TENDER DOCUMENT
Tender No: 4241-GRC-CE-C-HQ-49-2020 Closing Date/Time: 01/04/2021 12:00
CE/CON acting for and on behalf of The President of India invites E-Tenders against Tender No 4241-GRC-CE-C-HQ-49-2020 Closing
Date/Time 01/04/2021 12:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers
are not allowed against this tender, and any such manual offer received shall be ignored.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.
1. NIT HEADER
2. SCHEDULE
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule A-Execution of all works as detailed in schedule 7989894.73
Below/Par
Please see Item Breakup for details. 8769503.60 (-) 8.89 7989894.73
1
Description:- Earthwork under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule B-Execution of all works as detailed in schedule 29729465.54
Below/Par
Please see Item Breakup for details. 21087718.50 40.98 29729465.54
2
Description:- Carriage of Materials under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule C-Execution of all works as detailed in schedule 20513190.67
Below/Par
Please see Item Breakup for details. 9867329.20 107.89 20513190.67
3
Description:- Plain Cement Concrete under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule D-Execution of all works as detailed in schedule 14546052.32
Below/Par
Please see Item Breakup for details. 7642141.60 90.34 14546052.32
4
4
Description:- Reinforced Cement Concrete under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule E-Execution of all works as detailed in schedule 45304857.17
Below/Par
Please see Item Breakup for details. 34316662.00 32.02 45304857.17
5
Description:- Supply of Reinforcement Steel & Anti Corrosive Reinforcement Bars under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule F-Execution of all works as detailed in schedule 6142742.93
Below/Par
Please see Item Breakup for details. 2501728.00 145.54 6142742.93
6
Description:- Brick Work under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule G-Execution of all works as detailed in schedule 9596358.79
Below/Par
Please see Item Breakup for details. 6421116.62 49.45 9596358.79
7
Description:- Steel & Aluminium Work under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule H-Execution of all works as detailed in schedule 23580946.64
Below/Par
Please see Item Breakup for details. 16205722.38 45.51 23580946.64
8 Description:- Flooring, Paving & Dado, Roofs & Ceilings and Dismantling & Demolishing under SERUSSOR -
2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule I-Execution of all works as detailed in schedule 23626241.85
Below/Par
Please see Item Breakup for details. 10652528.00 121.79 23626241.85
9
Description:- Bridge Work under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule J-Execution of all works as detailed in schedule 19202172.48
Below/Par
Please see Item Breakup for details. 12642989.52 51.88 19202172.48
10
Description:- Misc. Bridge Work under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule K-Execution of all works as detailed in schedule 723450.00
Below/Par
Lump Sum 500000.00 44.69 723450.00
11
Description :- Lump Sum Work for chapter 16 under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule L-Execution of all works as detailed in schedule 2250900.00
Below/Par
Lump Sum 1500000.00 50.06 2250900.00
12 Description :- Lump Sum Work except the items covered under schedules A to K, Q & X under SERUSSOR -
2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule M-Execution of all works as detailed in schedule 5531500.00
Below/Par
Lump Sum 2500000.00 121.26 5531500.00
13
Pa g e 2 o f 39 Ru n Da te/Time: 15 /0 3/2 0 2 1 16 :39 :5 0
SER-CONST-HQ-ENGG/SOUTH EASTERN RLY
TENDER DOCUMENT
Tender No: 4241-GRC-CE-C-HQ-49-2020 Closing Date/Time: 01/04/2021 12:00
13
Description :- Lump Sum Work under SERSOR - 2001
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule N-Execution of all works as detailed in schedule 65250000.00
Below/Par
Please see Item Breakup for details. 65250000.00 AT Par 65250000.00
14
Description:- Supply of Ballast under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule O-Execution of all works as detailed in schedule 19218584.80
Below/Par
Please see Item Breakup for details. 19218584.80 AT Par 19218584.80
15
Description:- P. Way Works under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule P-Execution of all works as detailed in schedule 21585000.00
Below/Par
Please see Item Breakup for details. 21585000.00 AT Par 21585000.00
16
Description:- Supply of Portland Slag Cement under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule Q-Execution of all works as detailed in schedule 9842490.63
Below/Par
Please see Item Breakup for details. 7906250.00 24.49 9842490.63
17
Description:- Supply of Ordinary Portland Cement under SERUSSOR - 2010
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule R-Execution of all works as detailed in schedule 246329200.00
Below/Par
Please see Item Breakup for details. 246329200.00 AT Par 246329200.00
18
Description:- Earthwork & Blanketing under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule S-Execution of all works as detailed in schedule 31576150.00
Below/Par
Please see Item Breakup for details. 31576150.00 AT Par 31576150.00
19
Description:- Misc. Work under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule T-Execution of all works as detailed in schedule 7370000.00
Below/Par
Please see Item Breakup for details. 7370000.00 AT Par 7370000.00
20
Description:- Geo textile under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule U-Execution of all works as detailed in schedule 4344.00
Below/Par
Please see Item Breakup for details. 4344.00 AT Par 4344.00
21
Description:- P.Way Fittings under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule V-Execution of all works as detailed in schedule 885890.00
Below/Par
Please see Item Breakup for details. 885890.00 AT Par 885890.00
22
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule W-Execution of all works as detailed in schedule 2222774.40
Below/Par
Please see Item Breakup for details. 2222774.40 AT Par 2222774.40
23
Description:- Maintainance of Track in Section under Non SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule X-Execution of all works as detailed in schedule 461500.84
Below/Par
Please see Item Breakup for details. 51948.00 788.39 461500.84
24
Description:- Metalizing under SERUSSOR - 2010
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule Y-Execution of all works as detailed in schedule 133510.00
Below/Par
Please see Item Breakup for details. 133510.00 AT Par 133510.00
25
Description:- Slope Stability Analysis under Non SERUSSOR - 2010
3. ITEM BREAKUP
6 014110 Providing and removing barricading with the help of Metre 7000.00 245.84 1720880.00
portable fencing along the running track where the work
is to be done in close vicinity of the track. Fencing shall
consist of self supporting steel angles of size 50
x50x6mm, 1.5m long provided with hooks etc. and
embedded in CC 1:2:4 block of size 0.23x0.23x0.23M
placed at c/c distance of 2.0 M along the track. 12 mm
dia rods in three horizontal layers tack welded with the
angle posts including providing Retro-reflective tapes in
Horizontal & vertical direction. Note : Released material
will be the property of the contractor after the completion
of work. Cost of cement to be paid separately.
Total 8769503.60
Schedule Schedule B-Execution of all works as detailed in schedule
Item- 2 Carriage of Materials under SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 021150 Leading miscellaneous materials such as iron work, rails, MT 8750.00 160.31 1402712.50
fittings & fastenings, pipes, wooden logs, stones over
pitching stone size, RCC/PCC beams / slabs etc and all
similar articles (each individual article or bundle being
not more than 3.5 metres long in the longest direction)
including all loading, unloading and stacking, lead over
500m and upto 10 km. Note : Lead under this item is
payable when the same exceeds 500m.
2 021151 Additional lead for every subsequent km or part thereof, MT/Km 800000.00 7.25 5800000.00
over 10 km and upto 100 km over item no. 021150.
