Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Machine Shop Productio

Operater Name: Bhavin Dodiya Machine Model : CNC

PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING CYCLE
NO. ERP Code DESCRIPTION QTY NAME TIME IN TIME IN
MINUTES MINUTES

1 Nut Stopper 126 Drilling 90 1

2 Manual Piece 14 OD,Face,Drilling 168 4

Total Production Hours o


Breakdown details & Time (If any):

Authorised By :
Prepared By : MR/Department Head
Format No. :
e Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021

Shift: Day Date: 24 February 2022

LODING
UNLODING TOTAL TOTAL OK REWORK REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL QTY Remarks
IN MINUTES HOURS QTY QTY
MINUTES

1 342 5.70 126 0 0

1 238 3.97 14 0 0

Total Production Hours of the Day: 9.67

Signature:

Approved By : MR/Department Head


Machine Shop Pr

Operater Name: Dafda Rahul Machine Model :

PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING
ERP Code
NO. DESCRIPTION QTY NAME TIME IN
MINUTES

1 Level Gauge Plate 1 Milling 20

2 25mm Boring 1 Boring 20

3 Holl Counter Application Rework 1 Drilling 20

4 TS Side clamp pad 1 Milling 30

5 Rail HGR 15-130L 1 Milling 20

6 Tailstock Pin Guide Block 1 Drilling,Boring 20

7 Tailstock Clamping pad 95 Drilling 60

Total Producti
Breakdown details & Time (If any): 5 Minute Insert Change

Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021

VMC Shift: Day Date: 24 February 2022

LODING
CYCLE TOTAL TOTAL OK REWORK
UNLODING REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL Remarks
TIME IN HOURS QTY
MINUTES IN MINUTES QTY QTY
MINUTES

20 2 42 0.70 1 0 0

15 2 37 0.62 1 0 0

60 2 82 1.37 1 0 0

120 3 153 2.55 1 0 0

10 22 52 0.87 1 0 0

20 0.33 1 0 0

3 1 440 7.33 95 0 0 Night

Total Production Hours of the Day: 13.77

Signature:

Approved By : MR/Department Head

You might also like