PERUNDING C.

F JABATAN KERJA RAYA SYARIKAT KONTREKTOR WISMA SDN BHD

PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAKCOASTAL


ROAD PACKAGE D5: PROPOSED CONSTRUCTION AND COMPLETION OF CONTRACT NO. : PWD/HO/BO57/2020
BATANG IGAN BRIDGE, MUKAH DIVISION

Wheel Loader Maintenance Checklist


Location: Type/Model: SANY/SYL956H5
Date: License Expire Date:
Reg. No: Meter Hour (Last):
JPJ Reg. No:

(  ) if condition are satisfactory


( × ) if service is required

Weeks
No Description
1 2 3 4
1 Physical condition of under carriage
2 Brakes functioning
3 Level gauge functioning
4 Air cleaner/ Air filter
5 Belts (fan)
6 Tyre in good condition
7 Steering system
8 Transmission oil
9 Overload warning and ‘cut off’ device function.
10 Exhaust system
11 Night light wiper, horn and alarm functioning
12 Boom, arm, bucket without defects: dent, distortion, corrosion, weld and straightness
13 Cutting edge
14 Hydraulic system in order (No Leaking)
15 Engine oil leakage
16 Hydraulic cylinder
17 Fire extinguisher available nearby
18 Swing lock
19 Battery
20 Cabin cleanliness
21 Side mirror
22 Lighting system
23
24
25
26

Remarks: ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………….

Checked by: Verify by:

(Signature) : (Signature) :
Name : Name :
Designation : Designation :