Availability Daily Report Friday, February 25, 2022

Shovels and Diggers


Shovels RH170E Availability % 70.83% MTD Ava 90.84% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
GET Day Opportune C/O 3x Tips 25-Feb-22 12:00 PM 25-Feb-22 12:15 PM
SH001 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Opportune C/O Air Filter 25-Feb-22 8:00 AM 25-Feb-22 8:15 AM
SH002 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Lubrication System Night Breakdown Bucket cut off,C/o L.H broken hose and stuck 25-Feb-22 7:00 PM 25-Feb-22 11:00 PM
SH003 4.00 83.33% 1 distributor
Lubrication System Night Breakdown C/o hose from distributor to main back wall 25-Feb-22 7:00 PM 25-Feb-22 11:00 PM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Major Welding Stoppage 24-Feb-22 1:00 AM
SH004 24.00 0.00% 1 Down
No of Equipment 4 Total Down (Hours) 28.00
Excavators RH120E Availability % 93.75% MTD Ava 87.52% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Lubrication System Night Breakdown bucket cut off,check grease leak and check 25-Feb-22 7:00 PM 25-Feb-22 9:00 PM
EX005 3.00 87.50% 2 servo pressure 50 par
Lubrication System-ELE Night Breakdown check grease system 25-Feb-22 7:00 PM 25-Feb-22 9:00 PM
Hydraulic Night Breakdown HYD oil leak, C/O hose 26-Feb-22 3:00 AM 26-Feb-22 4:00 AM
Lubrication System Day Opportune C/O Grease Hose 25-Feb-22 12:00 PM 25-Feb-22 12:15 PM

No of Equipment 1 Total Down (Hours) 3.00


Excavators RH90 Availability % 96.88% MTD Ava 92.88% Number of Equip 1 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Day Breakdown C/O L.H P.T.O Oil 25-Feb-22 10:15 AM 25-Feb-22 11:00 AM
EX007 0.75 96.88% 1
No of Equipment 1 Total Down (Hours) 0.75
Excavators 6040 BH Availability % 54.17% MTD Ava 90.81% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250 H Service , Backlog Jobs 25-Feb-22 7:00 AM
EX009 22.00 8.33% 1 Down
No of Equipment 1 Total Down (Hours) 22.00
Availability Daily Report Friday, February 25, 2022
Dump Trucks
Dump Trucks 785C Availability % 88.74% MTD Ava 92.84% Number of Equip 48 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Breakdown C/O pos 4 26-Feb-22 4:00 AM
DT006 1.00 95.83% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 2000 H Service 25-Feb-22 5:30 AM 25-Feb-22 2:30 PM
DT015 9.00 62.50% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 2000 H Service ,Backlog Jobs 24-Feb-22 6:15 AM 25-Feb-22 8:30 PM
DT016 15.50 35.42% 1
Final Drive & Diff Day Planned C/o Diff filter guard from (DT037) 24-Feb-22 6:15 AM 25-Feb-22 8:30 PM
Suspension Day Planned Reseal rear L.H suspension 24-Feb-22 6:15 AM 25-Feb-22 8:30 PM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Suspension Day Breakdown R.H Front Susp Leak 24-Feb-22 4:00 PM
DT029 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 500 H Service , Backlog Jobs 25-Feb-22 12:30 PM 25-Feb-22 9:00 PM
DT033 8.50 64.58% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Planned C/O Starter Motor 25-Feb-22 2:00 PM 25-Feb-22 5:00 PM
DT036 3.00 87.50% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Day Planned Full Life 16-Feb-22 9:00 AM
DT037 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Day Breakdown C/O 2x Hyd Hose 25-Feb-22 7:30 AM 25-Feb-22 1:30 PM
DT040 9.00 62.50% 2 Down
Final Drive & Diff Night Breakdown Noise at main drive shaft spider,C/O spider 26-Feb-22 2:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Day Planned Full Life 04-Feb-22 5:00 AM
DT042 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 500H service,backlog jobs 25-Feb-22 5:30 PM 26-Feb-22 4:00 AM
DT047 10.50 56.25% 1
Tires Night Planned C/o Front tires 25-Feb-22 5:30 PM 26-Feb-22 4:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Attachments Day Breakdown Repair Brackt L.H Mirror 25-Feb-22 1:00 PM 25-Feb-22 2:15 PM
DT048 1.25 94.79% 1
No of Equipment 11 Total Down (Hours) 129.75
Dump Trucks 775G Availability % 99.17% MTD Ava 98.68% Number of Equip 5 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown C/O Alternator 25-Feb-22 2:00 PM 25-Feb-22 3:00 PM
DT101 1.00 95.83% 1
Availability Daily Report Friday, February 25, 2022
No of Equipment 1 Total Down (Hours) 1.00
Availability Daily Report Friday, February 25, 2022
Ancillary
Project Excavators Availability % 100% MTD Ava 94.90% Number of Equip 2 Suspended

