park brake not working 13-Dec-21 1:00 AM
GR001 24.00 0.00% 1 Down
Trans and TC Night Breakdown C/O Trans. 13-Dec-21 1:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Breakdown C/O Pos# 2 05-Feb-22 3:00 AM 05-Feb-22 4:15 AM
GR002 1.25 94.79% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Night Opportune C/O Light 04-Feb-22 11:00 PM 04-Feb-22 11:15 PM
GR003 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service,Backlog Jobs 04-Feb-22 8:30 AM 05-Feb-22 2:30 AM
GR006 18.00 25.00% 1
No of Equipment 4 Total Down (Hours) 43.25
Water Trucks Availability % 70.31% MTD Ava 74.57% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Night Opportune No Brake 01-Feb-22 8:00 PM
WT002 0.00 100.00%
Availability Daily Report Friday, February 4, 2022
Brakes System Night Opportune 01-Feb-22 8:00 PM
WT002 0.00 100.00% Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Breakdown Pos# 3 Puncture 05-Feb-22 2:30 AM 05-Feb-22 4:00 AM
WT004 1.50 93.75% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Night Breakdown Brake Valve Leak 04-Feb-22 1:45 AM 04-Feb-22 11:00 AM
WT005 6.00 75.00% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Day Breakdown Check Brake Sys. 31-Jan-22 2:30 PM
WT006 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 500 H Service 03-Feb-22 9:45 PM 04-Feb-22 4:15 PM
WT007 11.25 53.13% 1
No of Equipment 5 Total Down (Hours) 42.75
Articulated Dump Truck Availability % 100% MTD Ava 100.00% Number of Equip 3 Suspended

Services Truck Availability % 100% MTD Ava 97.14% Number of Equip 2 Suspended

Integrated Tool Carrier Availability % 71.43% MTD Ava 70.31% Number of Equip 7 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Breakdown No Start/Check injector 30-Jan-22 12:00 PM
IT001 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Breakdown Fuel Pump oil Leak(Bolts Loose) 01-Feb-22 6:30 AM
IT002 24.00 0.00% 1 Down
No of Equipment 2 Total Down (Hours) 48.00
Compact Roller Availability % 100% MTD Ava 100.00% Number of Equip 2 Suspended

Telehandler Availability % 70.49% MTD Ava 91.23% Number of Equip 3 Suspended


Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Attachments Night Opportune Boom Broken 18-Dec-21 3:00 AM
TL001 0.00 100.00% Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown No Function 04-Feb-22 7:45 AM
TL002 21.25 11.46% 1 Down
No of Equipment 2 Total Down (Hours) 21.25