3 021152 Additional lead for every subsequent km or part thereof, MT/Km 1840000.00 6.62 12180800.00
over 100 km and upto 400 km over item no. 021150
&.021151
4 021153 Additional lead for every subsequent km or part thereof, MT/Km 140000.00 5.58 781200.00
over 400 km and upto 1000 km over item nos. 021150,
021151 & 021152
5 021170 Leading miscellaneous materials such as iron work, rails, MT 850.00 171.47 145749.50
pipes, wooden logs, stones over pitching stone size,
RCC/PCC beams / slabs etc. and all similar articles
(each individual article or bundle being more than 3.5
metres long in the longest direction) by truck, trailor, etc
including all loading, unloading and stacking, lead over
500m and upto 10 km. Note : Lead under this item is
payable when the same exceeds 500m.
6 021171 Additional lead for every subsequent km or part thereof, MT/Km 76500.00 8.40 642600.00
over 10 km and upto 100 km over item no. 021170
7 021172 Additional lead for every subsequent km or part thereof, MT/Km 21250.00 6.31 134087.50
over 100 km and upto 400 km over item nos. 021170
&.021171
8 021173 Additional lead for every subsequent km or part thereof, MT/Km 100.00 5.69 569.00
over 400 km and upto 1000 km over item nos. 021170,
021171 & 021172
Total 21087718.50
Schedule Schedule C-Execution of all works as detailed in schedule
Item- 3 Plain Cement Concrete under SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
Providing and laying in position cement concrete of
specified proportion excluding cost of cement, centering
and shuttering - All works upto Plinth level :
1 031011 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate cum 50.00 1593.12 79656.00
20mm nominal size)
Providing and laying in position cement concrete of M 20
grade, excluding the cost of cement and of centering
and shuttering, as per direction of the Engineer in
charge :
2 031051 All works upto Plinth level cum 3600.00 1754.79 6317244.00
3 031052 All works above plinth level in retaining walls, walls (of cum 250.00 1866.36 466590.00
any thickness) including attached pilasters, columns,
pillars, posts, struts, buttresses, anchor blocks, parapets,
copings, bed blocks, string or lacing courses, window
sills, fillets, kerbs, steps etc.
Centering and shuttering including strutting, propping
etc. and removal of form work for :
4 031061 Foundations, footings, bases of columns Sqm 16130.00 129.28 2085286.40
Providing and fixing at or near ground level, Precast M
20 grade cement concrete as per approved design and
setting in position with cement mortar 1:3 (1 cement : 3
coarse sand), including the cost of required centering
and shuttering complete but excluding the cost of
cement.(cast at site)
5 032031 in kerbs, edging etc. cum 40.00 1910.75 76430.00
6 032032 in ash pit stones, platform coping stones etc. cum 360.00 2339.23 842122.80
Total 9867329.20
Schedule Schedule D-Execution of all works as detailed in schedule
Item- 4 Reinforced Cement Concrete under SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
Providing and laying in position M 20 Grade concrete for
reinforced concrete structural elements but excluding
cost of centering, shuttering, reinforcement and
Admixtures in recommended proportion (as per IS:9103)
to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as
per direction of Engineer in charge
1 041011 All work upto plinth level, including raft foundation of cum 950.00 2123.57 2017391.50
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc.
2 041012 All work in buildings above plinth level upto floor two cum 1000.00 2363.49 2363490.00
level.
3 041015 In kerbs, steps and the likes etc. cum 10.00 2062.63 20626.30
Centering and shuttering including strutting, propping
etc. and removal of form for :
4 042011 Foundations, footings, bases of columns, raft foundation Sqm 1600.00 128.80 206080.00
of washable aprons, Pile caps, Footings of FOB etc.
5 042012 Walls (any thickness) including attached plasters, Sqm 3500.00 212.70 744450.00
buttresses, plinth and string courses etc.
6 042013 Suspended floors, roofs, landings, balconies, FOB slabs, Sqm 1300.00 205.20 266760.00
walkway slabs and access platform
7 042014 Lintels, beams, plinth beams, bed blocks, girders, Sqm 2200.00 180.45 396990.00
bressumers and cantilevers
8 042015 Columns, pillars, , posts and struts Sqm 900.00 266.90 240210.00
9 042016 Stairs (excluding landings) except spiral-staircases Sqm 10.00 245.40 2454.00
Centering and shuttering including strutting, propping
etc. and removal of form for special shapes
10 042025 Edges of slabs and beams in floors and walls under 20 Metre 200.00 73.60 14720.00
cm wide
11 042026 Edges of slabs and beams in floors and walls above 20 Sqm 50.00 340.90 17045.00
cm wide
26 109200 Providing and fixing permanently colour coated Sqm 1000.00 660.47 660470.00
trapezoidal profiled sheet of depth 28-30mm at 195-
205mm pitch distance with precisely engineered 'Rib &
Flute" design. Profiled sheets shall be min. 0.5mm
TCT/0.45mm BMT high tensile zinc aluminium alloy
coated zincalume / galvalume steel sheet (550 mpa yield
strength) having a coating of mass of 150 gsm zinc-
aluminium coating AZ-150 total on both sides as per, AS
1397:1993 finished with 20 microns approved colour
coating of Silicon Modified Polyester (SMP) / Super
Polyester paint coat on exposed surface over a primer
coat of 5 microns and a back coat of 5 microns on
reverse side over a 5 microns primer coat. There shall
be 2 small ribs/square flutes between profiles for
providing additional strength. The sheet to be fixed over
the purlins with hexagonal head self drilling suitable
fasteners with neoprene / EPDM washer on crests of the
sheet
27 109220 Providing and applying water proofing treatment to RCC Sqm 900.00 705.65 635085.00
roof slab etc. by application of two coats of cement slurry
mixed with water proofing compound (Acrylic based
polymer, solid content 30% ±3, pH >7) in the ratio of 1:2
(1 part of water proofing compound : 2 parts of cement
by weight), followed by two coats of single component
moisture cured polyurethane based elastomeric water
proofing coating conforming to ASTM C-836-89 having
tensile strength 3.1 N/mm². Topping layer of 25 mm thick
cement concrete 1:2:4 (to be paid separately) to be laid
12 mm cement plaster of mix -
28 111011 1:4 (1cement: 4 fine sand) Sqm 2000.00 55.63 111260.00
15 mm cement plaster on the rough side of single or half
brick wall of mix -
29 111021 1:4 (1cement: 4 fine sand) Sqm 450.00 63.82 28719.00
30 111022 1:6 (1cement: 6 fine sand) Sqm 1700.00 63.82 108494.00
31 111180 Neat cement punning Sqm 500.00 11.76 5880.00
32 112040 Providing and applying plaster of Paris putty of 2mm Sqm 500.00 66.58 33290.00
average thickness over plastered surface to prepare the
surface even and smooth complete
33 115050 Distempering two or more coats on new work with 1st Sqm 500.00 31.90 15950.00
quality acrylic washable distemper (ready mixed) of
approved manufacturer and of required shade and
colour complete as per manufacturer's specification
34 115080 Finishing walls with Deluxe Multi surface paint system for Sqm 1000.00 71.80 71800.00
interiors and exteriors using Primer as per
manufacturers specifications with two or more coats
applied @ 1.25ltr/10 sqm over and including one coat of
Special primer applied @ 0.75 ltr/10sqm
35 115110 Finishing walls with water proofing cement paint of Sqm 1500.00 36.35 54525.00
required shade two or more coats on new work applied
@ 3.84 Kg/10 sqm
36 115160 Finishing walls with Acrylic Smooth exterior paint with Sqm 1000.00 78.86 78860.00
Silicone additives of required shade on new work (Two
or more coats applied @ 1.67ltr/10 sqm over and
including one coat of water proofing cement paint
applied @ 2.20 kg/10sqm
37 115170 Finishing walls with Acrylic Smooth Interior paint of Sqm 2100.00 74.90 157290.00
required shade on new work (Two or more coats applied
@ 1.67 ltr/10 sqm over and including base coat of water
proofing cement paint applied @ 2.20 kg/10sqm
38 121020 Painting wood work with Deluxe Multi Surfaces Paint of Sqm 200.00 59.89 11978.00
required shade. Two or more coat applied @ 0.90ltr/
10sqm over an under coat of primer, applied @ 0.75ltr/
10sqm of approved brand or manufacture
39 121030 Painting Steel work with Deluxe Multi Surface Paint to Sqm 200.00 62.48 12496.00
give an even shade. Two or more coats applied @
0.90ltr/ 10sqm over an under coat of primer applied @
0.80ltr/ 10sqm of approved brand or manufacture
40 136150 Providing and placing on terrace/staging (at all heights) Litre 5000.00 8.03 40150.00
polyethylene water storage tank ISI : 12701 marked with
cover and suitable locking arrangement and making
necessary holes for inlet, outlet and overflow pipes but
without fittings and the base support for tank
Providing, laying and jointing glazed stoneware pipes
grade 'A' as per IS:651 including bends etc. with stiff
mixture of cement mortar in the proportion of 1:1
(1cement : 1fine sand) including testing of joints etc.