Wheel Loaders Availability % 66.67% MTD Ava 61.01% Number of Equip 3 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 250H service,backlog jobs 24-Feb-22 5:30 PM
WL002 24.00 0.00% 1 Down
No of Equipment 1 Total Down (Hours) 24.00
Dozer Availability % 77.38% MTD Ava 79.30% Number of Equip 7 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Full Life 17-Jun-21 3:00 AM
DZ006 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service 25-Feb-22 3:00 PM
DZ008 14.00 41.67% 1 Down
No of Equipment 2 Total Down (Hours) 38.00
Wheel Dozers 844H Availability % 90.10% MTD Ava 78.00% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Trans and TC Day Breakdown C/O 2x Hose From T.C To Pump 25-Feb-22 7:00 AM 25-Feb-22 4:30 PM
WD004 9.50 60.42% 1
No of Equipment 1 Total Down (Hours) 9.50
Graders Availability % 83.33% MTD Ava 76.85% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Night Breakdown Check Park brake not working 13-Dec-21 1:00 AM
GR001 24.00 0.00% 1 Down
Trans and TC Night Breakdown C/O Trans. 13-Dec-21 1:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Attachments Night Opportune Tip CYL pin loose,welding 25-Feb-22 11:00 PM 25-Feb-22 11:30 PM
GR003 0.00 100.00%
No of Equipment 2 Total Down (Hours) 24.00
Water Trucks Availability % 99.83% MTD Ava 84.68% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Day Planned Re-torque pos 3 25-Feb-22 6:00 AM 25-Feb-22 6:15 AM
WT005 0.25 98.96% 1
No of Equipment 1 Total Down (Hours) 0.25
Articulated Dump Truck Availability % 100% MTD Ava 98.22% Number of Equip 3 Suspended
Availability Daily Report Friday, February 25, 2022

Services Truck Availability % 100% MTD Ava 99.52% Number of Equip 2 Suspended

Integrated Tool Carrier Availability % 85.71% MTD Ava 80.96% Number of Equip 7 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Breakdown Fuel Pump oil Leak(Bolts Loose) 01-Feb-22 6:30 AM
IT002 24.00 0.00% 1 Down
PM Day Breakdown 250H Service 01-Feb-22 6:30 AM

No of Equipment 1 Total Down (Hours) 24.00


Compact Roller Availability % 100% MTD Ava 100.00% Number of Equip 2 Suspended

Telehandler Availability % 66.67% MTD Ava 73.65% Number of Equip 3 Suspended


Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Attachments Night Opportune Boom Broken 18-Dec-21 3:00 AM
TL001 0.00 100.00% Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Final Drive & Diff Day Breakdown RH Front Hub Not Move 15-Feb-22 8:00 AM
TL002 24.00 0.00% 1 Down
No of Equipment 2 Total Down (Hours) 24.00