Professional Documents
Culture Documents
Daily Production Report CNC & VMC (28.2)
Daily Production Report CNC & VMC (28.2)
PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING
NO. ERP Code DESCRIPTION QTY NAME TIME IN
MINUTES
Total Production H
Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
205 3.42
Signature:
Total P
Breakdown details & Time (If any): 30 minutes machine cleaning
Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
PROGRAM LODING
SETTING CYCLE UNLODING TOTAL OK REWORK REJECTION MATERIAL
TIME IN CYCLE TIME TOTAL HOURS
PRODUCTION
MATERIAL MATERIAL
TIME IN TIME IN QTY
MINUTES IN MINUTES QTY QTY
MINUTES MINUTES
30 50 2 186 3.10 3 0 0
60 90 5 155 2.58 1 0 0
10 20 5 35 0.58 1 0 0
15 2 1 27 0.45 4 0 0
5 1 240 4.00 40 0 0
40 4 2 310 5.17 45 0 0
Signature:
Remarks
Night
Night