complete
41 141011 100mm diameter Metre 300.00 150.72 45216.00
42 141012 150mm diameter Metre 300.00 258.87 77661.00
Providing and laying cement concrete 1:4:8 (1cement:
4coarse sand: 8graded stone aggregate 40mm nominal
size) all round S.W. pipes including bed concrete as per
standard design
43 141031 100mm diameter S.W. pipe Metre 300.00 220.33 66099.00
44 141032 150mm diameter S.W. pipe Metre 300.00 269.45 80835.00
Making soak pit 2.5m diameter 3.0m deep with 45x45cm
dry brick honey comb shaft with bricks of class
designation 7.5 and S.W. drain pipes 100mm diameter,
1.8m long complete as per standard design, including
excavation complete
45 143271 With F.P.S. bricks Each 5.00 11196.28 55981.40
Providing and fixing water closet squatting pan (Indian
type W.C. pan) with 100mm sand cast iron P or S trap,
10litre low level white P.V.C. flushing cistern with
manually controlled device (handle lever) conforming to
IS : 7231, with all fittings and fixtures complete including
cutting and making good the walls and floors wherever
required
46 151011 White Vitreous China Orissa pattern W.C. pan of size Each 5.00 2687.46 13437.30
580x440-mm with integral type foot rests
Providing and fixing white vitreous china flat back or wall
corner type lipped front urinal basin of 430x260x350mm
and 340x410x265mm sizes respectively with automatic
flushing cistern , with standard flush pipe and C.P. brass
spreaders with brass unions and G.I. clamps complete,
including painting of fittings and brackets, cutting and
making good the walls and floors wherever required
47 151041 One urinal basin with 5litre white P.V.C. automatic Each 5.00 2386.80 11934.00
flushing cistern
Providing and fixing one piece construction white
vitreous china squatting plate with an integral
longitudinal flushing pipe, white, P.V.C. automatic
flushing cistern, with fittings, standard size G.I. flush pipe
for back and front flush with standard spreader pipes
with fittings, G.I. clamps and C.P. brass coupling
complete including painting of fittings and cutting and
making good the walls and floors etc. wherever required
48 151061 Single squatting plate of 600x350 mm size with 5 litre Each 5.00 3462.24 17311.20
P.V.C. automatic flushing cistern
Providing and fixing wash basin with C.I./ M.S. brackets,
15mm C.P. brass pillar taps, 32mm C.P. brass waste of
standard pattern, including painting of fittings and
brackets, cutting and making good the walls wherever
required
49 151072 white vitreous china wash basin size 630x450mm with a Each 5.00 1500.37 7501.85
single 15mm C.P. brass pillar taps
50 171420 Supplying, fitting, fixing & installing including boring of 40 Each 7.00 46729.06 327103.42
mm dia hand tube well assembly India Mark II having
total depth of 50 metres with the following components
as per IS:9301 : i) Hand pump (single acting) India mark
- II galvanised as per IS : 9301 - 90. ii) Brass strainer
mesh type made of long slotted medium B class G.I.
pipes with 80-mesh brass wire net wrapping around the
perforated pipe and jacketed by 26 / 28 SWG brass
perforated sheet. 40 mm dia (2 lengths of each 1.83 m
connected with G.I. socket). iii) C.I. cylinder with G.M.
parts India mark - II 65 mm dia x 0.45 m long as per IS:
9301 - 90. iv) G.I. casing pipe 100 mm dia medium
quality ISI marked 18 m long. v) G.I. pipe 40 mm dia
medium quality ISI marked 28.35 m long. vi) 32 mm dia
G.I. pipe (riser) medium quality ISI marked 17 m long.
vii) 12 mm dia bright bar electro galvanised connecting
rod, 3.0 m long each as per IS : 9301 of length as
required. viii) all accessories as per IS: 9301 -90 such as
G.I. reducing socket 100 mm x 40 mm, C.I. plug cutter
40 mm, base plate, M.S. nuts & bolts etc. The work also
includes priming, development and testing of the yield
(which should be sufficient enough) for seven days with
all labour, material, tools and plants complete. ix) 40 mm
dia G.I. ISI marked medium quality hanging pipe to the
extent of 17 m. x) all accessories such as C.I. plug cutter
40 mm, base plate, M.S. nuts & bolts etc. as required .
The work also includes priming & development and
testing of the yield (which should be sufficient enough)
for seven days with cost of labour and material, all tools
and plants complete in all respect
Extra for providing the following type of strainer instead
of Brass strainer mesh type
51 171503 Stainless steel jacketed strainer 40 mm dia x 1.83 m Each 7.00 595.08 4165.56
long
52 171690 Providing & applying Pre-Construction Anti-Termite Sqm 1000.00 77.28 77280.00
treatment to proposed structure, with application of
Imidacloprid 30.5% SC @ o.075% concentration mixed
with water in ratio of 1:475, as per detailed specifications
given in Indian Railways Standard Specifications, so as
to create a chemical barrier below and around the
structure by an approved agency. (Plinth Area/Basement
floor area shall be considered for Payment)
Demolishing plain cement concrete including disposal of
material within 50m lead
53 181021 1:2:4 or richer mix with max. 20 mm coarse aggregate cum 35.00 451.85 15814.75
54 181022 Mix leaner than 1:2:4 with coarse aggregate larger than cum 15.00 276.70 4150.50
20mm
55 181030 Demolishing R.C.C. work including cutting and stacking cum 40.00 664.95 26598.00
of steel bars and disposal of unserviceable material
within 50m lead. (Extra payment for scraping, cleaning
and straightening of bars to be made separately)
56 181040 Extra over Item Nos. 181021 and 181050 if pavement cum 25.00 199.48 4987.00
breaker is used on orders of Engineer
Demolishing brick work including stacking of serviceable
material and disposal of unserviceable material within
50m lead
57 182013 In cement mortar cum 150.00 376.48 56472.00
58 183010 Dismantling cement concrete / terrazzo flooring and/or Sqm 600.00 15.15 9090.00
underlayer excluding base concrete
59 183020 Dismantling tile work in floors/dado/skirting laid in Sqm 200.00 20.21 4042.00
cement mortar/ chemical mortar/synthetic adhesive
including stacking material within 50m lead
60 185010 Dismantling doors, windows and clerestory windows Each 50.00 92.50 4625.00
(steel or wood) shutter including chowkhats, architrave,
holdfasts in CC or masonry etc. complete and stacking
within 50m lead
61 185020 Taking out doors, windows, clerestory window, cupboard Each 50.00 35.39 1769.50
shutters only (steel or wood) including stacking within
50m lead
Providing and laying water bound macadam with
specified stone aggregate, stone screening and binding
material including screening, sorting, spreading to
template and consolidation with power road roller of 8 to
10 tonne capacity etc. complete.
62 231042 Base course with 63mm to 45mm size including stone cum 1500.00 1276.05 1914075.00
screening 13.2mm size
Providing and laying bitumen penetration macadam with
hard stone aggregate, with bitumen of suitable
penetration grade including required key aggregate as
specified, spreading coarse aggregate with the help of
self propelled / tipper tail mounted aggregate spreader
and applying bitumen by a pressure distributor and then
spreading key aggregate with the help of aggregate
spreader complete including consolidation with road
roller of minimum 8 to 10 tonne capacity
63 231061 For 50mm compacted thickness using 6cum coarse Sqm 5250.00 258.20 1355550.00
aggregate of size 50-20mm graded, 1.5cum key
aggregate of size 12.5mm graded, and 500kg paving
asphalt 80/ 100 per 100sqm
64 231070 Providing and laying 4 cm thick moorum surfacing Sqm 12750.00 21.26 271065.00
(Consolidated Thickness) on platforms, pathways, etc
including spreading watering and consolidation with 3 T
Roller or light power roller complete
Providing and applying tack coat using bitumen emulsion
(Rapid setting) complying with IS: 8887- 1995, spraying
the bitumen emulsion with mechanically operated spray
unit, cleaning and preparing the existing road surface as
per specification
65 233011 On W.B.M. @ 0.4kg/ sqm Sqm 7000.00 21.79 152530.00
66 235010 Providing and laying seal coat of premixed fine Sqm 7000.00 44.02 308140.00
aggregate (passing 2.36mm and retained on 180micron
sieve) with bitumen using 128 kg of bitumen of grade 80/
100 bitumen and 0.60cum of fine aggregate per 100sqm
of road surface including rolling and finishing with road
roller all complete. Note - This should not be operated
along with Hot mix carpeting
Total 16205722.38
Schedule Schedule I-Execution of all works as detailed in schedule
Item- 9 Bridge Work under SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
Earth work in excavation for foundations and floors of
the bridges, retaining walls etc., including setting out,
dressing of sides, ramming of bottom, getting out the
excavated material, back filling in layers with approved
material and consolidation of the layers by ramming and
watering etc. incl. all lift, disposal of surplus soil upto a
lead of 300 M, all types of shoring and strutting with all
labour and material complete as per drawing and
technical specification as directed by Engineer in charge
1 192011 All kinds of soils cum 5100.00 188.47 961197.00
2 192040 Providing and laying in position machine mixed, machine cum 600.00 1622.40 973440.00
vibrated and machine batched Design Mix Cement
Concrete M35 grade (Cast - in Situ) using 20 mm
graded crushed stone aggregate and coarse sand of
approved quality in RCC raft foundation & Pile cap
including finishing, Using Admixtures in recommended
proportions ( as per IS 9103), if approved in Mix design
to accelerate or retard setting of concrete and/or
improve workability without impairing strength and
durability complete as per specifications and direction of
t h e Engineer in charge. Payment for cement,
reinforcement and shuttering shall be paid extra
3 192050 Providing and laying in position machine mixed, machine cum 700.00 1622.40 1135680.00
vibrated and machine batched Design Mix Cement
Concrete M20 grade (Cast - in Situ) using 20 mm
graded crushed stone aggregate and coarse sand of
approved quality in Abutment, pier, wing walls and return
walls of Mass cement concrete above RCC raft Including
finishing complete as per specifications and direction of
t h e Engineer in charge. Payment for cement,
reinforcement and shuttering shall be paid extra
Providing and laying in position machine mixed, machine
vibrated and machine batched Design Mix Cement
Concrete M35 grade (Cast - in Situ) using 20 mm
graded crushed stone aggregate and coarse sand of
approved quality for the following Reinforced cement
concrete structural elements up to height of 10 M from
foundation top level, including finishing, Using
Admixtures in recommended proportions ( as per IS
9103), if approved in Mix design to accelerate or retard
setting of concrete and/or improve workability without
impairing strength and durability complete as per
specifications and direction of the Engineer in charge.
Payment for cement, reinforcement and shuttering shall
be paid extra
4 192062 Wing wall and Return wall cum 900.00 1784.64 1606176.00
5 194010 Providing and laying in position machine mixed, machine cum 1550.00 1622.40 2514720.00
vibrated and machine batched Design Mix Cement
Concrete M35 grade (Cast - in Situ) In Bottom/top slab,
side walls, toe wall and sumps haunch filling head walls
or any other component using 20 mm graded crushed
stone aggregate and coarse sand of approved quality of
cast-in-situ RCC box of size upto 5 M (bigger inside
dimension) including finishing, Admixtures in
recommended proportions (as per IS 9103), if approved
in Mix design, to accelerate, retard setting of concrete,
improve workability without impairing strength and
durability, complete as per drawings and technical
specifications as directed by Engineer in charge.
Payment for cement, reinforcement and shuttering shall
be paid extra
6 194020 Providing and laying in position machine mixed, machine cum 700.00 1622.40 1135680.00
vibrated and machine batched Design Mix Mass Cement
Concrete M20 grade (Cast - in Situ) using 20 mm
graded crushed stone aggregate and coarse sand of
approved quality in Drop and curtain wall and alike
structures below bed level, Including the cost of centring,
shuttering and finishing complete as per drawings and
technical specifications as directed by Engineer.
Payment for cement & reinforcement shall be paid extra
7 195020 Providing and applying two coats of coal tar or bitumen Sqm 5300.00 86.15 456595.00
confirming to IS 3117 - 1965 on the top and sides of
RCC box/slabs @ 1.70 Kgs / Sqm after cleaning the
surface with all labour and materials complete job as
directed by the Engineer
9 222280 Supplying, spreading and filling coarse sand (No cum 2700.00 631.72 1705644.00
cohesive materials to be used) of approved quality
including watering and ramming in foundation, plinth,
behind the abutment, wing wall, retaining wall in layers
not exceeding 150mm thick including its compaction as
per direction of Engineer-in-charge. The rate includes all
lead, lift, ascent, descent, crossing of Railway line, etc.
complete with contractor's labour, materials, tools and
plant
10 222290 Providing Boulder backing behind wing wall, return wall, cum 2420.00 147.85 357797.00
retaining wall with hand packed boulders & cobbles with
smaller size boulders toward the back including all lead,
lift, labour & other incidental charges as complete work
in all respect. Payment for boulder/cobbles will be done
extra
11 252020 Moorum cum 1500.00 373.75 560625.00
12 252390 Stone Boulder Weighing minimum 35 Kg Each cum 2420.00 498.33 1205958.60
Total 12642989.52
Schedule Schedule N-Execution of all works as detailed in schedule
Item- 14 Supply of Ballast under Non SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 1 Supplying and stacking of machine crushed hard stone cum 30000.00 2175.00 65250000.00
ballast of 50mm guage of approved quality and
conforming to R.D.S.O. latest specification (annexed) at
different locations as directed by Engineer-in-charge of
the work or his representative at site.The rate includes
all cost of materials, loading, unloading, handling,
transportation, royalty, octroi, GST and other taxes
imposed by Central/State Govt, local bodies including all
other incidental charges with all lead, lift, crossing Rly.
lines,if required,and levelling of stacking ground if
necessary. The stacking ground will be certified by the
Engineer- in -charge of the work. Notes: (i) The tenderer
shall stack the ballast over the entire length of the
section at the nearest possible stacking ground duly
certified by the Engineer-in-charge at site. No extra
payment will be made towards leading out the ballast
stacked on uncertified grounds and tenderer has to
rehandle such quantity at his /their own cost otherwise
the cost of such quantity will be recovered from the
tenderer. (ii) The ballast shall be supplied as per the
requirement given by the site engineer. Quantity
supplied extra over the required Quantity will not be
paid.
Total 65250000.00
Schedule Schedule O-Execution of all works as detailed in schedule
Item- 15 P. Way Works under Non SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
5 5 Laying Railway BG Permanent Way track in straight, Per 14.60 378997.00 5533356.20
curves, level crossings, SEJs with SR/SWR/LWR of Track
specified length to correct alignment over ballast as KM
directed by the Engineer-in-charge of work consisting of
90R/52KG/60KG new or SH rails on Railways' concrete
sleepers (oridnary or special) or any other type of
sleeper with density (M+7) or any other as directed, with
Railway's rails and fitting to proper alignment and gauge
including cutting and drilling of holes in rails with all
fittings such as ER clips, GR pads, liners (metal or GFN)
to Railways' standard as directed by the Engineer-in-
charge or his representative. Notes: THE RATE
INCLUDES FOR THE FOLLOWING: (i) Handling of rails
and sleepers to actual place of laying. (ii) Laying of
sleepers on ballast already spread to specified spacing.
(iii) Fish bolting of rails as it arises including fixing of rails
to sleepers with suitable fittings and providing correct
gap at ends as required for SR/SWR/LWR track and
greasing fish plates and oiling the fish bolts where
necessary with tenderer's grease and oil and fixing the
same in correct position as directed by Engineer-in-
charge. The rate includes fixing of Railway SEJs on the
SEJ sleepers at the locations specified by the Engineer-
in-charge or his representative. However, if SEJ sleepers
can not be provided in time by the Railway, then the
replacement cost of ordinary sleeper already laid, with
special SEJ sleeper will be paid extra @ Rs.50.00 per
SEJ sleeper. (iv) Providing initial packing, first, second,
subsequent round of through packing to obtain the
desired ballast cushion of 350mm to the concrete
sleeper track involving opening out ballast where
necessary, squaring sleeper, slewing track to correct
alignment, gauging, tightening of fittings, levelling, the
track to required cross level, packing the sleepers and
boxing the ballast to standard ballast profile as per
Indian Railway Permanent Way Manual and as directed
by Engineer-in-charge at site i.e. full ballast cushion. (v)
Drilling of holes and cutting of rails by tenderers rail
cutting machine for adjustment of the length of the rails
in curves. (vi) Marking position of sleeper on foot, web,
head of rails with tenderer's paint etc. (vii) Use of
Railway's joggled fish-plates for rail joints to be welded
and returning the same to Railway store depot after
completion of welding work. TERMS AND CONDITIONS
FOR PAYMENT: (i) After placement of concrete sleepers
over the rolled ballast cushion to required spacing and
density, including, squaring and after placing of rails in
position over concrete sleepers and fixing of rails by P.
Way fittings with concrete sleepers and connecting the
rails by fish plates and bolts/joggled fish plates and
clamps with the rails, 60% of the total rate for the item
shall become due for payment. (ii) After initial packing
and boxing and making track fit for trial run 20% of the
total rate shall become due for payment. (iii) After engine
rolling and completion of through packings, attending the
slacks, attaining full ballast cushion and full ballast profile
balance 20% of the total rate for the item shall become
due for payment. (iv) The contractor has to ensure
proper guarding of the track till handing over the section
to open line organization.
6 6 Fabrication INSITU glued insulated joints for 52/60kg Per Joint 10.00 17486.00 174860.00
rails to RDSO drawing No. 5361/5843 and confirming to
manual for glued insulated rails joints 1988 issued by
ministry of Railway, RDSO, LKO with supply of all fittings
and accessories by contractor as such. a) 1m long fish
plates b) H.T.S bolts and nuts c) Punch washer d)
insulated bushes e) insulated channels f) 10mm thick
end posts g) Araldite h) Hardener i) Glass cloth carrier
and all the materials and fittings for cleaning and
assembling excluding rail.
7 7 De-stressing of BG track with tenderer's labour, all Per 14.60 25877.00 377804.20
equipment, tools and plants, all lead and lift, consumable Track
etc., all complete. KM
8 8 Fabrication, erecting, fixing of buffer stop as per Drg. No. Numbers 1.00 67480.00 67480.00
CE-23772 with Rly's 90/52 Kg. Rails, fitting and wooden
sleeper to the assembly embeded in M:10 concrete wall
constructed with contractor's chips, cement, sand etc.
The rate included cutting of rails of required length,
bending of rails as per Drg., transporatation of rails,
sleepers, fitting etc. from any railway store/depot in KGP
divn.to work site , fixing of wooden sleepers, fish plated,
nuts & bolts, cleats,white wash of concrete structure and
painting of wooden sleepers with special paint, earth
work in foundation etc. including all taxes, labour
charges, GST all complete.
9 9 Manufacturing, supplying and fixing of small boards such Sqm 3.00 1436.00 4308.00
as curve/LWR/SEJ/Bridge/other warning boards as per
requirement/reference board with 16SWG MS sheet,
painting and lettering with porcelain vitreous enamel
painting as directed by Engg.-in-charge. The board
should be fixed to Rly's unserviceable. The size and
detials of the baords shall be furnished by the Engg-in-
charge.
10 10 Extra for fixing of various type of safety boards where Each 30.00 702.00 21060.00
ever applicable with tenderer's' cement and aggregate
and sand and other consumable item including all lead,
lift, ascent, decent, labour, crossing one or more Railway
line where arising, etc. Note: This item will be applicable
only for those items for the boards where the item 'fixing'
is not included in the Supply of Boards item.
11 11 Slewing of existing track latterally upto 3.0m to suite Per 100.00 654.00 65400.00
alignment with the proposed work. The work have to be Track
executed under traffic block as and when obtained and Metre
no extra payment for idle of labour will be paid
seperately.The rate includes packing of track to make
track fit for movement of traffic immediate after
cancelletion of block.
