Professional Documents
Culture Documents
Daily Production Report CNC & VMC (24.2)
Daily Production Report CNC & VMC (24.2)
PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING CYCLE
NO. ERP Code DESCRIPTION QTY NAME TIME IN TIME IN
MINUTES MINUTES
Authorised By :
Prepared By : MR/Department Head
Format No. :
e Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
LODING
UNLODING TOTAL TOTAL OK REWORK REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL QTY Remarks
IN MINUTES HOURS QTY QTY
MINUTES
1 238 3.97 14 0 0
Signature:
PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING
ERP Code
NO. DESCRIPTION QTY NAME TIME IN
MINUTES
Total Producti
Breakdown details & Time (If any): 5 Minute Insert Change
Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
LODING
CYCLE TOTAL TOTAL OK REWORK
UNLODING REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL Remarks
TIME IN HOURS QTY
MINUTES IN MINUTES QTY QTY
MINUTES
20 2 42 0.70 1 0 0
15 2 37 0.62 1 0 0
60 2 82 1.37 1 0 0
10 22 52 0.87 1 0 0
20 0.33 1 0 0
Signature: