Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 250H Service,Backlog Jobs 30-Aug-20 1:30 AM
DT030 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Night Opportune injector No#11 Error/Nut Loose 30-Aug-20 11:00 PM 30-Aug-20 11:45 PM
DT033 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Night Breakdown Front Light Not Working(Relay C/O) 31-Aug-20 3:00 AM 31-Aug-20 3:45 AM
DT034 0.75 96.88% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate Pos#6 30-Aug-20 5:30 PM 30-Aug-20 5:45 PM
DT036 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Day Opportune Check Brake Sys.(N.F.F) 30-Aug-20 7:45 AM 30-Aug-20 9:00 AM
DT037 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Planned inflate pos#3 30-Aug-20 9:00 PM 30-Aug-20 9:15 PM
DT038 0.25 98.96% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Planned inflate pos#2 30-Aug-20 7:30 PM 30-Aug-20 8:00 PM
DT041 0.50 97.92% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Breakdown Deflate Bulge pos#4 31-Aug-20 1:15 AM 31-Aug-20 2:00 AM
DT046 0.75 96.88% 1
Availability Daily Report Sunday, August 30, 2020
No of Equipment 15 Total Down (Hours) 71.00
Dump Trucks 775G Availability % 80.00% MTD Ava 97.10% Number of Equip 5 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Final Drive & Diff Day Breakdown Hyd. Oil Transfer into Axle(C/O Final Drives) 29-Aug-20 3:00 PM
DT100 24.00 0.00% 1 Down
No of Equipment 1 Total Down (Hours) 24.00
Availability Daily Report Sunday, August 30, 2020
Ancillary
Project Excavators Availability % 50.00% MTD Ava 48.30% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Hydraulic Night Breakdown C/O Implement ECM -Pump Combination Valve 25-Jul-20 10:30 PM
EX002 24.00 0.00% 1 Down
No of Equipment 1 Total Down (Hours) 24.00
Wheel Loaders Availability % 99.31% MTD Ava 87.33% Number of Equip 3 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Night Breakdown C/O Eng. Oil & Filters 30-Aug-20 7:15 PM 30-Aug-20 7:45 PM
WL002 0.50 97.92% 1
No of Equipment 1 Total Down (Hours) 0.50
Dozer Availability % 87.89% MTD Ava 91.96% Number of Equip 8 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 500H Service,Backlog Jobs 30-Aug-20 5:45 AM 31-Aug-20 4:00 PM
DZ007 23.25 3.13% 1
No of Equipment 1 Total Down (Hours) 23.25
Wheel Dozers 844H Availability % 100.00% MTD Ava 79.08% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate Pos#3 30-Aug-20 6:00 PM 30-Aug-20 6:15 PM
WD003 0.00 100.00%
No of Equipment 1 Total Down (Hours) 0.00
Graders Availability % 80.56% MTD Ava 78.67% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Brakes System Day Breakdown Rebuild Brakes 15-Aug-20 5:00 AM
GR003 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 250H Service,Backlog Jobs 30-Aug-20 8:00 PM 31-Aug-20 12:00 AM
GR006 4.00 83.33% 1
No of Equipment 2 Total Down (Hours) 28.00
Water Trucks Availability % 83.33% MTD Ava 92.38% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate pos#1 30-Aug-20 8:45 PM 30-Aug-20 9:00 PM
WT003 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 500H Service,Backlog Jobs 29-Aug-20 9:00 PM 31-Aug-20 4:15 PM
WT006 24.00 0.00% 1
No of Equipment 2 Total Down (Hours) 24.00
Availability Daily Report Sunday, August 30, 2020
Articulated Dump Truck Availability % 100% MTD Ava 99.47% Number of Equip 3 Suspended
Services Truck Availability % 100.00% MTD Ava 97.52% Number of Equip 2 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Opportune 2000H Service,Backlog Jobs 31-Aug-20 12:00 AM
SV010 0.00 100.00% Down
No of Equipment 1 Total Down (Hours) 0.00
Integrated Tool Carrier Availability % 69.94% MTD Ava 75.19% Number of Equip 7 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown C/O Altrnator - Battery 05-Aug-20 8:30 AM
IT002 24.00 0.00% 1 Down
Engine Day Breakdown C/O Engine 05-Aug-20 8:30 AM
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Air Cond Day Breakdown A/C 30-Aug-20 2:00 PM 30-Aug-20 4:30 PM
IT004 2.50 89.58% 1
Engine Day Breakdown Coolant Leak 30-Aug-20 2:00 PM 30-Aug-20 4:30 PM
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Breakdown Exhaust Manifold Cracked 17-Aug-20 5:00 AM
IT006 24.00 0.00% 1 Down
Cab/ Chassis & Superst Day Breakdown Articualtion Bearing C/O ( Line Booring ) 17-Aug-20 5:00 AM