12 12 Manufacturing and supply SPEED indicator board 1000 Numbers 4.00 11558.00 46232.00
mm equilateral trangle made out of 2 mm thick
alluminium alloy sheet confirming to IS 736 with back
support of MS angle 25x25x3. The entier face of the
board shall be coverd with Yellow high intensity
encapsulated sheeting with HLVA prosses. The Speed
figure shall be cut out black high intensity encapsulated
sheeting and provided on the base sheet with HLVA
prosses. The speed figure will be supplied by Engineer-
in-charge.
13 13 Manufacturing, supplying caution indicator boards as Numbers 4.00 14052.00 56208.00
shown in IRPW mannual made on the 14 gauge
alluminium alloy sheet with back support of MS angle 25
x 25 x 3 mm .The entire face of the sign shall be covered
with yellow and black high intensity encapsulated type
retro reflective sheeting .The board should be fixed in
Railway's un serviceable rails as directed by Engineer-in-
charge.
23 23 Supply of labour with all tools and equipment required to Kilometre 14.60 14746.00 215291.60
carry out pre- tamping, post tamping and during tamping
works during packing of B.G. track with Railway's tie-
tamping machine, including loop lines in yard ,to bring
the track to requisite Track standard. The rate includes
labour required to perform all pre-tamping and post
tamping work covered by IRPWM, boxing and dressing
of ballast to bring it to required profile etc., complete with
tenderer's labour, tools and plants as required. B) 2nd
packing.
24 24 Supplying , fitting fixing and erecting at site standerd Each 4.00 293016.00 1172064.00
type of lifting barrier gate (8m long) to RDSO Drg
No.SA8836 with provision of boom , locking to S.E.
Railway's Drg No. SI-9964 etc. Including interlocking
frame ground type of DRg No. SA-922 and supplying
and assembling different parts related to the work such
as winch to RDSO 's Drg. No. SA-8132 foundation A type
wheels horizontal , vertical rope, wheels , wire adjusting ,
screws stake pulley . "F" type lock with key , wire rope of
required length, screws , lamp , signal, cranks, roller
guides, compenseting , GI pipe of required length and all
components as per site requirement complete including
contractors materials , all taxes , lead , lift, painting etc.
complete(concreting works in foundation are payble
separately).
25 25 Manufactering, suply and instalation of rubberized level Per 15.00 115856.00 1737840.00
crossing pads of approved quality and specification, as Track
Rly. track by suitable clamping arrangments to make Metre
arubberized road . The road surface is to be prepered
by using multiple"set" of rubber pads of length 1.20 M
each and each set consist of 02 nos. rubber pads placed
inside the running rails and 02 nos .out side the running
rail on RCC edge beam at the edge to retain the
assembly as per approved drawing. The cement & steel
for this will be supplied by contractor and is included in
the rates. No separate payment shal be made.
26 26 Hire charges for erection and fixing of temporary tent of Day 10.00 1039.00 10390.00
Size 3mX3m for oparational facility during NI working at
desired location as per insrtruction of Engineer in charge
of his representative . The rate includes dismentling the
same after completion of NI(Each tent will be provided
with 6 chairs and 2 tables). Note: Here unit day means
per day per tent.
27 27 Supply of rail thermometer VMKL pocket size with Each 1.00 965.00 965.00
magnatic sensor and prismatic capillary Aluminium alloy
having wide mercury column of KELVIN or equivalent.
28 28 Supply of Matisa Gauge (BG) including level sprit Each 2.00 4401.00 8802.00
complete.
29 29 Supply of unskilled labour for fixing and fitting of liners, Each 2000.00 228.00 456000.00
G.R.Pads , ERC etc with contractor's grease/oil etc as
directed by Engineer in charge at site for existing laid
track to recoup fittings and also to assist site work during
N.I. working.
30 30 Manufacturing and supply of light weight, self propelled, Each 1.00 148889.00 148889.00
insulated, inspection motor trolley for broad guage
complete with umbrella and accessaries. The trolley is to
be provided with foot rest with chequared plate flooring.
The trolley is to be fitted with 4 nos bake brackets to
develop insulation between wheel set and frame and to
prevent the dust etc.to enter into ball bearings.The
trolley frame is to be manufactured out 47mm square
allumineum pipe of heavy guage with planketing
system.The planketing system is to be fabricated out of
high quality teak wood. The trolley should be fitted with
efficient braking system.The trolley frame is to be fitted
with 6 nos of handles for easy handling, loading and
unloading of trolley on the track.The trolley has to be got
approved by engineer in charge of the work after a few
trial run.It should be able to run at 40 KMPH.The motor
trolley has to be procured from RDSO approved firms
like KELVIN etc.
31 31 Manufactering & supplying push trolly BG complete with Each 1.00 89766.00 89766.00
umbrella & accesseries. The trolly is to be provided with
foot rest with chequred plate flooring. The trolly is to be
fitted with 4 Nos brackets to developed insulation
between wheel set & frame and the prevent dust etc. to
enter into ball bearing. The trolly frame is to be
manufacture out of 47 mm square aluminium pipe of
heavy gauge with plankting system is to be fabricated
out of high quality teak wood, MS fabriacted wheel of
585 mm dia are to fitted in the trolley. The trolley should
be fitted with efficient breaking system. The trolley frame
is to be fitted with 6 nos handles for easy handling,
loading & unloading of the trolley on the track. The
handles at the corner of the frame & handles in between
are of folding type. The push trolley has to be got
approved by engineer -In-Charge after a few trial runs it
should be able to run 30kmph.
32 32 Laying /Renewal of SEJ for PSC layout bearing plates , Set 2.00 6125.00 12250.00
fittings, tie angle , one round of packing and grading of
appraoches , carrying necessary rubber pads and
fittings from PWI's godown excluding SEJ Sleeper.
33 33 Through Packing of track for attention of lead spot with a Per 1000.00 41.00 41000.00
lift of less than 50mm for correction of track parameters Sleeper
as per IRPWM.
34 34 Unloading of rails ( upto 20 rail panel) from railway BFRs Per 14600.00 59.00 861400.00
on the cess along the track in block working and shifting Track
and carrying same to the siite of work within a free lead Metre
of 250 m by deep lorrey/rail dolley/ mannually or by any
other approved means on running lines/non runnings on
the cess with contractor's all labour tools, machinary.
35 35 Per 500.00 29.00 14500.00
Extra over and above free lead of 250 m upto 1Km. Track
Metre
36 36 Manufacturing, transportation and fixing wooden Each 50.00 56.00 2800.00
distance piece, in between platform wall and non gauge
face of the running rails as per the directions of
Engineer-in-charge. The rate includes manufacturing of
wooden distance piece of required size from the
unserviceable wooden sleepers, (sleepers will be
supplied free by Railways) painting the distance piece
with white paint and all tools and plants and other
incidental charges. The Tenderer shall return all the
unused wooden sleeper or pieces thereof to the Railway
Store.
3 3 Providing and laying blanketing materials conforming to cum 85000.00 1353.00 115005000.00
the guidelines & specification f The Earth work shall be
executed as per the guideline and Specification No.
