Professional Documents
Culture Documents
DDS Duct Deluge System For The Protection of Ventilation Ductwork Handling Corrosive Gases General Description
DDS Duct Deluge System For The Protection of Ventilation Ductwork Handling Corrosive Gases General Description
www.tyco-fire.com
Contacts
Protection
Sheets, the applicable standards of the
• Copper Mineral Processing NATIONAL FIRE PROTECTION ASSO-
CIATION, in addition to the standards of
• Lead Mineral Processing
• Zinc Mineral Processing
any other authorities having jurisdiction. Objectives
Failure to do so may impair the perfor-
• Coal Power Generation mance of this system. The TYCO DDS Duct Deluge System is
intended to reduce fire hazards inher-
• Semiconductor Fabrication The owner is responsible for main- ent in industrial exhaust systems and
taining their fire protection system prevent fire spread via these systems,
• Pulp & Paper Facilities and devices in proper operating con- whether within buildings or between
dition. Contact the installing contrac- adjacent buildings.
CAUTION tor or product manufacturer with any
This system is unique in its intent and questions. The DDS System components are
design. Anyone involved at any level capable of withstanding environments
must thoroughly understand the limita-
tions and capabilities of such systems.
Approvals & in which extremely corrosive gases may
be present, including but not limited to:
Application • Hydrochloric acid (HCL)
Criteria
• Hydrofluoric acid (HF)
• Sulfuric Acid (H2SO4)
The components of the TYCO DDS • Nitric Acid (HNO3)
Duct Deluge System are Factory Mutual
(FM) Approved for use in extremely • Sulfur Dioxide (SO2)
corrosive environments.
IMPORTANT
Refer to Technical Data Sheet The DDS System is intended for use
TFP2300 for warnings pertaining to in plastic ventilation ductwork con-
regulatory and health information. structed of Fiber-Reinforced Plastic
PROTECTOWIRE
ZONE CONNECTION
BOX
MAXIMUM
PROTECTOWIRE NOZZLE MAXIMUM
LINEAR HEAT TO HEAT NOZZLE
DETECTOR CABLE DETECTOR SPACING IN
RUN BETWEEN SPACING: VERTICAL
ZONE BOXES 3 FEET DUCTS:
(0,9 m) 24 FEET
(TYPICAL) (7,3 m)
FIELD WIRING
FROM CONTROL
PANEL TO FIRST
ZONE BOXES VIA
FLEXIBLE CONDUIT FLEXHEAD FLEXHEAD
FLEXIBLE HOSE DETACHABLE MOUNTING
SUPPLY ASSEMBLY BLOCK ASSEMBLY
PIPE
RED-E CABINET
(DV-5 DELUGE
VALVE WITH DUCT MAXIMUM TYPE PROTECTOWIRE
ELECTRIC NOZZLE DN-5 LINEAR HEAT
ACTUATION SPACING IN NOZZLE DETECTOR LOOP
TRIM) HORIZONTAL
DUCTS:
WATER 12 FEET
SUPPLY (3,7 m)
FIGURE 1
DDS DUCT DELUGE SYSTEM
SCHEMATIC DIAGRAM
TABLE A
DDS DUCT DELUGE SYSTEM
COMPONENTS
1/2" NPT
THREAD
WATERWAY Nozzle
BLOW-OFF Installation
2-9/16"
(65,1 mm)
PLUG WITH
INTEGRATED Instructions
O-RING
The TYCO Type DN-5 Corrosion Resis-
1-15/16"
tant Duct Nozzles must be installed in
(49,2 mm)
FRAME accordance with this section.
NOMINAL Step 1. With pipe-thread sealant
SPLITTER applied to nozzle pipe threads, hand
tighten nozzle into Mounting Block
until the O-Ring makes contact with the
DEFLECTOR
Mounting Block Sealing Surface, then
continue hand tightening the nozzle
1-7/8" NOTE: HALAR coating on all nozzle another 1/4 to 1/2 turn.
(47,6 mm) surfaces except 1/2" NPT thread.
FIGURE 2 CAUTION
TYPE DN-5 CORROSION RESISTANT DUCT NOZZLE Do not hand tighten more than 1/4 to
ASSEMBLY 1/2 turn once the Type DN-5 Nozzle is
seated to the Mounting Block Sealing
Surface. Over-tightening may result in
equipment failure.
Use of a metal wrench when installing
the Type DN-5 Nozzle may damage the
nozzle coating and decrease the nozzle
FLEXHEAD corrosion resistance.
FLEXIBLE HOSE
ASSEMBLY Step 2. Ensure Type DN-5 Nozzle
THREADED OUTLET O-Ring is firmly seated between Nozzle
PIPE CONNECTION and Mounting Block Sealing Surface.
(FIGURE 730 Correctly installed O-Ring forms a seal
MECHANICAL around the Type DN-5 Nozzle pipe
TEE SHOWN) SUPPLY threads.
PIPE
Step 3. Ensure Blow-Off Plug is fully
seated into nozzle waterway.
Care and
Maintenance
FLEXHEAD
FLEXHEAD FIXED The TYCO DDS Duct Deluge System
DETACHABLE
LOWER MOUNTING UPPER MOUNTING
must be maintained and serviced in
BLOCK WITH ADHESIVE BLOCK WITH accordance with this section.
GASKET Before closing a fire protection system
control valve for inspection or main-
DUCT tenance work, obtain permission to
shut down the affected fire protection
system from the proper authorities
and notify all personnel who may be
BLOW-OFF affected by this action.
PLUG O-RING
FLUSH WITH Exercise care to avoid damage to the
TYPE DN-5 MOUNTING TYCO DDS Duct Deluge System com-
NOZZLE BLOCK ponents before, during, and after instal-
lation. Replace components damaged
by improper handling, dropping, strik-
ing, or the like.
FIGURE 3
Water spray systems for fire protec-
DN-5 CORROSION RESISTANT DUCT NOZZLE
tion service require regularly sched-
INSTALLATION
uled care and maintenance by trained
personnel.
NOTICE
It is recommended that TYCO DDS
Duct Deluge System components be
inspected six months after installa-
tion. Inspect components located in
TFP870
Page 5 of 6
HYDRAULIC REQUIREMENTS
D FLOW
DUCT SIZE NOZZLE NOZZLE EACH NOZZLE
FEET QTY POSITION GPM NOTES:
(METERS) (LPM) 1. MEASURED ALONG SURFACE
CONTOUR OF DUCT
20 2. CONTACT FM APPROVALS FOR
Less than 4 (1,2) 1 X (75,7) APPLICATIONS REQUIRING
GREATER VARIATION
30
4 (1,2) TO 8 (2,4) 1 X (113,6)
Greater than 8 (2,4) 20
2 Y and Z
to 16 (4,9) (75,7)
A A
X A A
NOZZLE
POSITION Y Z
VARIATION
NOMINAL
NOZZLE
POSITION
DUCT DUCT
NOZZLE
POSITION
VARIATION
D D
FIGURE 4
NOZZLE HYDRAULIC REQUIREMENTS
AND POSITION VARIATION