RDSO/2020/GE:IRS-0004 september -2020. in Layer of
250 mm in loose state using motor graders and
compaction using vibratory compactor with top and side
dressing to provide final formation as per design
profile.Compaction shall be done with heavy duty power
driven contractor's vibratory roller of minimum 10 tonnes
capacity so as to achieve a dry densityof 100% of the
maximum dry density of blanketing materials. The
blanket material should confirm to the dry density of
100%, enveloping curve, CBR value, los angles abrasion
value, etc.by blending the material of aggregate 20mm,
aggregate 10mm. quarry dust, sand, moorum or any
other suitable material confirm to the guideline and
Specification No. RDSO/2020/GE:IRS-0004 september -
2020. The blanketing materials are to be blended in pug
mill/ mixing plant for which no separate payment will be
made. Blending material should laid over well compacted
sub grade confirm to latest RDSO specification. The
proportion of blending material is to be adopted duly
approved by the Engineer-in-charge after testing in
approved laboratory. The rate also includes of all lead,
lift, dressing of slopes, all labour, consumable materials,
ascent, descent, loading/unloading, royalty, tools &
plants, all taxes, all incidental charges, etc. complete as
required.The thickness of the blanket layer will be as
decided by the Engineer-in-charge depending on the site
condition. Note: 1.The rate shall include testing of the
blanketing materials, CBR test, Deformation
modulus(Ev-2) test, los angles abrasion test, and other
field tests as per latest RDSO guidelines. 2.Payment for
mechanical compaction will be paid separately. 3.The
quantity qualifying for payment under this item will be
arrived at by cross sections. The net quantity of the
blanket cross section shall be obtained bydeducting 5%
shrinkage from gross quantity. 4.Contractor should bring
genuine royalty clearance certificate for minor minerals
(Earth, Sand, Morrum, Stone aggregates etc.) from
competent state Govt. authority and submit at the time of
submission of each on A/c bill. If it is not submitted at the
time of passing of on account bill, the amount equivalent
to twice the prescribed royalty charges as advance
(Amount to deducted = 2X Royalty Charges) will be
deducted from on account bill. The above advance
amount of royalty to be released only after the royalty
certificates are cleared from respective BLRO/Tahsils.
5 5 Supplying, filling contractor's sand of approved quality or cum 45000.00 413.00 18585000.00
gravel with uniformity coefficient should be greater than
2 with sufficiently large size and strength and watering till
saturation in layers not exceeding 300 mm depth in
loose state in formation below or above natural ground
level or as directed to dimension and slopes shown in
cross - section sheets or as directed by the Engineer-in-
charge. 10 T Vibrator roller shall be used to compact up
to the required relative density (minimum 70% of the
relative density obtained as per IS:2720 Pt.IV-1983) for
layers below the ground level or in continuation up to
bottom of earth layer. For sand layer in between the
earth layer (i.e. in case of sandwitch construction)
vibratory roller shall be used for compaction to achieve
minimum 70% relative density. The number of passes
for achieving 70% relative density shall be decided by
field trial. Note :- (a) Payable quantity shall be derived
from theoretical cross sections. A deduction of 5% shall
be made towards shrinkage from the compacted
theoretical cross section area. (b)compaction will be paid
under relevent item.
Total 246329200.00
Schedule Schedule S-Execution of all works as detailed in schedule
Item- 19 Misc. Work under Non SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 1 Manufacturing, supplying & fixing of precast RCC Metre 650.00 1074.00 698100.00
fence(Majestic type) of 1.0M width 1.5M high and 65mm
thick specially casted in FRP mould for smooth finish as
per approved design and drawing. The precast RCC
used for the work should be M-30 grade design mix
concrete with two vibro compacted and all ingedients
shall be as per actual mix design approved by the Rly.
The rate includes all labour, materials including cost of
cement, steel, tools, plants etc. with all charges of lead,
lift, taxes, royalty, ascent, decent, curing etc. complete
as per the direction of the Engineer in Charge of the
work.
2 2 Supply,fabrication,erection & fixing of steel of required MT 30.00 99610.00 2988300.00
shape & sizes and thickness of various componenys
made from channel.angle plate flat etc inpostion as steel
structural for height gauge &steel plate etc .as per
approved drawing for this work or as directed by
Railway's Engineer -in-Charge or his authorised
representative at site. The rate includs loading.
unloading,ascent,descent,lead,lift,transportation,crossing
of railways track, allapplicable taxes charges
etc.contractor's materials & labours,tools plants etc.
3 3 Supply and providing of 1.8 meter long pre-cast RCC Metre 8500.00 396.00 3366000.00
pole/post with dimension of 100mmX100mm and
125mm X125mm at Top and Bottom of the post
respectivly for fenching with an arrangment of fixing GI
barbed wires, The rate includes Transportation ,loading
/Unloading ,Shifting to the work site, all taxes & GST in
complete . Rate is inclusive of requsite Man, Materials ,
machinery, cost of barbed wire, oil bound distemper
paint (berger) white/yellow as per approved Drg. Note:
The rate also includes maintenance of fenching to
upkeep the same in order till the complition of work or as
per decision of Engineer-In-Charge
4 4 Rail piling with contractor's equipments by the side of Metre 6000.00 521.00 3126000.00
track for track protection or elswhere as directed with
railways rails. Driving of piles is to be done as per the
directions of Engineer-in-charge at site. The rate is
includes all labour, tools and machinery as required,
lead and lift and rehandling of rails at site.Rails will be
provided by Railways and to be transported by the
contractor at thier cost.
5 5 Supply of economical design and drawing for MS. Sheet MT 70.00 45306.00 3171420.00
pilling in pond/jheel/any other water body and pilling with
contractor's MS sheet , MS Lags and MS liners,
fabrication,installation of H-piles with steel lagging and/or
Sheet piles,complete with all
runners,struts,wales,brackets etc. including all
lead,lift,tools and plants and including dismantling, to
retain all types of earth including slush in the bed of the
pond/ jheel/any other water body for the construction of
Railway formation or any other structure etc.Releases of
all the material brought by the contractores shall be his
property.The payment shall be made as per the actual
weight of steel used including the weight of MS
plate,lagging for the H-pilles etc. NOTE:-a) all the
material has to be supplied by the contractor and after
revoval of the same, the released materials will be the
property of the contractor. Only consumed finished
quantity will be considered for the purpose of the
payment. b)Sheet piles may be used in place of H-piles
and lagging,for which also same rate will be
applicable.Total weight of sheet piles etc. (supplied by
the contractor)used for shoring shall be considered for
payment.c)For situation where H-pile /sheet pile has to
left in position owing to site considerations (decision of
the engineer in charge shall be final and binding, in this
regard), the contractor will be reimbursed at the rate of
Rs.11000/- per MT in respect of the material.
6 6 Supplying, fabrication, installation Bullah piles of average Metre 20900.00 447.00 9342300.00
nominal dia 5" to 7", 4.5 to 6.0 m long and painting of
two coats by coal tar on the exposed portion of bullah
from ground level to prevent collapse of side slope and
jungle cutting from berm to toe bank as requires
including all lead, lift, tolls, and plants and removal for
reuse if require to retain all type of earth including slush
for construction of bridge/retaining walls.
7 7 Supplying and fixing Bituminous drum sheet walling to Sqm 1390.00 207.00 287730.00
bullah pile with nailing or to side of Boulder crates before
filling of sand as directed by Engineer in charge at site
for guarding of slip of earth/sand. The rate includes
supplying of necessary materials and fittings like nails
etc. to hold the wall in proper position and all labour,
equipments with all lead, lift (ascent/descent), crossing
of railway lines etc. complete.
8 8 Supplying of stone boulder of approved quality of cum 3100.00 2773.00 8596300.00
suitable sizes of weight not less than 30kgs and stacking
the same at desired locations including loading,
unloading, handling and all lead lift and freight charges
etc. completeand manufacturing, providing boulder
crate, placing the sote boulder crate for construction of
cofferdam in pond/jheel/or any other water bodies with
sand etc. in above/under water conditions as per
direction of Railway engineer at site including supplying
of 8 SWG GI wire netting 150X150mm mesh with proper
securing. Boulder will be supplied by the contractor as
directed by the engineer in charge.
Total 31576150.00
Schedule Schedule T-Execution of all works as detailed in schedule
Item- 20 Geo textile under Non SERUSSOR - 2010
2 2 Supply of Railway welding portion from RDSO approved Per Joint 150.00 5508.00 826200.00
firms for welding of 60 kg 90 UTS rail joints by Aluminium
Thermit SKV process with automatic tapping thimble and
use of single shot crucible and 3 piece moulds. The rate
include: i) Conversion of single rails to 3 (three) rail
panels. LWR/ CWR on cess including supervision and
finishing with firms portion, equipments complete. (ii)
Cost of transportation of portion and other associated
equipment complete by road from firm's manufacture
plant to PWI store including insurance, all
loading/unloading and stacking at destination. (iii) Supply
of all required materials & equipments (except petrol) for
welding and grinding after welding complete as per IRS
specification for fusion welding of rails by Alumino -
Thermic Process sl. no. IRST-19-2012 with all correction
slips upto the date of opening of tender as well as
manual for fusion welding of rails with latest revision upto
the date of opening of tender. (iv) Rate includes use of
approved hydraulic weld trimer with power pack, rail
profile weld grinder & generator arranged by contractor
& cost of transporting the portion with dry mould &
consumable for welding to anywhere as directed by the
Engineer in charge. (v) Rate also includes supervision &
supply of welder with RDSO competency certificate for
the purpose. Compressed air blower with automatic
mixing of fuel and air, mould fitter gauge & Core shooted
dry moulds approved by RDSO/RB will only be used for
welding Pressure tank will not be allowed. (b) For
welding in cess.
Total 885890.00
Schedule Schedule W-Execution of all works as detailed in schedule
Item- 23 Maintainance of Track in Section under Non SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 1 Maintenance of newly laid BG P. Way track for full Kilometre 87.60 13674.00 1197842.40
sectional length for 6 months from the date of opening of
the section to traffic to keep the track safe to Railway
standard and to the satisfaction of Engineer-in-charge
including all maintenance operations as prescribed in the
Indian Railway Permanent Way Manual, Complete as
directed by the Engineer-in-charge (Total quantity =
ETKM x 6 months). Note: Here unit Kilometre means
ETKM month. Notes: i) Contractor will bring all the tools,
plants, equipment and small track machines required for
maintenance of the track. ii) For doing the above work,
the contractor must deploy TWO experience skilled
labourers per KM and they should be skilled and
experience in doing P. Way works. They should also be
fully conversant with the safety rules. iii) The weightage
for one turnout, one cross over and one derailing switch
will be given as 0.10 ETKM, 0.20 ETKM, and 0.020
ETKM respectively against maintenance. iv) One
mate/supervisor should be deployed to supervise the
work of one gang. v) One day rest will be given per
w e e k . However the same can be rescheduled by
Railway Supervisor. vi) If the manpower deputed is less
than the required numbers, deduction will be made @
Rs.150.00 per day per person short. vii) The period of
maintenance will be directed by the Engineer-in-charge.
2 2 Providing security guards for safe guarding of Railway Kilometre 87.60 9470.00 829572.00
Track from the date of completion of track linking for the
entire section i.e. track becomes fit for trolley run. The
maintenance periood is for 6 months Considered in this
schedule. Note: Here unit Kilometre means Km month.
3 3 Supplying trained healthy trolleymen for pushing BG Day 240.00 814.00 195360.00
push trolley (A team of minimum 6 trolley men per
trolley) at a minimum speed of 10 kmph. Note: Here unit
Day means Per day per trolley. Note: Payment will be
made on the basis of per team per day. No payment will
be made for part team i.e. less than 6 trolley man.
Total 2222774.40
Schedule Schedule X-Execution of all works as detailed in schedule
Item- 24 Metalizing under SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 211050 Metalizing of steel work of girder with grit blasting as per Sqm 650.00 79.92 51948.00
IRS-B1-2001 following by one coat of etch primer (as per
IS: 5666) one coat of Zinc Chrome primer (as per
IS:104) and two coats of aluminium paint (as per IS:
2339) with all labour, T&P and material as a complete
job
Total 51948.00
Schedule Schedule Y-Execution of all works as detailed in schedule
Item- 25 Slope Stability Analysis under Non SERUSSOR - 2010
S No. Item Description of Item Unit Qty Rate Amount
No
1 1 Carrying out slope stability analysis for Embankments & Each 10.00 13351.00 133510.00
cutting as per RDSO guide lines for Earthwork in Railway
Projects GE-B-1(ANNEXUREIII) for 25T loading-2008 for
different heights /depths of formations i.e (a) above 6m
& up to 12m. (b) above 12 m & up to 18m (c) above 18m
height/depth and submitting the report along with the
detailed calculations =, sketches and Revised profile of
bank/cuttings, if standard cutting /bank slopes found in
adequate during analysis with contractor's own qualified
personnel supervision and other resources including all
taxes etc. complete in all respects through any Govt.
Engineering college.The rate is inclusive of all collecting
soil samples from field for sub soil, fill materials and from
cutting slopes and condducting necessary Geo-
Technical Investigations as required in approved
laboratory for carrying out slope stability analysis.
Total 133510.00
4. ELIGIBILITY CONDITIONS
Important : All documents uploaded and remarks / confirmation entered by the bidders against any eligibility condition
shall be opened as part of technical bid only
Please submit a certificate in the prescribed format (please download the format from the
link given below) for verification / confirmation of the documents submitted for compliance
of eligibility / qualifying criteria. Non submission of the certificate, or submission of Allowed
1 No No
certificate either not properly filled in, or in a format other than the prescribed format shall (Mandatory)
lead to summary rejection of your offer.
( Click here to download the Format of Self Certificatio)
5. COMPLIANCE
Important : All documents uploaded and remarks / confirmation entered by the bidders against any compliance
condition shall be opened as part of technical bid only.
Commercial-Compliance
General Instructions
Contract under EBR (IF): It is agreed by and between the parties that Railway
shall continue to be held responsible for all obligations, risk and liabilities,
whatsoever, arising out of or in connection with the Principal agreement and this
novation agreement, whether during the progress of the work or after its
completion. It is further agreed and understood by and between the parties that
IRFC shall be the owner of assets, if any, arising out of execution of works as
defined in the Principal Agreement, except the land whose ownership shall
6 No No Not Allowed
continue with Railway. Accordingly, the invoices shall be issued by capturing
GSTIN of contractor (as the supplier) and GSTIN of IRFC (as bill to party). Also,
the contractor shall submit the invoice, issued in the name of IRFC, to railway
for processing payment by Railway to contractor subject to applicable TDS
under the Income Tax, GST or any other applicable laws. It is further agreed by
and between the Parties that IRFC shall be responsible to comply with Income
Tax and GST laws in relation to filling of returns.
Technical-Compliances
Undertakings
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by Department
of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no. 2015/RS(G)/779/5 dated
03/08/2017 and 27/12/2017 and amendments/ revisions thereof.
As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions of
GFR regarding procurement through GeM.
Designation : AXEN/C/W-A/GRC